    Quarterly ReviewQuarterly Review

    October, 2008October, 2008

    C-17 APU Organic CapabilityC-17 APU Organic Capability

    ContractContract

  • 8/14/2019 Quarterly Review Oct 2008

    2/39

    AgendaAgenda

    8:008:00 Welcome and IntroductionsWelcome and Introductions

    Contract ReviewContract Review

    Progress UpdateProgress Update

    Power Section and ElectricalPower Section and ElectricalComponent ModuleComponent Module

    UpdateUpdate

    Technical Manual UpdateTechnical Manual Update

    Drawing UpdateDrawing Update

    11:0011:00 Open DiscussionOpen Discussion

    12:0012:00 DismissalDismissal

    22

  • 8/14/2019 Quarterly Review Oct 2008

    3/39

    AttendeesAttendees

    Triumph AirTriumph AirRepairRepair

    The BoeingThe BoeingCompanyCompany

    OO-ALCOO-ALC

    WR-ALCWR-ALC

    33

  • 8/14/2019 Quarterly Review Oct 2008

    4/39

    Contract ReviewContract Review

    Deliver Depot Level C-17 APU MaintenanceDeliver Depot Level C-17 APU MaintenanceCapability at OO-ALC by June 2009Capability at OO-ALC by June 2009

    Facility ModificationsFacility Modifications SE - Support EquipmentSE - Support Equipment

    TD - Technical Data TD - Technical Data

    MD&T - Maintenance Demonstration &MD&T - Maintenance Demonstration &

    TrainingTraining FA - First Article ( Validation / Verification )FA - First Article ( Validation / Verification )

    Drawings and DocumentationDrawings and Documentation

    44

  • 8/14/2019 Quarterly Review Oct 2008

    5/39

    Contract ReviewContract Review

    Facility ModificationsFacility Modifications Fuel-Oil-Pneumatic-APUFuel-Oil-Pneumatic-APU

    Routing Utilities (powerRouting Utilities (power& air supply)& air supply)

    Floor space allocationFloor space allocation

    Test Cell # 4Test Cell # 4

    Future Electrical Dept.Future Electrical Dept.

    55

  • 8/14/2019 Quarterly Review Oct 2008

    6/39

    66

    Contract ReviewContract Review

    FacilityFacilityModifications -TestModifications -TestCell # 4Cell # 4 Load BankLoad Bank

    Start Power UnitStart Power Unit

    Airflow MeasuringAirflow MeasuringSectionSection

    Inlet Air Handler &Inlet Air Handler &air deflectorair deflector

    Data Acquisition &Data Acquisition &ControlControl

    Software SytronicsSoftware Sytronics

  • 8/14/2019 Quarterly Review Oct 2008

    7/39

    77

    Contract ReviewContract Review

    Support EquipmentSupport Equipment Test StandsTest Stands

    Test AdaptersTest Adapters Overhaul ToolsOverhaul Tools

    Shipping ContainersShipping Containers

    COTS itemsCOTS items

    OverOver 400400 pieces ofpieces ofSE designed/fabricated toSE designed/fabricated to

    datedate+ ~80 more for power+ ~80 more for power

    and electrical sectionsand electrical sections

  • 8/14/2019 Quarterly Review Oct 2008

    8/39

    Contract ReviewContract Review

    SupportSupportEquipmentEquipment

    Test standsTest stands MaintenanceMaintenanceStandsStands

    TransportTransportStandsStands

    Oil ComponentsOil Components FuelFuel

    ComponentsComponents

    PneumaticPneumaticComponentsComponents

    Future -Future - 88

  • 8/14/2019 Quarterly Review Oct 2008

    9/39

    99

    Contract ReviewContract Review

    SupportSupportEquipmentEquipment

    Test adaptersTest adapters FuelFuelComponentsComponents

    Oil ComponentsOil Components PneumaticPneumatic

    ComponentsComponentsTest Cell dressTest Cell dress

    equipmentequipment

    Future -Future -ElectricalElectrical

    ComponentsComponents

  • 8/14/2019 Quarterly Review Oct 2008

    10/39

    Contract ReviewContract Review

    SupportSupportEquipmentEquipment

    Overhaul toolsOverhaul tools Provided for allProvided for alloil, fuel,oil, fuel,

    pneumaticpneumatic

    componentscomponents

    Provided forProvided forengine test,engine test,gearbox, loadgearbox, load

    compressorcompressor

    modulesmodules

    Designed/mostDesigned/mostready to ship forready to ship for 1010

  • 8/14/2019 Quarterly Review Oct 2008

    11/39

    Contract ReviewContract Review

    SupportSupportEquipmentEquipment

    ShippingShippingContainersContainers

    Overall APUOverall APU ModulesModules

    Gearbox , LoadGearbox , Load

    CompressorCompressor Line ReplaceableLine Replaceable

    Units ( LRUs )Units ( LRUs )

