  • 7/29/2019 Rehabailitation Clarification 2012.3.27

    1/22

    LOT B

  • 7/29/2019 Rehabailitation Clarification 2012.3.27

    2/22

    * note : No tree planting is Permitted on areas where the topopgraphic gradient exceeds 30 degre

  • 7/29/2019 Rehabailitation Clarification 2012.3.27

    3/22

  • 7/29/2019 Rehabailitation Clarification 2012.3.27

    4/22

    s.

  • 7/29/2019 Rehabailitation Clarification 2012.3.27

    5/22

    Plant Estimated Qty & Soil Condition

    plantEffluent Pit B1

    (Type 1A)

    uen

    B2 (TypeEffluent Pit

    B3 (Type 1B)

    Gatch Pit B1

    (Type 2)

    Gatch Pit B2

    (Type 2)

    Soil Condition (refer to Table 1) Uncontaminated Soil

    Alternate

    Ecotoxicity

    Primary

    Ecotoxicity

    Primary

    Ecotoxicity

    Primary

    Ecotoxicity

    Area (m2) 51,138 62,398 47,658 112,443 112,838

    Soil Amendment (m2) 51,000 31,200 24,000

    High irrigation : 50cm long anf

    10cm diameter at 2m spacing72 1,750 1,750 2,150 2,900

    Low irrigation : 50cm long anf

    7.5cm diameter72 1,750 1,750

    Plant as per plant list : Nurserygrown, 1 growing seasov old at2m spacing

    Plant as per

    plant list :

    Nursery grown,

    1 growingseasov old at

    2m spacing

    Plants and

    Materials Six

    planting

    blocks 48m x

    48m to

    include

    Nursery

    grown plants,1 growing

    season old,

    at 1m

    spacing

    incorporating:

    Plants and

    Materials Six

    planting

    blocks 48m x

    48m to

    include

    Nursery

    grown plants,1 growing

    season old,

    at 2m

    spacing

    incorporating:

    Nurserygrown, 1growingseasov old at2m spacing :2,000ea

    Nurserygrown, 1growingseasov old at2m spacing :2,650ea

    S1 : Rhanterium epapposum 25 600 600

    S2 : Nitraia retusa 25 600 600

    G1 : Panicum turgidum 25 600 600

    G2 : Cyperus conglomeratus 25 600 600

    L1 : Astragalus spinosus 50 1,200 1,200

    Trees : Nursery grown, 1 growing

    season old at minimum 3m

    s acinT1: Acacia gerrardii(Pachyceras) 17 23

    T2 : Prosopis Farcath 17 23

    T3 : Ziziphus spina-christi 17 23

  • 7/29/2019 Rehabailitation Clarification 2012.3.27

    6/22

  • 7/29/2019 Rehabailitation Clarification 2012.3.27

    7/22

    Sludge Pit B1

    (Type 1C)Sludge Pit B2

    on am na e

    d total

    Primary

    Ecotoxicity

    Primary

    Ecotoxicity

    Primary

    Ecotoxicity

    13,751 149,249 2,972 552,447

    7,000 149,000 262,200

    430 9,052

    430 4,002

    Plants and

    Materials Six

    planting

    blocks 24m x

    24m to

    include

    Nursery

    grown plants,1 growing

    season old,

    at 2m

    spacing

    incorporating:

    4,650

    150 1,375

    150 1,375

    150 1,375

    150 1,375

    300 2,750

    40

    40

    40

  • 7/29/2019 Rehabailitation Clarification 2012.3.27

    8/22

    Rebabilitation Characterisation Plan(Monitoring)_ Lot B

    1. Testing and assessment frequency

    Sampling / AssessmentTime

    Soil Pollutionsuite

    Soil suite Survivorshipper species

    Plant height

    and width perspecies

    Pre - installation of

    plants (one week before

    planting)

    1 1

    Installation of plants

    (November to January)1

    End of first Growing

    season (April only)1 1 1

    Start of second growing

    season (December only) 1 1 1

    End of Second growing

    Season (April only)1 1 1 1

    Total Testing 2 4 3 4

    From each Composite sample, remove approximately 1 kg of

    soil and place into a sample bag. Seal the bags with an

    identification number. A polyethylene bag or glass jar is

    permitted.

