ENGINEERING INFRASTRUCTURE ASSESSMENT
FOR
A PORTION OF CROSSROADS EAST AND A PORTION OF THE NORTH HALF OF
SECTION 36, TOWNSHIP 4 NORTH, RANGE 4 EAST (74.44± Acres – Tract 14A)
April 17, 2020
WP# 205104
Prepared for: Arizona State Land Department
Mr. Joe Charles
Sales & Leasing
1616 West Adams Street
Phoenix, AZ 85007
Phone: (602) 542-4631
Prepared by: Wood, Patel & Associates, Inc.
2051 West Northern Avenue
Suite #100
Phoenix, AZ 85021
Phone: (602) 335-8500
Fax: (602) 335-8500
............
.eta
D
dengiS
.ONETAIFITREC
C
BROWNNICHOLAS E.
45869
A R IZ O NA , U SA
Reg i
ste re
d Prof e s sional Engineer (Civil)
...
EXPIRES 03-31-22
04/17/2020
-
TABLE OF CONTENTS
1.0 PROJECT INTRODUCTION ....................................................................................................... 4
2.0 EXISTING ZONING, ADJACENT USES, AND DEVELOPMENT FEES............................. 6
3.0 FEMA FLOODPLAIN ................................................................................................................... 8
4.0 DRAINAGE, RETENTION & STORM BASINS ....................................................................... 9
5.0 ENVIRONMENTAL PERMITS AND SECTION 404 PERMIT ............................................. 12
6.0 STREETS | ROADWAYS .......................................................................................................... 13
7.0 DOMESTIC WATER ................................................................................................................... 16
8.0 SANITARY SEWER ................................................................................................................... 17
9.0 COMMUNICATIONS .................................................................................................................. 19
10.0 ELECTRIC.................................................................................................................................... 20
11.0 GAS ............................................................................................................................................... 21
12.0 LIST OF CONTACTS ................................................................................................................. 22
............
.eta
D
dengiS
.ONETAIFITREC
C
BROWNNICHOLAS E.
45869
A R IZ O NA , U SA
Reg i
ste re
d Prof e s sional Engineer (Civil)
...
EXPIRES 03-31-22
04/17/2020
-
APPENDICES
APPENDIX A Figures
1. Vicinity Map
2. City of Scottsdale Quarter Section Contour Maps
3. City of Scottsdale Quarter Section Land Maps
4. City of Scottsdale Quarter Section Aerial Maps
5. City of Scottsdale Quarter Section Storm Drain Maps
6. City of Scottsdale Quarter Section Water & Sewer Maps
7. FEMA Flood Insurance Rate Map
8. AT&T Utility Map
9. Southwest Gas Quarter Section Maps
10. Arizona Public Service Utility Map
11. Century Link Facilities Map
12. Cox Communications Facilities Map
13. Hydrant Fire Flow Test
14. Post Drainage Area Map
APPENDIX B Excerpts from the City of Scottsdale Zoning 19-ZN-2002#6
1. Stipulations
2. Proposed Planning Unit Map
APPENDIX C Excerpts from the City of Scottsdale Zoning Ordinance
1. C-2 (Central Business District)
2. C-3 (Highway Commercial District)
3. C-O (Commercial Office District)
4. I-1 (Industrial Park)
APPENDIX D Cross Roads East Traffic Impact Mitigation Analysis
APPENDIX E Title Report
APPENDIX F ALTA
APPENDIX G Preliminary Opinion of Probable Infrastructure Costs
1. Preliminary Opinion of Probable Infrastructure Cost Estimate
2. Conceptual Infrastructure Exhibit
3. Conceptual Storm Drain Exhibit
4. Conceptual Water Exhibit
5. Conceptual Sanitary Sewer Exhibit
APPENDIX H City of Scottsdale Fee Schedules
1. Application Fee Schedule
2. Plan Review Fee Schedule (Commercial)
3. Permit Fee Schedule (Commercial)
4. Fire Department Fees
5. Stormwater Management Fee Schedule
6. Wastewater-Sewer Rates Schedule
7. Miscellaneous Water Meter-Services Fees
8. Annual Fees for SWF and WCF
APPENDIX I Crossroads East Drainage Infrastructure Project No. 400-FB53B-56047
............
