LAPORAN OPERASIONAL MATERIAL PT. Syailendra Bangun Persada - Bandung Kavling : 28 Luas bangunan : Pelaksana : Periode : 07-10 februari 2011 No Tanggal URAIAN JUMLAH HARGA TOTAL SAT 1 7-Feb-11 Paku 5 Cm Kg 2 9,750 19,500 Benang No 9 Bh 3 5,000 15,000 Slang Waterfas Mtr 20 1,500 30,000 2 8-Feb-11 Pasir Beton Cimalaka 425x185x105 M3 8.255 145,000 1,196,975 Kawat Beton Kg 5 15,000 75,000 Pipa PVC (Maspion) AW Abu 4" Btng 4 220,000 880,000 Lem Pipa (Asahi) Klng 1 25,000 25,000 3 9-Feb-11 Besi Beton 13 Mm Btng 60 95,000 5,700,000 Besi Beton 6 Mm Btng 20 23,000 460,000 Split 1/2" 425x185x65 M3 5.11 150,000 766,500 4 10-Feb-11 Pipa PVC (Maspion) AW Putih 2" Btng 3 35,000 105,000 Ploksock 3"x2" Bh 1 12,000 12,000 Besi Beton 8 Bc Mm Btng 100 27,500 2,750,000 Besi Beton 10 Mm Btng 20 57,500 1,150,000 Besi Beton 13 Mm Btng 70 95,000 6,650,000 Knee 1" Bh 2 3,000 6,000 SDD 1" Bh 1 3,000 3,000 Siltip (Onda) Bh 1 2,000 2,000 Ember Bh 11 5,000 55,000 Jumlah 19,900,975 Dibuat Tgl: Di Ajukan Di Setujui Logistik Pelaksana SAT

Upload: bambang-erawan

Post on 20-Jan-2016

123 views

Category:

Documents


9 download

DESCRIPTION

Syailendra

TRANSCRIPT

Page 1: Rekap Material Mingguan Kav.28-1

Page 1

LAPORAN OPERASIONAL MATERIAL PT. Syailendra Bangun Persada - Bandung

Kavling : 28

Luas bangunan :

Pelaksana :

Periode : 07-10 februari 2011

No Tanggal URAIAN JUMLAHHARGA

TOTAL KeteranganSAT

1 7-Feb-11 Paku 5 Cm Kg 2 9,750 19,500

Benang No 9 Bh 3 5,000 15,000

Slang Waterfas Mtr 20 1,500 30,000

2 8-Feb-11 Pasir Beton Cimalaka 425x185x105 M3 8.255 145,000 1,196,975

Kawat Beton Kg 5 15,000 75,000

Pipa PVC (Maspion) AW Abu 4" Btng 4 220,000 880,000

Lem Pipa (Asahi) Klng 1 25,000 25,000

3 9-Feb-11 Besi Beton 13 Mm Btng 60 95,000 5,700,000

Besi Beton 6 Mm Btng 20 23,000 460,000

Split 1/2" 425x185x65 M3 5.11 150,000 766,500

4 10-Feb-11 Pipa PVC (Maspion) AW Putih 2" Btng 3 35,000 105,000

Ploksock 3"x2" Bh 1 12,000 12,000

Besi Beton 8 Bc Mm Btng 100 27,500 2,750,000

Besi Beton 10 Mm Btng 20 57,500 1,150,000

Besi Beton 13 Mm Btng 70 95,000 6,650,000

Knee 1" Bh 2 3,000 6,000

SDD 1" Bh 1 3,000 3,000

Siltip (Onda) Bh 1 2,000 2,000

Ember Bh 11 5,000 55,000

Jumlah 19,900,975

Dibuat Tgl:

Di Ajukan Di Setujui

Logistik Pelaksana

SAT

Page 2: Rekap Material Mingguan Kav.28-1

Page 2

LAPORAN OPERASIONAL MATERIAL

PT. Syailendra Bangun Persada - Bandung

Kavling : 28

Luas bangunan :

Pelaksana :

Periode : 12-18 Februari 2011

No Tanggal URAIAN JUMLAHHARGA

TOTAL KeteranganSAT

1 12-Feb-11 Semen Holcim Zak 5 54,500 272,500

Kawat Beton Kg 0.5 12,400 6,200 2 14-Feb-11 Singkup (Ken Master) Bh 2 45,000 90,000

Semen Holcim Zak 2 54,500 109,000

Kawat Beton Kg 1.5 12,400 18,600 3 15-Feb-11 Semen Holcim Zak 7 54,500 381,500

Semen Holcim Zak 2 54,500 109,000 4 16-Feb-11 Semen Holcim Zak 6 54,500 327,000

Pencil Kayu Bh 1 1,500 1,500

Batu Belah 425x185x75 M3 5.896 90,000 530,640

Semen Holcim Zak 4 54,500 218,000

Pasir Pasang 425x185x105 M3 8.255 115,000 949,325

Semen Holcim Zak 2 54,500 109,000

Multi 9 Mm Lbr 20 94,000 1,880,000

Kaso 4x6 M3 2 1,200,000 2,400,000 5 17-Feb-11 Semen Holcim Zak 10 54,500 545,000

Kawat Beton Kg 1.5 12,400 18,600

Paku 7 Cm Kg 1.5 9,750 14,625

Paku 4 Cm Kg 5 10,750 53,750

Pasir Beton Cimalaka 425x185x107 M3 8.4112 145,000 1,219,624

Split 1/2 425x185x65 M3 5.11 150,000 766,500

Cangkul (Chrocodile) Bh 2 55,000 110,000

Doran Bh 2 10,000 20,000

Semen Holcim Zak 5 54,500 272,500 6 18-Feb-11 Semen Holcim Zak 5 54,500 272,500

Jumlah 10,695,364

Dibuat Tgl:

Di Ajukan Di Setujui

Logistik Pelaksana

SAT

Page 3: Rekap Material Mingguan Kav.28-1

Page 3

LAPORAN OPERASIONAL MATERIAL

PT. Syailendra Bangun Persada - Bandung

Kavling : 28

Luas bangunan :

Pelaksana :

Periode : 19-24 Februari 2011

No Tanggal URAIAN JUMLAHHARGA

TOTAL KeteranganSAT

1 19-Feb-11 Paku 7 Cm Kg 1.5 9,750 14,625

Bata Merah Idramayu Bh 7000 520 3,640,000

2 21-Feb-11 Semen Holcim Zak 1 54,500 54,500

Kawat Beton Kg 2 12,400 24,800

Mata Gergaji Besi (Sandflex) Bh 1 11,000 11,000

3 22-Feb-11 Besi Beton 10 Mm SNI Btng 20 57,000 1,140,000

Pencil Kayu Bh 1 1,500 1,500

Paku 5 Cm Kg 2 9,750 19,500

Pipa PVC (Triliun) D Putih 3" Btng 4 42,500 170,000

Kawat Beton Kg 1 12,400 12,400

Semen Holcim Zak 5 54,500 272,500

4 23-Feb-11 Semen Holcim Zak 15 54,500 817,500

Ram Ayam Mtr 14.5 12,500 181,250

Ram Kawat 1 Cm Mtr 1.5 14,000 21,000

Pipa PVC (Triliun) D Putih 2 1/2" Btng 5 32,000 160,000

Kawat Beton Kg 1 12,400 12,400

5 24-Feb-11 Dop 1/2" Bh 1 1,500 1,500

Lem Pipa (Asahi) Klng 1 25,000 25,000

Semen Holcim Zak 10 54,500 545,000

Pasir Pasang 420x190x105 M3 8.39 115,000 964,850

Jumlah 8,089,325

Dibuat Tgl:

Di Ajukan Di Setujui

Logistik Pelaksana

SAT

Page 4: Rekap Material Mingguan Kav.28-1

Page 4

LAPORAN OPERASIONAL MATERIAL

PT. Syailendra Bangun Persada - Bandung

Kavling : 28

Luas bangunan :

Pelaksana :

Periode : 26 feb-04 mar 2011

No Tanggal URAIAN JUMLAHHARGA

TOTAL KeteranganSAT

1 26-Feb-11 Kawat Beton Kg 1 12,400 12,400

Semen Holcim Zak 10 54,500 545,000

Paku 7 Cm Kg 1 9,750 9,750 2 28-Feb-11 Pipa PVC (Triliun) D Pth 3" Btng 2 55,000 110,000 3 1-Mar-11 Kaso (Borneo) 4x6x400 Cm M3 2 1,200,000 2,400,000

Bambu Btng 100 8,500 850,000

Semen Holcim Zak 5 54,500 272,500

Bata Merah Idramayu Bh 7000 520 3,640,000 4 2-Mar-11 Ploksock 4"x3" Bh 1 12,000 12,000

Knee 3" Bh 2 10,000 20,000

Pipa PVC (Triliun) 4" D Ptih Btng 4 65,000 260,000

Pipa PVC (Triliun) 3" D Ptih Btng 1 42,500 42,500

Kawat Beton Kg 1 12,400 12,400

Paku 7 Cm Kg 2 9,750 19,500

Paku 10 Cm Kg 1.5 9,750 14,625

Poksock 1"x3/4" Bh 1 3,000 3,000

Ploksock 3/4"x1/2" Bh 1 2,500 2,500

Stop Kran 1" Bh 1 16,500 16,500

Semen Holcim Zak 6 54,500 327,000 5 3-Mar-11 Bata Merah Bh 7000 520 3,640,000

Siltip (Onda) Bh 1 2,000 2,000

Socket 1" Bh 2 2,500 5,000

Semen Holcim Zak 10 54,500 545,000 6 4-Mar-11 Paku 5 Cm Kg 2.5 9,750 24,375

Paku 7 Cm Kg 5 9,750 48,750

Benang No 9 Bh 2 5,000 10,000

Paku 10 Cm Kg 3 9,750 29,250

Jumlah 12,874,050

Dibuat Tgl:

Di Ajukan Di Setujui

Logistik Pelaksana

SAT

Page 5: Rekap Material Mingguan Kav.28-1

Page 5

LAPORAN OPERASIONAL MATERIAL

PT. Syailendra Bangun Persada - Bandung

Kavling : 28

Luas bangunan :

Pelaksana :

Periode : 05-11 maret 2011

No Tanggal URAIAN JUMLAHHARGA

TOTAL KeteranganSAT

1 5-Mar-11 Paku 10 Cm Kg 3 9,750 29,250

Paku 7 Cm Kg 3.5 9,750 34,125 2 7-Mar-11 Paku 4 Cm Kg 5 10,750 53,750

Pasir Pasang Hitam 425x185x105 M3 8.255 115,000 949,325 3 8-Mar-11 Pipa PVC (Triliun) D Ptih 3" Btng 1 55,000 55,000

