Regional Tourism Product Development Funding Program - Stream One RTO Project Name Grant Status LGA Key results/ comment Blue Mountains Get in Tonight, Get in Now and Attractions Rewards $50,000 Final reports submitted – queries on report content provided to project owners Across region (Blue Mountains/ Oberon/Lithgow) Interim results: (for the period April – June 2013) 1,389 new leads to operators over three months 80 room night leads generated. Since launching in October, the app has received the following: Unique downloads – 9,073 Single sessions – 39,236 Rewards pages – 5,923 Rewards redemptions – 191 Blue Mountains Blue Mountains product and experience visitor touchscreens $20,000 Final reports submitted – queries on report content provided to project owners Across region (Blue Mountains/ Oberon/Lithgow) Interim results: Project outcome was the installation of five interactive touchscreens in the following locations: Echo Point Visitor Centre Glenbrook Visitor centre Explorer Bus Trolley Shop BM Cultural Centre Touchscreens have increased website visitation by 129% from these locations. Blue Mountains Oberon “on the map” mountain biking and digital visitor app $45,000 Final reports submitted – queries on report content provided to project owners Oberon Interim results: 87% increase in riders at the Kanangra Classic year on year. Blue Mountains Visitor product directional signage Lithgow (attractions and heritage digital content) $45,000 Final reports submitted – queries on report content provided to project owners Lithgow Interim results: 18.9% increase in domestic overnight visitors for the YE Dec 12. 6.7% increase in spend for Domestic overnight visitors for the YE Dec 12.

Upload: others

Post on 11-Oct-2020

1 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Regional Tourism Product Developement Program - Project ......1,389 new leads to operators over three months 80 room night leads generated. Since launching in October, the app has

Regional Tourism Product Development Funding Program - Stream One

RTO Project Name Grant Status LGA Key results/ comment

Blue Mountains

Get in Tonight, Get in Now and Attractions Rewards

$50,000 Final reports submitted – queries on report content provided to project owners

Across region (Blue Mountains/ Oberon/Lithgow)

Interim results:

(for the period April – June 2013)

1,389 new leads to operators over three months

80 room night leads generated.

Since launching in October, the app has received the following:

Unique downloads – 9,073 Single sessions – 39,236 Rewards pages – 5,923

Rewards redemptions – 191

Blue Mountains

Blue Mountains product and experience visitor touchscreens

$20,000 Final reports submitted – queries on report content provided to project owners

Across region (Blue Mountains/ Oberon/Lithgow)

Interim results:

Project outcome was the installation of five interactive touchscreens in the following locations:

• Echo Point Visitor Centre • Glenbrook Visitor centre • Explorer Bus • Trolley Shop • BM Cultural Centre

Touchscreens have increased website visitation by 129% from these locations.

Blue Mountains

Oberon “on the map” mountain biking and digital visitor app

$45,000 Final reports submitted – queries on report content provided to project owners

Oberon Interim results:

87% increase in riders at the Kanangra Classic year on year.

Blue Mountains

Visitor product directional signage Lithgow (attractions and heritage digital content)

$45,000 Final reports submitted – queries on report content provided to project owners

Lithgow Interim results:

18.9% increase in domestic overnight visitors for the YE Dec 12.

6.7% increase in spend for Domestic overnight visitors for the YE Dec 12.

Page 2: Regional Tourism Product Developement Program - Project ......1,389 new leads to operators over three months 80 room night leads generated. Since launching in October, the app has

RTO Project Name Grant Status LGA Key results/ comment

Blue Mountains

Greater Blue Mountains World Heritage Trails (export ready product content, pricing and booking

$35,000 Final reports submitted – queries on report content provided to project owners

Across region (Blue Mountains/ Oberon/Lithgow)

Interim results:

Kanangra Classic participant numbers increased by 87% in in 2012 in comparisons to 2011.

Blue Mountains

Commercialisation of indigenous and nature based tourism products

$35,000 Final reports submitted – queries on report content provided to project owners

Across region

(Blue Mountains/ Oberon/Lithgow)

Interim results:

Six songline maps have been developed along with of cultural content being installed at scenic world.

Blue Mountains

Regional Festivals Multi Venue Product Content and Online Ticketing Capability – commencing with Roaring 20s Festival

$20,000 Final reports submitted – queries on report content provided to project owners

Across region

(Blue Mountains/ Oberon/Lithgow)

Interim results:

81 online tickets were sold for 14 events totalling $2,401.

