    Activity ID Activity Name OriginalDuration

    Start Finish

    SWT-CP-1160 Grouting of identified shearkey locations in North Side 18d 26-May-12 14-Jun-12

    SWT-CP-1170 Grouting of identified shearkey locations in East Side 10d 17-Jun-12 27-Jun-12SWT-CP-1180 Grouting of identified shearkey locations in South Side 8d 28-Jun-12 07-Jul-12

    WALKWAY REPAIRING WWALKWAY REPAIRING WORKS 40d 02-May-12 17-Jun-12

    SWT-CP-1190 Sealing by Epoxy injection on cracked surfaces 30d 02-May-12 05-Jun-12

    SWT-CP-1200 Saw Cutting and Sealing in Construction joint surfaces 30d 14-May-12 17-Jun-12

    HANDINGOVERHANDINGOVER 55d 05-May-12 07-Jul-12

    SWT-CP-1205 Removal of debris and cleaning of site 55d 05-May-12 07-Jul-12

    SWT-CP-1210 Handing over 0d 07-Jul-12

    Apr May Jun Jul

    Qtr 2, 2012 Qtr 3, 2012

    Grouting of identified shearkey locations in Nor

    Grouting of identified

    Gr17-Jun-12, WALKWAY REPAIRING WO

    Sealing by Epoxy injection on cracked surfaces

    Saw Cutting and Sealing in Construction07-

    ReHa

    DOHA NORTH SEWERAGE TRATMENT PLANT-BIOREACTOR 5 REPAIR WORKS FOR BIOREACTOR -5

    SEWERAGE TREATMENT PLANT -DOHA NORTH

    05-Apr-12 13:41

    Primary Baseline

    Actual Work

    Remaining Work

    Critical Remaining W ork

    Milestone

    Summary Date Revision Checked Approved 5