Page 1: Raymond u Code Nim Pv t Ltd Yavatmal

C-1, MIDC, Lohara, Yavatmal – 445 001 (MS)

Page 2: Raymond u Code Nim Pv t Ltd Yavatmal

Location Raymond UCO Situated in Vidharbha ,Yavatmal

Maharashtra.

Maharashtra Industrial Development Corporation (MIDC)

Manufacturing Denim Fabric

Commissioning 1996

of Plant

Capacity Fabric( Denim) – 420 Lac Mtr.

Plot Area of 557311 Sq. Mts.

Plant Industrial Utilization - 200631.96 Sq. Mtr.

Residential - 55731.10

Green Belt - 70853 Sq. Mtr.

Roads - 30094.94

Utility Power - 128.53 Lacs Kwh per annum

Consumption Water - 15300 Lacs Ltrs per annum

Man Power Employed Staff - 415 , Workers - 1110

Accolades An ISO 9001:2000 Certified Company. ; SA – 8000 ; GOTS

Plant Details

Page 3: Raymond u Code Nim Pv t Ltd Yavatmal

Raymond UCO Denim Private Limited

Raymond Group is a front runner in the Indian textiles market. Denim plant of Yavatmal is single largest Denim fabric producer in India. Raymond Denim is well recognized in India and created a favorable image in international market. The plant is located in Yavatmal (Maharashtra) and manufacturing one of the best Quality ring Denim fabric. In the year 2007-08, 337.94 Lac linear meter fabric was produced and sales turn over was 400.08 Corers.

M/s Raymond UCO (Denim Pvt. Ltd) has adopted latest modern technology with Energy Efficient Technique from the beginning. For example we have fitted all the tube fittings with electronic ballast, all the lighting was supplied with low voltage, street lights were with timers, Variable frequency drives were used in almost all the application & automation was used to great extent.

We strive continuously to reduce our specific energy consumption by a well established system in place for monitoring, and finding innovative techniques for adopting Energy Efficient Equipment and machineries.The following figures itself explain that, how we are rationally uses the energy-In the year of 2007-08 we have increased the connected load by – 41.42 % still we have reduced the Energy Cost by – 1.8%.This was achieved by maintaining the specific power (Kwh/Mtr) and Thermal (Kcal/Mtr) consumption equal to or less than last two years.

We believe energy conservation as the way of life and thus for the year 2008-09 we have planed a huge investment towards it. The Projects planed would cost Rs.170Lac with a lucrative return of Rs.197 Lac/annum. Most of the plans (Almost 70%) are under either erection or commissioning.

Our aim is to become a role model to all the Denim manufacturing units in terms of Quality, Quantity and Efficient Utilization of ENERGY.

Looking to our commitment for continual improvement and preparedness for investment towards energy conservation, we strongly believe that we are the most eligible participant for this prestigious award.

C-1, MIDC, Lohara, Yavatmal – 445 001 (MS)

Page 4: Raymond u Code Nim Pv t Ltd Yavatmal

Energy Management Policy

We at Raymond UCO Denim Private Limited. Yavatmal, involve in the production of High quality Denim Fabric and Yarn, are dedicated to Conserve Energy for the self, National and global interest without affecting our product quality.

We strive continuously to –

Reduce specific energy consumption of the plant.Use renewable energy sources wherever possible.Rationalize the consumption of fossil fuels.Implement the innovative techniques to reduce energy consumption. Comply with the Energy Legislation and other regulations.Spread and implement the information of energy conservation techniques in organization.Educate the people / student on the benefit of energy conservation.Reduce the specific energy consumption of our plant by 1% for next 5 years i.e. up to 2013

Suketu Shah

Chief Manufacturing Officer

Page 5: Raymond u Code Nim Pv t Ltd Yavatmal

Quality Policy

We are committed to delight and service the most discerning

customers of Denim Garment Brands

all over the world.We endeavor to achieve this

by consistent qualityand timely delivery of Specialty Denims.