.eta
D
dengiS
.ONETAIFITREC
C
BROWNNICHOLAS E.
45869
A R IZ O NA , U SA
Reg i
ste re
d Prof e s sional Engineer (Civil)
...
EXPIRES 03-31-22
04/17/2020
-
APPENDIX J Kimley Horn Biological Evaluation - Crossroads East Project #291068000
APPENDIX K Logan Simpson Clean Water Act Section 404 Technical Memorandum
APPENDIX L Excerpts from the Crossroads East Sewer Lift Station 60% Submittal APPENDIX M Ninyo & Moore Phase 1 Environmental Service Assessment Project No. 605816001 APPENDIX N CVL Crossroads East Water Master Plan Update Project No. 1.07.019650 APPENDIX O CVL Crossroads East Wastewater Master Plan Update Project No. 1.07.0196501 APPENDIX P Michael Baker International Crossroads East Drainage Infrastructure Phase 1 Project No.
169678
............
.eta
D
dengiS
.ONETAIFITREC
C
BROWNNICHOLAS E.
45869
A R IZ O NA , U SA
Reg i
ste re
d Prof e s sional Engineer (Civil)
...
EXPIRES 03-31-22
04/17/2020
-
1.0 PROJECT INTRODUCTION
This report is the result of services rendered to the Arizona State Land Department (ASLD) by Wood, Patel
& Associates (WOODPATEL). Under contract with the ASLD, WOODPATEL is providing an Engineering
Infrastructure Assessment for a particular parcel of land currently owned by the ASLD. This report relies on
information communicated or furnished by others, which was used by WOODPATEL to develop professional
opinions presented herein. WOODPATEL offers no warranties or guarantees for information presented.
The parcel, Tract 14A of State Plat No. 16-B Core South, consists of a portion of the north half of Section
36, Township 4 North, Range 4 East, in the City of Scottsdale, Arizona. The parcel is approximately 74.44
acres in size and is located northeast of the intersection of Hayden Road and Union Hills Drive in the City of
Scottsdale, Arizona. The parcel’s west boundary has frontage along the east side of Hayden Road and the
parcel’s south boundary has frontage along north side of Union Hills Drive. Additionally, the north side of the
parcel parallels a portion of Arizona Department of Transportation (ADOT) State Route 101.
Figure 1 from Appendix A, Figure 1 – Vicinity Map
-
The parcel is vacant of surface structures, with the exception of the improvements covered in section 4.1,
and significant portions of the parcel have been cleared and covered with recycled asphalt millings to
provide dust control. Reportedly, the parcel has previously served as overflow parking. Portions of the parcel
that have not been cleared, or disturbed, display native desert terrain, common to the area. The parcel
slopes to the southwest at an average slope of 1.5%. As displayed in Appendix A, Figure 2 – City of
Scottsdale Quarter Section Contour Map, contour elevations range from approximately 1,605 feet to 1,583
feet.
The parcel is subject to a 100-year floodplain, as determined by the Federal Emergency Management
Agency (FEMA). Section 3.0 further expands on this matter.
Wood, Patel & Associates, Inc prepared an ALTA Survey for the Arizona State Land Department. Reference
Appendix E and Appendix F, respectively, for the parcels title report and prepared ALTA.
In summary, regarding public access, infrastructure, drainage, and the FEMA floodplain, this parcel is
believed to be developable, having opportunities and constraints similar to the other projects in the area
-
2.0 EXISTING ZONING, ADJACENT USES, AND DEVELOPMENT FEES
The ASLD parcel is a part of Crossroads East, an existing Planned Community District (PCD). As part of the
Greater Airpark Character Area Plan (GACAP), Crossroads East is designated for Airport Mixed Use
Residential (AMU-R) and Employment (EMP). The Tract 14A is currently zoned to accept C-2 (Central
Business), C-3 (Highway Commercial), C-O (Commercial Office), and I-1 (Industrial Park) land use. Refer to
Appendix C, Excerpts from the City of Scottsdale Zoning Ordinance, for zoning descriptions.