    Power sectionPower sectionmodulemodule

    1111

  • 8/14/2019 Quarterly Review Oct 2008

    12/39

    Contract ReviewContract Review

    SupportSupportEquipmentEquipment

    COTS itemsCOTS items

    Hand ToolsHand Tools Gages - measuringGages - measuring Exceptions perExceptions per

    ResponsibilityResponsibilityMatrixMatrix

    1212

  • 8/14/2019 Quarterly Review Oct 2008

    13/39

    Contract ReviewContract Review

    Technical OrdersTechnical Orders Derivative of existingDerivative of existing

    Component MaintenanceComponent Maintenance

    ManualsManuals 23 T.O.s produced and23 T.O.s produced and

    accepted including APU,accepted including APU,

    gearbox, load compressor,gearbox, load compressor,

    and fuel, oil, pneumaticand fuel, oil, pneumatic

    LRUsLRUs Validation built in duringValidation built in during

    maintenance andmaintenance and

    demonstration/1demonstration/1stst ArticleArticle

    Development of 14Development of 14

    additional T.O.s inadditional T.O.s inro ressro ress

    1313

  • 8/14/2019 Quarterly Review Oct 2008

    14/39

    1414

    Contract ReviewContract Review

    MaintenanceMaintenanceDemonstrationsDemonstrations

    & Training& Training

    Hands onHands on

    trainingtraining

    Onsite at HillOnsite at Hill

    AFB w/TriumphAFB w/Triumphlead technicianslead technicians

    and engineeringand engineering

    Proper use ofProper use of

    toolstools

    Validation ofValidation of

  • 8/14/2019 Quarterly Review Oct 2008

    15/39

  • 8/14/2019 Quarterly Review Oct 2008

    16/39

    Contract ReviewContract Review

    Drawings andDrawings andDocumentatiDocumentati

    onon

    SupportSupport

    EquipmentEquipment

    drawingsdrawings

    andand

    documentatidocumentati

    on deliveredon delivered

    to WR-ALCto WR-ALC

    followingfollowing

    OO-ALCOO-ALC 1616

  • 8/14/2019 Quarterly Review Oct 2008

    17/39

    Contract ReviewContract Review

    EngineEnginemodulesmodules FuelFuel

    ComponentsComponents

    Oil ComponentsOil Components

    GearboxGearbox

    LoadLoad

    CompressorCompressor PneumaticPneumatic

    ComponentsComponents

    Overall APUOverall APU

    Power SectionPower Section

    ElectricalElectrical 1717

  • 8/14/2019 Quarterly Review Oct 2008

    18/39

    1818

    Contract Review Questions?Contract Review Questions?

  • 8/14/2019 Quarterly Review Oct 2008

    19/39

    1919

    Break

  • 8/14/2019 Quarterly Review Oct 2008

    20/39

    2020

    Progress ReportProgress Report

    CompletedCompletedactivitiesactivities

    Gearbox Module:Gearbox Module:

    SE delivered FebSE delivered Feb20052005

    TD delivered JuneTD delivered June

    20052005 MD&T completedMD&T completedJune 2005June 2005

    FA completed AugFA completed Aug20052005

    Additional trainingAdditional training

  • 8/14/2019 Quarterly Review Oct 2008

    21/39

    Progress ReportProgress Report

    CompletedCompletedActivitiesActivities

    Fuel ComponentsFuel Components

    SE delivered MarchSE delivered March20052005

    TD delivered OctTD delivered Oct20052005

    MD&T completedMD&T completedNov 2005Nov 2005

    FA completed DecFA completed Dec20052005

    2121

  • 8/14/2019 Quarterly Review Oct 2008

    22/39

    2222

    Progress ReportProgress Report

    Completed ActivitiesCompleted Activities Load CompressorLoad Compressor

    SE delivered AprilSE delivered April20062006

    TD delivered MarchTD delivered March20062006

    MD&T completed MayMD&T completed May20062006 FA completed JuneFA completed June

    20062006

    Additional trainingAdditional training

    provided May 2008provided May 2008

  • 8/14/2019 Quarterly Review Oct 2008

    23/39

    Progress ReportProgress Report

    CompletedCompletedActivitiesActivities

    Oil ComponentsOil Components SE delivered JuneSE delivered June

    20062006

    TD delivered JuneTD delivered June20062006

    MD&T completedMD&T completedAug 2006Aug 2006

    FA completed SeptFA completed Sept20062006

    2323

  • 8/14/2019 Quarterly Review Oct 2008

    24/39

    2424

    Progress ReportProgress Report

    Completed ActivitiesCompleted Activities PneumaticPneumatic

    ComponentsComponents

    SE delivered Oct 2007SE delivered Oct 2007TD delivered Sept 2007TD delivered Sept 2007 MD&T completed DecMD&T completed Dec

