rail - bwb consulting

14
Rail www.bwbconsulting.com Civils Signalling Track

Upload: others

Post on 29-Dec-2021

10 views

Category:

Documents


1 download

TRANSCRIPT

Page 1: Rail - BWB Consulting

Rail

www.bwbconsulting.com

Civils

Signalling

Track

Page 2: Rail - BWB Consulting

ABOUT US

BWB is a multi-award winning engineering and environmental design consultancy

with a proven reputation for technical excellence and exceptional Client

satisfaction.

Spanning 30 years, BWB’s historic success is firmly grounded in providing a

commercial, agile and responsive service to the demanding private sector. We are

successful in the private sector because we are different. We have the scale and

capability of the largest consultants, but retain the responsiveness, pragmatism and

commercial competitiveness of the smallest. We are accessible and decisive. We

understand what ‘being there’ and ‘timely decision making’ really means for our

Clients.

Our aim is apply this ethos to the BWB Rail Group and challenge the old traditions

prevalent in the sector. We are different. We are BWB Rail.

"Agile,

Responsive,

Commercially Competitive" 04

COMPETITIVE Our history and success is deeply

rooted in providing value to the

demanding private sector. Our

approach is no different in the

public sector. We deliver the

same standard of value driven

service at competitive market

rates.

OUR APPROACH

05

PRACTICABLE We understand design to

construction build practice,

construction phasing and

buildability. We fully embrace

collaboration with our D&B

contactor partners. Their success

is the source of our success.

06

TECHNICALLY

ASTUTE A repeated Times Top 100

Companies to Work for and

Investor in People Platinum status

is testament that BWB attracts the

best and develops the best.

01

SAFETY FIRST BWB are RISQS accredited and

drive a safety first culture - vital for

the safety critical environment

we work in. As well as safe

practices and processes, we also

promote employee wellbeing

and mindfulness.

02

RESPONSIVE At 250 strong, BWB is large

enough to provide the complete

service, but small enough to

operate with the agility and

r e s p on s i ve ne ss o f n i c he

specialists.

03

DECISIVE We operate a flat management

structure. Our Directors and senior

managers are hands on and

remain involved in the delivery of

our design services. Always

accessible and empowered to

make quick decisions.

Page 3: Rail - BWB Consulting

AT A GLANCE Champions of Safety, Environment, Wellbeing &

Mindfulness

Established UK resource in Rail Civils, Track and

Signalling disciplines

CEM & CRE Experience

IRSE Licenced Resource

Project Engineering/Assurance Experience

BIM Level 2 Accredited

RISQS Accredited Consultancy.

Complete consulting services for rail infrastructure

assets and depots.

Multi-disciplinary expertise from land surveyors, rail and

civil engineers, geotechnical engineers, bridge

engineers and IT & software specialists.

Delivery of the GRIP process and deliverables required

for each stage

Delivery of the Engineering Assurance process &

acceptance criteria

Established relationships with key contacts within

Network Rail

Experience of working directly with the NR Route

teams

Experience in Stakeholder Management

Experience of working with remote delivery teams

Specialising in UK Standards with the skills required to

undertake alterations, enhancements and renewals to

the existing infrastructure

Experience of working through the Asset Protection

application process for third party funded projects

Stefan Zalega Executive Director | Rail & International

THE TEAM

Executive Director | Infrastructure

Andrew Davies Service Director | Rail Track Associate Director | Rail Civils

Graham Sant Executive Director | Infrastructure

Neil Jackson Associate Director | Rail Civils

Paul Robilliard Service Director | Rail Signalling

Page 4: Rail - BWB Consulting

SIGNALLING OUR SERVICES

DESIGN

Design Specifications/Reports

Interface/Fringe Specification

Reasonable Opportunity Assessment (E810)

Scheme Plan Production & Supporting Calculations

Bonding Plans

Location Plans

Control System VDU/Panel

Interlocking Design: Mechanical, Electro-mechanical,

Route Relay Interlocking, Westpac Geographical, GEC (AEI

-GRS, Scottish Region), E10K

REB/Location Wiring

Lineside Equipment: Signals, Train Detection, Point

Machines & Level Crossings (All Types)

Final Records/Returns - NRG

IRSE Licenced Designers/Verifiers

ENGINEERING

Network Rail Assurance Roles:

Client Side – DPE & PE

Contractor – CEM & CRE

Systems Engineering & Integration

Management

Pre-Feasibility Study & Option Selection

Report

Initial Signal Sighting Reports (GRIP 1-3)