A Phase 1 Environmental Site Assessment (ESA) was completed by Ninyo & Moore, on March 27, 2020,
and concluded that there were no recognized environmental conditions (RECs) in connection with the
parcel. This report titled Phase 1 Environmental Site Assessment, Ninyo & Moore project number
605816001, is included in Appendix M.
The applicant for development shall be required to designate a four (4) acre (net) site, or as negotiated with
the City of Scottsdale, for civic use as outlined in the Stipulations for the Zoning Application: Crossroads
East, Case Number: 19-ZN-2002#6. During a meeting with WOODPATEL on February 27, 2020, City of
Scottsdale representatives indicated this civic use area is intended to be placed in the southwest corner of
the parcel, within the Hayden Core Transition Area, and used for future development of a fire station and
well site. The Hayden Core Transition area only allows uses consistent with the I-1 zoning designation; the
above mentioned future civic facilities will help fulfil the zoning requirements of this transition area.
Figure 2 from Appendix B - Excerpts from the City of Scottsdale Zoning 19-ZN-2002#6
-
The parcel to the south is zoned residential, R-4 (Townhouse Residential), and is currently fully developed.
It is not a part of the Crossroads East PCD. City representatives indicated that during Tract 14A's zoning
process, the Scottsdale Stonebrook II Home Owners Association (HOA) expressed interest in the
development plans for Tract 14A. City representatives recommend keeping the HOA informed during the
planning process for this parcel.
The parcels to the southwest and east are zoned PCP and I-1 and are currently fully developed. These
parcels are not a part of the Crossroads East PCD.
The parcel to the west, north of Princess Boulevard, south of Mayo Boulevard, and west of Hayden Road, is
zoned for R-5 (Multiple-family Residential), C-2, C-O, I-1, PRC (Planned Regional Center), and PCP
(Planned Airpark Core Development) uses and is part of the Crossroads East PCD. It is currently under
development by Mark-Taylor and is designed to consist of multifamily community and separate single-family
residences. The Crossroads East Development Plan's Land Use Budget was amended by Mark-Taylor
through case 19-ZN-2002#7. The adjusted budget transferred 10 acres from the CO allotment to the R-5
allotment with no change in overall residential density.
Tract 10C, located directly west of Tract 14A (ASLD parcel), is currently owned by ASLD and is zoned for R-
5, C-2, C-O, I-1, PRC, and PCP uses. It is currently undeveloped and is part of the Crossroads East PCD.
The City of Scottsdale has numerous development fees, including but not limited to, plan review, permits
and inspection, water and sewer development impact fees, and meter fees. In addition, there are fees due
per the Crossroads East Development Agreement associated with public infrastructure. The applicant for
development is encouraged to meet with the City Planning Department to solicit information relating to fees,
once the development plan has been established. The City of Scottsdale displays the fee structure for
various requirements on their website at www.ci.scottsdale.az.us.
A site plan is an industry-standard requirement for estimating development fees in the City of Scottsdale.
WOODPATEL has no benefit of a site plan or knowledge of the ultimate land use. As a result of this
restriction, WOODPATEL made no assumptions to estimate the potential fees. Reference Appendix H – City
of Scottsdale Fee Schedules for current City application, plan review, permit, and other development fees.
-
3.0 FEMA FLOODPLAIN
ASLD Parcel Tract 14A is located within a Federal Emergency Management Agency (FEMA) floodplain
designation, Zone "AO-Depth 1 Foot, Velocity 3 FPS" per Flood Insurance Rate Map (FIRM) Map number
04013C1320L (see Appendix A, Figure 7 – FEMA FIRM Map). The current FEMA floodplain is commonly
referred to as the Reata Wash floodplain.
Zone "AO-Depth 1 Foot" is defined by FEMA as follows:
"Special flood hazard area inundated by 100-year flood depths 1 to 3 feet (usually sheet flow on sloping
terrain); average depths determined. For areas of alluvial fan flooding, velocities also determined."