    20072007

    FA completed 01 FebFA completed 01 Feb0808

    Delivery of DrawingsDelivery of Drawingsinitial submittalinitial submittal

    01 May 0801 May 08

    OO-ALC ProcessOO-ALC Process

    Engineer reviewed allEngineer reviewed alldrawings 27 June 08drawings 27 June 08

  • 8/14/2019 Quarterly Review Oct 2008

    25/39

    2525

    Progress ReportProgress Report

    Completed ActivitiesCompleted Activities Overall APUOverall APU

    SE delivered 07 Dec 08SE delivered 07 Dec 08

    TD delivered 07 Dec 08TD delivered 07 Dec 08 MD&T completed 14MD&T completed 14

    Mar 08Mar 08

    FA completed 28 MarFA completed 28 Mar0808

    Delivery of manual 30Delivery of manual 30May 08 received 07May 08 received 07July 08July 08

    Delivery of DrawingsDelivery of Drawingsinitial submittalinitial submittal 15 July15 July

    0808

  • 8/14/2019 Quarterly Review Oct 2008

    26/39

    Power Section & ElectricalPower Section & Electrical

    Components UpdateComponents Update

    Power Section ModulePower Section Module SE Nov 2008SE Nov 2008

    TD - Nov 2008TD - Nov 2008

    MD&T Jan 2009 [12 weeks]MD&T Jan 2009 [12 weeks] FA - April 2009 [12 weeks]FA - April 2009 [12 weeks]

    Electrical ComponentsElectrical Components SE - Dec 2008SE - Dec 2008

    TD - Dec 2008TD - Dec 2008 MD&T Jan 2009 [4 weeks]MD&T Jan 2009 [4 weeks]

    FA Feb 2009 [4 weeks]FA Feb 2009 [4 weeks]

    2626

  • 8/14/2019 Quarterly Review Oct 2008

    27/39

    27272727

    Power Section Module StatusPower Section Module Status

    Special ToolingSpecial Tooling Design 100%Design 100%

    completedcompleted

    Fabrication 90%Fabrication 90%

    completedcompleted

    Design/FabDesign/Fab

    Verified 75 %Verified 75 %

    completedcompleted

    Drawings @ 80%Drawings @ 80%

    Tech data @ 50%Tech data @ 50%

  • 8/14/2019 Quarterly Review Oct 2008

    28/39

    2828

    Electrical Components StatusElectrical Components Status

    ElectricalElectricalComponentsComponents

    Starter MotorStarter Motor

    Run-In StandRun-In Stand

    Starter Dyno TestStarter Dyno Test

    StandStand

    Wiring HarnessWiring Harness

    Test StandTest Stand

  • 8/14/2019 Quarterly Review Oct 2008

    29/39

    2929

    Electrical Components StatusElectrical Components Status

    ElectricalElectricalComponentsComponents

    StarterStarterMotor Run-InMotor Run-In

    StandStand

    Starter DynoStarter Dyno

    Test StandTest Stand

    WiringWiring

    Harness TestHarness Test

    StandStand

  • 8/14/2019 Quarterly Review Oct 2008

    30/39

    3030

    Electrical Components StatusElectrical Components Status

    ElectricalElectricalComponentsComponents

    Starter MotorStarter Motor

    Run-In StandRun-In Stand

    Starter Dyno TestStarter Dyno Test

    StandStand

    Wiring HarnessWiring Harness

    Test StandTest Stand

  • 8/14/2019 Quarterly Review Oct 2008

    31/39

    Technical Order UpdateTechnical Order Update

    Complete engine overhaul requires 37 technicalComplete engine overhaul requires 37 technicalordersorders All are identified and catalogued by WR-ALCAll are identified and catalogued by WR-ALC

    23 are compete/in the system/in use23 are compete/in the system/in use Remaining 14 submitted to BoeingRemaining 14 submitted to Boeing