Experienced in writing Operational

Requirements

Experienced in all legacy technology

types (not supplier specific)

MSRP Representation

Installation, Testing & Commissioning

Support – DO Cover

Technical Expert – Multi Discipline

Design, Project Delivery &

Signalling Maintenance

SITE BASED

Asset Condition Report

Site Surveys - Layout

Detailed Correlation – Equipment/Wiring

Identification of Site-Specific Hazards

Paul Robilliard Service Director | Rail Signalling

BEng (Hons) Electrical Engineering

BEng (Hons) Railway Engineering

Chartered Member of the Institution of Railway Signal Engineers, CEng MIRSE

Member of the Institution of Engineering and Technology, MIET

1.1.550v3 Signalling Principles Designer Licence

1.1.160v3 Signalling Design Verifier

MANAGEMENT & REPORTING

Planning, Resource/Programme Management (MS

Project)

Research/Investigation, Scope Clarification &

Requirements Capture

Stakeholder Engagement/Workshops

Bid/Estimate/Programme Support

Management of Specialists/Suppliers

Requirements Documentation

BIM Management

Records Requests/Returns – NRG

Version Requests/Control - NRG

Page 5: Rail - BWB Consulting

MANAGEMENT & REPORTING

Interpretation of surveys and investigations

Assistance with scope production

review of record drawings, GRIP designs

by others and pre-construction

information

Feasibility studies, option selection, cost

estimate and recommendations reporting

Coordination, survey, assessment and

reporting for Gauging studies

Multi-disciplinary design management

and coordination of 10+ disciplines

LINESIDE CIVILS

Bridge design: new-build and

refurbishment

Route works design

Levelling, retaining walls and embankment

works

Crossings – undertrack, above track and on track

Drainage design: track, surface and foul

Substation compounds and access roads

Earthworks and retaining walls

earth mats

Cable/Troughing routing

Concrete Plinths for modularised buildings,

substations, auto-transformers and ancillary railway

equipment

SPECIALIST FOUNDATIONS

Design of:

Pre-cast concrete foundations for

viaduct works.

Bespoke wall brackets / supports.

Platform Foundations.

Piled Foundations.

Portal foundations, including special

foundations incorporated within re-

enforced concrete aprons

Foundations for OLE supports and

gantries

SURVEY & SITE INVESTIGATION WORKS

Bridge, gantry and retaining wall inspections

Topographical Surveys

Intrusive materials testing including core drilling and testing

of masonry cores and paint testing

Ferrous scanning

Exploratory trial holes to determine bridge deck

construction / existing foundation

Trial holes for foundations to confirm ground type and

presence of buried services

Dilapidation surveys

Lineside routeworks surveys

Provision of access platforms, scaffolding and pontoons to

facilitate intrusive surveys to railway assets

Foundations for OLE supports and gantries

CIVILS OUR SERVICES

Meng (Hons) Civil & Structural Engineering

Member of the Institution of Civil Engineering, CEng MICE

Member of the Chartered Management Institute, CMgr MCMI

Member of the European Federation of National Engineering Associations, EUR ING

Direct Current Conductor Rail and Alternating Current Competency (PTS)

Neil Jackson Associate Director | Rail Civils

Page 6: Rail - BWB Consulting

SITE BASED

Track visual survey, scoping and asset inspection

Topographical rail surveys (through BWB survey team*)

Tunnel and platform gauging

Switches & Crossing inspections

Factory Acceptance Tests for track products (rails, sleepers,

fastenings etc.)

Track installation engineering supervision

TRACK OUR SERVICES

DESIGN

Track Alignment

Maintenance – tamping schemes

Renewals

Enhancements, remodelling, greenfield

Slab Track (Structural Design)

Track componentry (in liaison with manufacturers)

Switches and Crossings (S&C)

Gauging and Clearances

Track Drainage

Level Crossings

Platforms

ENGINEERING

Wheel-Rail Interface studies

Track Noise & Vibration studies

Independent checking and auditing

Network Rail Assurance roles: CEM, DPE,

CRE-Track, PE-Track

Rail stressing schemes

Track standards writing

Multi-disciplinary engineering integration

CAD & BIM

Technical Experts

Project definition and feasibility studies.

Andrew Davies Service Director | Rail Track

MSc Mechanical Engineering

BEng (Hons) Mechanical Engineering

Member of the Permanent Way Institution, MPWI

Chartered Member of the Institution of Mechanical Engineers, CEng MIMechE

MANAGEMENT & REPORTING

Planning, resourcing and programme management

(P6, MS Project etc.)

