recycling bin design and construction drawings
DESCRIPTION
Recycling at Cal, 2009 TGIF Grant Project http://tgif.berkeley.edu/index.php/funded-projects/grant-cycle/2009-projects/59-recycling-at-calTRANSCRIPT
Contact Information
Project Head
Michal Shuldman [email protected]
Ph.D candidate, Integrative Biology
UC BerkeleyTheron Klos [email protected]
Lisa Bauer [email protected]
Grounds Operations Manager
Campus Recycling and Refuse Services Manager
DesignersJohn Carroll [email protected]
Emma Oppen [email protected]
Maha Haji [email protected]
Architecture Student
Architecture Student
Mechanical Engineering and Applied Mathematics Student
Document InformationDocument prepared by John Carroll
Revision A prepared by Maha Haji
Revision B prepared by John Carroll
Styles Explanation
Bin as Constructed
Exploded View of Bin Assemblies
Assemblies Skeleton
Base
Ring M
Faces and Skeleton
Door
Door and Skeleton
Roof Panels
Cap
Roof
Roof and Skeleton
Guards
Trash
Glass
Paper
PartsParts List
Anchor Ring
Cap Panel
Decorative Door Member
Door Face A
Door Face B
Door Rib
Table of Contents
5
6
8
11
14
16
18
20
24
25
27
29
31
32
33
34
35
37
38
39
40
41
42
43
Feet
Floor Plate
Glass Guard
Guard Ring
Label
Magnet Mate
Paper Guard
Piano Hinge
Ring A
Ring B
Roof Panel
Roof Rib
Spoke
Standard Face A
Standard Face B
Trash Guard
Vertical Door Support
Vertical Support
44
45
46
47
48
49
50
51
52
53
54
55
56
57
58
59
60
61
Project
Recycling Bin Redesign,UC Berkeley
Assembly/Part Scale Date
7/6/10
pg.
# : #
# : #
and
# of #
#
The “2” in front of some view indicators means that you’re looking ata construction view of some kind. Construction views, unlike regularviews without a “2” in front of them, don’t depict the item the way itwill look when assembled.
This tells you if the page describes a part or assembly, the name of whats described on the page, and the number of pages that decribe this item
P T RF ?B
2P 2T 2R2F 2B
Scale is accurate (excluding perspective views)
If there is an “A” here, it means that this page is describing an assembly. If there is a “x#” here, it means that this page describes a part and the number of these parts needed to construct the bin is equal to #
This box contains a thumbnail picture of the recycling bin, with the part of the bin described on this page shown in bold.
Front View Perspective View Top View Right View Back View
Project
Recycling Bin Redesign,UC Berkeley
Assembly
Bin asConstructed
Scale Date
7/6/10
pg.
1 : 16
1 of 2
P T
RF
A
6
Project
Recycling Bin Redesign,UC Berkeley
Assembly
Bin asConstructed
Scale Date
7/6/10
pg.
1 : 16
2 of 2
P
T
R
F
A
7
Project
Recycling Bin Redesign,UC Berkeley
Assembly
Exploded Viewof Bin
Assemblies
Scale Date
7/6/10
pg.
N/A
1 of 2
2P
2P
A
Standard Face A
Standard Face B
Label
Door Assembly
Skeleton Assembly
Roof Assembly
Paper GuardAssembly
Glass GuardAssembly
Trash GuardAssembly
8
Project
Recycling Bin Redesign,UC Berkeley
Assembly
Exploded Viewof Bin
Assemblies
Scale Date
7/6/10
pg.
1 : 16
2 of 2
2T
2R2F
A
9
Skeleton Assembly
Number Name
A Ring M Assembly
B Base Assembly
C 1 Ring B
D 2 Vertical Support
E 2 Guard Ring
F 1 Vertical Door Support
G 1 Floor Plate
Parts list
C
D
B
A
E
G
F
11
Project
Recycling Bin Redesign,UC Berkeley
Assembly
Skeleton
Scale Date
7/6/10
pg.
N/A
1 of 2
12
2P A
Vertical Support
Guard Ring
Ring B
Ring M Assembly
Vertical Door Support
Floor Plate
Base Assembly
Project
Recycling Bin Redesign,UC Berkeley
Part
Skeleton
Scale Date
7/6/10
pg.