    Minimum 50% completeMinimum 50% complete

    Major changes completed in Gearbox and LoadMajor changes completed in Gearbox and Load

    Compressor manualsCompressor manuals Will be submitted 10/08Will be submitted 10/08

    Annual in-house review program established toAnnual in-house review program established toensure currencyensure currency Program shown on next three slidesProgram shown on next three slides

    3131

  • 8/14/2019 Quarterly Review Oct 2008

    32/39

    3232

    T.O. Review/Change Log (Page 1 ofT.O. Review/Change Log (Page 1 of

    3)3)

    Review Month T.O. Number T.O. Title Latest Version Change #

    Annual

    Review Comments

    Jan 2G-GTCP331-3 OVERALL APU 30-May-08 0

    Jan 2G-GTCP331-3-12-2

    APU TEST CELL FAULT

    MATRIX 50% Submitted to Boeing 7/08

    Jan 2G-GTCP331-3-12-1 APU RECEIVING PROCESS 50% Submitted to Boeing 7/08

    Feb 2G-GTCP331-3-3 FUEL FLOW DIVIDER 16-Dec-05 0

    Feb 2G-GTCP331-3-2 FUEL CONTROL UNIT 22-Dec-05

    Chg 1 IN

    WO RK C/W Apr 08 Finalizing Change 1

    Feb 2G-GTCP331-3-4 IGV ACTUATOR ASSEMBLIES 16-Dec-05 0

    Mar 2G-GTCP331-3-5 FUEL MANIFOLD ASSEMBLY 22-Dec-05 0

    Mar 34Y26-6-1-3 FUEL COLLECTION STAND 22-Dec-05 0

    Mar 34Y26-6-1-4 HYDRAULIC SUPPLY CART 22-Dec-05 0

    Mar LDP-OO/ALC-15

    CALIBRATION for HYDRAULIC

    SUPPLY CART 28-Feb-05 0

    Apr 2G-GTCP331-3-1

    GEARBOX MODULE

    ASSEMBLY 25-Aug-05

    Chg 1 IN

    WORK C/W Apr 08 Change 1 ready to submit

    May 2G-GTCP331-3-11 LOAD COMPRESSOR MODULE 28-Jul-06

    Chg 1 IN

    WORK C/W Apr 08 Change 1 ready to submit

  • 8/14/2019 Quarterly Review Oct 2008

    33/39

    3333

    T.O. Review/Change Log (Page 2 ofT.O. Review/Change Log (Page 2 of

    3)3)

    Review Month T.O. Number T.O. Title Latest Version Change #

    Annual

    Review Comments

    Jun 2G-GTCP331-3-12 POWER SECTION MODULE 50% Submitted to Boeing 7/08

    Jun 2G-GTCP331-3-12-3 PRESSURE RELIEF VALVE 50% Submitted to Boeing 9/08

    Jun 34Y26-7-1-2 THERMOCOUPLE TESTER 50% Submitted to Boeing 9/08

    Jul 33D2-9-10-3 PNEUMATIC TEST STAND 29-Feb-08 0 C/W Sep 08

    Jul 7J14-9-3 FLOW SENSOR ASSEMBLY 29-Feb-08 0

    Jul 7J6-21-3 SURGE CONTROL VALVE 29-Feb-08 0

    Aug 7J6-6-17-3 LOAD CONTROL VALVE 29-Feb-08 0

    Aug 7J15-9-3

    COOLING FAN ASSEMBLY

    3616959-6 29-Feb-08 0

    Aug 7J15-10-3

    COOLING FAN ASSEMBLY

    3614416-1/-2 29-Feb-08 0

    Sep 2G-GTCP331-3-13 STARTER MOTOR (-6) 50% Submitted to Boeing 7/08

    Sep 2G-GTCP331-3-14 STARTER MOTOR (-7/-8) 50% Submitted to Boeing 7/08

    Sep 34Y26-7-1-5 STARTER DYNO TEST STAND 50% Submitted to Boeing 9/08

    Sep 34Y26-7-1-4 STARTER BREAK-IN STAND 50% Submitted to Boeing 9/08

  • 8/14/2019 Quarterly Review Oct 2008

    34/39

    3434

    T.O. Review/Change Log (Page 3 ofT.O. Review/Change Log (Page 3 of

    3)3)

    Review Month T.O. Number T.O. Title Latest Version Change # Annual Review Comments