200 tickets were sold for the “Art Deco Ball” totalling $19,800.

Central Coast Mt Penang Festival Site; enhancement of event site

$45,000 Project activity has been finalised – however a final report is yet to be submitted

Gosford Project was launched by the Minister for Tourism, the Hon George Souris on 20 September 2013.

Central Coast Glenworth Valley multi-purpose Function Centre for 200 pax at Glenworth Valley Outdoor Adventures

$30,000 Ongoing Gosford An extension to this project has been approved until July 2014.

Central Coast Interpretive signage in the Reserve and Cottages and Lighthouse at Norah Head

$20,000 Project activity has been finalised – however a final report is yet to be submitted

Wyong DNSW have been advised that all elements of the project have been delivered but a final report including KPIs is yet to be submitted.

Central Coast Wheelchair access to Lakes Beach

$12,750 Project activity has been finalised – however a final report is yet to be submitted

Wyong DNSW have been advised that all elements of the project have been delivered but a final report including KPIs is yet to be submitted.

Page 3: Regional Tourism Product Developement Program - Project ......1,389 new leads to operators over three months 80 room night leads generated. Since launching in October, the app has

RTO Project Name Grant Status LGA Key results/ comment

Central Coast Pioneer Diary/Central Coast wetlands - Signage

$12,250 Project activity has been finalised – however a final report is yet to be submitted

Wyong DNSW have been advised that all elements of the project have been delivered but a final report including KPIs is yet to be submitted.

Central Coast Central Coast Eco Tours (CCET)

$20,000 Completed Wyong Between project completion and the submission of a final report the “Tipis” have had 214 visitor nights, worth $29,378.

Central Coast Pioneer Dairy Eco Tourism, Wetlands Education and Public Recreation – Path

way

$20,000 Project activity has been finalised – however a final report is yet to be submitted

Wyong DNSW have been advised that all elements of the project have been delivered but a final report including KPIs is yet to be submitted.

Central Coast Australian Reptile Park Nature walk

$45,000 Project activity has been finalised – however a final report is yet to be submitted

Gosford DNSW have been advised that all elements of the project have been delivered but a final report including KPIs is yet to be submitted.

Central Coast 5 Lands Coastal Walkway enhancement

$45,000 Completed Gosford In 2012, 5 Lands Walk experienced a 41% increase in visitor numbers (1,963). Up from 1,159 visitors in 2011.

Central NSW Parkes Mining Trail Development

$25,000 Final report has been submitted and is under review

Parkes Interim results:

(for the period January – June 2013 )

7.6% increase in visitor enquiries at Parkes VIC

7.5% increase in visitor enquiries at Peak Hill VIC

283% increase in tour numbers for Bland Shire Gold and Heritage Tour.

Central NSW Escort Rock Enhancement at Eugowra.

$12,500 Final report has been submitted and is under review

Cabonne Interim results:

QR codes installed at various locations around Eugowra

Interpretative signage and facility upgrades have been installed at Escort Rock.

Page 4: Regional Tourism Product Developement Program - Project ......1,389 new leads to operators over three months 80 room night leads generated. Since launching in October, the app has

RTO Project Name Grant Status LGA Key results/ comment

Central NSW Taste Orange Creation of cellar/ Winery trail

$9,145 Final report has been submitted and is under review

Orange A survey of Orange Cellar Doors in 2012 indicated an increase in visitation of 37.5%, up from the 20% target.

Central NSW Bathurst Gold Fields attractions

$25,500 Project activity has been finalised – however a final report is yet to be submitted

Bathurst DNSW have been advised that all elements of the project have been delivered but a final report including KPIs is yet to be submitted.

Central NSW Grenfell Gold Mining Interpretive Development at O'Brien's Hill

$14,240 Final report has been submitted and is under review

Parkes Interim results:

(for the period October – December 2012)

Accommodation occupancy rates increased by 23%

Visitor centre saw a 23% increase in visitor numbers

Visitation to O’Brien’s Hill increased by 21%.

Central NSW Install a unisex disabled, self-composting toilet at Peak Hill's "The Open Cut Mine Experience"

$15,100 Final report has been submitted and is under review

Parkes Interim results:

(for the period March – June 2013)

Visitation to Peak Hills Open Cut Mine has increased by 20%.