Quantitative based risk analyses and mitigation

proposals

Technical contract and requirements management

Procurement/BOQs/Cost estimates (quantity

surveying)

Document/Drawing Control systems

Testing and Commissioning

Client and stakeholder management

Page 7: Rail - BWB Consulting

PROJECT DESCRIPTION

Stage 1 of the Parramatta Light Rail comprises of 12km dual track alignment, with a mix of on-street and

dedicated corridor including 16 station stops. CAF TE are part of the SOM (Supply Operate and Maintain)

contract responsible for the Systems delivery activities, Light Rail Vehicle procurement and Operations &

Maintenance once the project transitions from the delivery to operation phase in 2023.

BWB were responsible for the delivery of the Signalling solution, embedded within the CAF TE Engineering

delivery team. The responsibilities include the design, interface management, manufacture, installation,

test, commissioning and entry into service of the chosen system. The delivery teams are spread across

Australia, UK, Spain & Italy so the use of video conferences and good time co-ordination between the

different time zones was key.

BWB’s Rail Civils Team also provided peer review and value engineering services to CAF for all the civil

structures on the project, including bridges. OHW support and retaining structures.

KEY FACTS CLIENT

CAF

YEAR

2020

PROJECT VALUE

£2.4 Bn

SERVICES PROVIDED

Rail Signalling Design

Rail Civils

PARRAMATTA LIGHT RAIL, AUSTRALIA

PROJECT DESCRIPTION

BWB played a key role in Nottingham's NET Phase 2 tram extension, delivering transport, traffic signal and

infrastructure design services. The £570m scheme has extended the lines to Chilwell and Clifton, more than

doubling the size of the city's tram network by adding 11 miles of track, 28 stations and 22 trams.

BWB has been involved for over a decade, initially providing detailed traffic modelling and highway

design of junctions on projects that connect to the tram route including ng2 Business Park, Highfields

Science Park and Medi-Park. Following this the NET Promoter appointed BWB for the Advanced Design

Phase of the scheme where we reviewed and redesigned five shared-use traffic signal controlled

junctions on the tram route through Beeston town centre. We were later commissioned by Nottingham

City Council to assist them in checking the detailed design proposals prepared by the scheme's external

design team.

The extension opened to the public in August 2015 and it is anticipated that the scheme could help

generate £300 million a year for the local economy and help create up to 8,000 jobs.

KEY FACTS CLIENT

NCC/TRAMLINK NOTTS

YEAR

2015

PROJECT VALUE

£540M

SERVICES PROVIDED

Rail Signalling Design

Traffic Signals

Highway Design

Micro-Simulation

NOTTINGHAM NET PHASE 2

Page 8: Rail - BWB Consulting

PROJECT DESCRIPTION

BWB Consulting is proud to be part of the team delivering the exciting £400 million iPort logistics

development in Doncaster. The 700-acre scheme has outline planning consent for up to 6 million sq ft of

warehouse space and will incorporate a 35-acre dedicated strategic rail freight terminal. The developers

Verdion estimate that iPort will bring up to 5,000 new jobs to the area when fully operational.

BWB has supported the project from its early planning stages and have been appointed by Verdion to

provide primary infrastructure, ground improvement and earthworks design. Our range of services has

included highways design, surface water and foul water design, hydraulic modelling, flood risk assessment

and supervision of onsite infrastructure works.

In addition to civils design for the rail terminal, BWB was also responsible for the drainage, structural and

foundation design of the first two warehouse units that were speculatively developed by Verdion.

KEY FACTS CLIENT

VERDION

YEAR

2018

PROJECT VALUE

£400m

SERVICES PROVIDED

Rail Civils

Geotechnical

Earthworks

Drainage

Highways

iPORT STRATEGIC FREIGHT

PROJECT DESCRIPTION

BWB undertook full responsibility for the gauging workstream part of the CAF Class 197 rolling stock

introduction to the Wales and Borders areas.

BWBs roles were Contractors Engineering Manager (CEM), Project Manager, Contractors Responsible

Engineer (CRE) and surveyors for the GRIP 1-3 deliverables of around 30 sites. BWB delivered the surveys,

gauging assessments and option selection reports where works were required. This was undertaken to

Network Rail standards.

BWB assisted with the scope development by reviewing the national gauging database and utilising

supply chain contacts to understand local knowledge in the area. BWB formed a collaborative

relationship with the Network Rail Gauging Engineers to ensure full understanding of the work and

deliverables were coherent.