Pipa PVC (Triliun) D Ptih 2 1/2" Btng 4 41,000 164,000

Paku 7 Cm Kg 2 9,750 19,500

Kaso 4x6 M3 1 1,200,000 1,200,000 4 9-Mar-11 Paku 7 Cm Kg 6.5 9,750 63,375

Pipa PVC (Neovin) 1/2" Btng 2 12,000 24,000

Besi Beton 8 Mm Bc Btng 60 27,500 1,650,000

Besi Beton 10 Mm Full Btng 25 57,500 1,437,500

Besi Beton 13 Mm Full Btng 90 95,000 8,550,000

Multi 9 Mm Lbr 30 94,000 2,820,000 5 10-Mar-11 Semen Holcim Zak 1 54,500 54,500

Kawat Brton Kg 1 12,400 12,400

Knee Rck 3" Bh 5 10,000 50,000

Knee Rck 2 1/2" Bh 2 7,500 15,000

Pipa PVC (Triliun) AW Putih 1" Btng 1 4,000 4,000 6 11-Mar-11 Paku 7 Cm Kg 4 9,750 39,000

Pasir Beton Cimalaka 425x185x110 M3 8.648 145,000 1,253,960

Kawat Beton Kg 2.5 12,400 31,000

Jumlah 18,509,685

Dibuat Tgl:

Di Ajukan Di Setujui

Logistik Pelaksana

SAT

Page 6: Rekap Material Mingguan Kav.28-1

Page 6

LAPORAN OPERASIONAL MATERIAL

PT. Syailendra Bangun Persada - Bandung

Kavling : 28

Luas bangunan :

Pelaksana :

Periode : 12 - 18 maret 2011

No Tanggal URAIAN JUMLAHHARGA

TOTAL KeteranganSAT

1 12-Mar-11 Paku 7Cm, 5 Cm Kg 2 9,750 19,500

Split 1/2" 425x185x75 M3 5.896 150,000 884,400

Pasir Beton Cimalaka 425x185x103 M3 8.098 145,000 1,174,210

Kawat Brton Kg 1.5 12,400 18,600 2 14-Mar-11 Paku 7 Cm Kg 1 9,750 9,750

Paku 7 Cm Kg 0.5 9,750 4,875

Pipa Listrik (Triliun) C Putih 5/8" Btng 15 4,000 60,000 3 15-Mar-11 Pipa Listrik (Triliun) C Putih 5/8" Btng 3 4,000 12,000

Kawat Beton Kg 2 12,400 24,800 4 15-Mar-11 Paku 10 Cm Kg 1 9,750 9,750

Pipa PVC (Triliun) D Putih 1 1/4" Btng 1 25,000 25,000 5 16-Mar-11 Kawat Beton Kg 1.5 12,400 18,600

Paku 10 Cm Kg 1.5 9,750 14,625 6 17-Mar-11 Jerigen Bh 10 18,000 180,000

Solar Ltr 5 4,500 22,500

Spatu Boat (AP) Psng 5 55,000 275,000

Semen Holcim Zak 50 54,500 2,725,000

Mata Gergaji Besi (Sandflex) Bh 1 11,000 11,000

Singkup Bh 1 45,000 45,000

Pasir Beton Cimalaka 425x185x105 M3 8.255 145,000 1,196,975

Pengki Karet Bh 5 11,000 55,000

Samen Holcim Zak 8 54,500 436,000

Solar Ltr 5.5 4,500 24,750

Semen Holcim Zak 20 54,500 1,090,000 7 18-Mar-11 Pencil Kayu Bh 1 1,500 1,500

Pipa Listrik (Triliun) C Putih 5/8" Btng 2 4,000 8,000

Jumlah 8,346,835

Dibuat Tgl:

Di Ajukan Di Setujui

Logistik Pelaksana

SAT

Page 7: Rekap Material Mingguan Kav.28-1

Page 7

LAPORAN OPERASIONAL MATERIAL

PT. Syailendra Bangun Persada - Bandung

Kavling : 28

Luas bangunan :

Pelaksana :

Periode : 19-025 maret 2011

No Tanggal URAIAN JUMLAHHARGA

TOTAL KeteranganSAT

1 19-Maret-11 Semen Holcim Zak 3 54,500 163500

Kabel (Eterna) 3X21,5 Mtr 5 6500 32500

Paku 7 Cm Kg 2 9,750 19500

Paku 5 Cm Kg 3 9,750 29250

2 21-Maret-11 Semen Holcim Zak 10 54,500 545000

Pipa Listrik (Triliun) C Pth 5/8" Btng 1 4,000 4000

3 22-Maret-11 Pasir Pasang 420X190X105 M3 8.379 90,000 754110

Kabel (Eterna) 3X21,5 Mtr 6 6500 39000

4 23-Maret-11 Kawat Beton Kg 1 12,400 12400

Semen Holcim Zak 10 54,500 545000

Semen Holcim Zak 1 54,500 54500

Pipa Listrik (Triliun) C Pth 5/8" Btng 1 4,000 4000

5 24-Maret-11 Ram Kawat 1 Cm Cm 30 14000 420000

Semen Holcim Zak 5 54,500 272500

6 25-Maret-11 Paku 7 Cm Kg 3 9,750 29250

Semen Holcim Zak 6 54,500 327000

Pipa Listrik (Triliun) C Pth 5/8" Btng 2 4,000 8000

Kawat Beton Kg 2 12,400 24800

Jumlah 3,284,310

Dibuat Tgl:

Di Ajukan Di Setujui

Logistik Pelaksana

SAT

Page 8: Rekap Material Mingguan Kav.28-1

Page 8

LAPORAN OPERASIONAL MATERIAL

PT. Syailendra Bangun Persada - Bandung

Kavling : 28

Luas bangunan :

Pelaksana :

Periode : 28 maret - 01 april 2011

No Tanggal URAIAN JUMLAHHARGA

TOTAL KeteranganSAT

1 28-Maret-11 Semen Holcim Zak 5 54,500 272,500

Paku Triplex Kg 1 1/4 20,000 25,000

Paku 4 Cm Kg 1 10,750 10,750

Pasir Pasang 420X190X105 M3 8.379 115,000 963585

2 29-Maret-11 Paku 7 Cm Kg 2 9,750 19,500

Paku 10 Cm Kg 2 9,750 19,500

3 30-Maret-11 Semen Holcim Zak 10 54,500 545,000

Paku 5 Cm Kg 2 9,750 19,500

Paku 7 Cm Kg 2 9,750 19,500

Paku 10 Cm Kg 3 9,750 29,250

4 31-Maret-11 Bata Merah Indramayu Bh 7000 520 3,640,000

5 1-Apr-11 Semen Holcim Zak 5 54,500 272,500

Besi Beton 8 Mm PKS Btng 40 38,000 1,520,000

Besi Beton 10 Mm PKS Btng 25 57,500 1,437,500

Besi Beton 13 Mm Ulir PKS Btng 20 95,000 1,900,000

Jumlah 10,694,085

Dibuat Tgl:

Di Ajukan Di Setujui

Logistik Pelaksana

SAT

Page 9: Rekap Material Mingguan Kav.28-1

Page 9

LAPORAN OPERASIONAL MATERIAL

PT. Syailendra Bangun Persada - Bandung

Kavling : 28

Luas bangunan :

Pelaksana :

Periode : 02 - 80 April 2011

No Tanggal URAIAN JUMLAHHARGA

TOTAL KeteranganSAT

1 2-Apr-11 Semen Holcim Zak 10 54,500 545,000

Paku 7 Cm Kg 2.5 9,750 24,375

Benang No 9 Bh 1 5,000 5,000

Pipa Listrik PVC (Triliun) C ptih 5/8" Btng 8 4,000 32,000

Kawat Beton Kg 2 12,400 24,800

2 4-Apr-11 Knee 2 1/2" Bh 2 8,000 16,000

Besi Beton 6 Mm Full Btng 5 27,500 137,500

3 5-Apr-11 Pipa Listrik PVC (Triliun) C ptih 5/8" Btng 9 4,000 36,000

4 6-Apr-11 Kawat Beton Kg 5.5 12,400 68,200

Pipa Listrik PVC (Triliun) C ptih 5/8" Btng 4 4,000 16,000

Paku 7 Cm Kg 2 9,750 19,500

5 7-Apr-11 Semen Holcim Zak 10 54,500 545,000

Pipa Listrik PVC (Triliun) C ptih 5/8" Btng 5 4,000 20,000

6 8-Apr-11 Semen Holcim Zak 10 54,500 545,000

2,034,375

Dibuat Tgl:

Di Ajukan Di Setujui

Logistik Pelaksana

SAT

Page 10: Rekap Material Mingguan Kav.28-1

Page 10

LAPORAN OPERASIONAL MATERIAL

PT. Syailendra Bangun Persada - Bandung

Kavling : 28

Luas bangunan :

Pelaksana :

Periode : 09 - 15 April 2011

NoTanggal

URAIAN JUMLAHHARGA

TOTAL KeteranganSAT

1 9-Apr-11 Semen Holcim Zak 10 54,500 545,000

Pipa Listrik PVC (Triliun) C pth 5/8" Btng 5 4,000 20,000

2 11-Apr-11 Pipa Listrik PVC (Triliun) C pth 5/8" Btng 1 4,000 4,000

3 12-Apr-11 Paku 5 Cm Kg 3 9,750 29,250

Semen Holcim Zak 5 54,500 272,500

4 13-Apr-11 Pipa Listrik PVC (Triliun) C pth 5/8" Btng 2 4,000 8,000

Benang Cap Peniti Bh 1 2,000 2,000

Semen Holcim Zak 5 54,500 272,500

Ram Ayam 1/2 Cm Mtr 3 20,000 60,000

5 14-Apr-11 Paku 7 Cm Kg 2 9,750 19,500

Paku 10 Cm Kg 2 9,750 19,500

Semen Holcim Zak 5 54,500 272,500

Pipa Listrik PVC (Triliun) C pth 5/8" Btng 2 4,000 8,000

6 15-Apr-11 Pipa Listrik PVC (Triliun) C pth 5/8" Btng 1 4,000 4,000

1,536,750

Dibuat Tgl:

Di Ajukan Di Setujui

SAT

Page 11: Rekap Material Mingguan Kav.28-1

Page 11

LAPORAN OPERASIONAL MATERIAL

PT. Syailendra Bangun Persada - Bandung

Kavling : 28

Luas bangunan :

Pelaksana :

