radisson phuket mai khao beach construction report · welcome to the monthly construction report...

19
Radisson Phuket Mai Khao Beach Construction Progress Report Disclaimer: https://turtlebayphuket.com/disclaimer/ Radisson Phuket Mai Khao Beach Construction Report Date: November 2019 Report Number: 001NOV2019

Upload: others

Post on 26-Sep-2020

1 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Radisson Phuket Mai Khao Beach Construction Report · Welcome to the monthly construction report for the Radisson Mai Khao Beach project. This update will be issued monthly during

Radisson Phuket Mai Khao Beach Construction Progress Report Disclaimer: https://turtlebayphuket.com/disclaimer/

Radisson Phuket Mai Khao Beach Construction Report

Date: November 2019 Report Number: 001NOV2019

Page 2: Radisson Phuket Mai Khao Beach Construction Report · Welcome to the monthly construction report for the Radisson Mai Khao Beach project. This update will be issued monthly during

Radisson Phuket Mai Khao Beach Construction Progress Report Disclaimer: https://turtlebayphuket.com/disclaimer/

Welcome to the monthly construction report for the Radisson Mai Khao Beach project. This update will be issued monthly during the construction phase and will be available on website at end of each month. It will keep our valued customers up to speed with the progress milestones during the period for construction. We provide a pictorial story and general detail of the works completed within the month, and the works schedule for the following month. General & Site information: The site is located in Mai Khao area of Phuket Thailand between Soi Mai Khao 6 And Soi Mai Khao 7 A google map reference can be found on following link: https://www.google.com/maps/@8.1238403,98.3072577,1592m/data=!3m1!1e3 A sales gallery is constructed, and already available on site from 09:00-18:00

A full mock unit of the Room type B is currently under construction, aside the sales gallery that is due to open to the public in December 2020, after inspection by the brand in early December. Visit onto the construction area is strictly controlled and by appointment only, please contact [email protected] to arrange any visit to the construction area. The preliminary works commenced in November 2019 Main construction work is scheduled to commence in December 2020 Please visit our websites at: www.turtlebayphuket.com www.tcphg.com www.aplanproperties.com

Page 3: Radisson Phuket Mai Khao Beach Construction Report · Welcome to the monthly construction report for the Radisson Mai Khao Beach project. This update will be issued monthly during

Radisson Phuket Mai Khao Beach Construction Progress Report Disclaimer: https://turtlebayphuket.com/disclaimer/

Page 4: Radisson Phuket Mai Khao Beach Construction Report · Welcome to the monthly construction report for the Radisson Mai Khao Beach project. This update will be issued monthly during

Radisson Phuket Mai Khao Beach Construction Progress Report Disclaimer: https://turtlebayphuket.com/disclaimer/

Page 5: Radisson Phuket Mai Khao Beach Construction Report · Welcome to the monthly construction report for the Radisson Mai Khao Beach project. This update will be issued monthly during

Radisson Phuket Mai Khao Beach Construction Progress Report Disclaimer: https://turtlebayphuket.com/disclaimer/

November 2019

▪ Site fence- the perimeter of the property had a fence created that is clad in advertising material

▪ Excavation of the basement area soil and footprint

▪ Soil protection work for basement and piling works

▪ Site office – construction of the engineers and project team, site offices

▪ Storeroom – on site stock room

▪ Worker toilets

▪ Water storage area

▪ Rebar store area and workshop

▪ Mock-up room construction and fit out

▪ Offsite, but in Mai Khao vicinity the main contractor has acquired the land for the worker camp and is preparing the camp for the ramp up of labour for the project works

Page 6: Radisson Phuket Mai Khao Beach Construction Report · Welcome to the monthly construction report for the Radisson Mai Khao Beach project. This update will be issued monthly during

Radisson Phuket Mai Khao Beach Construction Progress Report Disclaimer: https://turtlebayphuket.com/disclaimer/

December Forecast Completion and inspection of mock -up room Completion of site preparation works such as storerooms, site offices and admin areas Commencement of piling works and footings, there are approximately 1,200 Piles to place into the ground, we have to pile to a depth of 24 metres and we have 2 size of piles within the structural design, at 25X25CMS & 40X 40 CMS sizing’s. Technical services meeting in early December with Radisson hotel tech service team and the project owners and consultants- approximately every 6 to 8 weeks the on ground teams meet with the Hotel operator teams for update design, discussion with engineers, discussion with architects and consultants in conjunction with meeting the specified needs and standards of the brand. This will continue during the total construction phase, and at milestones within the project, in addition as time progresses towards completion, then other areas of the hotel operations will begin to become involved. Commencement basement footing works, in conjunction with piling works. As piles are completed and the load testing reports are completed then individual footing work will commence connecting the piles to the footings

Page 7: Radisson Phuket Mai Khao Beach Construction Report · Welcome to the monthly construction report for the Radisson Mai Khao Beach project. This update will be issued monthly during