KEY FACTS CLIENT

CAF RAIL SERVICES

YEAR

2020

SERVICES PROVIDED

Rail Civils

Track Design

Project Management /

CDM

WALES & BORDERS GAUGING

Page 9: Rail - BWB Consulting

PROJECT DESCRIPTION

Prologis Park Coventry is one of the country's most successful industrial parks. The scheme provides more

than 2 million sq ft of rail served, mixed commercial/distribution development and is excellently located

three miles from Junction 3 of the M6. Prologis Park was one of the first major projects that included all

BWB's disciplines and where we earned our stripes for delivering major multi-modal infrastructure. It also

helped move BWB to the front of the consultant pack in the UK industrial sector.

BWB provided a truly integrated engineering and environmental service to assist in the redevelopment of

this major brownfield former colliery site. The infrastructure comprised the construction of 5km of on and off

-site roads, widening of the M6 Junction 3, drainage networks included two feature balancing lakes and

the provision of a 3KM rail link and rail sidings to the distribution buildings.

KEY FACTS CLIENT

WELDON PLANT

PROJECT VALUE

£50m

SERVICES PROVIDED

Rail Civils

Geotechnical

Earthworks

Drainage

Highways

PROLOGIS PARK, COVENTRY

PROJECT DESCRIPTION

BWB were appointed by Shapir Civil & Marine Engineering Ltd to undertake the track for the J-NET

Jerusalem Light Rail Project. A Joint Venture consortium of CAF and Shapir won the $2billion contract to

Design, Build, Maintain and Operate the new Green Line and an extension of the existing Red Line.

BWB's track design work commenced in January 2020 and was delivered entirely via our UK based track

design team, with initial co-ordination and interface provided to the Client by a locally based design

manager. Travel restrictions due to Covid-19 had little impact on BWB's delivery and the experienced

team met each of the ambitious design delivery milestones.

BWB's scope is to deliver the track design for the entire project, which includes:

- 7km twin track extension to existing Red Line

- 20km twin track new green line

- Circa 250 units of Switches and Crossings (S&C)

- Design of two new depots and the extension one existing depot.

KEY FACTS CLIENT

SHAPIR

YEAR

2020

PROJECT VALUE

£2 BILLION

SERVICES PROVIDED

Track Design

Noise & Vibration

J-NET JERUSALEM LIGHT RAIL

Page 10: Rail - BWB Consulting

PROJECT DESCRIPTION

BWB's Client, Rendel were appointed by Eurotunnel as the Principal Contractor to design & construct a

new Modalohr Station within Dollands Moor Depot in order to provide additional capacity for the

loading/unloading of commercial freight vehicles on the UK Terminal. This will become part of an overall

project known as 'Terminal d'Avenir. The new system will enable the loading/unloading of several wagons

simultaneously.

BWB was appointed by Rendel as their rail design consultancy and instructed the start of GRIP 3 design for

Signalling, Track & OLE. BWB undertook the Signalling design in-house and utilised its supply chain for the

delivery of Track & OLE while acting as the main integrator for these disciplines.

The project is nearing the end of GRIP stage 3, where BWB is providing a lead role in the interface with

Network Rail.

KEY FACTS CLIENT

RENDEL

YEAR

2020

PROJECT VALUE

£40m

SERVICES PROVIDED

Rail Signalling Design

DOLLANDS MOOR FREIGHT YARD

PROJECT DESCRIPTION

BWB was selected as the Signalling Layout designer for French Hill Depot in August 2020 by CAF Signalling.

A JV of CAF and Shapir in autumn 2019 won the $2.4billion contract with Jerusalem Transportation

Masterplan Team (JTMT) for the Design, Build, Maintain and Operate on a 25 year concession, an

extension of the existing Red Line and a new Green line. The project is due for completion in 2025.

BWB's scope consisted of the Signalling Design for French Hill Depot extension work, which included

provision of the 1:250 Detailed Layout, along with a detailed design report containing Signalling

Architecture and Equipment Specifications, Positioning Rules, Layout Schematic, Route Tables,

Compliance Issues/constraints for both the existing & new equipment and proposed Cable Route Pit

connections.

KEY FACTS CLIENT

CAF

YEAR

2020

PROJECT VALUE

£50m

SERVICES PROVIDED

Rail Signalling Design

JNET FRENCH HILL DEPOT

Page 11: Rail - BWB Consulting

PROJECT DESCRIPTION

East Midlands Gateway Strategic Rail Freight Interchange (SRFI) delivers 6 million sq. ft. of rail and road

served warehousing, creating up to 7000 jobs. The scope includes extensive highway works including

major improvements to M1 junction 24 and provision of a new bypass for the village of Kegworth.