Periode : 16 -22 April 2011

No Tanggal URAIAN JUMLAHHARGA

TOTAL KeteranganSAT

1 16-Apr-11 Semen Holcim Zak 2 54,500 109,000

2 18-Apr-11 Semen Holcim Zak 3 54,500 163,500

3 18-Apr-11 Semen Holcim Zak 7 54,500 381,500

Knee 1/2" Bh 2 2,000 4,000

Besi Beton 8 Mm Full Btng 2 38,000 76,000

Besi Beton 10 Mm Full Btng 2 57,500 115,000

Besi Beton 13 Mm Full Btng 10 95,000 950,000

Besi Beton 10 SNI Btng 15 57,500 862,500

4 19-Apr-11 Semen Holcim Zak 10 54,500 545,000

Pasir Pasang 425X185X110 M3 8.648 115,000 994,520

Besi Beton 6 Mm Full Btng 10 27,500 275,000

Besi Beton 8 Mm Full Btng 20 38,000 760,000

Besi Beton 10 Mm Full Btng 25 57,500 1,437,500

5 21-Apr-11 Semen Holcim Zak 10 54,500 545,000

Paku 10 Cm Kg 2 9,750 19,500

Paku 7 Cm Kg 1.5 9,750 14,625

Paku 5 Cm Kg 1.5 9,750 14,625

Pencil Kayu Bh 1 1,500 1,500

SAT

Page 12: Rekap Material Mingguan Kav.28-1

Page 12

6 22-Apr-11 Pipa (Triliun) AW Pih 1/2" Btng 3 14,000 42,000

7,310,770

Dibuat Tgl:

Di Ajukan Di Setujui

LAPORAN OPERASIONAL MATERIAL

PT. Syailendra Bangun Persada - Bandung

Kavling : 28

Luas bangunan :

Pelaksana :

Periode : 23 - 30 April 2011

No Tanggal URAIAN JUMLAHHARGA

TOTAL KeteranganSAT

1 23-Apr-11 Pipa PVC (Triliun) AW Putih 1/2" Btng 2 14,000 28,000

2 25-Apr-11 Semen Holcim Zak 10 54,500 545,000

Paku 7 Cm Kg 2 9,750 19,500

Paku 5 Cm Kg 2 9,750 19,500

Inbowdus (Panasonic) Bh 59 2,000 118,000

Kabel (Etena) NYM 3X1,5 Roll 1 6,500 6,500

3 27-Apr-11 Kleman Kabel No 9 Bks 4 4,000 16,000

Kabel (Eterna) NYM 3X2,5 Roll 1 462,500 462,500

Semen Holcim Zak 10 54,500 545,000

Pipa Listrik (Triliun) C Putih 5/8" Btng 3 4,000 12,000

Kabel (Eterna) NYM 3X1,5 Roll 1 325,000 325,000

Kabel (Eterna) NYM 2X1,5 Roll 1 255,000 255,000

4 28-Apr-11 Pipa Listrik (Triliun) C Putih 5/8" Btng 2 4,000 8,000

Kabel (Eterna) NYM 3X1,5 Roll 1 325,000 325,000

Solasi (Nitto) Bh 1 7,500 7,500

Kleman Kabel No 8 Bks 2 4,000 8,000

SAT

Page 13: Rekap Material Mingguan Kav.28-1

Page 13

5 30-Apr-11 Semen Holcim Zak 10 54,500 545,000

Benang No 9 Bh 1 5,000 5,000

3,250,500

Dibuat Tgl:

Di Ajukan Di Setujui

LAPORAN OPERASIONAL MATERIAL

PT. Syailendra Bangun Persada - Bandung

Kavling : 28

Luas bangunan :

Pelaksana :

Periode : 2 - 6 mei 2011

No Tanggal URAIAN JUMLAHHARGA

TOTAL KeteranganSAT

1 2-Mei-11 Semen Holcim Zak 10 54,500 545,000

Kawat Beton Kg 1 12,400 12,400

Pipa PVC (Triliun) D Putih 4" Btng 2 75,000 150,000

Knee 4" Bh 1 12,000 12,000

Knee 3" Bh 2 9,000 18,000

Tee Y 4"x3" Bh 1 40,000 40,000

Lem Pipa (Asahi) Kleng 1 25,000 25,000

Pasir Pasang 425x185x102 M3 8.019 115,000 922,185

2 3-Mei-11 Kawat Beton Kg 1 12,400 12,400

Pipa PVC (Triliun) D Putih 4" Btng 1 75,000 75,000

3 4-Mei-11 Semen Holcim Zak 10 54,500 545,000

Klem Kabel No 8 Bks 2 4,000 8,000

Teedus Cbng 3 Bh 10 3,000 30,000

Teedus Cbng 4 Bh 5 3,500 17,500

SAT

Page 14: Rekap Material Mingguan Kav.28-1

Page 14

Pipa Listrik (Triliun) C Putih 5/8" Btng 1 4,000 4,000

Solasi Nitto Bh 1 7,000 7,000

4 6-Mei-11 Semen Holcim Zak 10 54,500 545,000

Paku 7+10Cm Kg 1 9,750 9,750

Paku 7Cm Kg 1 9,750 9,750

Paku 5Cm Kg 1 9,750 9,750

Benang No 9 Bh 1 5,000 5,000

Pipa Listrik (Triliun) C Putih 5/8" Btng 2 4,000 8,000

Solasi Nitto Bh 1 7,000 7,000

Pipa PVC (Triliun) D Putih 4" Btng 1 75,000 75,000

3,092,735

Dibuat Tgl:

Di Ajukan Di Setujui

Logistik Pelaksana

Kavling : 28

Periode : 7 - 13 mei 2011

No Tanggal URAIAN JUMLAHHARGA

TOTAL KeteranganSAT

1 7-Mei-11 Pipa PVC (Triliun) D Putih 4" Btng 6 75,000 450,000

Pipa PVC (Triliun) D Putih 3" Btng 1 55,000 55,000

Knee 4" Bh 4 12,000 48,000

Knee 3" Bh 4 9,000 36,000

Knee 2 1/2" Bh 4 8,000 32,000

Tee 4" Bh 2 12,000 24,000

Tee Y 4"x3" Bh 1 40,000 40,000

Ploksock 4"x3" Bh 2 -

Tee 4" Bh 1 12,000 12,000

Paku 10 Cm Kg 2 9,750 19,500

2 9-Mei-11 Knee 2 1/2" Bh 2 8,000 16,000

Pencil Kayu Bh 1 1,500 1,500

Kikir Bh 1 22,500 22,500

Paku 4+7Cm Kg 1 10,750 10,750

3 10-Mei-11 Kawat Beton Kg 1 12,400 12,400

Semen Holcim Zak 10 54,500 545,000

SAT

Page 15: Rekap Material Mingguan Kav.28-1

Page 15

Kabel TV Mtr 48 3,000 144,000

Kabel Tlpn Mtr 100 3,000 300,000

Pipa Listrik (Triliun) C Putih 5/8" Btng 2 4,000 8,000

Paku 10 Cm Kg 2-Jan 9,750 34,125

Paku 5 Cm Kg 2 9,750 19,500

4 11-Mei-11 Bambu Btng 20 9,000 180,000

Tambang Injuk iKet 25 5,000 125,000

Pipa PVC (Triliun) D Putih 4" Btng 1 75,000 75,000

5 12-Mei-11 Pipa PVC (Triliun) AW Putih 1" Btng 5 20,000 100,000

Pipa PVC (Triliun) AW Putih 1/2" Btng 3 1,400 4,200

Tee 1"x1/2" Bh 8 3,000 24,000

Ploksock 1"x2" Bh 5 6,000 30,000

Thinner Laba2 Hijau Gln 2 55,000 110,000

Cat Nippe NP 041 Saddle Brown Kg 3 49,000 147,000

Menie Celva Kg 4 40,000 160,000

Knee 1" Bh 5 3,000 15,000

Knee 1/2" Bh 3 2,000 6,000

Tee 1" Bh 5 3,000 15,000

Slang Ripeng (Westpeak) Mtr 50 9,000 450,000

Kabel (Eterna) NYM 2x1,5 Mtr 30 5,100 153,000

Klem Kabel No 8 Bks 3 4,000 12,000

6 13-Mei-11 Benang No 9 Bh 1 5,000 5,000

Skrup Gipsum Bh 60 150 9,000

Mata Bor Besi 2 Mm Bh 1 14,000 14,000

Paku 5 Cm Kg 2 9,750 19,500

Semen Holcim Zak 5 54,500 272,500

Box Sikring 6 Grup Bh 1 45,000 45,000

3,801,475

LAPORAN OPERASIONAL MATERIAL

PT. Syailendra Bangun Persada - Bandung

Kavling : 28

Luas bangunan :

Pelaksana :

Periode : 14- 20 mei 2011

No Tanggal URAIAN JUMLAHHARGA

TOTAL KeteranganSAT

1 14-Mei-11 Kabel (Prima) NYM 3x1,5 mm Roll 1 325,000 325,000

Pipa Listrik (Triliun) C Putih 5/8" Btng 1 4,000 4,000

Inbowdus (Panasonic) Bh 10 3,000 30,000

Semen Holcim Zak 10 54,500 545,000

Pipa PVC (Triliun) AW Putih 1" Btng 7 20,000 140,000

Pipa PVC (Triliun) AW Putih 1/2" Btng 5 14,000 70,000

Knee 1" R Bh 10 3,000 30,000

Knee 1" R Bh 10 3,000 30,000

Lem Pipa (Asahi) Kleng 1 25,000 25,000

2 15-Mei-11 Pipa PVC (Triliun) AW Putih 1" Btng 5 20,000 100,000

SAT

Page 16: Rekap Material Mingguan Kav.28-1

Page 16

Pipa PVC (Triliun) AW Putih 1/2" Btng 5 14,000 70,000

Knee 2 1/2" Bh 1 8,000 8,000

Knee Besi Drat Dalam 1/2" Bh 1 5,000 5,000

SDL 12" Bh 1 3,000 3,000

3 16-Mei-11 Pasir Pasang 425x185x102 M3 8.019 115,000 922,185

Triplex 6 Mm Lbr 2 75,000 150,000

4 18-Mei-11 Solasi (Nitto) Bh 1 7,000 7,000

Paku Kaca Ons 1 2,000 2,000

Semen Holcim Zak 10 54,500 545,000

5 19-Mei-11 Kabel (Eterna) NYM 3x2,5 mm Roll 31-Dec 462,500 462,500

Pasir Pasang 425x185x102 M3 8.019 90,000 721,710

6 20-Mei-11 Knee Drat Dalam 1/2" Bh 8 5,000 40,000

SDL 12" Bh 15 3,000 45,000

Knee Ripeng Westpeak 1/2" Bh 2 25,000 50,000

Knee Drat Ripeng Westpeak 1/2" Bh 4 25,000 100,000

4,430,395

Dibuat Tgl:

Di Ajukan Di Setujui

Logistik Pelaksana

LAPORAN OPERASIONAL MATERIAL

PT. Syailendra Bangun Persada - Bandung

Kavling : 28

Luas bangunan :

Pelaksana :