Central NSW The Dish Experience Interactive display system

$12,500 Final report has been submitted and is under review

Parkes Interim results:

(for the period January – June 2013)

7.6% increase in visitors at Parke VIC

17% decrease in ticket sales at the Henry Parkes Centre

4.5% increase in Group Bookings at the Henry Parkes Centre

18.4% increase in visitation to “The Dish Experience” outside peak visitation periods

Central NSW Gnoo Blass racing simulator circuit

$12,500 Project activity has been finalised – however a final report is yet to be submitted

Orange DNSW have been advised that all elements of the project have been delivered but a final report including KPIs is yet to be submitted.

Page 5: Regional Tourism Product Developement Program - Project ......1,389 new leads to operators over three months 80 room night leads generated. Since launching in October, the app has

RTO Project Name Grant Status LGA Key results/ comment

Central NSW Restoration of Putta Bucca Wetlands

$12,500 Final report has been submitted and is under review

Orange Interim results:

Project outcome was the construction of three viewing platforms, including amenities around the wetlands for bird watching.

Central NSW Mrs Foster attraction at Lake Cargelligo's

$12,500 Ongoing Lachlan Project has been provided an extension for completion until 30 October 2013.

Central NSW 100MPH Farm Feast Heritage Circuit

$18,800 Project activity has been finalised – however a final report is yet to be submitted

Bathurst DNSW have been advised that all elements of the project have been delivered but a final report including KPIs is yet to be submitted.

Central NSW 100 Miles of Country Experiences, Training Networking Seminars

$79,715 Project activity has been finalised – however a final report is yet to be submitted

Parkes, Orange, Mudgee, Cowra

DNSW have been advised that all elements of the project have been delivered but a final report including KPIs is yet to be submitted.

Hunter Maitland Gaol Thematic Tour and Interpretive Displays

$50,000 Project activity has been finalised – however a final report is yet to be submitted

Maitland DNSW have been advised that all elements of the project have been delivered but a final report including KPIs is yet to be submitted.

Hunter The Incredible Milking Cow Experience

$50,000 Complete Muswellbrook (for the period March – October 2012)

37% increase in average monthly visitors.

56% increase in retail sales.

Hunter Interpretation of heritage and sustainability themes at Wyndham Estate and Dalwood House

$30,000 Final reports submitted – queries on report content provided to project owners

Cessnock Interim results:

Project outcome was the production and installation of twenty five interpretive signs at eight sites within Wyndham Estate.

Visitation increases to be provided 12 months from project completion.

Hunter Scone Conference Centre $35,000 Complete Scone 15% growth in conference revenue.

4% growth in accommodation booking though the enhanced conference facilities.

Page 6: Regional Tourism Product Developement Program - Project ......1,389 new leads to operators over three months 80 room night leads generated. Since launching in October, the app has

RTO Project Name Grant Status LGA Key results/ comment

Hunter Online Cruise Guide $10,000 Project activity has been finalised – however a final report is yet to be submitted

Newcastle, Port Stephens, Maitland, Lake Macquarie, Cessnock

DNSW have been advised that all elements of the project have been delivered but a final report including KPIs is yet to be submitted.

Hunter Satellite Training $25,000 Complete Newcastle, Cessnock, Lake Macquarie, Upper Hunter, Port Stephens, Gosford, Wyong, Gloucester

Workshop attendance increased by 35% in comparisons to previous years.

Hunter Soft adventure tour on a working harbour

$25,000 Project activity has been finalised – however a final report is yet to be submitted

Newcastle DNSW have been advised that all elements of the project have been delivered but a final report including KPIs is yet to be submitted.

Hunter Mobile iPhone application for top twenty walking trails in Lake Macquarie

$25,000 Project activity has been finalised – however a final report is yet to be submitted

Lake Macquarie Interim results:

App has been downloaded more than 900 times during the period measured, a 300% increase against the proposed target.