The City of Scottsdale regulates development in FEMA designated floodplains under its floodplain
ordinance. Generally, proposed development in the floodplain is allowed if the lowest floor elevations are at
or above the FEMA 100-year water surface elevations, or elevated at least two feet above the highest
adjacent grade, and/or the proposed development meets protection criteria. The City of Scottsdale also
considers whether the proposed development addresses additional requirements like conveyance corridors,
and seeks to ensure that the proposed development does not penalize upstream or downstream properties.
FEMA has previously refused to remove any land from this published Alluvial Fan Special Flood Hazard
Area (Zone AO) unless a regional structural solution is constructed.
-
4.0 DRAINAGE, RETENTION & STORM BASINS
4.1 Crossroads East Drainage Infrastructure Improvements
There is a City owned and maintained floodwater conveyance system running through the parcel
referenced as Crossroads East Drainage Infrastructure Phase 1. A drainage report supporting the
Crossroads East Drainage Infrastructure Phase 1 design was completed by Michael Baker International
and has been included in Appendix P. The conveyance system is designed to carry stormwater runoff,
generated north of Arizona SR 101, through the parcel, south, to its ultimate outfall location.
Improvements within Tract 14A include two (2) 60" diameter corrugated metal pipes (CMP), running in
parallel, that convey stormwater to an open channel. The open channel runs parallel to Union Hills Drive
and is approximately 62' wide with a depth of 4.5'. The stormwater in the channel exits the parcel
through an existing box culvert, located under Union Hills Drive, near the southwest corner of the
parcel, and continues south. The conveyance system is part of the Crossroads East Drainage
Infrastructure plan (City of Scottsdale Project No. 400-FB53B-56047). Construction of the improvements
is underway and has an estimated completion date of August 4, 2020.. Excerpts from Crossroads East
Drainage Infrastructure plan can be found in Appendix I.
4.2 Onsite Stormwater Runoff and Retention
It is WOODPATEL's understanding, through correspondence with the City of Scottsdale Stormwater
Management Department, there are two conditions the applicant for development will be required to
satisfy regarding onsite stormwater runoff and retention.
1. Interim Condition: Until the referenced Crossroads East Drainage Infrastructure, Phase 1
improvements have been completed, onsite retention will be required for 100% of the volume
generated by first flush or pre vs post calculations, whichever is greater. The collected runoff is
required to be disposed of within 36 hours as required by the City of Scottsdale Design
Standards & Policies Manual, Section 4-1.201.
2. Ultimate Condition: The City is currently sponsoring drainage improvements that may be
sufficient to support a storm water waiver for onsite retention, normally required for parcel
development. First flush requirements will still be required for development of the parcel.
Should the applicant desire to pursue a storm water retention waiver, a separate technical
drainage submittal is required for review and approval by the City of Scottsdale. The drainage
submittal needs to demonstrate that there is a drainage corridor sufficient to convey runoff to
the Central Arizona Project's approved impoundment area for upstream drainage volumes.
Estimated first flush treatment and retention volumes, seen in Table 1, and pre vs. post retention volumes, seen in
Table 2, were calculated following the City of Scottsdale Design Standards & Policies Manual section 4-1.201.C.2
and Section 4-1.201.C.1.b, respectively.
-
Table 1 - First Flush Requirements
First Flush Required Treatment and Retention Volumes
Drainage Area ID
Drainage Area “A” (Acres)
Runoff Coefficient
“C”
Required Retention
(AF)
Required Retention
(CF)
NORTH 36.90 1.00 1.54 66,970
SOUTH 24.73 1.00 1.03 44,890
TOTAL 61.63 2.57 11,860
Table 2 - Pre VS Post Requirements
Figure 3 from Appendix A, Figure 14 – Post Drainage Area Map
The applicant for development is required to submit a master drainage plan and report, to the City of
Scottsdale, as defined in the Stipulations for the Zoning Application: Crossroads East, Case Number: 19-
ZN-2002#6.
