revised ms kpis 18 oct 04
TRANSCRIPT
-
7/28/2019 Revised MS KPIs 18 Oct 04
1/23
LCL UCL Max Penalty
1 Cells having utilization >90% >=9%
-
7/28/2019 Revised MS KPIs 18 Oct 04
2/23
LCL
1 Cells having utilization >90% >=9%
LCL
2 SDCCH Blocking =95%
92.5%/87.
5%
4 TCH Blocking
-
7/28/2019 Revised MS KPIs 18 Oct 04
3/23
UCL
Max Penalty
Limit
=5%
97.5%/92.
5%HOSR
-
7/28/2019 Revised MS KPIs 18 Oct 04
4/23
LCL UCL Max Penalty Limit
1 Round Trip Time =800 >=900 ms
2Attach Success rate excluding Unregistered
subs=99.5% =5%
GPRS thruput
1 Average UL throughput per TBF =25
-
7/28/2019 Revised MS KPIs 18 Oct 04
5/23
PARAMETERS KPI TARGETMetro/Circle Mumbai
Total Equipped Capacity (as on 25th of the month)
Sites
Cells
Total TRX
EDGE TRX
Erlangs
Incremental Capacity added during the monthNo. of BTS sites installed during the month
No. of Erlangs installed during the month.
No. of EDGE TRXs installed during the month
Traffic (NBH)
Full Rate Traffic
Half Rate Traffic
Total Traffic
Traffic (BBH)
Total Traffic
Utilization
Radio Network Utilization (during BBH)
-
7/28/2019 Revised MS KPIs 18 Oct 04
6/23
Cells with Utilization>90% =95 % >95/90
SDCCH Blocking 95/90
SDCCH Time Congestion 95/90
SDCCH Drop 95/90
TCH Blocking 95/90TCH Time Congestion 95/90
TCH Assignment Success Rate >=95 % >95/90
TCH Drop 95/90
Handover Success Rate>=95 % >95/90
Switch KPI's
Peak Processor Load (MSCs/BSCs) % =92
Location Update Success Rate (NBH) % >=97
Successful Call Rate (24 Hrs) % >99
Network Availability (Switch/IN/GPRS)% >99.99
Data KPI's
Round trip time =99
PDP context activation success rate (Only NW Cause codes) % >=99
Gb Utilisation % =30 kbps
EDGE KPIs
Average UL throughput per TBF >=30 kbps
Average DL throughput per TBF >=45 kbps
Voice Quality
Voice Quality (MOS) in all cells during NBH >=3.8
Remarks
For Ericsson India Pvt LtdNetwork Quality-Authorised Signatory
-
7/28/2019 Revised MS KPIs 18 Oct 04
7/23
For Bharti Televentures LtdHead -Commercial
-
7/28/2019 Revised MS KPIs 18 Oct 04
8/23
MH&G Gujarat Bihar Orissa
revious month to 25th of Current
KPI ACHIEVED
st East
-
7/28/2019 Revised MS KPIs 18 Oct 04
9/23
twork Quality-Authorised Signat
or Bharti Televentures Lt
-
7/28/2019 Revised MS KPIs 18 Oct 04
10/23
For Bharti Televentures LtdHead -Network Quality
-
7/28/2019 Revised MS KPIs 18 Oct 04
11/23
LCL UCL
1 Radio Network Utilization (during BBH) >=50% =75%
-
7/28/2019 Revised MS KPIs 18 Oct 04
12/23
8 Random Access Success Rate =98.5%
9 Paging Success Rate =94%
10 Location Update Success Rate =98%
11 Successful Call Rate (during 24 hrs) =99.5%
12 SDCCH Drop =1.3%
13 TCH Drop =2.2%
92%
97%
99%
2%
Retainability
1.2%
98%
-
7/28/2019 Revised MS KPIs 18 Oct 04
13/23
14 Handover Success Rate =99%
LCL UCL
15 Voice Quality (MOS) in all Cells during NBH =3.9
LCL UCL
17 Network Availability (Radio) =99.99%
18 Network Availability (Switch/IN/GPRS)=99.995
%99.99%
3.8
AvailabilityNetwork Wide KPIs (during 24 hours) Target
97%
Voice Quality
Network Wide KPIs (during NBH)
99.97%
Target
-
7/28/2019 Revised MS KPIs 18 Oct 04
14/23
Max Penalty Limit Comments Formulae Reference
>=100%
netwrok expansion is taking
place not in accordance with real
traffic. And since we are already
have call blocking as KPI, why
we need this KPI Used Erlang/ Created Erlang
>=90%
Why this should be a KPI. We
are measuring anyway the swith
performance as part of the KPI
(SCR). Any high loading of the
Switch will reflect in those KPIs
>=1%Existing formula to be used blck_5a
=2%
Existing formula to be used. UCL
should be 1.5% blck_8d
>=0.5%
(cngt_2)3600*1/100
>=2.8%
(cngt_1)3600*1/100
-
7/28/2019 Revised MS KPIs 18 Oct 04
15/23
-
7/28/2019 Revised MS KPIs 18 Oct 04
16/23
-
7/28/2019 Revised MS KPIs 18 Oct 04
17/23
Detail Formula
100 x (SDCCH_busy_att - tch_seiz_due_sdcch_con) / (SDCCH_seiz_att)
100*(tch__assign)/(tch_call_req)%
sum(a.tch_call_req - a.tch_norm_seiz)
- sum(b.msc_o_sdcch_tch + b.bsc_o_sdcch_tch + b.cell_sdcch_tch);
DR calls
+ sum(a.tch_succ_seiz_for_dir_acc) ;ref.2
- sum(a.tch_rej_due_req_ch_a_if_crc ; Aif type mismatch or congestion
-(b.bsc_i_unsucc_a_int_circ_type ; Aif circuit pool handover failures
+ b.msc_controlled_in_ho
+ b.ho_unsucc_a_int_circ_type))
100 * -------------------------------------------------------------------------- %
sum(a.tch_call_req)
- sum(a.tch_rej_due_req_ch_a_if_crc ; Aif type mismatch or congestion
-(b.bsc_i_unsucc_a_int_circ_type ; Aif circuit pool handover failures
+ b.msc_controlled_in_ho
+ b.ho_unsucc_a_int_circ_type))
Counters from table(s):
a = p_nbsc_traffic
b = p_nbsc_ho
Ref.2. Compensation needed since in the case of Direct Access to super
reuse TRX
the tch_norm_seiz is triggered in parallel with the cell_sdcch_tch.