1 : 8
1 : 16
2 of 2 1 : 32Scale 1 : 4
P
T
R
F A
2T
3/16”
0-15/16"
5-3/4"
1-1/16"
0-3/16"
3-1/4"
2'4-3/4"
1'0-13/16"
All pieces welded as shown. If part “Floor Plate” is too thin to be welded, contact
one of the people listed in this document to discuss alternatives
13
Project
Recycling Bin Redesign,UC Berkeley
Assembly
Base
Scale Date
7/6/10
pg.
1 : 16
1 of 1
P
T
R
F
A2P
Centerline
Spoke
Ring A
Anchor Ring
Feet
All Pieces welded as shown15
Project
Recycling Bin Redesign,UC Berkeley
Assembly
Ring M
Scale Date
7/6/10
pg.
1 : 8
1 of 1
17
P
T
A
2P
Ring AMagnet Female
6"
2-3/8"
All Pieces Welded as shown
Faces + Skeleton Assembly
Number Name
A Skeleton Assembly
B 2 Standard Face A
C 2 Standard Face B
Parts list
C
B
A
18
Project
Recycling Bin Redesign,UC Berkeley
Assembly
Faces +Skeleton
Scale Date
7/6/10
pg.
1 : 8
1 : 16
and
1 of 1
19
P
2T
A
T
2P
Standard Face A
Standard Face B
Standard Face B
Standard Face A
Faces bolted to “Skeleton” assembly as shown
through D1/4” holes on faces and through holes
on Skeleton assembly part “Ring A”
0-11/16"
2-1/16"
2-1/16"
0-11/16"
Bottom of part “StandardFace” sits !ush with bottomof assembly “Base”
Door Assembly
Number Name
A 4 Door Rib
B 1 Door Face A
C 1 Door Face B
D 1 Piano Hinge
E 1 Decorative Door Member
F 1 Magnet
Parts list
C
E
B
A
20
Project
Recycling Bin Redesign,UC Berkeley
Assembly
Door
Scale Date
7/6/10
pg.
N/A
1 of 3
2P
A
Door Face A
Door Face B
Magnet
Door Rib
Piano Hinge
Decorative Door Member
21
Project
Recycling Bin Redesign,UC Berkeley
Assembly
Door
Scale Date
7/6/10
pg.
2 of 3
1 : 8
1 : 16
and
2P
T
RF
A
PB
2T
Decorative Door Member
Piano Hinge
Door Rib
Door ribs welded to piano hinge as shown. Decorative doormember welded to piano hinge as shown.
0-13/16"
0-5/16"
5-13/16"
11-5/8"
5-13/16"
1-13/16"
22
Project
Recycling Bin Redesign,UC Berkeley
Assembly
Door
Scale Date
7/6/10
pg.
1 : 8
1 : 16
and
3 of 3
PT
R F
A
2P
2T
Door Face A and Door Face B welded to Door Ribs as shown.Magnet bolted to Door Face A as shown.
0-1/2"0-1/2"
2'7-1/4"
5-1/4"
0-1/4"
1-5/8"
B
23
Project
Recycling Bin Redesign,UC Berkeley
Assembly
Door andSkeleton
Scale Date
7/6/10
pg.
1 : 16
1 of 1
24
2P
T
B
A
PF
Skeleton Assembly
Door Assembly
Convex side of Piano Hingewelded to inside of Vertical
Door Support
Project
Recycling Bin Redesign,UC Berkeley
Assembly
Roof Panels
Scale Date
7/6/10
pg.
1 : 16
1 of 1
2P
TA
P
2T
Roof Panel
Roof Panels welded togetheras shown
26
Project
Recycling Bin Redesign,UC Berkeley
Assembly
Cap
Scale Date
7/6/10
pg.
N/A
1 of 1
ACap Panels
2P
TP
2T
Cap panels fastened together as shown
28
Project
Recycling Bin Redesign,UC Berkeley
Assembly
Roof
Scale Date
7/6/10
pg.
1 : 16
1 of 1
P
T
RF
A
2P
Roof Panels Assembly
Roof Rib
Cap Assembly
Weld Seam
Roof Ribs welded to Roof Panels assembly overweld seams on Roof Panels assembly. Cap assembly
welded as shown.
