Recommendations to railway domain issued from SECRET project Pierre Lambert (ALSTOM) SECRET Project, Final Conference, 29 th Oct. 2015 1

Upload: others

Post on 13-Apr-2020

19 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Recommendations to railway domain issued from SECRET project€¦ · Recommendations to railway domain issued from SECRET project Pierre Lambert (ALSTOM) SECRET Project, Final Conference,

Recommendations to railway domain issued

from SECRET project

Pierre Lambert (ALSTOM)

SECRET Project, Final Conference, 29th Oct. 2015 1

Page 2: Recommendations to railway domain issued from SECRET project€¦ · Recommendations to railway domain issued from SECRET project Pierre Lambert (ALSTOM) SECRET Project, Final Conference,

2 SECRET Project, Final Conference, 29th Oct. 2015

Introduction

Processing and Methodology • Capture from WP 1, 2, 3, 4

• Classification

Technical Presentation • Risk Assessment

• System Architecture

• On-board and Trackside

• Attack Detection

Decision Trees • Temporary Recommendations

Conclusions

Page 3: Recommendations to railway domain issued from SECRET project€¦ · Recommendations to railway domain issued from SECRET project Pierre Lambert (ALSTOM) SECRET Project, Final Conference,

3

WP 5 : Recommendations for a resilient

railway infrastructure to EM attacks

WP1: Threat analysis and risk

assessment of EM attack scenarios

WP2: Static

protection

WP3: Monitoring the EM

environment and EM detection WP4: Dynamic

protection

Technical Recommendations Capture

More than 40 recommendations

collected throughout the project

16 TecRec

5 TecRec 14 TecRec 8 TecRec

SECRET Project, Final Conference, 29th Oct. 2015

Page 4: Recommendations to railway domain issued from SECRET project€¦ · Recommendations to railway domain issued from SECRET project Pierre Lambert (ALSTOM) SECRET Project, Final Conference,

GENERAL : • Subject

• Description

• Involved Standard

TYPES : • Operational (process, methodology, railway application)

• EM Attack Detection (techniques and application)

• Engineering (design, architecture guidelines)

IMPLEMENTATION : • Permanent (preventive measure)

• Temporary (activated in case of attack detection)

4 SECRET Project, Final Conference, 29th Oct. 2015

Technical Recommendations

Outlining and Classification

Page 5: Recommendations to railway domain issued from SECRET project€¦ · Recommendations to railway domain issued from SECRET project Pierre Lambert (ALSTOM) SECRET Project, Final Conference,

5 SECRET Project, Final Conference, 29th Oct. 2015

Operational Recommendations

Methodology : WP1_TecRec_001 : Perform Risk management study

WP4_TecRec_002 : Ensure Interoperability of Risk Analysis Methods

WP4_TecRec_006 : Create Knowledge Repository based on ISO 27034

System Architecture - Application Standardization : WP1_TecRec_005 : Backup communication links (end-to-end)

WP4_TecRec_005 : Evaluate Architecture Features for Resilience

WP4_TecRec_007 : implement Radio Bearer Independence for ETCS

WP4_TecRec_008 : Implement ETCS over IP

WP4_TecRec_009 : Integrate Multi-vector Radio Communication in ETCS

Application & Signalling principles : WP1_TecRec_002 : Minimize train brake impact (lower train speed)

Page 6: Recommendations to railway domain issued from SECRET project€¦ · Recommendations to railway domain issued from SECRET project Pierre Lambert (ALSTOM) SECRET Project, Final Conference,

6 SECRET Project, Final Conference, 29th Oct. 2015

Risk Assessment

Line Categories Dedicated High-

Speed Line

High-Capacity

Line

Low-Capacity

Line

Urban Railways

Big Stations

Dedicated

Freight

Typical Speed

(km/h) 300 200 160 0 - 120 100

Traffic Type Passenger Passenger and

freight

Passenger and

freight Passenger Freight

Traffic Density

(trains /h

/direction)

15 8 (mixed traffic)

15 (passenger ) 2-10 30 Typically 12

Train/ jammer location

On-board the train Near the BTS

Between two BTSs

Along the track Near the BTS

Between two BTSs

Page 7: Recommendations to railway domain issued from SECRET project€¦ · Recommendations to railway domain issued from SECRET project Pierre Lambert (ALSTOM) SECRET Project, Final Conference,

7 SECRET Project, Final Conference, 29th Oct. 2015

System Architecture

Radio RX/TX

Techno 1

TRAIN ANTENNA AND FEEDER SYSTEM

Radio

RX/TX

Techno 1

ANTENNA COUPLING (OPTIONAL)