Pre VS Post Required Retention Volumes
Drainage Area ID
Drainage Area “A” (Acres)
Post - Runoff Coefficient
“Cpost”
Pre - Runoff Coefficient
“Cpre”
Increased Runoff
Coefficient “∆C”
Required Retention
(AF)
Required Retention
(CF)
NORTH 36.90 0.90 0.31 0.59 4.15 180,774
SOUTH 24.73 0.90 0.31 0.59 2.78 121,097
TOTAL 61.63 6.93 301,871
-
4.3 Offsite Stormwater Runoff
Public roadway infrastructure improvements for Mayo Boulevard and Union Hills Drive are expected to
include the associated storm drainage infrastructure. These storm drain systems will be capable of
handling the stormwater runoff generated from the associated road right-of-way
Figure 4 from Appendix G - Preliminary Opinion of Probably Infrastructure Costs
-
5.0 ENVIRONMENTAL PERMITS AND SECTION 404 PERMIT
The development of the parcel must comply with Federal, State, County, and City regulations.
This section is limited to the application of the Federal Government's "Section 404 Permit – Clean Water
Act". The local office of the U.S. Army Corps of Engineers (USACE) is the agency that determines if a
watercourse or desert wash meets the criteria to be designated as "Waters of the U.S." or commonly
referred to as "jurisdictional delineation". The purpose of the "Section 404 Permit – Clean Water Act" is to
restore and maintain the chemical, physical, and biological integrity of the nation's waters.
The parcel's current status with the USACE regarding Section 404 Permit - Clean Water Act is explained in
the technical memorandum prepared by Logan Simpson, titled “Clean Water Act Section 404 Technical
Memorandum”, dated April 06, 2020, project name Hayden Road/Loop 101. A copy of this technical
memorandum is provided in Appendix K. The memorandum states, the USACE identified no Waters of the
U.S. under jurisdiction of the Clean Water Act within the parcel limits. Unless new information or events
warrant a revision, this determination by the USACE is valid for 5 years from the date of August 15, 2018.
Therefore, under the current 2015 definition of Waters of the U.S., if the development of the parcel occurs
prior to August 15, 2023, a preparation of a Preliminary Jurisdictional Delineation (PJD) or a Section 404
permit would not be required for submission to the local USACE.
U.S. Army Corps of Engineers
Regulatory Branch
3636 North Central Avenue, Suite 760
Phoenix, AZ 85012-1936
(602) 640-5385
-
6.0 STREETS | ROADWAYS
Figure 5 from Appendix B - Excerpts from the City of Scottsdale Zoning 19-ZN-2002#6
The City of Scottsdale has jurisdiction over the local public streets in the greater area. Hayden Road is
located along the western portion of the property and is a currently developed, 4-lane (two northbound, two
southbound), divided, major arterial road. The parcel has approximately 1,600 feet of frontage along Hayden
Road with 110 feet of existing designated full-street right-of-way. Tract 14A falls within Planning Unit X & XI,
placing the applicant for development responsible for the construction of one additional northbound lane.
The interim Hayden Road four-lane cross-section is planned to have an ultimate six-lane road cross-section,
as determined in Traffic Impact Mitigation Analysis Report for Crossroads East prepared by CivTech dated
June 2011. The applicant for development of the parcel is responsible for dedicating the necessary
additional right-of-way, as determined by the City of Scottsdale, to achieve a 75-foot half-street right-of-way
along Hayden Road as defined in the Stipulations for the Zoning Application: Crossroads East, Case
Number: 19-ZN-2002#6.
Figure 6 - Major Arterial (Urban) Cross-section
-
Mayo Boulevard currently extends from Tatum Boulevard to the West side of Hayden Road. The intersection
of Hayden Road and Mayo Boulevard currently exists as a T-intersection with a one-way stop on the
eastbound approach. There is no westbound approach. The northbound approach consists of two (2)
through lanes, and one (1) dedicated left-turn lane. The southbound approach consists of one (1) shared
through/right turn lane and one (1) through lane. The eastbound approach consists of one (1) designated
right-turn lane, and one (1) designated left-turn lane, controlled by a stop sign. The final alignment of Mayo
Boulevard is planned to continue through the Tract 14A and intersect with Union Hills Drive. Refer to
Appendix B, Figure 2 – Proposed Planning Units, for the conceptual continuation of Mayo Boulevard. The
developer of the parcels in Planning Unit X & XI is responsible for the westbound and eastbound half street
improvements, respectively, as defined in the Stipulations for the Zoning Application: Crossroads East, Case
Number: 19-ZN-2002#6. The Traffic Impact Mitigation Analysis Report for Crossroads East prepared by
CivTech dated June 2011 recommends an ultimate cross-section within 100-feet of right-of-way and a 12-
foot center two-way left-turn lane.