Inland NSW Touring Routes and Trails – Business and Product Development Program

Broken Hill $10,000 Complete Broken Hill

More than 100 businesses and 120 participants attended the 10 workshops

Bourke $10,000 Complete Bourke

Armidale $10,000 Complete Armidale

Dubbo $10,000 Complete Dubbo

Inverell $10,000 Complete Inverell

Narrabri $10,000 Complete Narrabri

Tenterfield $10,000 Complete Tenterfield

Walgett $10,000 Complete Walgett

Wentworth $10,000 Complete Wentworth

Capital Country Region $10,000 Complete Young, Boorowa, Upper Lachlan, Wingecarribee

Page 7: Regional Tourism Product Developement Program - Project ......1,389 new leads to operators over three months 80 room night leads generated. Since launching in October, the app has

RTO Project Name Grant Status LGA Key results/ comment

Inland NSW Quality Assurance & Training Program - Customer Service Training

$50,000 Project activity has been finalised – however a final report is yet to be submitted

Balranald, Central Darling, Unincorporated Far West, Walgett

DNSW have been advised that all elements of the project have been delivered but a final report including KPIs is yet to be submitted.

Inland NSW Elizabeth Park Regional Botanic Garden

$50,000 Final reports submitted – queries on report content provided to project owners

Dubbo Interim results:

Oasis Valley attracted approx. 3,000 visitors in the first 3 weeks it opened.

Inland NSW Great Artesian Drive - North West NSW

$50,000 Project activity has been finalised – however a final report is yet to be submitted

Moree Plains, Narrabri, Walgett

DNSW have been advised that all elements of the project have been delivered but a final report including KPIs is yet to be submitted.

Inland NSW Development of Gold Trail signage, with QR tags, at 3-5 key attractions and locations

$50,000 Final reports submitted – queries on report content provided to project owners

Bathurst, Boorowa, Forbes, Goulburn, Mulwaree, harden, Tumut, Upper Lachlan, Yass Valley, Young and Weddin.

Interim results:

186% increase in visitor numbers to the Harden Gold Festival.

Development and installation of interpretative signage at five Gold Trail locations.

Inland NSW The Story of Nundle Gold and Gem History – Catalogue, Preserve and Present the Collection

$50,000 Project activity has been finalised – however a final report is yet to be submitted

Tamworth DNSW have been advised that all elements of the project have been delivered but a final report including KPIs is yet to be submitted.

Inland NSW Macquarie River Trails $50,000 Complete Warren, Wellington, Dubbo, Narromine, Coonamble, Walgett and Bogan

Project outcome was the development and installation of Macquarie River Trails (MRT) sign in twelve locations.

1,065 unique visitors to the MRT website from December 2012 – Jan 2013.

Inland NSW Inland NSW Mobile Applications & Explore the Outback

$100,000 Final reports submitted – queries on report content provided to project owners

Dubbo, Coonamble, Nyngan, Bourke, Brewarrina, Walgett, Narromine, Warren Warrumbungle,

DNSW have been advised that all elements of the project have been delivered but a completed final report including KPIs is yet to be submitted.

Page 8: Regional Tourism Product Developement Program - Project ......1,389 new leads to operators over three months 80 room night leads generated. Since launching in October, the app has

RTO Project Name Grant Status LGA Key results/ comment

The Inland NSW

Regional BBQ Challenge and

Food and Wine Agri-

tourism Program

Southern Highlands $50,000

Final reports submitted – queries on report content provided to project owners

Wingecarribee

DNSW have been advised that all elements of the project have been delivered but a completed final report including KPIs is yet to be submitted.

Boorowa, Harden and Young $50,000 Boorowa, Harden, Young

Bungendore, Yass, Goulburn $50,000 Bungendore, Yass, Goulburn

Tenterfield $50,000 Tenterfield

Inverell $50,000 Inverell

North Coast Destination Network

‘Y-Knot’ Charters $40,000 Project activity has been finalised – however a final report is yet to be submitted

Port Stephens DNSW have been advised that all elements of the project have been delivered but a final report including KPIs is yet to be submitted.

North Coast Destination Network

The Jurassic Pond - Estuarine Crocodile Exhibit

$50,000 Final report has been submitted and is under review

Port Macquarie Interim results:

(for the period Sept – Dec 2012)

Income to the park increased by 19.4%

Total visitation to the park increased by approx. 14% between 2011 and 2012.

North Coast Destination Network

Tilligerry Peninsula Upgrade. $21,000 Final reports submitted – queries on report content provided to project owners

Port Stephens Interim results:

Daily visitor expenditure in Port Stephens increased from $101 in 2011 to $124 in 2012.

North Coast Destination Network

Spirit of the Land (Sea Acres Rainforest)

$35,000 Project activity has been finalised – however a final report is yet to be submitted

Port Macquarie DNSW have been advised that all elements of the project have been delivered but a final report including KPIs is yet to be submitted.