BWB has been involved extensively, providing engineering advice on transportation, highways, flooding

and also playing a key role in the production of the Development Consent Order (DCO). The early stages

of developing the DCO saw BWB set up and chair the transport working group for the scheme, which

included representatives from the 6 highway authorities.

The working group was set up with all of the highway authorities that cover or are close to EMG, given its

location adjacent to M1 junction 24 and close to 3 county borders. The working group was successful in

steering the production of the complex, multi-modal transport issues dealt with by the Transport

Assessment (TA). TA and related ES chapters were produced to the satisfaction of all the participating

highway authorities.

KEY FACTS CLIENT

ROXHILL

YEAR

2020

SERVICES PROVIDED

Civil Engineering

Earthworks

Flood Risk

Rail Services

Transport Planning

EAST MIDLANDS GATEWAY SRFI

PROJECT DESCRIPTION

BWB was appointed as the multi-disciplined designer by the Isle of Man Railways to produce a track

renewal scheme and construction package for the re-design and renewal of the Switches and Crossings

(S&C) at Snaefell Mountain Railways tram shed.

The Isle of Man Government operate and maintain 3 railways on the island - Isle of Man Steam Railway,

Manx Electric Railway and Snaefell Mountain Railway, all of which are narrow gauge.

BWB's scope of work included the following:

- Renewal and re-alignment of existing life expired track with new materials

- Replacement of 3 Switches and Crossing units

- Construction of an additional siding line with connection to existing lines

- Design of track and surface water drainage

- Design of building foundations

- Design of Overhead Line Electrification pole foundations.

KEY FACTS CLIENT

IOM GOVENMENT

YEAR

2020

SERVICES PROVIDED

Track Design

Rail Civils

SNAEFELL SHED, ISLE OF MAN

Page 12: Rail - BWB Consulting

The Complete Rail Service

In 2017 BWB became part of the global transport engineering giant CAF

Group. The transaction gives BWB greater financial resilience and stability and

through CAF Turnkey Engineering access to an even deeper pool of resource

and expertise. Together BWB and CAF will be able to play a leading role in

digital engineering, Smart Cities, and colossal investment in infrastructure, not

just here in the UK but across the world.

BWB Rail and CAFTE are able to combine rail systems and civil engineering

expertise to provide integrated solutions to add value at all stages of the asset

lifecycle. Using the latest digital design technology, we provide building, civils,

electrification, signalling, telecommunications and permanent way services

throughout GRIP Stages 1 to 8.

Planning Multi-Modal Pedestrian & Transport Modelling

Capacity Analysis & Optimisation of Existing Assets

Gauging Surveys & Studies

Project Feasibility (Outline Design, Budget, Programme)

Design Complete Design Service

Drainage, Environmental & Geotechnical

Rail Track, Electrification

Signalling (UK Legacy & ERTMS)

Rail Structures & Depots

Rail Systems & Sub-Systems (Onboard & Infrastructure)

Light Rail, Metro, Commuter, High Speed, Freight, eBUS

Energy Collection, eBus Charging & Catenary Free

Digital Solutions, BIM, Visualisation

Construction Procurement Strategy

Contract Management, Project Management

Construction Management

Supervision, Inspection & Validation

As Built Records

Operation & Maintenance Testing, Commissioning & Handover

Safety Integration, SMS, Risk Management, RAMS

Infrastructure and Systems Renewals & Upgrades

1

2

3

4

Page 13: Rail - BWB Consulting

CAF GROUP

COLLABORATIONS Comprehensive Rail Solutions BWB Rail and the CAFTE Group can draw upon the vast scale, reach and

capabilities of the CAF Group to finance, design, construct, supply,

operate and maintain connected mobility solutions across the globe.

Rolling Stock

Wheelsets

Traction &

Comms Systems

Signalling

Full Procurement & Supply

Management

Internal Equipment Design

& Production

Strategic Purchasing

COMPONENTS

GROUP

Concessions

Financing Solutions

IP

Complete eBus

Solutions

Vehicle Supply

After Sales

Page 14: Rail - BWB Consulting

Rail

GET IN TOUCH to find out how we can add

value to your project.

W: www.bwbconsulting.com

E: [email protected]

T: 0113 233 8000