30
Project
Recycling Bin Redesign,UC Berkeley
Assembly
Roof +Skeleton
Scale Date
7/6/10
pg.
1 : 8
1 of 1
31
P
T
RF
A2P
Roof sits !ush ontop of Skeleton
Roof assembly welded to top
of skeleton assembly as
shown
Guards
Number Name
Recycling Bin
Parts list
C
B
A
There are 3 di!erent types of guards: Glass, Paper, and Trash. For any one bin, only one type of guard is needed.
A 6 Trash Guard
OR
B 6 Glass Guard
OR
C 6 Paper Guard
32
Project
Recycling Bin Redesign,UC Berkeley
Assembly
Trash Guards
Scale Date
7/6/10
pg.
1 : 8
1 of 3
PT
RF
A
Trash Guards bolted to Guard Rings as shown
0-1/8"
0-1/8"
1-7/8"
0-1/2"
1-7/8"
0-1/2"
33
Project
Recycling Bin Redesign,UC Berkeley
Assembly
Glass Guards
Scale Date
7/6/10
pg.
1 : 8
2 of 3
34
PT
RF
A
Glass Guards bolted to Guard Rings as shown
0-1/8"
0-1/8"
1-7/8"
0-1/2"
1-7/8"
0-1/2"
Project
Recycling Bin Redesign,UC Berkeley
Assembly
Paper Guards
Scale Date
7/6/10
pg.
1 : 8
3 of 3
35
PT
RF
A
Paper Guards bolted to Guard Rings as shown1-7/8"
0-1/8"
0-1/8"
0-1/2"
1-7/8"
0-1/2"
Parts List
Name of Part Number of Parts Needed
Anchor Ring 1
Cap Panel 3
Decorative Door Member 1
Door Face A 1
Door Face B 1
Door Rib 4
Feet 3
Floor Plate 1
Glass Guard 6*
Label 3
Magnet Mate 1
Paper Guard 6*
Piano Hinge 1
Ring A 2
Roof Panel 3
Roof Rib 3
Spoke 3
Standard Face A 2
Standard Face B 2
Trash Guard 6*
Vertical Door Support 1
Vertical Support 2
* 6 Glass Guard parts or 6 Trash Guard parts or 6 Paper Guard parts
37
Project
Recycling Bin Redesign,UC Berkeley
Part
Anchor Ring
Scale Date
7/6/10
pg.
1 : 1
1 of 1
38
PT
RF
x1
0-1/2"
D1"
0-3/16"
Project
Recycling Bin Redesign,UC Berkeley
Part
Cap Panel
Scale Date
7/6/10
pg.
1 : 2
1 of 1
39
P
2T
F
x3
2T
2T
Part “Cap Panel” is made out of 11 gauge sheet steel(.1196 inch thick) that is cut usingthe pattern shown in 2T and bent alongindicated line
bend around dashed line
162.3*
2-5/8"
115.1*
61.2*
61.2*
61.2*
57.6*
32.4*
86.3*
3.7*
28.8*
61.2*
2-9/16"
2-9/16"
2-5/8"
2-9/16" 1-3/8"
2-1/8"
0-3/16"
2-5/8"1-1/4"
2-5/16"
Project
Recycling Bin Redesign,UC Berkeley
Part
DecorativeDoor Member
Scale Date
7/6/10
pg.
1 : 8
1 of 1
40
P
T
RF
x1
0-5/16"
0-13/16"
2'5-3/8"
Project
Recycling Bin Redesign,UC Berkeley
Part
Door FaceA
Scale Date
7/6/10
pg.
1 : 8
1 of 1
41
x1
T
RF
11-1/2"
P
60*
0-3/16"
D1/4"
2'8-13/16"
D1/4"
5-1/2"2-3/4"
2-3/4"0-1/2"
2'9-1/8"
1-11/16"
R1/2"
5-15/16"
4"
1'11-1/8"
The part “Door Face A” is to be cut from 3/16” thick steel using the patternshown in 2F and bent along dashed line
2F
2'7-3/8"
1-3/4"
2-5/8"
3-5/8"5-11/16"
0-7/16"
2'10-5/16"
2'9-7/16"
2'8-13/16"
Indicates start of bend
Project
Recycling Bin Redesign,UC Berkeley
Part
Door FaceB
Scale Date
7/6/10
pg.