    Oct 2G-GTCP331-3-15 IGNITION EXCITER 50% Submitted to Boeing 7/08

    Oct 2G-GTCP331-3-17 IGNITER PLUG 50% Submitted to Boeing 7/08

    Oct 2G-GTCP331-3-18 IGNITER PLUG LEAD 50% Submitted to Boeing 7/08

    Oct 2G-GTCP331-3-16 WIRING HARNESS ASSEMBLY 50% Submitted to Boeing 9/08

    Oct 34Y26-7-1-3 WIRE HARNESS TEST STAND 50% Submitted to Boeing 9/08

    Nov 2G-GTCP331-3-6 LUBE PUMP ASSEMBLY 3-Nov-06 0

    Nov 34Y26-2-3 OIL TEST STAND 3-Nov-06 0

    Nov 2G-GTCP331-3-7

    GENERATOR FILTER

    ASSEMBLY 3-Nov-06 0

    Nov 2G-GTCP331-3-8

    GENERATOR SCAVENGE

    PUMP ASSEMBLY 3-Nov-06 0

    Dec 2G-GTCP331-3-9 OIL COOLER 3-Nov-06 0

    Dec 34Y26-1-3 FLUSHING STAND 3-Nov-06 0

    Dec 2G-GTCP331-3-10 OIL TEMP. CONTROL VALVE 3-Nov-06 0

  • 8/14/2019 Quarterly Review Oct 2008

    35/39

    Drawing UpdateDrawing Update

    I need your helpI need your help And some more helpAnd some more help

    And some more.And some more.

    Remembertheyll make an issue of lateness, so itRemembertheyll make an issue of lateness, so it Would be best to show the step-by-step progressionWould be best to show the step-by-step progression

    (and headaches) to show this has been(and headaches) to show this has been

    a full time tasking times 3 peoplea full time tasking times 3 people

    3535

  • 8/14/2019 Quarterly Review Oct 2008

    36/39

    Drawing UpdateDrawing Update

    I need your helpI need your help And some more helpAnd some more help

    And some more.And some more.

    Remembertheyll make an issue of lateness, so itRemembertheyll make an issue of lateness, so it Would be best to show the step-by-step progressionWould be best to show the step-by-step progression

    (and headaches) to show this has been(and headaches) to show this has been

    a full time tasking times 3 peoplea full time tasking times 3 people

    3636

  • 8/14/2019 Quarterly Review Oct 2008

    37/39

    3737

    FY08 Triumph Training @ HAFBFY08 Triumph Training @ HAFB

    Training breakdown is as follows:Training breakdown is as follows: Feb 08120 hours (2 technicians x 60 hours each): CoolingFeb 08120 hours (2 technicians x 60 hours each): Cooling

    Fan (both part numbers)Fan (both part numbers) Feb 08240 hours (2 technicians, 1 at 150 hours, 1 at 90Feb 08240 hours (2 technicians, 1 at 150 hours, 1 at 90

    hours): Load Control Valve, Surge Control Valve, Flowhours): Load Control Valve, Surge Control Valve, FlowPalletPallet

    Feb 08120 hours (1 technician): Pneumatic Test StandFeb 08120 hours (1 technician): Pneumatic Test Standintroduction and testing of Load Control Valve, Surgeintroduction and testing of Load Control Valve, SurgeControl Valve, Flow PalletControl Valve, Flow Pallet

    Mar 08160 hours (2 technicians x 80 hours each): TestMar 08160 hours (2 technicians x 80 hours each): TestCell operationCell operation

    Mar 08180 hours (3 technicians x 60 hours each): OverallMar 08180 hours (3 technicians x 60 hours each): OverallAPU (everything except Power Section)APU (everything except Power Section)

    May 08240 hours (3 technicians x 80 hours each):May 08240 hours (3 technicians x 80 hours each):Gearbox and Load Compressor requalification trainingGearbox and Load Compressor requalification training

    Total hands-on training hours from above:Total hands-on training hours from above: 10601060 hourshours Note that this does not include the time spent correlating the test cellNote that this does not include the time spent correlating the test cell

    in Nov and Dec 07. This was approximately three weeks of engine runin Nov and Dec 07. This was approximately three weeks of engine runtime to solve the problems we encountered, and that entire time theretime to solve the problems we encountered, and that entire time therewas a Hill AFB en ineer and technician hel in and learnin .was a Hill AFB en ineer and technician hel in and learnin .

  • 8/14/2019 Quarterly Review Oct 2008

    38/39

    Next meeting discussionNext meeting discussion

    Location:Location: ??

    Date:Date: ??

  • 8/14/2019 Quarterly Review Oct 2008

    39/39

    Open DiscussionOpen Discussion

    3939