Radisson Phuket Mai Khao Beach Construction Progress Report Disclaimer: https://turtlebayphuket.com/disclaimer/

Photos

Excavation of the basement Area, soil has been removed to a level approximately -4 metres from ground level

Page 8: Radisson Phuket Mai Khao Beach Construction Report · Welcome to the monthly construction report for the Radisson Mai Khao Beach project. This update will be issued monthly during

Radisson Phuket Mai Khao Beach Construction Progress Report Disclaimer: https://turtlebayphuket.com/disclaimer/

Soil excavation works & soil protection works to prepare basement area ready for main piling

Page 9: Radisson Phuket Mai Khao Beach Construction Report · Welcome to the monthly construction report for the Radisson Mai Khao Beach project. This update will be issued monthly during

Radisson Phuket Mai Khao Beach Construction Progress Report Disclaimer: https://turtlebayphuket.com/disclaimer/

The area of excavation here is approximately at building 7 & 8 location, looking east towards rear of plot

Looking from area of building 8 back towards total length of site (looking north)

Page 10: Radisson Phuket Mai Khao Beach Construction Report · Welcome to the monthly construction report for the Radisson Mai Khao Beach project. This update will be issued monthly during

Radisson Phuket Mai Khao Beach Construction Progress Report Disclaimer: https://turtlebayphuket.com/disclaimer/

Steel support for construction water tank storage (not the water tanks for the completed project, they will locate in basement area)

Storeroom construction & worker toilet area and rebar process area

Page 11: Radisson Phuket Mai Khao Beach Construction Report · Welcome to the monthly construction report for the Radisson Mai Khao Beach project. This update will be issued monthly during

Radisson Phuket Mai Khao Beach Construction Progress Report Disclaimer: https://turtlebayphuket.com/disclaimer/

Toward rear of building 8 looking back along road toward the rest of the site

Project team offices & meeting rooms

Page 12: Radisson Phuket Mai Khao Beach Construction Report · Welcome to the monthly construction report for the Radisson Mai Khao Beach project. This update will be issued monthly during

Radisson Phuket Mai Khao Beach Construction Progress Report Disclaimer: https://turtlebayphuket.com/disclaimer/

Page 13: Radisson Phuket Mai Khao Beach Construction Report · Welcome to the monthly construction report for the Radisson Mai Khao Beach project. This update will be issued monthly during

Radisson Phuket Mai Khao Beach Construction Progress Report Disclaimer: https://turtlebayphuket.com/disclaimer/

A glimpse of the lake to the rear of the property

Side access area at building 8 end of the plot

Page 14: Radisson Phuket Mai Khao Beach Construction Report · Welcome to the monthly construction report for the Radisson Mai Khao Beach project. This update will be issued monthly during

Radisson Phuket Mai Khao Beach Construction Progress Report Disclaimer: https://turtlebayphuket.com/disclaimer/

Directly in front of the plot, road and cycle/pathway and to the right onto the beach

Page 15: Radisson Phuket Mai Khao Beach Construction Report · Welcome to the monthly construction report for the Radisson Mai Khao Beach project. This update will be issued monthly during

Radisson Phuket Mai Khao Beach Construction Progress Report Disclaimer: https://turtlebayphuket.com/disclaimer/

Start of the beach areas opposite the edge of the plot (at building 8 end)

View of the beach, looking to the south

Page 16: Radisson Phuket Mai Khao Beach Construction Report · Welcome to the monthly construction report for the Radisson Mai Khao Beach project. This update will be issued monthly during

Radisson Phuket Mai Khao Beach Construction Progress Report Disclaimer: https://turtlebayphuket.com/disclaimer/

Beach looking to the north

From the beach looking East, back to the project

Page 17: Radisson Phuket Mai Khao Beach Construction Report · Welcome to the monthly construction report for the Radisson Mai Khao Beach project. This update will be issued monthly during

Radisson Phuket Mai Khao Beach Construction Progress Report Disclaimer: https://turtlebayphuket.com/disclaimer/

Air conditioning ducting foyer area of ceiling ion mock -up room, also trunking to the lighting and plug circuits

Tiling installation in bathroom wall area, frame of the bathroom ‘window’ can also be seen

Page 18: Radisson Phuket Mai Khao Beach Construction Report · Welcome to the monthly construction report for the Radisson Mai Khao Beach project. This update will be issued monthly during

Radisson Phuket Mai Khao Beach Construction Progress Report Disclaimer: https://turtlebayphuket.com/disclaimer/

Ceiling support frame in bedroom & foyer area

Page 19: Radisson Phuket Mai Khao Beach Construction Report · Welcome to the monthly construction report for the Radisson Mai Khao Beach project. This update will be issued monthly during

Radisson Phuket Mai Khao Beach Construction Progress Report Disclaimer: https://turtlebayphuket.com/disclaimer/

Conduit and trunking for plugs & lighting circuits, view back towards foyer from TV area of bedroom

The view from the bedroom door to terrace, the location of the mock-up is a similar position to building 4 & 5 at the main pool area