Page 1: Replacement Steam Generator - Framatomede.areva.com/customer/liblocal/docs/KUNDENPORTAL/Forward Allianc… · Steam Generator Replacement Steam Generator Reliable and optimized steam

Steam Generator

Replacement Steam Generator

Reliable and optimized steam generators for Long-Term Operation (LTO)

The challenge

The fi rst generations of Steam Generators (SG) using Inconel 600 alloys (particularly alloys with-out thermal treatment) have been confronted by corrosion issues leading to the necessity to plug damaged tubes. The corrosion of the tubes varied considerably from one plant to the other and was highly impacted by chemistry management in the early days of the plant.

In order to ensure the safety and reliability of the plant in the longer term the Inconel 600 SG must be replaced especially when LTO is envisaged.

Utilities can take advantage of such replacements to uprate the plant.

The solution

With 340 Steam Generators designed and manu-factured including 100 Replacement Steam Gen-erators, AREVA has gained extensive experience that supports its capability to supply highly reliable steam generators. AREVA products also benefi t from operating experi-ence: improvements have been implemented to reduce the deposits and performance has been improved.

Combined with optimized chemistry management, steam generator replacement can consequently contribute to improve the performance of the plant for long-term operation.

Additionally the axial economizer technology can effi ciently support Power uprates.

Aging Management by Component

Anti vibration bars on Steam Generator

Key features

• Capability of supply for all models

• Conventional design or axial economizer designs

• Improved corrosion resistance:

– Alloy 690 TT tubing

– Stress relief heat treatment of small U-bends

• Loose parts trapping system

• Anti-stratifi cation design

• High-effi ciency primary separators

• Stainless Steel Tube Support Plates with fl at lands

Page 2: Replacement Steam Generator - Framatomede.areva.com/customer/liblocal/docs/KUNDENPORTAL/Forward Allianc… · Steam Generator Replacement Steam Generator Reliable and optimized steam

Your benefi ts at a glance

• A high level of reliability supported by AREVA’s experience gained in designing and delivering 100 RSGs and 240 for New build

• Steam generators that will cover the remaining lifetime of the plant

• Large manufacturing capabilities guaranteeing optimization of on-time delivery

• Option to replace existing conventional SGs by axial economizer SGs in the case of power uprate

• Capability to provide support supply and installation packages to facilitate interface management for the customer

Replacement Steam Generator

The statements contained in this document are for information purpose only and shall under no circumstances be considered as a binding off er or an off er to contract. In no event this document and any information included herein shall be construed as providing any warranties or performance guarantees either express or implied, including without limitation warranties of merchantability and fi tness for a particular purpose. Subject to any applicable law, AREVA and any AREVA group companies disclaim all responsibility in case of error or omission and assume no responsibility to update any statements contained herein.

AREVA References:

• Belgium: 6 Replacement of Steam Generators (RSG) at Doel 4 and Tihange 3• Brazil: 2 RSG at Angra 1• France: EDF 1300MW and 900 MW fleet: 84 RSG• Sweden: 6 RSG at Ringhals 3&4• Switzerland: 2 RSG at Beznau 2• USA: 18 RSG at Prairie Island 1&2, Callaway, ANO1, Salem 2, St Lucie 2, TMI • 240 Steam Generators for New Build projects

Steam generator transport