E. S. SankarChief Operating Officer ( INDIA )

Page 6: Raymond u Code Nim Pv t Ltd Yavatmal

Environmental Policy

To build and sustain an organization which is totally committed toConserve and protect the environment through

Prevention of Pollution*

Continual Improvement in environmental performance*

Compliance with all environmental legislation and regulationsApplicable to plant operations

*Our motto

*To give a

CLEANER & GREENEREnvironment to the posterity

Suketu ShahChief Manufacturing Officer

Page 7: Raymond u Code Nim Pv t Ltd Yavatmal

Methodology adopted for energy conservation

1. Energy Conservation Cell

2. Small Group Activity of departments

3. Awareness & Training

4. Continuous Monitoring

5. Bench Marking

6. Energy audit ( Internal & External)

7. Adoption of new ideas through various inputs.

Page 8: Raymond u Code Nim Pv t Ltd Yavatmal

Encon Cell Structure

Plant Head

DGM Engineering

Power Plant

Mechanical

Engg.

Elect/ Inst

Engg. Manager Energy Conservation Civil Engg

ENCON Cell

Small Groups

Engineering Spinning Weaving Dyeing Processing

1. Energy Conservation Cell

Page 9: Raymond u Code Nim Pv t Ltd Yavatmal

Management of Energy Conservation Programs

Constitution Of Energy Conservation Cell:

A full fledge group of 9 members has been formed which includes one ortwo member from each department and headed by Energy Manager. Thisgroup known as Energy Conservation Cell (ECC), meets once in everymonth to review progress on matter of Energy Conservation measuresimplementation and follow-up.

Technical Committee:

Technical committee is formed which comprises of Engineers from allFaculties viz., Mechanical, Electrical, Electronics and Textile, headed byDGM Engineering. This committee evaluates suggestions andrecommendations of Energy Conservation Cell for its technical andfinancial aspects. Than a proposal is prepared and submitted to topmanagement for its approval.

1. Energy Conservation Cell

Page 10: Raymond u Code Nim Pv t Ltd Yavatmal

Functions Of Energy Conservation Cell

• To ensure Involvement of top level Management to workman forthe cause of Energy Conservation

• To create Awareness among all employees regarding Energy Conservation

• To obtain Approval from top management for implementation ofvital suggestions

• Organizing Periodic Meetings to brainstorm along with workmen andevaluate feasibility of suggestions received from employees

• Workout of Savings achieved after implementation of saving projects

• Data Compilation and send it to corporate office

• Close Monitoring and follow-up of Energy Conservation Activities

1. Energy Conservation Cell

Page 11: Raymond u Code Nim Pv t Ltd Yavatmal

Small Group Activity

• A small group is formed in each Dept.

• Idea is to get direct input from the users

• Ownership of the ideas and Energy conservation

• Spreading the importance of Energy Conservation

2. Small Group Activity of departments

Page 12: Raymond u Code Nim Pv t Ltd Yavatmal

•Display of Slogans and Banners at various locations in millspremises for promotion of Energy Conservation amongst theemployees

•Formation of small Group Activities and Task Force cell atdepartment level to ensure involvement of Workmen in EnergyConservation Activities

•Conduct the workshop on energy Efficient Motors and inviteddelegates from out side Industries

•Continues motivation to all members through reorganization andreward.

Energy Conservation - Awareness

3. Awareness and training

Page 13: Raymond u Code Nim Pv t Ltd Yavatmal

Energy Conservation - Awareness

Displays at Various Locations

3. Awareness and training

Page 14: Raymond u Code Nim Pv t Ltd Yavatmal

Energy Conservation - Awareness

Displays at Various Locations

3. Awareness and training

Page 15: Raymond u Code Nim Pv t Ltd Yavatmal

Energy Conservation - Awareness

Program Conducted in Raymond UCO Denim Private Limited

3. Awareness and training

Page 16: Raymond u Code Nim Pv t Ltd Yavatmal

Energy Conservation - Awareness

Training program attended by Cell Member

These programs are the part of Employ Motion and Awareness

Sr. No. Program name & Details Organized byNo Of

Participant Duration

1 Workshop onEnergy Efficient

Motors

International copper Promotion Council of India & Raymond UCO, Yavatmal

20 1 Day

2 3L Workshop for Textiles Sector

BEE India

1 1 Day

3. Awareness and training

Page 17: Raymond u Code Nim Pv t Ltd Yavatmal

Absolute Energy Savings Vs Investment for Energy Conservation

Year 2005-06 2006-07 2007-08

Savings in Rs. Lakhs 42.17 38.79 54.52

Investment in Rs. Lakhs 2.65 21.5 17.41

4. Continuous Monitoring

42.1738.79

54.52

2.65

21.517.41

0

10

20

30

40

50

60

2005-06 2006-07 2007-08

Year

La

kh

Rs

.