    Soil Sample Botanical Survey

    2. Soil Sampling methodology

    Each composite sample shall consist of 10 sub-samples taken

    from randomised locations within the block. Collect the sample

    as follows:

    Depth 1 Surface.; collect 10 sub samples from a depth of

    0cm 25 cm. If using a soil probe, each sub-sample will

    consist of one (1) core. If using a shovel each sub-sample

    will consist of approximately 125g of soil.

    Depth 2 - Sub surface collect 10 sub samples from a depth

    of 25 cm 60 cm. If using a soil probe, each sub-sample will

    consist of one (1) core. If using a shovel each sub-sample

    will consist of approximately 125g of soil.

  • 7/29/2019 Rehabailitation Clarification 2012.3.27

    9/22

  • 7/29/2019 Rehabailitation Clarification 2012.3.27

    10/22

    Pre Post

    ItemMoM

    Ref.Description Remarks

    Estimated

    Q'ty

    Estimated

    Q'tyTotal Q'ty Unit

    Rate

    (KD)

    1 Soil Sample

    1.1 Soil Pollution Suite

    1.1.1 Depth 1 Surface(0-25cm) EPB1 1 1 2 ea

    EPB2 6 6 12 eaEPB3 6 6 12 ea

    SPB1 6 6 12 ea

    GPB1 6 6 12 ea

    GPB2 6 6 12 ea

    1.1.2 Depth 2 Sub-Surface(25-60cm) EPB1 1 1 2 ea

    EPB2 6 6 12 ea

    EPB3 6 6 12 ea

    SPB1 6 6 12 ea

    GPB1 6 6 12 ea

    GPB2 6 6 12 ea

    1.2 Soil suite

    1.2.1 Depth 1 Surface(0-25cm) EPB1 1 3 4 ea

    EPB2 6 18 24 ea

    EPB3 6 18 24 ea

    SPB1 6 18 24 ea

    GPB1 6 18 24 ea

    GPB2 6 18 24 ea

    1.2.2 Depth 2 Sub-Surface(25-60cm) EPB1 1 3 4 ea

    EPB2 6 18 24 ea

    EPB3 6 18 24 eaSPB1 6 18 24 ea

    GPB1 6 18 24 ea

    GPB2 6 18 24 ea

  • 7/29/2019 Rehabailitation Clarification 2012.3.27

    11/22

    Total

    Amount

    KD

  • 7/29/2019 Rehabailitation Clarification 2012.3.27

    12/22

    Planting Schedule

    PIT Type Planting Schedule

    EPB1 1A 15th November 2012 to 15th December 2012

    EPB2 1B 15th November 2013 to 15th December 2013

    EPB3 1B 15th November 2013 to 15th December 2013

    SPB1 1C 15th November 2013 to 15th December 2013GPB1 2 1th November 2013 to 31th January 2014

    GPB2 2 1th November 2013 to 31th January 2014

    * note : Aftercare & Maintenance period (18month)

    Until 24th March 2015

  • 7/29/2019 Rehabailitation Clarification 2012.3.27

    13/22

    * note :

  • 7/29/2019 Rehabailitation Clarification 2012.3.27

    14/22

    * Irrgation Water

  • 7/29/2019 Rehabailitation Clarification 2012.3.27

    15/22

  • 7/29/2019 Rehabailitation Clarification 2012.3.27

    16/22

    refer to Drawing

    Submit the certificate of Irrigation Water

  • 7/29/2019 Rehabailitation Clarification 2012.3.27

    17/22

    1. IRRIGATION TYPE AND INSTALLATION

    2. PLANT PROCUREMENT AND DELIVERY

  • 7/29/2019 Rehabailitation Clarification 2012.3.27

    18/22

  • 7/29/2019 Rehabailitation Clarification 2012.3.27

    19/22

    3. PLANTING PROCEDURES AND LAYOUT

  • 7/29/2019 Rehabailitation Clarification 2012.3.27

    20/22

    4. AFTERCARE AND MAINTENANCE

  • 7/29/2019 Rehabailitation Clarification 2012.3.27

    21/22

  • 7/29/2019 Rehabailitation Clarification 2012.3.27

    22/22