MULTI-VECTOR MANAGER

AND QoS MANAGER

IP MOBILITY and ROUTING

Radio

Jammer

Detector

Radio

Jammer

Detector

LAN PHYSICAL AND LOGICAL

SWITCHING SYSTEM

Operation and

Maintenance

Manager

TRAIN LAN INTERFACES

Subscriber

Identity

Module

Radio RX/TX

Techno 2

Radio

RX/TX

Techno 2

Mobile

Localizer

SECURITY

MANAGER

Radio RX/TX

Techno 1

RADIO COVERAGE (frequency and site planning)

Radio

RX/TX

Techno 1

ANTENNA AND FEEDER SUB-SYSTEM (dedicated or shared)

MULTI-VECTOR GATEWAY

SERVER AND QoS MANAGER

IP ROUTING

Radio

Jammer

Detector

Radio

Jammer

Detector

LAN PHYSICAL AND LOGICAL

SWITCHING SYSTEM

Netw

ork

Opera

tion a

nd M

ain

tenance

Managem

ent

Sys

tem

TRACKSIDE LAN INTERFACES

Subscriber

Database

Mgr

Radio RX/TX

Techno 2

Radio

RX/TX

Techno 2

Radio GW

Acc. Node

Radio GW

Acc. Node

SECURITY

MANAGER

&

Infra

Database

AIR INTERFACE ON-BOARD TRACKSIDE

Train antenna and network coverage

Multi-Vector IP communication over several technologies

Train mobile localizer

Jammer detector on-board & trackside (within security management)

MAJOR

RADIO

EVOLUTION

Page 8: Recommendations to railway domain issued from SECRET project€¦ · Recommendations to railway domain issued from SECRET project Pierre Lambert (ALSTOM) SECRET Project, Final Conference,

8 SECRET Project, Final Conference, 29th Oct. 2015

Engineering Recommendations I

Rolling Stock : WP1_TecRec_009 : Coach RF isolation

WP2_TecRec_001 : Enlarge the ground plane below the train antenna

WP2_TecRec_002 : Improve the shielding effect of the locomotive

WP2_TecRec_003 : Use RF double-shielded coaxial cables

WP2_TecRec_004 : Check if the locomotive vent holes are rightly sized

Train antenna : WP3_TecRec_003 : Switch of train radio (front & rear cab)

WP3_TecRec_005 : Switch electronically a quarter wave reflector

WP3_TecRec_006 : Antenna with managed diagram polarity

WP1_TecRec_010 : MiMo antenna for mobile station

Train Mobile Station : WP3_TecRec_002 : Increase temporarily the train Mobile output power

WP1_TecRec_004 : Send Mobile high power pulse signal

Page 9: Recommendations to railway domain issued from SECRET project€¦ · Recommendations to railway domain issued from SECRET project Pierre Lambert (ALSTOM) SECRET Project, Final Conference,

9 SECRET Project, Final Conference, 29th Oct. 2015

Rolling Stock & Train Antenna

Improve Train Shielding

Larger Antenna Ground Plane

Active Notch Antenna

Switch between Rear & Front

Cab Mobile Radio

(Passenger Trains)

MIMO Antenna

Page 10: Recommendations to railway domain issued from SECRET project€¦ · Recommendations to railway domain issued from SECRET project Pierre Lambert (ALSTOM) SECRET Project, Final Conference,

10 SECRET Project, Final Conference, 29th Oct. 2015

Engineering Recommendations II

Trackside Antenna : WP3_TecRec_005 : Install very-narrow-beam antennas on BTS

WP3_TecRec_004 : E-plane high front-to-back ratio directive antennas

Radio Network Planning : WP3_TecRec_007 : Install additional BTSs in hazardous area

WP3_TecRec_010 : Activate AIR or OF Repeater

WP3_TecRec_001 : Increase temporarily the ground BTS output power

WP1_TecRec_003 : Send infrastructure high power pulse signal

WP3_TecRec_008 : Switch on emergency BTSs

WP3_TecRec_009 : Create microcells

Radio Network features : WP1_TecRec_006 : Mesh architecture

WP1_TecRec_007 : Frequency hopping

WP1_TecRec_008 : Channel hopping

Page 11: Recommendations to railway domain issued from SECRET project€¦ · Recommendations to railway domain issued from SECRET project Pierre Lambert (ALSTOM) SECRET Project, Final Conference,

11 SECRET Project, Final Conference, 29th Oct. 2015

Radio Network Planning & Antenna

Temporarily increase BTS

Power Level

Page 12: Recommendations to railway domain issued from SECRET project€¦ · Recommendations to railway domain issued from SECRET project Pierre Lambert (ALSTOM) SECRET Project, Final Conference,