Savings Lakhs

Invest. Lakhs

Page 18: Raymond u Code Nim Pv t Ltd Yavatmal

Absolute Energy Savings in Electrical Units

12.05

8.62 7.97

0

2

4

6

8

10

12

14

2005-06 2006-07 2007-08

Year

Lakh

KW

H

Savings inLakh KWH

Year 2005-06 2006-07 2007-08

Energy saved in Lacs KWH 12.05 8.62 7.97

4. Continuous Monitoring

Page 19: Raymond u Code Nim Pv t Ltd Yavatmal

Specific Energy Consumption

2.102.22

1.50

2.00

2.50

2006-07 2007-08

Year

Kw

h/M

tr Kwh/Mtr

Year2006-07 (a)

2007-08 (b)

% Change (a-b/a)*100

Specific Energy Consumption in KWH/ Mtr 2.10 2.22 -5.7

Connected Load 13401.26 18952.26 -41.42

Value added products 58% 73% -25.86

4. Continuous Monitoring

Page 20: Raymond u Code Nim Pv t Ltd Yavatmal

Specific Water Consumption

Year 2005-06 2006-07 2007-08

Ltrs / Mtr 53.4 46.5 45.27

53.4

46.5 45.2

0

15

30

45

60

2005-06 2006-07 2007-08

Kw

h/M

tr

Year

Ltr/Mtr

4. Continuous Monitoring

Page 21: Raymond u Code Nim Pv t Ltd Yavatmal

Innovative Technologies Employed

Use of Wind Energy

Cooling Water Recovery Pump

Natural Draft Cooling Tower

Waste Heat Recovery Boiler at FO Generator Power Plant.

Page 22: Raymond u Code Nim Pv t Ltd Yavatmal

Innovative Technologies Employed

Caustic Recovery Plant

Air Booster Pump

Waste Heat Recovery Plate

Automatic Steam Control Valve

Page 23: Raymond u Code Nim Pv t Ltd Yavatmal

Measures taken for Encon: 07-08

Heat Recovery Plate

Location of Installation : Caustic Recovery Plant

No. of Installation : 1

Advantages : Saved Thermal Energy : 3888 Lac Kcal/

Annum

TOTAL Investment Rs. 2 Lac. : Saving Rs. 5.38 Lac/Year

7. Adoption of new ideas through various inputs

Page 24: Raymond u Code Nim Pv t Ltd Yavatmal

Measures taken for Encon: 07-08

Automatic Steam Control Valve

Location of Installation : Rope Dyeing, Desizer and Finishing

No. of Installation : 5

Advantages : Saved Thermal Energy : 7776 Lac Kcal/ Annum

TOTAL Investment Rs. 2.1 Lac. Saving Rs.9.62 Lac/Year

7. Adoption of new ideas through various inputs

Page 25: Raymond u Code Nim Pv t Ltd Yavatmal

Innovative Technologies Employed

First Time in Textiles Industries

Location of Installation : Master Dyeing MachineNo. of Installation : 1Advantages : Saved 11 KW Electrical Energy by

stopping compressor.

Saving - 0.81 Lac Kwh/ AnnumTOTAL Investment Rs.0.35Lac. Saving Rs.3.80 Lac/Annum

Principal Of Working –It takes the compress air of 6/ 7 Kg /cm2. And compresses it further up to12Kg. With the help of inbuilt pneumatic booster pump.

7. Adoption of new ideas through various inputs

Page 26: Raymond u Code Nim Pv t Ltd Yavatmal

Measures taken for Encon: 07-08

Observation

It was observed that 90 kw compressor motor was having minimum loading cycle, and

was taking 130Amp,on load and 56 Amp on Unload. The Driver Pulley was of 30 Inch.