Figure 7 - Major Collector (Urban) Cross Section
The intersection of Hayden Road and Union Hills Drive currently exists as a T-intersection with a one-way
stop on the westbound approach. There is no eastbound approach. The northbound approach consists of
two (2) through lanes, and one (1) dedicated right-turn lane. The southbound approach consists of one (1)
dedicated left-turn lane, two (2) through lanes. The westbound approach consists of one (1) shared left/right
turn lane. Union Hills Drive has been classified as a minor arterial determining the scope of improvements to
Union Hills Drive, east of Hayden Road. The Traffic Impact Mitigation Analysis Report for Crossroads East
prepared by CivTech dated June 2011 recommends an ultimate cross-section within 100-feet of right-of-way
and a 12-foot center two-way left-turn lane. The developer of the parcels in Planning Units X & XI is
responsible for dedicating the necessary additional right-of-way, as determined by the City of Scottsdale, to
achieve a 45-foot half-street right-of-way along Union Hills Road as defined in the Stipulations for the Zoning
Application: Crossroads East, Case Number: 19-ZN-2002#6.
Figure 8 - Minor Arterial (Suburban) Cross-Section
-
Changes to the cross-sections of Hayden Road and Union Hills drive along with an increased average daily
trip count, warrant the installation of a traffic signal. The applicant for development shall assume a portion, of
the required 75% participation, and pay to the City of Scottsdale, the design and construction costs
associated with the traffic signal installation at this intersection as defined in the Stipulations for the Zoning
Application: Crossroads East, Case Number: 19-ZN-2002#6.. Participation in the traffic signal design and
installation may be a shared cost with developers east of Hayden Road.
Access points to the parcel are restricted to Union Hills Drive, and the future Mayo Boulevard alignment, as
the applicant for development is required to dedicate a one-foot wide vehicular non-access easement along
Hayden Road as defined in the Stipulations for the Zoning Application: Crossroads East, Case Number: 19-
ZN-2002#6.
Recommended street cross sections from the Traffic Impact Mitigation Analysis Report for Crossroads East
report can be found in Appendix D. Appendix B, Excerpts from the City of Scottsdale Zoning 19-ZN-2002#6,
contains the above mentioned stipulations. A conceptual design of the right-of-way improvements has been
competed by WOODPATEL and is included in Appendix G, Figure 2 – Conceptual Infrastructure Exhibit,
Sheet 1 of 2.
Figure 9 from Appendix G - Preliminary Opinion of Probably Infrastructure Costs
The Arizona Department of Transportation (ADOT) has jurisdiction over ADOT State Route 101 and its entrance
ramp which adjoins the parcel's northern boundary. Access to ADOT State Route 101 is restricted to the Hayden
Road traffic interchange.
-
7.0 DOMESTIC WATER
The City of Scottsdale is responsible for providing public water and has jurisdiction over the existing water
facilities adjacent to the parcel. Per City records, there is an existing 16-inch ductile iron pipe (DIP) located
within the Hayden Road right-of-way. There is also an existing 12-inch DIP located within the Union Hills
Drive right-of-way with two (2) existing stubs, of unknown size, at the southern property line. The stubs are
approximately 1,550 feet from the southwest corner of Tract 14A. Refer to Appendix A, Figure 6- City of
Scottsdale Quarter Section Water & Sewer Map, for a schematic layout of existing potable water mains.