1 : 8
1 of 1
42
P
T
RF
x1
2F
The part “Door Face B” is to be cut from 3/16” thick steel using the patternshown in 2F and bent along dashedline
start bend here
1"
2'8-13/16"
2"
2'5-5/16"
9-1/2" 1"
2'8-13/16"
2'9-7/16"
11-1/2"
0-3/16" 1-3/4"
3'0-15/16"
60*
D3/16"
D1/4"
Project
Recycling Bin Redesign,UC Berkeley
Part
Door Rib
Scale Date
7/6/10
pg.
1 : 8
1 of 1
43
x4
P
TR
F
1'1-5/8"
10-1/2"
120.0*
0-3/8" 1”
Project
Recycling Bin Redesign,UC Berkeley
Part
Feet
Scale Date
7/6/10
pg.
1 : 1
1 of 1
44
x3
0-3/8"
1-1/2"
1"
D3/8"
P
R F
T
Project
Recycling Bin Redesign,UC Berkeley
Part
Floor Plate
Scale Date
7/6/10
pg.
1 : 8
1 : 16
and
1 of 1
45
0-1/16"
6-29/32"
11-31/32"
1'1-105/128"
120.0*
To be cut out of 11 gauge sheet steel (0.1196 inches)
Project
Recycling Bin Redesign,UC Berkeley
Part
Glass Guard
Scale Date
7/6/10
pg.
1 : 4
1 of 1
46
P
T
R
F
x6
D5"
7"
11-1/2"
0-3/8"
0-1/4" 0-1/4"
3-1/2"
5-3/4"
0-3/8"
D0-3/16"
0-3/16"
Project
Recycling Bin Redesign,UC Berkeley
Part
Guard Ring
Scale Date
7/6/10
pg.
1 : 16
1 of 1
47
P
T
RF
x22F
Cross Section of 2F
Begin with a piece of steel with the dimensions of 2F. Bend at thelocations shown to form a hexagon. Drill 3/16” diameter holes as shown.
Bend locations
Hole centerline120.00*
0-1/2"
0-3/4"
11"
2-1/8"
0-3/4"
11"
2-1/8"
D3/16"
0-1/4"
1'1-13/16"
0-1/2"
1'1-13/16"
6'10-7/8"
1'1-13/16"
0-3/8"
1'1-13/16"
1'1-13/16"
1'1-13/16"
1'1-13/16"
0-1/2"
Project
Recycling Bin Redesign,UC Berkeley
Part
Label
Scale Date
7/6/10
pg.
1 : 2
1 of 1
48
P
R F
x3
Made out of 11 guage sheet steel
3-1/2" 0-1/2"
0-1/2" 9-1/2"
2"
1"
0-1/2"
Project
Recycling Bin Redesign,UC Berkeley
Part
Magnet Mate
Scale Date
7/6/10
pg.
1 : 1
1 of 1
49
P T
R F
x1
5-1/2"
1-1/4"
0-3/16"
Project
Recycling Bin Redesign,UC Berkeley
Part
Paper Guard
Scale Date
7/6/10
pg.
1 : 4
1 of 1
50
P
T
R
F
x60-3/16"
0-3/8"
0-3/8"
0-1/4"0-1/4"
3"
6-1/2"
9-1/2"
11-1/2"
7"
Project
Recycling Bin Redesign,UC Berkeley
Part
Piano Hinge
Scale Date
7/6/10
pg.
N/A
1 of 1
51
from available options
P
T
F
x1
Project
Recycling Bin Redesign,UC Berkeley
Part
Ring A
Scale Date
7/6/10
pg.
1 : 16
1 of 1
52
PT
RF
x2
Cross Section of 2F
Begin with a piece of steel with the dimensions of 2F. Bend at thelocations shown to form a hexagon. Drill 1/4” diameter holes as shown.
Bend locations
Hole centerline
2F 1"
1"
1'1-13/16"
1"
4-3/4"
4-3/4"
1-1/2"
2-7/8"
4-3/4"4-3/4"
1-1/2"
2-7/8"
D1/4"
0-3/8"
1'1-13/16"
1'1-13/16"
6'10-7/8"
1'1-13/16"
1'1-13/16"
1'1-13/16"
1'1-13/16"
Project
Recycling Bin Redesign,UC Berkeley
Part
Ring B
Scale Date
7/6/10
pg.