This Pulley was replaced with 36 inches Pulley. Which result in increase in loading

time with less current.

Before After

Power consumption Kwh/Day 888 775.2

Power consumption Kwh/year 306360 267444

Power saving Kwh / year 38916

Saving Rs. ( lac/ Year ) 1.95

Pulley change

7. Adoption of new ideas through various inputs

Page 27: Raymond u Code Nim Pv t Ltd Yavatmal

Measures taken for Encon: 07-08

Observation

The ID fan No.3 having 30 kw motor was running on star delta starter. VFD was

incorporated for it (ABB Make) and it was observed that nearly 50% power was

saved.

Before After

Power consumption Kwh / Day 470 334

Power consumption Kwh /year 162150 115230

Power saving Kwh/ year 46920

Saving Rs. ( lac/ Year ) 2.35

VFD at Boiler FD Fan

7. Adoption of new ideas through various inputs

Page 28: Raymond u Code Nim Pv t Ltd Yavatmal

Measures taken for Encon: 07-08

Observation

The CT fan having 22 kw motor was running on star delta starter. VFD was

incorporated for it ( ABB Make) and it was observed that nearly 65% power was

saved.

Before After

Power consumption Kwh/Day 384 160.8

Power consumption Kwh /year 132480 55476

Power saving Kwh / year 77004

Saving Rs. ( lac/ Year ) 3.85

VFD At CT Fan

7. Adoption of new ideas through various inputs

Page 29: Raymond u Code Nim Pv t Ltd Yavatmal

Measures taken for Encon: 07-08

ObservationVFD of ABB make was introduced for 37 kw ID fan motor at Boiler No.1 and

it was observed that 26% power was saved

Before After

Power consumption/Day 686 432

Power consumption /year 226380 142560

Power saving / year 83820

Saving Rs. ( lac/ Year ) 4.19

VFD At Boiler ID Fan

7. Adoption of new ideas through various inputs

Page 30: Raymond u Code Nim Pv t Ltd Yavatmal

Use of Renewable Energy Sources

1. Solar Energy

Location of Installation : Solar Water Heaters at Mill Guest House.

No. of Installation : 08

Capacity : 500 lit/day

Advantages : Saved electrical energy 4000KWH/Year

Replaced 8 no. of electrical geysers of 2 KWh. Hot water available for 24 hours for 250 days/year.

Saving on maintenance cost of geysers.

Safe operation than Electrical geysers.

KWH Saved =8* 2*250 = 4000KWH/ Year

Page 31: Raymond u Code Nim Pv t Ltd Yavatmal

Use of Renewable Energy Sources

2. Wind Energy

Location of Installation : Turbo Ventilators at roof

of Dyeing &Process house

No. of Air Changes : 12

No. of Installation : 60

Advantages : Saved electrical energy 2.14 Lac KWH/annum

Replaced 20 no. of 1.5 KW electrical exhaust fans.

Inside room temperature decrease.

Illumination level increase due to natural light through transparent PVC sheet

Driven by wind power, no electricity required Maintenance free

Page 32: Raymond u Code Nim Pv t Ltd Yavatmal

Use of Renewable Energy Sources

3. Use Of Natural Sun Light

Location of Installation : Transparent PVC sheet at Process,

dyeing and finishing roof.

No. of Installation : 50

Advantages : Illumination level increased

Maintenance free.

Saved Electrical Energy 11520/ Year

No of T/L stopped = 96

Light OFF for day time for 250 Days/ year.

KWH saved / Year = 80x96x6x250 = 11520 KWH/ Year

Page 33: Raymond u Code Nim Pv t Ltd Yavatmal

Management of Energy Conservation Programs

Finance Availability :

Projects having recommendation of Energy Conservation Cell and arehaving investment Up to Rs. 5.0 Lacs are approved by CMO At Plant Levelitself

Projects having investment more than Rs. 5.0 Lacs are send for approval tocorporate office, Thane for Capital Expenditure Budgeting