Public roadway infrastructure improvements for Mayo Boulevard are expected to include the associated
public water infrastructure. An exhibit illustrating a conceptual utility layout was completed by WOODPATEL,
and used for estimating quantities, can be found in Appendix G, Figure 2 – Conceptual Infrastructure
Exhibit, Sheet 2 of 2.
Figure 10 from Appendix G - Preliminary Opinion of Probably Infrastructure Costs
City representatives indicated that the existing public water lines are anticipated to be sufficient to
accommodate this parcel. Their conclusion is based on a Master Water and Wastewater Report update for
Crossroad East prepared by Coe & Van Loo Consultants dated February 22, 2012, and accepted by the City
of Scottsdale Water Resources Department on April 13, 2012. Additionally, a fire flow test was performed by
Arizona Flow Testing LLC, on March 12, 2020, and supported these conclusions. Appendix A, Figure 13 –
Hydrant Flow Test Report contains the results for the most recent fire flow test.
-
8.0 SANITARY SEWER
The City of Scottsdale is responsible for providing public sanitary sewer service and has jurisdiction over the
existing sanitary sewer facilities adjacent to the parcel. Per City records, there is an existing 12-inch
Polyvinyl Chloride (PVC) sewer line located within the Hayden Road right-of-way. There is also an existing
12-inch PVC stub located within the Union Hills Drive right-of-way. The stub extends approximately 185 feet
from the 12-inch line running within Hayden Road. Manhole inverts, at existing manholes along the Hayden
Road alignment, range between 18.31' and 17.31' below rim elevation. Refer to Appendix A, Figure 6, for
the City of Scottsdale Quarter Section Water & Sewer Map for a schematic layout of existing sanitary sewer
lines.
Public roadway infrastructure improvements for Mayo Boulevard and Union Hills Drive are expected to
include the associated public sewer infrastructure. An exhibit illustrating a conceptual utility layout was
completed by WOODPATEL, and used for estimating quantities.
Figure 11 from Appendix G - Preliminary Opinion of Probable Infrastructure Costs
The City of Scottsdale indicated the existing public sewer line, within the Hayden Road right-of-way, is
anticipated to be sufficient to accommodate this parcel. City of Scottsdale representatives based this
conclusion on a Wastewater Master Plan Update report for Crossroads East prepared by Coe & Van Loo
Consultants dated February 22, 2012, and accepted by the City of Scottsdale Water Resources Department
on April 13, 2012. During a meeting with WOODPATEL on February 27, 2020, City representatives
indicated that a lift station is to be installed, north of AZ SR101, and will free up capacity in the existing line
south of AZ SR101. As of the date of this report, a 60% complete plan set for the proposed sewer lift station
has been completed by Wilson Engineers and submitted to the City of Scottsdale on December 16, 2019.
-
Excerpts from this plan set have been included in Appendix L - Excerpts from the Crossroads East Sewer
Lift Station 60% Submittal, to provide the location and layout of the proposed sewer lift station.
-
9.0 COMMUNICATIONS
Cox Communications and Century Link provide telecommunication have indicated they provide services to
this parcel and have services in the area.
Century Link reports having aerial lines running along the east side of Hayden Road and along Union Hills
Drive. Century Link provided a facilities map in response to a request for information on behalf of
WOODPATEL and is provided in Appendix A, Figure 11.
Cox Communications reports having services running along a portion of Hayden Road and along Union Hills
Drive. Cox communications provided a facilities map in response to a request for information on behalf of
WOODPATEL and is provided in Appendix A, Figure 12.
The applicant for development of the property should contact Cox Communications and Century Link to
determine if any offsite improvements are required to serve the property once a development plan for the
property has been prepared. Refer to the List of Contacts section of this report for the respective
communication company representatives.
-
10.0 ELECTRIC
Arizona Public Service (APS) provides electric service to this parcel and to the area. A utility map provided
by APS indicated that both overhead and underground electric lines are present and accessible to serve the
parcel. Appendix A, Figure 10 provides the APS Utility map for the area. Easements associated with these
power lines are described on the ALTA, prepared by WOODPATEL, for this assessment. The applicant for
development of the parcel should contact APS to determine if any offsite improvements are required to
provide service to the property once a development plan has been prepared. Refer to the list of contacts
section of this report for the APS representative.
