Page 2: Renewable Energy in Kuwait Between Vision & Reality...MEW Roof Top PV Projects Applying PV’s on the Roofs of (6) Stores in Sabhan Installed Capacity 3.75 MW. Tendering Installation

By 2030 about 900,000 Barrels / day will be use to

cover the Demand for Electricity & Water

Which will be 1/3 of Kuwait

OIL Production

Kuwait Renewable Energy Vision

Page 3: Renewable Energy in Kuwait Between Vision & Reality...MEW Roof Top PV Projects Applying PV’s on the Roofs of (6) Stores in Sabhan Installed Capacity 3.75 MW. Tendering Installation

Power Demand Forecasting 2030

Housing Projects 12,000 MW

KOC Upstream 1,100MW

NEW University 450 MW

Commercial & Industrial 600 MW

KNPC (NRP+CFP) 800 MW

Bobyan Island 900 MW

Additional Power Required for Kuwait Projects up to 2030

18,000 MW

Page 4: Renewable Energy in Kuwait Between Vision & Reality...MEW Roof Top PV Projects Applying PV’s on the Roofs of (6) Stores in Sabhan Installed Capacity 3.75 MW. Tendering Installation

Peak Load & Available Capacity - 2030

5000

10000

15000

20000

25000

30000

35000

2010 2016 2020 2025 2030

Peak Load Including Projects (MW) Available + Expected Capacity (MW)

13390 MW

30274 MW

33710 MW

22622 MW

10890 MW

15682 MW

20700 MW

29510 MW

11650 MW

16905 MW

Page 5: Renewable Energy in Kuwait Between Vision & Reality...MEW Roof Top PV Projects Applying PV’s on the Roofs of (6) Stores in Sabhan Installed Capacity 3.75 MW. Tendering Installation

Completed VS. Future

Since 2013

26 project have been completed

Total installed capacity 39.5 MW

By 2022

35 project are under design and/or construction

Total installed capacity 1,658 MW

Renewable contribution estimated to reach 11.42%

Page 6: Renewable Energy in Kuwait Between Vision & Reality...MEW Roof Top PV Projects Applying PV’s on the Roofs of (6) Stores in Sabhan Installed Capacity 3.75 MW. Tendering Installation

MEW & MPW Buildings

First project with Mega capacity

Operation on April 20 2014

Installed Capacity 1 MW

Page 7: Renewable Energy in Kuwait Between Vision & Reality...MEW Roof Top PV Projects Applying PV’s on the Roofs of (6) Stores in Sabhan Installed Capacity 3.75 MW. Tendering Installation

MEW Roof Top PV Projects

Applying PV’s on the Roofs of (6) Stores in Sabhan

Installed Capacity 3.75 MW.

Tendering Installation PV’s on the roofs of existing and new parking areas at

Phase I - Main Workshops - Installed Capacity 2.7 MW

Phase II - Power Stations - Installed Capacity 3.0 MW

Phase III - Other MEW Buildings - Installed Capacity 3.3 MW

Planned date for operation by 2019

Page 8: Renewable Energy in Kuwait Between Vision & Reality...MEW Roof Top PV Projects Applying PV’s on the Roofs of (6) Stores in Sabhan Installed Capacity 3.75 MW. Tendering Installation

First CDM PV Project

Sidra 500

• Installed capacity 10 MW

• Operation date October 2016

Page 9: Renewable Energy in Kuwait Between Vision & Reality...MEW Roof Top PV Projects Applying PV’s on the Roofs of (6) Stores in Sabhan Installed Capacity 3.75 MW. Tendering Installation

PV @ MEW Ground Water Reservoirs

• 25 Locations

• 300 MW Total Installed Capacity

• Phase 1- to be tendered 2nd Quarter 2017

• Location : Subiya - Capacity 30 MW

Page 11: Renewable Energy in Kuwait Between Vision & Reality...MEW Roof Top PV Projects Applying PV’s on the Roofs of (6) Stores in Sabhan Installed Capacity 3.75 MW. Tendering Installation

Abdaleyah Integrated Solar Combined Cycle “ISCC” Project

Total 280 MW including 60 MW Solar.

PQ List includes 8 Consortiums.

Page 12: Renewable Energy in Kuwait Between Vision & Reality...MEW Roof Top PV Projects Applying PV’s on the Roofs of (6) Stores in Sabhan Installed Capacity 3.75 MW. Tendering Installation

0,00 0,02 0,03 0,30 0,84

3,70 3,72

10,85 11,30 11,42

0,00

2,00

4,00

6,00

8,00

10,00

12,00

2013 2014 2015 2016 2017 2018 2019 2020 2012 2022

RENEWABLE VS DEMAND

Page 13: Renewable Energy in Kuwait Between Vision & Reality...MEW Roof Top PV Projects Applying PV’s on the Roofs of (6) Stores in Sabhan Installed Capacity 3.75 MW. Tendering Installation