1 : 16
1 of 1
53
P
T
RF
x3
Cross Section of 2F
Begin with a piece of steel with the dimensions of 2F. Bend at thelocations shown to form a hexagon.
Bend locations
2F
120!
1'2-1/4"
1-1/4"
0-3/8"
7'1-1/2"
1'2-1/4"
1'2-1/4"
1'2-1/4"
1'2-1/4"
1-1/4"1'2-1/4"
1-1/4"
0-3/8"
1'2-1/4"
Project
Recycling Bin Redesign,UC Berkeley
Part
Roof Panel
Scale Date
7/6/10
pg.
1 : 16
1 of 1
54
P
2T
R
F
x3
F
2T
2T
The part “Roof Panel” is to be cut from 1/8” thick steel usingthe pattern shown in 2F and bent along dashed line
bend around here
4"
162.3*
7-1/8"
1'2
-13/1
6"
3.7
*
32.4*
61.2
*
28.8*
86.3
*
57.6
*
1'2-1/4"
1'1
"
1'2-1/4" 7-5/8"
1'0
"0
-15
/16
"
1'2-3/4"
1'2-13/16"
1'2
-1/4
"
0- 1
/8"
Project
Recycling Bin Redesign,UC Berkeley
Part
Roof Rib
Scale Date
7/6/10
pg.
1 : 4
1 of 1
55
P
2TR
F
x3
The part “Roof Rib” is to be cut from 11 gauge steel (.1196 inch) using the patternshown in 2T and bent along dashed line
bend around line
162.3*
0-1/4"
1-1/8"
11-11/16"
0-7/8"
0-1/8"
0-5/8"
Project
Recycling Bin Redesign,UC Berkeley
Part
Spoke
Scale Date
7/6/10
pg.
1 : 2
1 of 1
56
x3
10-7/8"
1"0-3/16"
R T
F
P
Project
Recycling Bin Redesign,UC Berkeley
Part
Standard Face A
Scale Date
7/6/10
pg.
1 : 8
1 of 1
57
P
T
RF
x2
2F
The part “Standard Face A” is to be cut from 3/16” thick steel using the patternshown in 2F andbent along dashed line
1"
11-1/2"
0-3/16"
60*
2'9-1/8"
2'8-13/16"
2'8-13/16"
4-3/4"
2'6-5/16"
1-3/4"
3'0-15/16"
2'9-7/16"
1"4-3/4"
0-1/2"
D1/4"
D1/4"
Indicates start of bend
Project
Recycling Bin Redesign,UC Berkeley
Part
Standard Face B
Scale Date
7/6/10
pg.
1 : 8
1 of 1
58
PT
RF
x2
2F
The part “Standard Face B” is to be cut from 3/16” thick steel using the patternshown in 2F andbent along dashed line
60*
0-3/16"
2'8-13/16"
2'8-13/16"
4-3/4"
2'6-5/16"
1-3/4"
3'0-15/16"
2'9-7/16"
1"4-3/4"
0-1/2"
1"
D1/4"
11-1/2"
2'9-1/8"
2"
2'5-5/16"
D3/16"
Project
Recycling Bin Redesign,UC Berkeley
Part
Trash Guard
Scale Date
7/6/10
pg.
1 : 4
1 of 1
59
P
T
R
F
x60-3/16"
D3/16"0-3/8"
0-3/8"
0-1/4"0-1/4"
11-1/2"
5"
1"
7"
Project
Recycling Bin Redesign,UC Berkeley
Part
Vertical DoorSupport
Scale Date
7/6/10
pg.
1 : 8
1 of 1
60
P
T
RFx1
*Note, same as “Vertical Sup-port” Part except with a chunk cut out
1-1/4"
0-3/8"0-13/16"
1-1/4"
0-13/16"
0-7/16"
120*
Project
Recycling Bin Redesign,UC Berkeley
Part
VerticalSupport
Scale Date
7/6/10
pg.
1 : 8
1 of 1
61
P
T
R F
x2
0-3/8"
120.00!3
'5-3/4"
1-1/4"