-
11.0 GAS
Southwest Gas Corporation provides natural gas service to this parcel and to the area. Review of the
Southwest Gas Corporation Quarter Section Map 38-47 and Map 38-48 (see Appendix A, Figure 9)
indicated there is a 4" gas line running in the Perimeter Drive right-of-way and along Union Hills Drive. An
onsite stub, from this line, is available to serve the parcel. The stub is approximately 2,250 feet east of the
southwest corner of Tract 14A. The applicant for development of the property should contact Southwest Gas
Corporation to determine if any offsite improvements are required to serve the parcel once a development
plan for the property has been prepared. Refer to the List of Contacts section of this report for the Southwest
Gas Corporation representative.
-
12.0 LIST OF CONTACTS
NATURAL GAS: SOUTHWEST GAS CORPORATION 1600 East Northern Avenue Phoenix, Arizona 85020-3982
Andy Saks 480.730.3857 [email protected] [email protected]
ELECTRIC: ARIZONA PUBLIC SERVICE (APS)
4612 East Bell Road Phoenix, Arizona 85032
Ronnie Gandara 602.371.7546
COMMUNICATIONS: COX COMMUNICATIONS
1550 W Deer Valley Road Phoenix, Arizona 85027
Misty Spellman 866.272.5777 [email protected]
COMMUNICATIONS: AT&T
1231 W. University Drive Mesa, AZ 85201
Luke Jensen 480.707.8581 [email protected]
WATER & SEWER CITY OF SCOTTSDALE
9379 East San Salvador Drive Scottsdale, Arizona 85258 480-312-3111 scottsdaleaz.gov
Scott Mars, P.E. Planning And Engineering [email protected]
FLOODPLAIN: CITY OF SCOTTSDALE
3839 North Drinkwater Boulevard Scottsdale, Arizona 85251 480-312-3111 scottsdaleaz.gov
Ashley Couch Floodplain Administrator 480.312.4317 [email protected]
ROADWAY: CITY OF SCOTTSDALE
3839 North Drinkwater Boulevard Scottsdale, Arizona 85251 480-312-3111 F: 480-312-2888 scottsdaleaz.gov
Phillip Kercher, P.E., PTOE Traffic Engineering 480-312-7645 [email protected]
ARIZONA DEPARTMENT OF
TRANSPORTATION 205 South 17th Avenue Phoenix, Arizona 85007
Stephen M O'Brien Sr. Division Administrator Project Management Group 602-712-4282 SO'[email protected]
ARIZONA DEPARTMENT OF
TRANSPORTATION 205 South 17th Avenue Phoenix, Arizona 85007
Tony S. Abbo, PE, PTOE, FITE Regional Traffic Engineer (RTE) – Central Region Project Management Group [email protected]
SECTION 404 WASH: ARMY CORP OF ENGINEERS
U.S. Army Corps of Engineers Regulatory Branch 3636 North Central Avenue Suite 760 Phoenix, Arizona 85012-1936 602-640-5385
Sally Diebold Chief, Arizona Branch
COVER SHEETTABLE OF CONTENTSAPPENDICES1.0 PROJECT INTRODUCTION2.0 EXISTING ZONING, ADJACENT USES, AND DEVELOPMENT F3.0 FEMA FLOODPLAIN ASLD Parcel Tract 14A is located within a Federal Emergency4.0 DRAINAGE, RETENTION & STORM BASINS 4.1 Crossroads East Drainage Infrastructure Improvements5.0 ENVIRONMENTAL PERMITS AND SECTION 404 PERMIT6.0 STREETS | ROADWAYS7.0 DOMESTIC WATER The City of Scottsdale is responsible for providing public water an8.0 SANITARY SEWER The City of Scottsdale is responsible for providing public sanitary s9.0 COMMUNICATIONS10.0 ELECTRIC Arizona Public Service (APS) provides electric service to this parc11.0 GAS Southwest Gas Corporation provides natural gas service to this12.0 LIST OF CONTACTS NATURAL GAS: SOUTHWEST GAS CORPORATION