Periode : 21-27 mei 2011

No Tanggal URAIAN JUMLAHHARGA

TOTAL KeteranganSAT

1 21-Mei-11 Tee Ripeng (Westpeak) Bh 5 40,000 200,000

Knee Drat Ripeng (Westpeak) Bh 1 25,000 25,000

2 23-Mei-11 Semen Holcim Zak 10 54,500 545,000

Pipa Galpanis 3/4" Btng 1 120,000 120,000

Tombak Split penangkal petir Bh 1 25,000 25,000

Socket Drat Besi 3/4" Bh 1 5,000 5,000

Teedus Cbng 3 Bh 5 3,000 15,000

Klem Kabel No 9 Bks 2 4,000 8,000

SAT

Page 17: Rekap Material Mingguan Kav.28-1

Page 17

Klem Kabel No 8 Bks 1 4,000 4,000

kabel (Eterna) NYM 2x1,5 Mm Roll 1 255,000 255,000

Pisau Kramik (Bosch) Bh 2 85,000 170,000

3 24-Mei-11 Paku 10 Cm Kg 3 9,750 29,250

Kabel Antena TV Mtr 47 3,000 141,000

Kain Bal Kiloan Kg 0.5 20,000 10,000

4 25-Mei-11 Benang No 9 Bh 1 5,000 5,000

Paku 5 Cm Kg 1.5 9,750 14,625

Bata Merah Indramayu Bh 4392 520 2,283,840

Paku Kaca Ons 1 2,000 2,000

5 27-Mei-11 Semen Holcim Zak 10 54,500 545,000

Kleman Kabel No 8 Bks 1-Jan 4,000 8,000

Kleman Kabel No 9 Bks 1 4,000 4,000

Teedus Cbng 3 Bh 5 3,000 15,000

Kabel BC 25 Mtr 40 25,000 1,000,000

Pasir Pasang 425x185x105 M3 8.255 115,000 949,325

6,379,040

Dibuat Tgl:

Di Ajukan Di Setujui

Logistik Pelaksana

LAPORAN OPERASIONAL MATERIAL

PT. Syailendra Bangun Persada - Bandung

Puri Syailendra

Kavling : 28

Luas bangunan :

Pelaksana :

Periode : 28 mei -3 juni 2011

No Tanggal URAIAN JUMLAHHARGA

TOTAL KeteranganSAT

1 28-Mei-11 Amplas No 80 Mtr 1 9,000 9,000

Paku Beton 1" Dus 1 14,000 14,000

Kabel (Eterna) NYM 4x2,5 Mm Mtr 5 17,000 85,000

SAT

Page 18: Rekap Material Mingguan Kav.28-1

Page 18

Pipa PVC (Triliun) AW Putih 1/2" Btng 2 14,000 28,000

Kawat Beton Kg 1.5 12,400 18,600

2 30-Mei-11 Box MCB 8 Group Bh 1 45,000 45,000

Teedus Cbng 3 Bh 3 3,000 9,000

Mata Gergaji Besi (Sandflex) Bh 1 11,000 11,000

3 31-Mei-11 Paku Triplex Ons 1 2,000 2,000

Paku 4 Cm Ons 1 1,500 1,500

Besi 8 Banci Btnng 1 38,000 38,000

4 1-Juni-11 Semen Holcim Zak 10 54,500 545,000

Amplas slep Bh 5 11,000 55,000

Amplas Tayo No 80 Mtr 1 9,000 9,000

Meni Celva Kg 5 36,500 182,500

Thinner Laba2 Hijau Gln 2 55,000 110,000

Batu Slep (Resibon) Bh 3 10,000 30,000

Kawat Las Dus 1 97,500 97,500

Lampu (Cosco) 9 wtt Bh 1 22,000 22,000

Stecker (Broco) Bh 31-Dec 9,000 9,000

Fiting Lampu Bh 1 9,000 9,000

Paku 5 Cm Kg 1.5 1,500 2,250

Paku Triplex Ons 1 1,500 1,500

Batu Potong (Kinik) 14" Bh 1 31,000 31,000

Besi Beton 8 Banci Btng 1 27,500 27,500

5 2-Juni-11 Paku 5 + 10 Cm Kg 1.5 15,000 22,500

Thinner Laba2 Hijau Gln 1 57,500 57,500

6 3-Juni-11 Dempul Sanpolac Gln 1 86,000 86,000

Amplas No 240 Mtr 1 9,000 9,000

Ramset 7x8 Bh 20 1,200 24,000

Batu Potong (Kinik) 14" Bh 1 31,000 31,000

1,622,350

Dibuat Tgl:

Di Ajukan Di Setujui

Logistik Pelaksana

LAPORAN OPERASIONAL MATERIAL

PT. Syailendra Bangun Persada - Bandung

Puri Syailendra

Kavling : 28

Luas bangunan :

Pelaksana :

Periode : 4 - 10 juni 2011

No Tanggal URAIAN JUMLAHHARGA

TOTAL KeteranganSAT

1 4-Juni-11 Calbond U-stron Kg 1 30,000 30,000

Thinner Laba2 Hijau Gln 2 55,000 110,000

Cat Nippe Black dof 380 Kg 2 50,000 100,000

SAT

Page 19: Rekap Material Mingguan Kav.28-1

Page 19

Batu Slep (Resibon) 4" Bh 2 31,000 62,000

Paku 10 Cm Kg 1 9,750 9,750

Amplas No 80 Mtr 1 9,000 9,000

Semen Holcim Zak 4 54,500 218,000

2 6-Juni-11 Alcasit Bks 2 16,000 32,000

Amplas No 150 Mtr 4 9,000 36,000

Dempul RJ Gln 2 45,000 90,000

Koas 2 1/2" Bh 1 6,000 6,000

Impra SH-113 TEAK Gln 1 115,000 115,000

Benang No 9 Bh 1 5,000 5,000

Thinner Laba2 Hijau Gln 1 55,000 55,000

Kabel (Eterna) NYM 3x1.5 Roll 1 325,000 325,000

Kabel (Eterna) NYM 3x2.5 Roll 1 462,500 462,500

Kleman Kabel No 9 Bks 3 4,000 12,000

Semen Holcim Zak 10 54,500 545,000

3 7-Juni-11 Alumunium Omega Btng 4 45,000 180,000

Alumunium Lis U Btng 1-Jan 17,500 35,000

Cat Nippe Black dof 380 Kg 4 49,000 196,000

Solarlite Lbr 1 1,660,000 1,660,000

Thinner Laba2 Hijau Gln 1 55,000 55,000

Engsel Bubut 1" Psng 1 18,000 18,000

Paku Ruping 12x30 Bh 400 350 140,000

Nuts Sters Pendek Pcs 1 25,000 25,000

Knee Drat Ripeng Bh 4 25,000 100,000

Tee 1/2" Bh 3 3,000 9,000

Ploksock 1" x 1/2" Bh 2 3,000 6,000

Knee 1/2" Bh 6 2,000 12,000

Knee Besi Drat Dalam 1/2" Bh 8 5,000 40,000

Siltip Onda Bh 3 2,000 6,000

Paku 4 Cm Kg 1 15,000 15,000

Sealant Clear Bh 3 32,500 97,500

Knee Besi Drat Dalam 1/2" Bh 10 5,000 50,000

Dempul RJ Gln 1 45,000 45,000

Pipa PVC (Trilliun) AW Putih 1/2" Btng 4 14,000 56,000

4 8-Juni-11 Pipa PVC (Trilliun) D Putih 2 1/2" Btng 1 41,000 41,000

Pipa PVC (Triliun) D Putih 4" Btng 1 75,000 75,000

Paku 5 Cm Kg 0.5 9,750 4,875

Dempul RJ Pail 1 165,000 165,000

Plok sock 2 1/2"x3" Bh 3 9,500 28,500

Knee 2 1/2" Bh 5 8,000 40,000

Knee 1/2" Bh 10 2,000 20,000

Tee Drat 1/2" Bh 2 3,000 6,000

Besi Beton 8 Full Btng 2 38,000 76,000

Besi Beton 8 Banci btng 1 27,500 27,500

5 9-uni-11 Calbond U-stron Kg 1 30,000 30,000

Koas (Eterna) 3" Bh 1 6,500 6,500

Paku 5 Cm Kg 1 9,750 9,750

Page 20: Rekap Material Mingguan Kav.28-1

Page 20

Kawat Beton Kg 1 12,400 12,400

Knee 1" Bh 4 3,000 12,000

Tee Ripeng (Westpeak) Bh 1 40,000 40,000

Dop 1" Bh 2 3,000 6,000

Kabel Antena TV Mtr 13 3,000 39,000

Kabel (Eterna) NYM 2x1,5 Roll 1 255,000 255,000

Pipa Listrik (Triliun) C Putih 5/8" Btng 1 4,000 4,000

Dempul Gipsum Kg 1 5,000 5,000

Paku Beton 7 cm Bh 20 280 5,600

Semen Holcim Zak 10 54,500 545,000

Lem Pipa (Asahi) Kleng 1 25,000 25,000

Pipa PVC (Triliun) AW Putih 1/2" Btng 2 14,000 28,000

Pipa Listrik (Triliun) C Putih 5/8" Btng 1 4,000 4,000

Ploksock 3"x4" Bh 3 12,000 36,000

Tee 3"x2" Bh 1 15,000 15,000

Knee 3" Bh 3 9,000 27,000

Knee 4" Bh 1 12,000 12,000

Tee 3" Bh 2 12,000 24,000

Skraf NUG Set 1 15,000 15,000

6 10-juni-11 Spliter Antena TV 4x1 wy (Seebest) Bh 1 12,000 12,000

Spliter Antena TV 3x1 wy (Seebest) Bh 2 10,000 20,000

Pipa Listrik (Triliun) C Putih 5/8" Btng 1 4,000 4,000

Spliter Terminal Tlpn Bh 1 10,000 10,000

Eleganza YPKH 65100 Classic White (97 Box) Box 1 19,634,000 19,634,000

Eleganza MMP6700A Pure Black Box 17 -

Paku 10 Cm Kg 2 9,750 19,500

Calbond U-stron Kg 1 30,000 30,000

Kawat Beton Kg 1 12,400 12,400

Knee 3" Bh 8 9,000 72,000

Pipa PVC (Triliun) D Putih 3" Btng 2 55,000 110,000

26,531,775

Dibuat Tgl:

Di Ajukan Di Setujui

Logistik Pelaksana

LAPORAN OPERASIONAL MATERIAL

PT. Syailendra Bangun Persada - Bandung

Puri Syailendra

Kavling : 28

Luas bangunan :

Pelaksana :

