As part of RACV’s ongoing commitment to provide the best possible services and facilities to our members, we have commenced construction of our exciting new resort facility. This fully integrated building is being constructed adjacent to the existing clubhouse. The project is expected to run until mid-2018. We expect there may be noise in the current clubhouse associated with construction, but this will not continue past 5pm. There will be no construction activity from 23 December 2015 to 10 January 2016 inclusive. We will continue to provide our full range of services throughout the redevelopment, including a slightly modified 18 hole golf course. RACV Cape Schanck Resort Redevelopment Project

Upload: others

Post on 14-Jun-2020

2 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: RACV Cape Schanck Resort - Redevelopment Project Flyer€¦ · clubhouse associated with construction, but this will not continue past 5pm. There will be no construction activity

As part of RACV’s ongoing commitment to provide the best possible services and facilities to our members, we have commenced construction of our exciting new resort facility. This fully integrated building is being constructed adjacent to the existing clubhouse.

The project is expected to run until mid-2018. We expect there may be noise in the current clubhouse associated with construction, but this will not continue past 5pm. There will be no construction activity from 23 December 2015 to 10 January 2016 inclusive.

We will continue to provide our full range of services throughout the redevelopment, including a slightly modified 18 hole golf course.

RACV Cape Schanck Resort Redevelopment Project

Page 2: RACV Cape Schanck Resort - Redevelopment Project Flyer€¦ · clubhouse associated with construction, but this will not continue past 5pm. There will be no construction activity

“The design for the Cape Schanck Resort Redevelopment has been directly affected by the extraordinary coastal context in which it is sited and specifically the land on which it is built. The soft, rolling dune-like quality of the topography calls for an architecture that is fluid and sculptural.” – Roger Wood, Director, Wood/Marsh PTY LTD Architecture.

Architectural Inspiration

Artist impression

Page 3: RACV Cape Schanck Resort - Redevelopment Project Flyer€¦ · clubhouse associated with construction, but this will not continue past 5pm. There will be no construction activity

204 ACCOMMODATION ROOMS CONSISTING OF: 120 new first class rooms and suites with ocean views 8 two bedroom villas 4 Premium executive suites 4 three bedroom villas 48 ocean view rooms

Accommodation FacilitiesGUEST SERVICESLobby shopUndercover parking 24 hour reception

Artist impression

Page 4: RACV Cape Schanck Resort - Redevelopment Project Flyer€¦ · clubhouse associated with construction, but this will not continue past 5pm. There will be no construction activity

Conference and banquet facilities with seating for up to 550 guests Natural light Wi-Fi Latest AV technology Breakout areas 2 Pre-function areas

Syndicate

Function Room Artist impression

Artist impression

Conference, Events and Wedding Facilities

Page 5: RACV Cape Schanck Resort - Redevelopment Project Flyer€¦ · clubhouse associated with construction, but this will not continue past 5pm. There will be no construction activity

Dining Facilities

Café View

Restaurant Lounge Artist impression

Artist impression

Restaurant All day café and pizza bar In-room dining

Private dining rooms available Coffee lounge

Page 6: RACV Cape Schanck Resort - Redevelopment Project Flyer€¦ · clubhouse associated with construction, but this will not continue past 5pm. There will be no construction activity

One Spa

Treatment Room

Plunge Pool Artist impression

Artist impression

8 double spa treatment rooms Hydrotherapy area

Turkish steam room

Page 7: RACV Cape Schanck Resort - Redevelopment Project Flyer€¦ · clubhouse associated with construction, but this will not continue past 5pm. There will be no construction activity

18-hole golf course Driving range with practice facilities Fully equipped gymnasium

Group fitness room25m indoor pool, spa and saunaGames room

Recreation Facilities

Plunge Pool Artist impression

Page 8: RACV Cape Schanck Resort - Redevelopment Project Flyer€¦ · clubhouse associated with construction, but this will not continue past 5pm. There will be no construction activity

Ground Level Level 1

Level 2

RACV Cape Schanck Resort Floor Plans

Page 9: RACV Cape Schanck Resort - Redevelopment Project Flyer€¦ · clubhouse associated with construction, but this will not continue past 5pm. There will be no construction activity

Update