North Coast Destination Network

Observatory Bike n’ Hike Audio Tours

$11,000 Final report has been submitted and is under review

Port Macquarie Interim results:

Daily visitor spend to the region increased to $146 for the YE September 2012.

North Coast Destination Network

Tabatinga Family Fun Centre $30,000 Project activity has been finalised – however a final report is yet to be submitted

Coffs Harbour DNSW have been advised that all elements of the project have been delivered but a final report including KPIs is yet to be submitted.

Page 9: Regional Tourism Product Developement Program - Project ......1,389 new leads to operators over three months 80 room night leads generated. Since launching in October, the app has

RTO Project Name Grant Status LGA Key results/ comment

North Coast Destination Network

Mad Hatters Tea Garden $25,000 Final report has been submitted and is under review

Oxley Interim results:

Yearly income increased by 20%, up from the expected 5% target.

North Coast Destination Network

"Get the Buzz" $13,000 Final report has been submitted and is under review

Great Lakes Interim results:

Developed and launched a Native Bee Sanctuary website – with 230 species profiled.

179 plant signs installed throughout the facility – a 49% increase on target.

North Coast Destination Network

Regional Food and Produce Retail Shop and Tours

$25,000 Final reports submitted – queries on report content provided to project owners

Coffs Harbour DNSW have been advised that all elements of the project have been delivered but a completed final report including KPIs is yet to be submitted.

North Coast Destination Network

Product Packaging Incubator Workshops

$25,000 Final report has been submitted and is under review

Ballina, Lismore, Byron Interim results:

Three product packages have been produced, two targeting South East Asian with a third targeting New Zealand.

North Coast Destination Network

12 themed Interactive Trails and Itinerary Builder

$25,000 Cancelled Clarence, Tweed, Byron, Ballina, Richmond Valley, Kyogle

Project has been cancelled.

North Coast Destination Network

Conference infrastructure improvements to Byron Community Centre

$28,700 Complete Ballina 33% increase in conference bookings over the first 12 months.

20% increase in accommodation bookings from conferences.

9 new positions as a result of increased bookings.

North Coast Destination Network

Eco cruises & guided kayak tours

$36,000 Complete Ballina Project has delivered monthly bookings to the value of approx. $5,000

North Coast Destination Network

Mountain Bike Trail design $13,500 Complete Ballina Project outcome was the development of a 2.5km course built to international standards.

110 riders attended the launch event with approx. 30 riders using the facility weekly.

Page 10: Regional Tourism Product Developement Program - Project ......1,389 new leads to operators over three months 80 room night leads generated. Since launching in October, the app has

RTO Project Name Grant Status LGA Key results/ comment

North Coast Destination Network

Byron Easy Bus - Airport Shuttle

$35,750 Final reports submitted – queries on report content provided to project owners

Ballina Interim results:

Approx. 400 people are expected to use this facility in the first year of operation, approx. a 66% decrease from original estimates.

North Coast Destination Network

Coastal Indigenous cultural experiences

$40,000 Project activity has been finalised – however a final report is yet to be submitted

Byron Bay Interim results:

“Surfing the Bundjalung” was launched 12 September 2013 with six people attending the first tour.

Overnight tour has been booked once with two customers.

North Coast Destination Network

Aboriginal Cultural Tour and Markets

$10,300 Cancelled Richmond Valley Project has been cancelled.

North Coast Destination Network

Byron Kombi Orientation Tours

$35,750 Ongoing – update requested

Ballina Project was granted an extension until 30 September 2013.

North Coast Destination Network

Legendary Pacific Coast Enhancements

$35,300 Final report has been submitted and is under review

North Coast Network Region – various locations

Destination NS has been advised that activity for this project has been completed with a final report submitted for review

Murray Australian Billy Cart Championship - Event Enhancement

$5,000 Complete Albury Event participation increased 20% in comparison to the previous years.

Murray Corowa Heritage Trail interpretative enhancement

$25,000 Final reports submitted – queries on report content provided to project owners

Albury Interim results:

Project outcome was the development and installation of interpretive signs throughout Corowa Heritage Trail.

Murray Greater Hume Village Tourist Information Boards

$25,000 Final reports submitted – queries on report content provided to project owners

Albury Interim results:

Project outcome was the development and installation of five tourist information boards in Culcairn, Hentry, Holbrook, Jindera and Walla Walla.

