RECONSTRUCTION OF County Route 1,

Golden Shores Pkwy &Oatman Highway

Public Information MeetingGolden Shores Senior Center

Tuesday, June 3, 2015

Agenda

• Purpose of Project• Scope of Project• Roadway Circulation• Private Property Impacts• Environmental & Right-of-Way Constraints• Funding• Schedule & Public Involvement Plan

Purpose of Meeting

• Inform you of the project• No alternatives have been developed• We have started to identify restraints and

fatal flaws• Obtain your feedback

Scope of Project

• How did the project come about … via a “safety study”

• Preliminary Designo 1) Studyo 2) Scoping, with 2 PIM’s

• Final Design, with 1 PIM• Construction

Project Overview Map

County Route 1 / Golden Shores Pkwy / Oatman Hwy

Scope of Project

• Reconstruct “Six Points” Intersection

• Reconstruct Powell Lake Road & Oatman Highway Intersection

• Eliminate CR 1 between Powell Lake Road and Oatman Highway

• Cul-de-sac Golden Shores Pkwy

Roundabout Concept

Thru-about Concept

Conventional Intersection Concept

Scope of Project

• Maintain Business Access

• Maintain Bike & Pedestrian Circulation

• Right-of-Way may be Required

• Alternate Routes Possible Using Adjacent Streets

Roadway Circulation

• Roundabout, thru-about & conventional layouts (?? - show sample of each)

• Screening … o fatal flawso Potential closures (roundabout most

restrictive, conventional least restrictive, thru-about in between)

Private Property Impacts

• Access – note how alternatives may impact vehicular, bike and pedestrian accesso Properties along Powell Lake Road,

between County Route 1 & Oatman Highway

o Station in the southwest corner of County Route 1 and Powell Lake Road

Environmental and ROW Constraints or Fatal Flaws

• Funding – alternative concepts must meet minimum benefit/cost ratios

• Environmental – certain activities include outside agency reviews whose time may not be completed in time …

• Right-of-Way – acquiring private lands may not be completed in time to use time sensitive funding

Funding

• … 100% funded with roundabout and possible the thru-about

• Design & construction Funding. – Design $827,841– Construction $1,202,439

Schedule & Public Involvement Meeting

• PIM No. 1 6/3/15• PIM No. 2 7/1/15• Study to 7/10/15• PIM No. 3 Fall, 2015• Scoping (Eng. & Env.) to 2/19/16• Design to 6/10/16• Construction Fall 2016

or Spring 2017