12 SECRET Project, Final Conference, 29th Oct. 2015

Radio Network Planning & Antenna

Additional

Emergency BTS

-80

-60

-40

-20

0

20

40

60

0 1 2 3 4 5 6 7

AR

BTS-B

BTS-A

km

AR : air repeater Gain =70dBDownlinkDownlink with repeaterUplink with repeater

Additional Emergency

Radio Repeater

Micro Cellular

Mesh Networks

Page 13: Recommendations to railway domain issued from SECRET project€¦ · Recommendations to railway domain issued from SECRET project Pierre Lambert (ALSTOM) SECRET Project, Final Conference,

13 SECRET Project, Final Conference, 29th Oct. 2015

Attack Detection Recommendations

Jammer Detection Techniques : WP1_TecRec_011 : Multi band detection

WP1_TecRec_012 : Spectrum sensing detection

WP1_TecRec_014 : Infrastructure detector

WP1_TecRec_015 : Individual detector (Staff)

WP1_TecRec_016 : Large band detection

WP3_TecRec_014 : Implementation of EVM jammer detector

Jammer Detection Application : WP3_TecRec_011 : Characterization of the EM rail environment

WP1_TecRec_013 : Coach detection system

WP3_TecRec_012 : Deploy sensors network

WP3_TecRec_013 : Integrate a monitoring system on spectrum database

Page 14: Recommendations to railway domain issued from SECRET project€¦ · Recommendations to railway domain issued from SECRET project Pierre Lambert (ALSTOM) SECRET Project, Final Conference,

-40

-60

-80

-100

-120

S(f

) (d

Bm

)

Bursts observation

EV

M

0 50 100 150 200 250 300 3500

20

40

60

80

100

120

Environmentdata base

Jamming Detection System

processing

Communication signal

System processing

Jamming detection

Environment data base

Trackside

Jammer

Detection

On-Board

Jammer

Detection

Spectral

Based

IQ

Based

SECRET Project, Final Conference, 29th Oct. 2015

Attack Detection

Page 15: Recommendations to railway domain issued from SECRET project€¦ · Recommendations to railway domain issued from SECRET project Pierre Lambert (ALSTOM) SECRET Project, Final Conference,

15 SECRET Project, Final Conference, 29th Oct. 2015

Temporary Recommendations

Typical temporary recommendations : WP3_TecRec_001 : Increase temporarily the ground BTS output power

WP3_TecRec_003 : Switch of train radio (front & rear cab)

WP3_TecRec_005 : Switch electronically a quarter wave reflector

WP3_TecRec_006 : Antenna with managed diagram polarity

WP3_TecRec_008 : Switch on emergency BTSs

WP3_TecRec_010 : Activate AIR or OF Repeater

WP4_TecRec_009 : Integrate Multi-vector Radio Communication in ETCS

Need to analyze their period of activation : Starting from the jammer detection Up to the full recovery of normal system behaviour

Page 16: Recommendations to railway domain issued from SECRET project€¦ · Recommendations to railway domain issued from SECRET project Pierre Lambert (ALSTOM) SECRET Project, Final Conference,

16 SECRET Project, Final Conference, 29th Oct. 2015

Recommendation Decision Trees

Line Categories Dedicated High-

Speed Line

High-Capacity

Line

Low-Capacity

Line

Urban Railways

Big Stations

Dedicated

Freight

Typical Speed

(km/h) 300 200 160 0 - 120 100

Traffic Type Passenger Passenger and

freight

Passenger and

freight Passenger Freight

Traffic Density

(trains /h /dir.) 15

8 (mixed traffic)

15 (passenger ) 2-10 30 Typically 12

Train/

jammer

location

Jamming

power

Jamming

on-board

Near

BTS

<= 1W

< 8W

> = 8 W

Bw two

BTSs

<= 1W

< 8W

> = 8 W

Jamming

trackside

Near

BTS

<= 1W

> = 8 W

Bw two

BTSs

<= 1W

> = 8 W

WiFi LTE

5G SATCOM

FDD TDD L Band S Band

Frequency

band

5,47 to 5.7 GHz 0.7 - 0.8 GHz

Public Safety

1.7 - 1.9 GHz

2.5 - 2.6 GHz

1.9 - 2.5 GHz

3.5 GHz ?

5.9 GHz ?

< 6 GHz

6 GHz-60 GHz

1.525 - 1.66 GHz 2 - 2.35 GHz

Interference,

Jamming

medium

(OFDM)

medium

(OFDM)

medium

(OFDM)

frequency evading more robust

(directive antenna)

more robust

(directive antenna)