Periode : 11 -17 juni 2011

Page 21: Rekap Material Mingguan Kav.28-1

Page 21

No Tanggal URAIAN JUMLAHHARGA

TOTAL KeteranganSAT

1 11-Juni-11 Paku Beton 2" Dus 1 14,000 14,000

Calbond U-stron Kg 1 30,000 30,000

Lampu Dinding Taman (Zetalux) Bh 2 45,000 90,000

Kabel Antena TV Mtr 21 3,000 63,000

Pipa Listrik (Triliun) C Putih 5/8" Btng 2 4,000 8,000

Lem Pipa (Asahi) Kleng 1 25,000 25,000

Pipa PVC (Triliun) D Putih 2 1/2" Btng 1 41,000 41,000

Semen Holcim Zak 4 54,500 218,000

Calbond U-stron Kg 1 30,000 30,000

Knee 3" Bh 2 9,000 18,000

Cat Vinilex (White) Gln 2 87,000 174,000

Calbond U-stron Kg 1 30,000 30,000

2 12-Juni-11 Besi Beton 8 Full Btng 1 27,500 27,500

3 13-Juni-11 Pipa Listrik (Triliun) C Putih 5/8" Btng 2 4,000 8,000

Inbowdus Clipsal Bh 5 3,000 15,000

Solasi Nitto Bh 1 7,000 7,000

Spliter Antena TV 3x1 wy (Seebest) Bh 1 10,000 10,000

Aquaproof Abu2 Kg 1 35,000 35,000

Cat Seiv 180 Super White Dof Kg 2 49,000 98,000

Teedus Cbng 3 Bh 10 3,000 30,000

Dempul Sanpolac Kg 1 22,500 22,500

Semen Holcim Zak 5 54,500 272,500

4 14-Juni-11 Semen Holcim Zak 10 54,500 545,000

Pipa Listrik (Triliun) C Putih 5/8" Btng 1 4,000 4,000

Pipa PVC (Triliun) D Putih 4" Btng 2 75,000 150,000

Knee 3/4" Bh 5 3,000 15,000

Pipa PVC (Triliun) D Putih 3/4" Btng 2 18,000 36,000

Teedus Cbng 3 Bh 10 3,000 30,000

Inbowdus (Panasonic) Bh 3 3,000 9,000

Kabel (Eterna NYM 3x1,5 Mtr 15 5,100 76,500

Spliter Terminal Tlpn Bh 1 10,000 10,000

5 15-Juni-11 Pipa PVC (Triliun) D Putih 1" Btng 3 20,000 60,000

Pipa PVC (Triliun) D Putih 2 1/2" Btng 1 41,000 41,000

Pipa PVC (Triliun) D Putih 1 1/4" Btng 1 27,500 27,500

Lem Pipa (Asahi) Kleng 1 25,000 25,000

Teedus Cbng 3 Bh 5 3,000 15,000

Teedus cbng 4 Bh 5 3,000 15,000

Kabel (Eterna) NYM 3x1,5 Mtr 5 6,500 32,500

Knee 2" Bh 1 6,000 6,000

Pipa PVC (Triliun) D Putih 2" Btng 1 32,500 32,500

6 16-Juni-11 Semen Holcim Zak 10 54,500 545,000

Cat Vinilex (White) 300 Pail 1 348,000 348,000

Bulu Roll Cat (Eterna) Bh 1 11,000 11,000

Pipa Listrik (Triliun) C Putih 5/8" Btng 2 4,000 8,000

SAT

Page 22: Rekap Material Mingguan Kav.28-1

Page 22

Kabel (Prima) NYM 2x1,5 Roll 1 255,000 255,000

Kabel Radar Torn (Perdana) 2x0,75 Roll 1 150,000 150,000

Pipa Listrik (Triliun) C Putih 5/8" Btng 2 4,000 8,000

7 17-Juni-11 Kabel (Eterna) NYM 3x1,5 Mtr 20 6,500 130,000

Teedus Cbng 3 Bh 3 3,000 9,000

Cat Dulux PT (Lakestone) 44153 Gln 1 121,000 121,000

Solasi (Unibel) Bh 2 7,000 14,000

Kramik Roman (RW 25x45 45206)(70 dus) ls 1 5,541,500 5,541,500

Kramik Roman (R 25x25 26249) dus 13 79,164 1,029,136

Knee 4" Bh 2 12,000 24,000

Pipa Listrik (Triliun) C Putih 5/8" Btng 1 4,000 4,000

10,594,136

Dibuat Tgl:

Di Ajukan Di Setujui

Logistik Pelaksana

LAPORAN OPERASIONAL MATERIAL

PT. Syailendra Bangun Persada - Bandung

Kavling : 28

Luas bangunan :

Page 23: Rekap Material Mingguan Kav.28-1

Page 23

Pelaksana :

Periode : 18- 24 juni 2011

No Tanggal URAIAN JUMLAHHARGA

TOTAL KeteranganSAT

1 18-Juni-11 Roll Cat (Motoroll) Bh 1 22,500 22,500

Pipa PVC (Triliun) D Putih 4" Btng 2 41,000 82,000

Semen Holcim Zak 10 54,500 545,000

Pipa Listrik (Triliun) C Putih 5/8" Btng 2 4,000 8,000

Downlet Inbow 4" Bh 1 20,000 20,000

Inbowdus Panasonic Bh 1 2,000 2,000

2 20-Juni-11 Cat Vinilex 300 White Pail 1 395,000 395,000

Paku 10 + 5 Cm Kg 1.5 9,750 14,625

Semen Holcim Zak 1 54,500 54,500

3 21-Juni-11 Downlight Inbow 4" Bh 2 20,000 40,000

Paku 10 Cm Kg 1 9,750 9,750

Paku 5 Cm Kg 0.5 9,750 4,875

Paku Triplex Kg 0.25 20,000 5,000

Kabel (Supreme) NYY 4x6 Mtr 21 56,000 1,176,000

Pipa PVC (Triliun) D Putih 1/2" Btng 1 14,000 14,000

Semen Holcim Zak 10 54,500 545,000

Kabel Antena TV Mtr 11 3,000 33,000

Besi Beton 8 Banci Btng 1 27,500 27,500

Box Tlpn Bh 1 90,000 90,000

Knee 1/2" Bh 1 2,000 2,000

4 22-Juni-11 Stopkontak Tutup (Broco) Bh 1 32,000 32,000

Inbowdus (Panasonic) Bh 2 2,000 4,000

Downlight Inbow 4" Bh 5 20,000 100,000

5 23-Juni-11 Downlight Inbow 4" Bh 9 20,000 180,000

Kabel (Suprim) NYY Mtr 20 56,000 1,120,000

Pasir Pasang 425x185x103 M3 8.098 115,000 931,270

Cat Dulux PT Lakestone 44153 Pail 1 959,000 959,000

Alkali Dulux 49100 Exterior Primer Pail 1 753,500 753,500

Semen Holcim Zak 10 54,500 545,000

Duradus External Bh 1 20,000 20,000

Kabel (Eterna) NYM 3x2,5 Mtr 25 9,250 231,250

6 24-Juni-11 Lampu Outbow Kotak Hitam Bh 1 70,000 70,000

Inbowdus Bh 2 2,000 4,000

Pipa Listrik (Triliun) C Putih 5/8" Btng 2 4,000 8,000

Amplas Slep Bh 2 11,000 22,000

Knee 1/2" Bh 2 2,000 4,000

8,074,770

Dibuat Tgl:

Di Ajukan Di Setujui

Logistik Pelaksana

LAPORAN OPERASIONAL MATERIAL

PT. Syailendra Bangun Persada - Bandung

SAT

Page 24: Rekap Material Mingguan Kav.28-1

Page 24

Kavling : 28

Luas bangunan :

Pelaksana :

Periode : 25 juni -01 juli 2011

No Tanggal URAIAN JUMLAHHARGA

TOTAL KeteranganSAT

1 25-Juni-11 Pipa PVC (Triliun) AW Putih 1" Btng 1 20,000 20,000

Lemkra Fs-202 (Putih) Kg 2 11,000 22,000

Sikat Kawat Kuningan Bh 2 6,000 12,000

Siltip Onda Bh 1 2,000 2,000

Semen Holcim Zak 1 54,500 54,500

Teedus Cbng 3 Bh 1 3,000 3,000

2 26-Juni-11 Semen Holcim Zak 1 54,500 54,500

3 27-Juni-11 Dempul Gipsum Kg 1.5 5,000 7,500

Cat Vinilex 300 (White) pail 1 395,000 395,000

Teedus Cbng 3 Bh 2 3,000 6,000

Semen Holcim Zak 6 54,500 327,000

Cat Dulux WS 4040M (DOVE) Gln 1 214,000 214,000

Cat Mowilex E200 (Hitam) Gln 1 110,000 110,000

Koas Eterna 2 1/2" Bh 1 6,000 6,000

Roll Cat Wall Coatter Bh 1 11,000 11,000

4 28-Juni-11 MCB (Schnider) 6A Bh 6 35,500 213,000

MCB (Schnider) 10A Bh 1 35,500 35,500

Lemkra Fs-202 (Putih) Kg 2 11,000 22,000

Paku 4 Cm Kg 0.25 15,000 3,750

Akuaproof Abu2 Kg 1 42,500 42,500

Koas Eterna 2 1/2" Bh 1 6,500 6,500

Dempul Gipsum Kg 8 5,000 40,000

5 29-Juni-11 Semen Holcim Zak 10 54,500 545,000

Knee 1/2" Bh 2 2,000 4,000

Tee 1" Bh 1 3,000 3,000

Dof 1" Bh 1 2,500 2,500

IMPRA MSS-123 Gln 1 182,000 182,000

Lakban Kertas Bh 2 6,000 12,000

Terpenten Btol 1 6,000 6,000

IMPRA Ws-162B Salak Brown Kg 1 44,000 44,000

Dempul RJ Gln1 1 45,000 45,000

Amplas No 120 Mtr 2 9,000 18,000

Amplas No 240 Mtr 2 9,000 18,000

Besi Beton 8 Banci Btng 5 27,500 137,500

Terpenten Btol 1 6,000 6,000

Thinner Laba2 Hijau Gln 1 55,000 55,000

6 30-Juni-11 Stopkontak AC (Panasonic) Bh 1 55,000 55,000

Semen Holcim Zak 3 54,500 163,500

7 1-Juli-11 IMPRA Ws-162B Salak Brown Kg 2 44,000 88,000

Lakban Kertas Bh 5 6,000 30,000

Terpenten Btol 2 6,000 12,000

SAT

Page 25: Rekap Material Mingguan Kav.28-1

Page 25

Semen Holcim Zak 13 54,500 708,500

Pasir Pasang Hitam 425x185x97 M3 7.626 115,000 876,990

Thinner Laba2 Hijau Gln 1 55,000 55,000

Stopkontak AC (Panasonic) Bh 1 55,000 55,000

Kabel Eterna NYM 3x2,5 Mtr 8 9,250 74,000

4,803,740

Dibuat Tgl:

Di Ajukan Di Setujui

Logistik Pelaksana

LAPORAN OPERASIONAL MATERIAL

PT. Syailendra Bangun Persada - Bandung

Kavling : 28

Luas bangunan :

Pelaksana :