Page 11: Regional Tourism Product Developement Program - Project ......1,389 new leads to operators over three months 80 room night leads generated. Since launching in October, the app has

RTO Project Name Grant Status LGA Key results/ comment

Murray Albury CBD Heritage Walking Tour Application

$29,000 Complete Albury 150 walking tour app downloaded since launch

More than 300 walking tour brochure distributed to visitors at the Visitor Information Centre.

2.4% increase in visitor spend, up to $127pp

Murray Wakool Promotional and Directional Signage

$23,000 Complete Murray Darling Project outcome was the development and installation of promotional/ tourist signage in Moulamein and Tooleybuc.

Murray Mathoura Heritage Trail Signage

$8,000 Complete Murray Darling Project outcome was the development and installation of nine interpretive signs around the Mathoura region.

Murray MRTB Tourism Excellence Training Program

$40,000 Project activity has been finalised – however a final report is yet to be submitted

Across region DNSW have been advised that all elements of the project have been delivered but a final report including KPIs is yet to be submitted.

Murray Lawson Syphons Interpretative Signage

$15,000 Ongoing Deniliquin An extension request until November 2013 has been received from this project.

Murray MRTB International Mentoring Program

$40,000 Project activity has been finalised – however a final report is yet to be submitted

Albury, Greater Hume, Deniliquin, Berrigan, Corowa and Murray

DNSW have been advised that all elements of the project have been delivered but a final report including KPIs is yet to be submitted.

Murray MRTB Leadership Program $40,000 Project activity has been finalised – however a final report is yet to be submitted

Murray, Berrigan, Corowa, Greater Hume, Albury, Wakool

DNSW have been advised that all elements of the project have been delivered but a final report including KPIs is yet to be submitted.

Page 12: Regional Tourism Product Developement Program - Project ......1,389 new leads to operators over three months 80 room night leads generated. Since launching in October, the app has

RTO Project Name Grant Status LGA Key results/ comment

Riverina Narrandera Cycling & Walking Trails – Stage One

$35,000 Final reports submitted – queries on report content provided to project owners

Murrumbidgee DNSW have been advised that all elements of the project have been delivered but a completed final report including KPIs is yet to be submitted.

Riverina Take a Day Trip to Ariah Park

$10,000 Final reports submitted – queries on report content provided to project owners

Murrumbidgee DNSW have been advised that all elements of the project have been delivered but a completed final report including KPIs is yet to be submitted.

Riverina Celebrity Chef appearance and Live Cooking Demonstrations (La Festa)

$15,000 Final report has been submitted and is under review

Murrumbidgee Interim results:

150% increase in local food and produce participation. Crowds up by approx. 10% on previous year.

Riverina Hermit’s Caves access trails $25,000 Project activity has been finalised – however a final report is yet to be submitted

Murrumbidgee Project was completed in August, a completed final report would not be eligible for submission until December 2013.

Riverina Junee Rhythm n Rail Festival

$13,500 Complete Murrumbidgee Festival database grew by 75%, up on the 60% forecast.

Approx. 1500 people attended the 2012 event, with numbers down due to adverse weather conditions.

Riverina Jerilderie Letter Event $10,000 Complete Murray Darling More than 300 visitors attended the 2012 event.

Riverina Re-thatching Ram Shed $42,500 Final reports submitted – queries on report content provided to project owners

Murray Darling DNSW have been advised that all elements of the project have been delivered but a completed final report including KPIs is yet to be submitted.

Riverina Functions @ the factory (Junee Liquorice and Chocolate factory)

$39,000 Project activity has been finalised – however a final report is yet to be submitted

Murrumbidgee DNSW have been advised that all elements of the project have been delivered but a final report including KPIs is yet to be submitted.

Riverina Birds of the Bush Festival - Rankin’s Springs

$25,000 Project activity has been finalised – however a final report is yet to be submitted

Murrumbidgee DNSW have been advised that all elements of the project have been delivered but a final report including KPIs is yet to be submitted.

Page 13: Regional Tourism Product Developement Program - Project ......1,389 new leads to operators over three months 80 room night leads generated. Since launching in October, the app has

RTO Project Name Grant Status LGA Key results/ comment

Riverina Junee Shire Heritage Tourism project

$25,000 Project activity has been finalised – however a final report is yet to be submitted

Murrumbidgee DNSW have been advised that all elements of the project have been delivered but a final report including KPIs is yet to be submitted.