Deployment New sites

GSM-R and/or

new sites

GSM-R and/or

new sites

GSM-R and/or new

sites

No infrastructure No infrastructure

Line

categories

Dense area

(urban/stations)

Conventional

and H-S lines

Conventional

lines

To be investigated Regional and low

density lines

Regional and low

density lines

Jammer

location

&

spectral

density

Operational context

Candidate Radio Technologies

DECISION TREES

Page 17: Recommendations to railway domain issued from SECRET project€¦ · Recommendations to railway domain issued from SECRET project Pierre Lambert (ALSTOM) SECRET Project, Final Conference,

SECRET Project, Final Conference, 29th Oct. 2015

Jamming on-board

Jamming > 8w

and spectral density

near BTS

not affected

Between two BTSs

Use alternative radio channel

SECRET_WP4_TecRec_008

Jamming < 8W

and spectral density

Between two BTSs

1

H-S Line

Not affected

2

High Density Line

Switching train cab adio

TecRec_003

Electronically switchable antenna reflector

TecRec_005

Increase BTS power

TecRec_001

Activate trackside radio repeater

TecRec_010

Use alternative radio channel

SECRET_WP4_TecRec_008

LTE in TDD mode

WLAN (G5/

802.11p)

...

5

Dedicated Freight Line

Select recommendations

according operational context

Use alternative radio channel

SECRET_WP4_TecRec_008

Satcom

near BTS

Not affected

RxQual Bit Error Rate (BER) Quality of the

communication

0 BER < 0.2% excelent

1 BER= [0.2% à 0.4%] good

2 BER= [0.4% à 0.8%]

3 BER= [0.8% à 1.6%] acceptable

4 BER= [1.6% à 3.2%]

5 BER= [3.2% à 6.4%] bad

6 BER= [6.4% à 12.8%]

7 BER>12.8% Very bad

Detect jamming before loss

of communication

On-board Jammer Mgt Decision Tree

Page 18: Recommendations to railway domain issued from SECRET project€¦ · Recommendations to railway domain issued from SECRET project Pierre Lambert (ALSTOM) SECRET Project, Final Conference,

SECRET Project, Final Conference, 29th Oct. 2015

RxQual Bit Error Rate (BER) Quality of the

communication

0 BER < 0.2% excelent

1 BER= [0.2% à 0.4%] good

2 BER= [0.4% à 0.8%]

3 BER= [0.8% à 1.6%] acceptable

4 BER= [1.6% à 3.2%]

5 BER= [3.2% à 6.4%] bad

6 BER= [6.4% à 12.8%]

7 BER>12.8% Very bad

Detect

jamming

before loss of

communication

Jamming trackside

Jamming > 8w

and spectral density

Between two BTSs

Use alternative radio channel

SECRET_WP4_TecRec_008

...

near BTS

1

H-S Line

Switching on emergency BTS

TecRec_008

Increase BTS power

TecRec_001

Use alternative radio channel

SECRET_WP4_TecRec_008

LTE in TDD mode

2 ...

Jamming < 8W

and spectral density

Near BTS

1

H-S Line

Not affected

5

Dedicated Freight Line

Switching on emergency BTS

TecRec_008

Increase BTS power

TecRec_001

Use alternative radio channel

SECRET_WP4_TecRec_008

Satcom

...

Between two BTSs

1

H-S Line

Not

affected

... 5

Dedicated Freight Line

....

Use alternative radio channel

SECRET_WP4_TecRec_008

Satcom

Trackside Jammer Mgt Decision Tree

Page 19: Recommendations to railway domain issued from SECRET project€¦ · Recommendations to railway domain issued from SECRET project Pierre Lambert (ALSTOM) SECRET Project, Final Conference,

19 SECRET Project, Final Conference, 29th Oct. 2015

Conclusions

SECRET Project Recommendations are : • Built upon a risk assessment process

• Addressing a wide range of technical aspects

• Preliminary classified and evaluated

• Depending on operational context

• Relying on technology evolution

• Subject to specific implementation strategy

Securing Railways against EM attacks is : • Opening the way to many technical innovations

• An essential topic in (Cyber) Security

Page 20: Recommendations to railway domain issued from SECRET project€¦ · Recommendations to railway domain issued from SECRET project Pierre Lambert (ALSTOM) SECRET Project, Final Conference,

Thank you

Pierre Lambert, ALSTOM

20 SECRET Project, Final Conference, 29th Oct. 2015