Periode : 2 - 8 juli 2011

No Tanggal URAIAN JUMLAHHARGA

TOTAL KeteranganSAT

1 2-Juli-11 Kleman Kabel No 8 Bks 1 4,000 4,000

Besi Beton 10 Mm Btng 9 55,000 495,000

Besi Beton 6 Mm Btng 2 27,500 55,000

2 4-Juli-11 Semen Holcim Zak 10 54,500 545,000

Calbond U-stron Kg 1 30,000 30,000

Meni Celva Kg 5 39,000 195,000

Batu Slep Resibon 4" Bh 5 10,000 50,000

Slepan Amplas Bh 5 11,000 55,000

Kawat Las Nikko steel 2,6 Dus 1 97,500 97,500

Mata Gergaji Besi Bh 1 11,000 11,000

Thinner Laba2 Hijau Gln 1 55,000 55,000

Batu Potong Kinik 14" Bh 1 31,000 31,000

Bata Merah Bh 7000 520 3,640,000

3 5-Juli-11 Btng 1 55,000 55,000

Btng 1 27,500 27,500

Kawat Beton Kg 1 12,400 12,400

Bh 1 45,000 45,000

Amplas Tayo No 8o Mtr 2 9,000 18,000

4 6-Juli-11 Thinner Laba2 Hijau Gln 1 55,000 55,000

Semen Holcim Zak 6 54,500 327,000

Batu Potong Kinik 14" Bh 1 31,000 31,000

Downligh Inbow 4" Bh 15 20,000 300,000

Amplas Tayo No 8o mTR 1 9,000 9,000

5 7-Juli-11 Sockdrat Luar Dalam Stainles 1/2" Bh 2 17,500 35,000

Knee 1 1/4" Bh 3 4,500 13,500

Dof 4" Bh 1 11,000 11,000

Pipa PVC Triliun D Putih 1 1/4" Btng 2 27,500 55,000

Pipa PVC Unilon AW Abu 3/4" Btng 1 18,000 18,000

Besi Beton Ø 10 Mm

Besi Beton Ø 8 Banci

Knee 4" 45°

SAT

Page 26: Rekap Material Mingguan Kav.28-1

Page 26

Paku 4 Cm Kg 0.5 10,750 5,375

Kabel (Supreme) NYY 4x6 Mtr 44 56,000 2,464,000

Ramset 8x7 Bh 20 1,200 24,000

Thinner Laba2 Hijau Gln 1 55,000 55,000

6 8-Juli-11 Paku 4 Cm Kg 1 15,000 15,000

Pencil Kayu Bh 1 1,500 1,500

Koas 2 1/2" Bh 1 6,500 6,500

Cat Vinilex 300 Putih Pail 1 395,000 395,000

Aquaproof Abu Kg 1 32,000 32,000

Semen Holcim Zak 10 54,500 545,000

Paku 10 cm Kg 1 9,750 9,750

Downligh Inbow 4" Bh 8 20,000 160,000

Dempul IMPRA SH-113 Teak Gln 1 115,000 115,000

Batu Potong Kinik 14" Bh 1 31,000 31,000

Siltip Onda Bh 1 2,000 2,000

10,137,025

Dibuat Tgl:

Di Ajukan Di Setujui

Logistik Pelaksana

Page 27: Rekap Material Mingguan Kav.28-1

Page 27

LAPORAN OPERASIONAL MATERIAL

PT. Syailendra Bangun Persada - Bandung

Kavling : 28

Luas bangunan :

Pelaksana :

Periode : 9 - 15 juli 2011

No Tanggal URAIAN JUMLAHHARGA

TOTAL KeteranganSAT

1 9-Juli-11 Downlight inbow 4" Bh 12 20,000 240,000

Siltip Onda Bh 2 2,000 4,000

Amplas no 240 Mtr 2 9,000 18,000

Amplas no 120 Mtr 2 9,000 18,000

Tee 1" Bh 2 3,000 6,000

Krmk Roman 25x45 Rhapsody black Dus 2 79,164 158,329

Kabel NYY 4x6 Mtr 50 56,000 2,800,000

2 11-Juli-11 Ramset 7x8 Bh 10 1,200 12,000

Haxosfan (Maspion)MW-16 EX 25 W Unit 1 140,000 140,000

Downlight Outbow Kotak (YOMIKO) Bh 1 70,000 70,000

Lem Kayu Fox Kg 1 9,000 9,000

Terpenten Btol 1 6,000 6,000

3 12-Juli-11 Thinner Laba2 Hijau Gln 1 55,000 55,000

Downlight inbow 4" (Zetalux) Bh 3 70,000 210,000

Cat Dulux 4014 (DOVE) Gln 2 425,000 850,000

Lemkra FS-2003 Kg 1 11,000 11,000

4 13-Juli-11 Semen Holcim Zak 5 54,500 272,500

Paku 4 Cm Kg 0.25 17,500 4,375

Lemkra FS-2003 Hitam Kg 1 11,000 11,000

Engsel Pintu (MAVEN) Psng 2 31,000 62,000

5 14-Juli-11 MCB 6 A (SCNIDER) Bh 5 35,500 177,500

MCB 10 A (SCNIDER) BH 2 35,500 71,000

Jack TV Bh 2 1,000 2,000

Teedus Cbng 3 Bh 1 3,000 3,000

Kabel Eterna NYM 3x2,5 Mtr 3 9,250 27,750

Kabel Eterna NYM 2x1,5 Mtr 12 5,100 61,200

6 15-Juli-11 Semen Holcim Zak 4 54,500 218,000

5,517,654

Dibuat Tgl:

Di Ajukan Di Setujui

Logistik Pelaksana

SAT

Page 28: Rekap Material Mingguan Kav.28-1

Page 28

LAPORAN OPERASIONAL MATERIAL

PT. Syailendra Bangun Persada - Bandung

Puri Syailendra

Kavling : 28

Luas bangunan :

Pelaksana :

Periode : 16 -22 juli 2011

No Tanggal URAIAN JUMLAHHARGA

TOTAL KeteranganSAT

1 16-Juli-11 Amplas Tayo No 80 Mtr 2 9,000 18,000

Knee 1 1/2" Bh 3 3,500 10,500

Pipa PVC (Triliun) D Putih 1 1/2" Btng 1 25,000 25,000

Semen Holcim Zak 5 54,500 272,500

2 17-Juli-11 Terpenten Btol 2 6,000 12,000

IMPRA WS 162 Salak Brown Kg 2 44,000 88,000

IMPRA SS 123 Gln 1 192,000 192,000

Hardinner Btol 1 25,000 25,000

Thinner Laba2 Hijau Gln 1 55,000 55,000

Koas 2 1/2" Bh 1 6,500 6,500

3 18-Juli-11 Batu Potong Kinik 14" Bh 1 31,000 31,000

Inbowdus Clipsal Bh 1 4,000 4,000

Pipa Listrik (Triliun) C Putih 5/8" Btng 1 4,000 4,000

4 19-Juli-11 Engsel Pintu (Delizia) 4" Psng 7 31,000 217,000

Lampu Cosco 9 W Bh 1 22,000 22,000

Strecker Broco Bh 1 9,000 9,000

Kabel Eterna NYM 2x1,5 Mtr 5 5,100 25,500

Solasi Unibel Bh 1 7,500 7,500

Piting Plapon Kotak (Broco) Bh 1 9,000 9,000

Cat Dulux Ws-40140 Dove Pail 1 1,559,000 1,559,000

Cat Mowilex E200 Hitam Gln 1 110,000 110,000

Amplas No 240 Mtr 2 9,000 18,000

Amplas Tayo No 80 Mtr 2 9,000 18,000

5 20-Juli-11 Flourdrain Bh 2 50,000 100,000

Semen Holcim Zak 5 54,500 272,500

Pasir Pasang Hitam 420x190x110 M3 8.778 115,000 1,009,470

Moriselock (Dekson) 8485 IL SN Bh 3 85,000 255,000

Deluxe Cylinder (Dekson) 60 TC SN Bh 3 45,000 135,000

Handle BELLAGIO AB-008 NB Psng 3 90,000 270,000

Amplas Tayo No 80 Mtr 2 9,000 18,000

Page 29: Rekap Material Mingguan Kav.28-1

Page 29

6 21-Juli-11 Semen Holcim Zak 5 54,500 272,500

Mortiselock Dekson 8485 IL SN Bh 4 85,000 340,000

Handle BELLAGIO AB-008 NB Psng 3 90,000 270,000

Deluxe Cylinder (Dekson) 60 TC SN Bh 1 45,000 45,000

Lampu Carpot (Fatro) Htam Polos Bh 2 45,000 90,000

Stop Kontak Clipsal Bh 10 9,000 90,000

Socket 1" Bh 1 3,000 3,000

7 22-Juli-11 Downlight Outbow Kotak Bh 3 70,000 210,000

Outlet TV (Clipsal) Bh 8 62,500 500,000

Outlet Tlpn (Clipsal) Bh 3 71,000 213,000

Semen Holcim Zak 2 54,500 109,000

6,940,970

Dibuat Tgl:

Di Ajukan Di Setujui

Logistik Pelaksana

LAPORAN OPERASIONAL MATERIAL

PT. Syailendra Bangun Persada - Bandung

Kavling : 28

Luas bangunan :

Pelaksana :

Periode : 23 - 29 juli 2011

No Tanggal URAIAN JUMLAHHARGA

TOTAL KeteranganSAT

1 23-Juli-11 Lakban Kertas Bh 5 5,000 25,000

IMPRA WS-162 Salak Brown Kg 1 44,000 44,000

Kain Ball Kiloan Kg 0.25 25,000 6,250

Downlight Outbow Kotak Bh 2 70,000 140,000

Saklar Seri (Clipsal) Bh 15 48,000 720,000

IMPRA WS-162 Salak Brown BH 1 44,000 44,000

Benang Cap Peniti Bh 1 5,000 5,000

Semen Holcim Zak 3 54,500 163,500

2 25-Juli-11 Semen Holcim Zak 5 54,500 272,500

3 26-Juli-11 Handle (BELLAGIO) AB-008 NB Psng 2 90,000 180,000

Deluxe Cylinder BK 60 SN Bh 1 45,000 45,000

Deluxe Cylinder DC 60 SN Bh 2 45,000 90,000

Mortiselock (Dekson) IL SN Bh 2 85,000 170,000

Saklar Seri (Clipsal) Bh 5 48,000 240,000

Saklar Tunggal (Clipsal) Bh 3 32,000 96,000

Saklar Hotel (Clipsal) Bh 1 38,000 38,000

Stopkontak (Clipsal) Bh 1 29,500 29,500

4 27-Juli-11 Cat Nippe Black Dof Kg 2 51,000 102,000

Menie Poxi (Nippe) Kg 1 39,000 39,000

Lemkra FS-202 Kg 1-Jan 11,000 22,000

Hexosfan MVY6EX (Masppion) 25 W Bh 31-Dec 140,000 140,000

Stopkontak (Clipsal) Bh 10 29,500 295,000

Page 30: Rekap Material Mingguan Kav.28-1

Page 30

Outlet TV (Clipsal) Bh 3 62,500 187,500

Outlet Tlpn (Clipsal) Bh 1 71,000 71,000

Semen Holcim Zak 1 54,500 54,500

Ramset 7x8 BH 22 1,200 26,400

5 28-Jli-11 Thinner Laba2 Hijau Gln 2 55,000 110,000

IMPRA ML-131 Semi Gloss Gln 1 192,000 192,000

Semen Holcim Zak 2 54,500 109,000

Saklar Tunggal (Clipsal) Bh 2 38,000 76,000

Saklar Seri (Clipsal) Bh 2 48,000 96,000

Teedus Cbng 3 Bh 2 3,000 6,000

Stopkontak (Clipsal) Bh 6 29,500 177,000

Lakban Kertas Bh 1 6,000 6,000

Delxe Cylinder (Dekson) TC 60 SN BH 1 85,000 85,000

Amplas No 120 Mtr 2 9,000 18,000

Semen Holcim Zak 1 54,500 54,500

Thinner Laba2 Hijau Gln 1 55,000 55,000

6 29-Juli-11 Stopkontak (Clipsal) Bh 2 29,500 59,000

Saklar Tunggal (Clipsal) Bh 1 32,000 32,000

Semen Holcim Zak 4 54,500 218,000

Paku Beton 1 1/4" Dus 1 16,000 16,000

4,555,650

Dibuat Tgl:

Di Ajukan Di Setujui

Logistik Pelaksana

LAPORAN OPERASIONAL MATERIAL

PT. Syailendra Bangun Persada - Bandung

Kavling : 28

Luas bangunan :

Pelaksana :

Periode : 30 juli - 5 agust 2011

No Tanggal URAIAN JUMLAHHARGA

TOTAL KeteranganSAT

1 30-Juli-11 Kleman Kabel No 8 Bks 1 4,000 4,000

Amplas No 120 Mtr 2 9,000 18,000

Dempul Sampolac Kg 1 22,000 22,000

Semen Holcim Zak 2 54,500 109,000

2 2-Agustus-11 Cat Dulux PT (Lakestone) 44153 Pail 1 959,000 959,000

Floor Grating Stainles Steel 4"x4" Bh 1 55,000 55,000

Thinner Laba2 Hijau Gln 1 55,000 55,000

3 3-Agustus-11 Semen Holcim Zak 2 54,500 109,000

Amplas No 180 Mtr 2 9,000 18,000

4 4-Agustus-11 Piber Talang Mtr 6 10,000 60,000

Semen Holcim Zak 1 54,500 54,500

5 5-Agustus-11 Semen Holcim Zak 2 54,500 109,000

Dempul RJ Gln 1 45,000 45,000

Page 31: Rekap Material Mingguan Kav.28-1

Page 31

Lampu Sorot Halogen Flood Light set 1 70,000 70,000

Zetalux 150 Wtt Bh 1 90,000 90,000

1,777,500

Dibuat Tgl:

Di Ajukan Di Setujui

Logistik Pelaksana

LAPORAN OPERASIONAL MATERIAL

PT. Syailendra Bangun Persada - Bandung

Puri Syailendra

Kavling : 28

Luas bangunan :

Pelaksana :

Periode : 6 - 12 agustus 2011

No Tanggal URAIAN JUMLAHHARGA

TOTAL KeteranganSAT

1 6-Agustus-11 Semen Holcim Zak 3 54,500 163,500

2 8-Agustus-11 Semen Holcim Zak 2 54,500 109,000

IMPRA WS-162 B Salak Brown Klng 1 44,000 44,000

Terpenten Btol 1 6,000 6,000

Semen Holcim Zak 4 54,500 218,000

Engsel Pintu 4" Psng 2 31,000 62,000

3 9-Agustus-11 Paku 5 Cm Kg 0.5 9,750 4,875

Tee 3/4" Bh 1 3,000 3,000

Dof 3/4" Bh 2 2,500 5,000

Sealant Clear Btol 2 32,500 65,000

Kawat Beton Kg 1 12,400 12,400

Paku 7 Cm Kg 0.5 9,750 4,875

Paku 10 Cm Kg 0.5 9,750 4,875

Thinner Laba2 Hijau Gln 1 55,000 55,000

IMPRA MSS-123 2 Comp Gln 1 180,000 180,000

Lakban Krtas Bh 2 5,000 10,000

Baud Ruping Bh 50 400 20,000

4 10-Agustus-11 Semen Tigaroda Zak 10 57,000 570,000

5 11-Agustus-11 Benang Cap Peniti Bh 1 5,000 5,000

Amplas No 240 Mtr 2 9,000 18,000

Pasir Pasang Hitam 420x190x105 M3 8.379 90,000 754,110

Thinner Laba2 Hijau Gln 2 55,000 110,000

Lakban Krtas Bh 2 5,000 10,000

6 12-Agustus-11 Semen Tigaroda Zak 5 57,000 285,000

Page 32: Rekap Material Mingguan Kav.28-1

Page 32

Tee 1"x1/2" Bh 1 3,000 3,000

Pipa PVC (Triliun) AW Putih 1/2" Btng 1 14,000 14,000

Masterproof Pail 1 585,000 585,000

Cat Genteng Merah CP Kg 5 12,000 60,000

Dounlight Inbow 4" Bh 1 20,000 20,000

Semen Holcim Zak 2 54,500 109,000

3,510,635

Dibuat Tgl:

Di Ajukan Di Setujui

Logistik Pelaksana

LAPORAN OPERASIONAL MATERIAL

PT. Syailendra Bangun Persada - Bandung

Kavling : 28

Luas bangunan :

Pelaksana :

Periode : 13 - 19 agustus 2011

No Tanggal URAIAN JUMLAHHARGA

TOTAL KeteranganSAT

1 13-Agustus-11 Semen Holcim Zak 4 54,500 218,000

Amplas No 120 Mtr 2 9,000 18,000

Mata Bor Beton 8 Mm Bh 1 12,500 12,500

Koas 2 1/2" Bh 1 6,000 6,000

Tee Shhower 1/2" (Stainles) Bh 3 16,000 48,000

2 15-Agustus-11 Semen Holcim Zak 2 54,500 109,000

Tee Z shower Bh 3 17,500 52,500

Sikat Kawat Kuningan Bh 2 6,000 12,000

Outbow Kotak 4" Bh 1 16,000 16,000

Torn Air 1100 Ltr + Kaki2 Bh 1 2,750,000 2,750,000

3 16-Agustus-11 Semen Holcim Zak 2 54,500 109,000

Thinner Laba2 Hijau Gln 2 55,000 110,000

Cat Nippe 2000 Black Dof Kg 1 51,000 51,000

Kawat Las Nikko Steel 2,6 Dus 1 97,500 97,500

Meni Nippe Kg 1 37,500 37,500

Stop Kontak Clipsal Bh 3 22,500 67,500

Benang Cap Peniti Bh 1 5,000 5,000

Sapu Lantai Bh 1 12,500 12,500

4 18-Agustus-11 Lemkra Fs-210 Cream Kg 5 11,000 55,000

Cat Dulux Pt Lakestone 44153 Pail 31-Dec 959,000 959,000

Semen Holcim Zak 3-Jan 54,500 218,000

Sikat Kawat Kuningan Bh 2 6,000 12,000

Batu Sikat Panca Warna Krung 2 40,000 80,000

5 19-Agustus-11 Semen Holcim Zak 4 54,500 218,000

Tee Shhower 1/2" (Stainles) Bh 2 19,000 38,000

Page 33: Rekap Material Mingguan Kav.28-1

Page 33

Lemkra Fs-210 Cream Kg 3 11,000 33,000

Sikat Kawat Kuningan Bh 2 6,000 12,000

Batu Sikat Panca Warna Krung 5 40,000 200,000

Koas 3" Bh 1 6,500 6,500

5,563,500

Dibuat Tgl:

Di Ajukan Di Setujui

Logistik Pelaksana

LAPORAN OPERASIONAL MATERIAL

PT. Syailendra Bangun Persada - Bandung

Puri Syailendra

Kavling : 28

Luas bangunan :

Pelaksana :

Periode : 20 - 24 agustus 2011

No Tanggal URAIAN JUMLAHHARGA

TOTAL KeteranganSAT

1 20-Agustus-11 Lemkra Fs-210 Cream Kg 2 11,000 22,000

Ploksock 1" x 3/4" Bh 2 3,500 7,000

Ploksock 3/4" x 1/2" Bh 2 3,000 6,000

Knee 3/4" Bh 4 3,000 12,000

SDL 3/4" Bh 4 35,000 140,000

Downlight Outbow Kotak Bh 2 70,000 140,000

Stopkran 1" Bh 2 22,500 45,000

Stopkran 1/2" Bh 2 14,000 28,000

Porstex Yuri Btol 1 11,000 11,000

Lemkra Fs-210 Cream Kg 10 11,000 110,000

Batu Sikat Panca Warna Krung 1 40,000 40,000

Semen Holcim Zak 3 54,500 163,500

2 22-Agustus-11 Semen Holcim Zak 6 54,500 327,000

Batu Sikat Panca Warna Krung 7 40,000 280,000

Pleuh 3/4" Bh 2 1,000 2,000

Pipa PVC 1/2" (Triliun) Btng 1 14,000 14,000

Sikat Kawat Kuningan Bh 4 6,000 24,000

Ploksok 3/4" x 1/2" Bh 2 3,000 6,000

Knee 3/4" Bh 2 2,500 5,000

Lampu Cosco 11 Watt Bh 1 22,500 22,500

Page 34: Rekap Material Mingguan Kav.28-1

Page 34

Tee 1" x 1/2" Bh 2 3,500 7,000

Ploksok 1" x 1/2" Bh 2 35,000 70,000

Lemkra Fs - 210 Cream Kg 6 11,000 66,000

Lemkra Fs - 203 Hitam Kg 2 11,000 22,000

Cat Dulux Ws Dove 40140 M Gln 4 214,000 856,000

Papan Borneo 3cm x 30cm x 4m Lbr 1 220,000 220,000

Triplek 4 Mm Lbr 2 45,000 90,000

3 23-Agustus-11 Lemkra Fs - 210 Cream Kg 4 11,000 44,000

Stopkontak Clipsal Bh 2 22,500 45,000

Radar Torn Bh 1 70,000 70,000

Paku Beton 1" Bh 10 14,000 140,000

HCL Btol 2 15,000 30,000

Coating Batu Mowilex Gln 1 125,000 125,000

Sikat Kawat Baja Bh 2 10,000 20,000

Paku 4 Cm Kg 30-Dec 15,000 7,500

4 24-Agustus-11 Coating Batu (AM) Clear Kleng 1 -

Lemkra Fs- 203 Hitam Kg 1 11,000 11,000

Dempul RJ Gln 1 45,000 45,000

Semen Holcim Zak 1 54,500 54,500

Talang PVC 4" Btng 1 -

Coating Batu Kleng 1 17,000 17,000

Gembok Bh 1 22,500 22,500

Semen Holcim Zak 4 54,500 218,000

3,585,500

Dibuat Tgl:

