DELIVERS OVER 40 YEARS OF PERFORMANCE DESIGNED SOLUTIONS 724•941•9300 URC4U.com [email protected] cUstOMeR need A large OEM was supplying new Stage I meal pipes for a Texas cement plant. They were interested in a process that would reduce costs, increase quality, and speed up delivery. URc sOLUtIOn Traditionally, this type of project would require multiple P.O.s, potentially including a fab shop, refractory contractor, refractory manufacturer, refractory molds, and logistics. (See figure 1.) This approach involves more time, money, and freight. In 2016, URC introduced 1sOURce…a one step process for fabricated, refractory lined components. (See figure 2.) 1 P.O. for the entire project 1 point of supply…all work done at 1 location 1 shop for inspector visits 1 shipment to final jobsite ResULts 1 P.O. = 15-20% Total Savings Fabrication and Refractory: Over 30 sections, sluice boxes and expansion joints were fabricated and lined at 1 URC location. Scope of Work Revisions: During the project, changes were made by the OEM. These were properly handled without excess shipping and with no errors. Minimal Logistics: Shipping was kept to a minimum. Simplified Inspections: The inspector visited 1 location to review all fabrication and refractory specs. APPLICATION: RefRactORy LIned fabRIcatIOn LOCATION: MIdwest – Usa 8917_1SRCE_0416 Dallas 5 6 2 4 1 3 5 1 Fab Parts to Refractory Contractor 2 Refractory to Contractor 3 Molds to Contractors 4 Fab Parts Require Revisions 5 Inspector Visits Multiple Locations 6 Finished Parts to Jobsite RefRactORy LIned fabRIcatIOn figure 1 Lined meal pipes are assembled for inspection prior to shipment. muLtI-stEP PrOcEss 1sOurcE Dallas Brookville, IN 1 1 Finished Parts to Jobsite figure 2 Fabricated pipes are being prepared for refractory. { • Less Time • Less Freight • Better Quality • More Savings

Upload: others

Post on 11-Nov-2021

44 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: RefRactoRy Lined fabRication midwest –Usa RefRactoRy …

DELIVERSOVER 40 YEARS OF PERFORMANCE DESIGNED SOLUTIONS

724•941•9300 • URC4U.com • [email protected]

cUstomeR needA large OEM was supplying new Stage I meal pipes for a Texas cement plant. They were interested in a process that would reduce costs, increase quality, and speed up delivery.

URc soLUtionTraditionally, this type of project would require multiple P.O.s, potentially including a fab shop, refractory contractor, refractorymanufacturer, refractory molds, and logistics. (See figure 1.) This approach involves more time, money, and freight.

In 2016, URC introduced 1soURce…a one step process for fabricated, refractory lined components. (See figure 2.)

1 P.O. for the entire project

1 point of supply…all work done at 1 location

1 shop for inspector visits1 shipment to final jobsite

ResULts

1 P.O. = 15-20% Total SavingsFabrication and Refractory:Over 30 sections, sluice boxes and expansion joints were fabricated and lined at 1 URC location.

Scope of Work Revisions: During the project, changes weremade by the OEM. These were properly handled without excess shipping and with no errors.

Minimal Logistics: Shipping was kept to a minimum.

Simplified Inspections: The inspector visited 1 location to review all fabrication and refractory specs.

APPLICATION: RefRactoRy Lined fabRication LOCATION: midwest – Usa

8917_1SRCE_0416

Dallas

5

6

24 1

3

5

1 Fab Parts to Refractory Contractor2 Refractory to Contractor3 Molds to Contractors4 Fab Parts Require Revisions5 Inspector Visits Multiple Locations6 Finished Parts to Jobsite

RefRactoRy Lined fabRication

figure 1

Lined meal pipes are assembled for inspection prior to shipment.

multi-step process 1source

Dallas

Brookville, IN

1

1 Finished Parts to Jobsite

figure 2

Fabricated pipes are being prepared for refractory.

{• Less Time• Less Freight• Better Quality• More Savings