Riverina Revitalise Riverina Tourism - Seminar Roadshow

$10,000 Complete Murrumbidgee 10% of attendees developed an online presence following workshops.

Snowy Mountains

Jindabyne Lake Light $48,000 Project activity has been finalised – however a final report is yet to be submitted

Snowy River DNSW have been advised that all elements of the project have been delivered but a final report including KPIs is yet to be submitted.

Snowy Mountains

Historical Car Museum $36,000 Project activity has been finalised – however a final report is yet to be submitted

Cooma-Monaro Interim results:

Car clubs stop overs as a result of the upgrades over the last 6 months have provided an additional 264 accommodation nights for the region.

Snowy Mountains

Thredbo Bike Track $15,000 Project activity has been finalised – however a final report is yet to be submitted

Snowy River DNSW have been advised that all elements of the project have been delivered but a completed final report including KPIs is yet to be submitted.

Snowy Mountains

Gutti Gutti $10,000 Cancelled Cooma-Monaro Project has been cancelled.

Snowy Mountains

Adaminaby Heritage Trail $26,000 Project activity has been finalised – however a final report is yet to be submitted

Snowy River DNSW have been advised that all elements of the project have been delivered but a completed final report including KPIs is yet to be submitted.

Snowy Mountains

Digital Touring Guide $24,000 Project activity has been finalised – however a final report is yet to be submitted

Snowy River DNSW have been advised that all elements of the project have been delivered but a completed final report including KPIs is yet to be submitted.

Page 14: Regional Tourism Product Developement Program - Project ......1,389 new leads to operators over three months 80 room night leads generated. Since launching in October, the app has

RTO Project Name Grant Status LGA Key results/ comment

Snowy Mountains

Rolling Ground Trail Mapping

$29,000 Project activity has been finalised – however a final report is yet to be submitted

Snowy River Interim results:

Produced 14 specific Mountain Bike trails maps for the Snowy Mountains region.

Participation in local Mountain Biking event increased by 67%

Snowy Mountains

Holistic Food Experiences $17,000 Cancelled Tumut, Tumbarumba, Snowy River, Cooma-Monaro, Bombala

Project has been cancelled.

Snowy Mountains

Steve Williamson Lake Tours $25,000 Complete Snowy River Increased sightseeing tours by 5% against a proposed 1-2% increase

Snowy Mountains

Regional Trade Fair $20,000 Final report has been submitted and is under review

Tumbarumba Interim results:

Festival attendance in 2012 was 5,210 resulting in approx. $463,00 worth of additional expenditure to the region

South Coast Gold Rush Colony Maze at Mogo

$25,000 Complete Bega 799 Visitors throughout Jan – March @ $5pp

Off peak visitation - 78 days = $365.00

Peak - 34 days = $2,950.00

Schools $680.00 (Total - $3,995)

South Coast Establish, Cycle Tours of South Coast

$45,000 Final reports submitted – queries on report content provided to project owners

Wollongong, Shellharbour, Kiama, Shoalhaven, Eurobodalla, Bega

Interim results:

Project outcome was the creation and launch of five bicycle tours of the South Coast by October 2012.

The new tours have attracted approx. 100 customers since launch.

South Coast Bodalla Cheese Making $45,000 Complete Bega Visitation to this facility has grown from a monthly average of 2,250 to 4,801. An increase of 113%

Page 15: Regional Tourism Product Developement Program - Project ......1,389 new leads to operators over three months 80 room night leads generated. Since launching in October, the app has

RTO Project Name Grant Status LGA Key results/ comment

South Coast Cupitt's Cheese Production Facility & Cooking School

$45,000 Ongoing Shoalhaven Project has experienced delays in gaining Development Application (DA). An extension will be requested once DA has been approved

South Coast Zero Gravity Cable Wake Park

$45,000 Final reports submitted – queries on report content provided to project owners

Shellharbour Interim results:

Three professional events attracting more than 150 spectators/ participants.

More than 650 registered users of the new system in Wollongong since launch.

South Coast Shallow Crossing Conference Pavilion

$45,000 Complete Eurobodalla Three new bookings for the new facilities in three months – resulting in 42 visitor’s nights @ $190 per night.