Di Ajukan Di Setujui

Logistik Pelaksana

LAPORAN OPERASIONAL MATERIAL

PT. Syailendra Bangun Persada - Bandung

Kavling : 28

Luas bangunan :

Pelaksana :

Periode : 6 - 9 sept 2011

No Tanggal URAIAN JUMLAHHARGA

TOTAL KeteranganSAT

1 6-Septmbr-11 Mesin Pendorong (SHIMIZU) PC-135 Unit 1 365,000 365,000

2 8-Septmbr-11 Rel Pintu Dorong AF 80 Bh 1 120,000 120,000

Bulu Roll Cat ACE Bh 1 15,000 15,000

3 9-Septmbr-11 Semen Holcim Zak 2 54,500 109,000

Amplas No 180 Mtr 1 9,000 9,000

618,000

Dibuat Tgl:

Di Ajukan Di Setujui

Page 35: Rekap Material Mingguan Kav.28-1

Page 35

Logistik Pelaksana

LAPORAN OPERASIONAL MATERIAL

PT. Syailendra Bangun Persada - Bandung

Kavling : 28

Luas bangunan :

Pelaksana :

Periode : 12 -16 sept 2011

No Tanggal URAIAN JUMLAHHARGA

TOTAL KeteranganSAT

1 12-Septmbr-11 Alkasit Bks 3 16,000 48,000

Mata Gergaji Besi Bh 1 11,000 11,000

2 13-Septmbr-11 Bulu Roll Cat Kecil (Busa) Bh 1 11,000 11,000

Amplas No 240 Mtr 0.5 9,000 4,500

Knee 1" Bh 5 3,000 15,000

Kran Taman (Onda) Bh 2 25,000 50,000

SDL 1" Bh 2 3,000 6,000

SDL 3/4" Bh 2 3,000 6,000

Ploksock 1" x 3/4" Bh 1 3,500 3,500

Siltip Onda Bh 2 2,000 4,000

Koas 1" Bh 1 3,000 3,000

Koas 2" Bh 1 4,500 4,500

Socket Ripeng (Westpeak) Bh 1 25,000 25,000

Slang Ripeng (Westpeak) Mtr 6 9,000 54,000

3 15-Septmbr-11 Pipa PVC (Triliun) AW Putih 1/2" Btng 1 14,000 14,000

Knee 1/2" Bh 5 2,000 10,000

Tee 1" x 1/2" Bh 1 3,500 3,500

Semen Holcim Zak 2 54,500 109,000

Tee Ripeng (Westpeak) 1/2" Bh 1 45,000 45,000

Page 36: Rekap Material Mingguan Kav.28-1

Page 36

Cat Dulux Ws Dove Gln 31-Dec 214,000 214,000

Body Kunci Pintu Dorong Psng 31-Dec 100,000 100,000

Porstex Yuri Btol 1 11,000 11,000

4 16-Septmbr-11 Koas 1" Bh 1 3,000 3,000

755,000

Dibuat Tgl:

Di Ajukan Di Setujui

Logistik Pelaksana

LAPORAN OPERASIONAL MATERIAL

PT. Syailendra Bangun Persada - Bandung

Kavling : 28

Luas bangunan :

Pelaksana :

Periode : 17 - 21 sept 2011

No Tanggal URAIAN JUMLAHHARGA

TOTAL KeteranganSAT

1 17-Septmbr-11 Knee 1" Bh 2 3,000 6,000

Semen Holcim Zak 1 54,500 54,500

Washtafel LW 240 CJ Set 2 1,103,200 2,206,400

Washtafel LW 562 Pth Set 1 1,078,000 1,078,000

2 19-Septmbr-11 Lemkra Fs-202 (Putih) Kg 1 11,000 11,000

Skruf 7 Cm Bh 4 250 1,000

Flashband (Tambal Talang) Roll 1 82,500 82,500

4 20-Septmbr-11 Saklar Seri (Clipsal) Bh 1 48,000 48,000

LEMKRA Fs-203 (Hitam) Kg 1 11,000 11,000

Porstex Yuri Btol 1 15,000 15,000

Lampu ECLAT 11W/CDL Classic Bh 75 22,000 1,650,000

Kap Bambu 1x18W(P) Philips Set 2 115,000 230,000

Broco Fiting Plafond Segi Bh 1 9,000 9,000

Atlantic Stopkontak Bh 1 32,500 32,500

Handle Kotak Psng 1 130,000 130,000

Lampu Taman B0130-60 (Vacolux) Bh 1 325,000 325,000

5 21-Septmbr-11 Mesin Pompa (SHIMIZU) 375 BIT Unit 1 1,400,000 1,400,000

Page 37: Rekap Material Mingguan Kav.28-1

Page 37

Hardener IMPRA 0,5 L Btol 1 25,000 25,000

Knee 1" Bh 1 3,000 3,000

Knee 1 1/4" Bh 2 4,500 9,000

SDL 1" Bh 1 3,000 3,000

SDL 1 1/4" Bh 1 6,500 6,500

Ploksock 1 x 1 1/4" Bh 1 4,500 4,500

Knee 2 12" Bh 1 8,000 8,000

Lemkra Fs-202 (Putih) Kg 1 11,000 11,000

Paku Beton 1 1/4" Bh 20 320 6,400

Knee 1" Bh 1 3,000 3,000

Knee 1/2" Bh 1 2,000 2,000

7,371,300

Dibuat Tgl:

Di Ajukan Di Setujui

Logistik Pelaksana

Page 38: Rekap Material Mingguan Kav.28-1

Page 38

1,963,475

Page 39: Rekap Material Mingguan Kav.28-1

Page 39

3,466,089

Page 40: Rekap Material Mingguan Kav.28-1

Page 40

4,604,850

Page 41: Rekap Material Mingguan Kav.28-1

Page 41

7,280,000

Page 42: Rekap Material Mingguan Kav.28-1

Page 42

2,203,285

Page 43: Rekap Material Mingguan Kav.28-1

Page 43

3,255,585

Page 44: Rekap Material Mingguan Kav.28-1

Page 44

4,603,585

Page 45: Rekap Material Mingguan Kav.28-1

Page 45

994,520

Page 46: Rekap Material Mingguan Kav.28-1

Page 46

922185

Page 47: Rekap Material Mingguan Kav.28-1

Page 47

922,185

Page 48: Rekap Material Mingguan Kav.28-1

Page 48

3,233,165

Page 49: Rekap Material Mingguan Kav.28-1

Page 49

931,270

Page 50: Rekap Material Mingguan Kav.28-1

Page 50

876,990

Page 51: Rekap Material Mingguan Kav.28-1

Page 51

1,009,470

Page 52: Rekap Material Mingguan Kav.28-1

Page 52

36,266,654

Page 53: Rekap Material Mingguan Kav.28-1

REKAPITULASI MATERIAL PT. Syailendra Bangun Persada - Bandung

Puri Syailendra

Kavling : 28Luas bangunan : 195Pelaksana :

No Minggu ke Periode

1 07-10 februari 2011 19,900,975 2 12-18 Februari 2011 10,695,364 3 19-24 Februari 2011 8,089,325 4 26 feb-04 mar 2011 12,874,050 5 05-11 maret 2011 18,509,685 6 12 - 18 maret 2011 8,346,835 7 19-025 maret 2011 3,284,310 8 28 maret - 01 april 2011 10,694,085 9 02 - 80 April 2011 2,034,375

10 09 - 15 April 2011 1,536,750 11 16 -22 April 2011 7,310,770 12 23 - 30 April 2011 3,250,500 13 2 - 6 mei 2011 3,092,735 14 7 - 13 mei 2011 3,801,475 15 14- 20 mei 2011 4,430,395 16 21-27 mei 2011 6,379,040 17 28 mei -3 juni 2011 1,622,350 18 4 - 10 juni 2011 26,531,775 19 11 -17 juni 2011 10,594,136 20 18- 24 juni 2011 8,074,770 21 25 juni -01 juli 2011 4,803,740 22 2 - 8 juli 2011 10,137,025 23 9 - 15 juli 2011 5,517,654 24 16 -22 juli 2011 6,940,970 25 23 - 29 juli 2011 4,555,650 26 30 juli - 5 agust 2011 1,777,500 27 6 - 12 agustus 2011 3,510,635 28 13 - 19 agustus 2011 5,563,500 29 20 - 24 agustus 2011 3,585,500 30 6 - 9 sept 2011 618,000 31 12 -16 sept 2011 755,000 32 17 - 21 sept 2011 7,371,300

TOTAL 226,190,173 423,461,898 520,961,898

Jumlah

Page 54: Rekap Material Mingguan Kav.28-1

2,741,905

Page 55: Rekap Material Mingguan Kav.28-1

REKAPITULASI MATERIALKALING 28

3/4/2011 Material bambu3/14/2011 Bata merah (UOB000039)3/16/2011 Material pasir+split (hana GHAA097684)3/16/2011 Konsumsi cor3/18/2011 Material pasir (MDR QH039121)3/29/2011 Material kayu multi (BCA AW097018)4/6/2011 Material kayu multi (BCA AW097020)

4/11/2011 Material bata + Pasir (BCA AW097022)5/6/2011 Material Bata (Hana GHAA097690)5/9/2011 Material plat esser u/talang

5/14/2011 Pek. Talang Canopi5/24/2011 Kurang bayar Material bata5/24/2011 Material Genteng (BCA BB242904)6/10/2011 Material kusen (BCA BB242910)6/23/2011 Cat dulux 6/23/2011 Cat dulux 6/30/2011 Rangka atap (BCA BB242914)7/16/2011 Material keramik roman (BCA BD861751)7/12/2011 Material logistik (BCA BB242915)6/4/2011 Pekerjaan las tralis,torem, kanopi

7/28/2011 Gipsum8/11/2011 Saniter7/20/2011 Pintu tobindo

9/5/2011 solartuff7/19/2011 solartuff (mulford)7/21/2011 bata merah (sari endah)7/21/2011 sari endah (pasir)7/20/2011 Batu andesit

8/2/2011 Material granitKusen almuniumParguetPintu garasi sandez

Page 56: Rekap Material Mingguan Kav.28-1

Rp 1,530,000 Rp 7,157,000 Rp 15,915,000 Rp 1,562,000 Rp 350,000

Rp 4,585,000 Rp 4,368,000 Rp 3,462,000 Rp 5,818,000 Rp 2,940,000 Rp 2,000,000 Rp 960,000 Rp 350,000 Rp 6,881,000 Rp 6,856,000 Rp 1,125,000 Rp 753,000 Rp 15,647,000 Rp 5,541,500 Rp 32,975,000 Rp 2,325,000

Rp 10,131,000 Rp 6,986,700 Rp 9,440,150 Rp 2,017,125 Rp 1,660,000 Rp 3,255,000 Rp 3,775,250 Rp 2,954,000 Rp 19,634,000 Rp 20,233,000

Rp 10,000,000 Rp 197,271,725