(sum(sdcch_cong_time/100)/3600)%
Counters from table(s):
p_nbsc_res_availUnit: seconds
(sum(tch_cong_time/100)/3600)%
Counters from table(s):
p_nbsc_res_avail
Unit: seconds
-
7/28/2019 Revised MS KPIs 18 Oct 04
18/23
sum(a.ghost_ccch_res - a.rej_seiz_att_due_dist; illegal establ. cause
+ a.bcsu_overload_lower_limit
+ a.bcsu_overload_upper_limit
+ a.bcsu_overload_deleted_rach)
100-100 * ---------------------------------------------------------------------- %
sum(a.ch_req_msg_rec+b.packet_ch_req
)
All counters are from the Counters from table(s):
a= p_nbsc_res_access
b= p_nbsc_packet_control_unti
100* sum(succ_page)/sum(fail_page+succ_page)
Counters from table(s):
p_msc_vlr
sum(nbr_of_calls) where counter_id = 26 /* LU completed */100 * -------------------------------------------------------------- %
sum(nbr_of_calls) where counter_id = 25 /* LU started */
Counters from table(s):
p_nbsc_cc_pm
= 1- ((INTERNAL_FAILURES)/TOTAL CALLS)
100 x sum (sdcch_radio_fail + sdcch_rf_old_ho + sdcch_user_act +
sdcch_bcsu_reset + sdcch_netw_act + sdcch_bts_fail + sdcch_lapd_fail +
/ sum (sdcch_assign + sdcch_ho_seiz) - sum(sdcch_abis_fail_call +
sdcch_abis_fail_old) -sum (sdcch_a_if_fail_call + sdcch_a_if_fail_old)
Drops after TCH assignment considering re-establishments
100 * -------------------------------------------------------- % =
TCH assignments for new calls
sum(spare057044 - tch_re_est_release)
100 * ------------------------------------- %
sum(tch_new_call_assign)
Counters from table(s):p_nbsc_service
-
7/28/2019 Revised MS KPIs 18 Oct 04
19/23
Sum(msc_o_call_clear+bsc_o_call_clear+cell_call_clear)
100 * ------------------------------------------------------%
/* all HO attempts */
sum(msc_o_tch_tch_at+msc_o_sdcch_tch_at+msc_o_sdcch_at
+bsc_o_tch_tch_at+bsc_o_sdcch_tch_at+bsc_o_sdcch_at
...... +cell_tch_tch_at+cell_sdcch_tch_at+cell_sdcch_at)
/* HO impossible, no HO command sent */
-sum(msc_o_fail_lack+msc_o_not_allwd+msc_controlled_out_ho
+msc_o_adj_cell_id_err_c
+bsc_o_fail_lack+bsc_o_not_allwd+bsc_o_unsucc_a_int_circ_type
+cell_not_allwd+cell_fail_lack+ho_unsucc_a_int_crct_type)
Counters from table(s):
p_nbsc_ho
-
7/28/2019 Revised MS KPIs 18 Oct 04
20/23
PARAMETERSKPI TARGET
Metro/Circle Comme
Total Equipped Capacity (as on 25th of the month)
Sites
Cells
Total TRX
EDGE TRX
Erlan s
Incremental Capacity added during the month
No. of BTS sites installed during the month
No. of Erlangs installed during the month.
No. of EDGE TRXs installed during the month
Traffic NBH
Full Rate Traffic
Half Rate Traffic
Total Traffic
Traffic (BBH)
Total Traffic
Utilization
Radio Network Utilization durin BBH
-
7/28/2019 Revised MS KPIs 18 Oct 04
21/23
PARAMETERSKPI TARGET
Metro/Circle Co
Handover Success Rate % >=97This
to b
Network Availability (Radio)% >=99.97
Cell Wise KPI % Cell Bus HourCells with Utilization>90% =95 % >95/90 Sam
SDCCH Blocking 95/90 Sam
-
7/28/2019 Revised MS KPIs 18 Oct 04
22/23
PARAMETERS KPI TARGETMetro/Circle Comme
Switch KPI's
Peak Processor Load (MSCs/BSCs) % =92
Location Update Success Rate (NBH) % >=97
Successful Call Rate (24 Hrs) % >99
Bharti pro
be tested
reviewed
agrremen
Network Availability (Switch/IN/GPRS)% >99.99
Data KPI's
Round trip time
-
7/28/2019 Revised MS KPIs 18 Oct 04
23/23
LCL UCL Max Penalty Limit
1 Radio Network Utilization (during BBH) >=50% =100%
2 Switch BHCA (during Switch NBH) >=75% =90%
LCL UCL Max Penalty Limit
3 % SDCCH Blocking =0.6% >=1%
4 % TCH Assignment Success Rate =98% =2%6 % SDCCH Time Congestion =0.35% >=0.5%
7 % TCH Time Congestion =1.7% >=2.8%
8 Random Access Success Rate =98.5%