revision 00 page 1 of 102 - trakheestrakhees.ae/en/ehs/gb/documents/guidelines... · revision 00...
TRANSCRIPT
![Page 1: Revision 00 Page 1 of 102 - Trakheestrakhees.ae/en/ehs/gb/Documents/Guidelines... · Revision 00 Page 14 of 102 B1 Compliance with Thermal Insulation system & Best Practices Energy](https://reader034.vdocuments.net/reader034/viewer/2022051909/5ffd9094e02b4e634174cabb/html5/thumbnails/1.jpg)
Revision 00 Page 1 of 102
![Page 2: Revision 00 Page 1 of 102 - Trakheestrakhees.ae/en/ehs/gb/Documents/Guidelines... · Revision 00 Page 14 of 102 B1 Compliance with Thermal Insulation system & Best Practices Energy](https://reader034.vdocuments.net/reader034/viewer/2022051909/5ffd9094e02b4e634174cabb/html5/thumbnails/2.jpg)
Revision 00 Page 2 of 102
![Page 3: Revision 00 Page 1 of 102 - Trakheestrakhees.ae/en/ehs/gb/Documents/Guidelines... · Revision 00 Page 14 of 102 B1 Compliance with Thermal Insulation system & Best Practices Energy](https://reader034.vdocuments.net/reader034/viewer/2022051909/5ffd9094e02b4e634174cabb/html5/thumbnails/3.jpg)
Revision 00 Page 3 of 102
Introduction
This document is being issued by EHS Sustainability department in the interest of the stakeholders so as to enable
them to make a proper submission. Most importantly this document is to provide the stakeholders with a broad
perspective of the type of evidence EHS Sustainability Department expects in the process of review of their
submissions prior to approvals.
Scope
This general guideline is applicable to all the stakeholders involved in the Green building projects within Trakhees -
PCFC / Dubai World business units
Aim
The aim of this document is to highlight the importance of supporting documentation and evidence in order to establish
the fulfilment of a credit in the project. It is important that the project stakeholders comprising the client, Architectural &
Engineering consultant, green building specialist(if involved in the project) and others together are able to demonstrate
the compliance to the Regulation and its requirements in a clear and consistent manner. This entails supporting
documentation comprising calculations, reports, photographs etc. depending on the nature of the credit
Sections
This guideline is given in the form of a several slides each representing a specific section of the regulation
![Page 4: Revision 00 Page 1 of 102 - Trakheestrakhees.ae/en/ehs/gb/Documents/Guidelines... · Revision 00 Page 14 of 102 B1 Compliance with Thermal Insulation system & Best Practices Energy](https://reader034.vdocuments.net/reader034/viewer/2022051909/5ffd9094e02b4e634174cabb/html5/thumbnails/4.jpg)
Revision 00 Page 4 of 102
Conclusion
This guideline provides a broad framework of the documentation involved in actual implementation of the green
building principles and is intended purely to familiarize the client and the other stakeholders on the need to
adequately demonstrate the compliance through several mechanisms. While this serves to throw light on the basic
requirements, the stakeholders can exercise their option and judgment in including other forms of evidence that they
feel are crucial in demonstrating the compliance
This document (Submission sample format ) has been prepared to serve as a guideline (assistance) for the
consultants and contractors to prepare their submission packages to EHS. This should not be seen as an all
inclusive requirement of Trakhees-EHS or as a set of instructions which if complied with would lead to automatic
approval from the authority. It will be the sole responsibility of the consultant and the contractor to ascertain the
actual requirements and expectations of the regulations and ensure that the submissions that they make to the
authorities are complete with ALL the evidence deemed essential to demonstrate the compliance.
This guideline does not bind EHS in limiting its response to the elements of this document. EHS has the right to ask
additional information / clarification / documentation that it may feel essential for demonstrating the compliance.
Should you need any assistance please do not hesitate to contact the department
![Page 5: Revision 00 Page 1 of 102 - Trakheestrakhees.ae/en/ehs/gb/Documents/Guidelines... · Revision 00 Page 14 of 102 B1 Compliance with Thermal Insulation system & Best Practices Energy](https://reader034.vdocuments.net/reader034/viewer/2022051909/5ffd9094e02b4e634174cabb/html5/thumbnails/5.jpg)
Revision 00 Page 5 of 102
GENERAL GUIDELINES
1. Fill out the Submission Booklet
2. Collate the evidence required as per the Regulation.
3. Suggested formats / documentation as highlighted in this document
4. Put together the submission package in a structured manner as illustrated
![Page 6: Revision 00 Page 1 of 102 - Trakheestrakhees.ae/en/ehs/gb/Documents/Guidelines... · Revision 00 Page 14 of 102 B1 Compliance with Thermal Insulation system & Best Practices Energy](https://reader034.vdocuments.net/reader034/viewer/2022051909/5ffd9094e02b4e634174cabb/html5/thumbnails/6.jpg)
Revision 00 Page 6 of 102
GENERAL GUIDELINES
1. Fill out the Submission Booklet
2. Collate the evidence required as per regulation.
3. Suggested formats / documentation as highlighted in this document
4. Put together the submission package in a structured manner as illustrated
![Page 7: Revision 00 Page 1 of 102 - Trakheestrakhees.ae/en/ehs/gb/Documents/Guidelines... · Revision 00 Page 14 of 102 B1 Compliance with Thermal Insulation system & Best Practices Energy](https://reader034.vdocuments.net/reader034/viewer/2022051909/5ffd9094e02b4e634174cabb/html5/thumbnails/7.jpg)
July 2016 Revision 00 Page 7 of 102
Supporting Documents
A
Green Building
1. Fee Receipt
2. Submission Booklet
3. Others
B
C
D
E
F
G
H
A1
A2 B1
B14
H1
H4
STRUCTURING THE GREEN BUILDING SUBMISSION PACKAGE
![Page 8: Revision 00 Page 1 of 102 - Trakheestrakhees.ae/en/ehs/gb/Documents/Guidelines... · Revision 00 Page 14 of 102 B1 Compliance with Thermal Insulation system & Best Practices Energy](https://reader034.vdocuments.net/reader034/viewer/2022051909/5ffd9094e02b4e634174cabb/html5/thumbnails/8.jpg)
Revision 00 Page 8 of 102
![Page 9: Revision 00 Page 1 of 102 - Trakheestrakhees.ae/en/ehs/gb/Documents/Guidelines... · Revision 00 Page 14 of 102 B1 Compliance with Thermal Insulation system & Best Practices Energy](https://reader034.vdocuments.net/reader034/viewer/2022051909/5ffd9094e02b4e634174cabb/html5/thumbnails/9.jpg)
Revision 00 Page 9 of 102
Integrated Design Approach for achieving energy savings A1
Minutes of Meeting Copy
Minutes of Meeting – Date stamped Photo
![Page 10: Revision 00 Page 1 of 102 - Trakheestrakhees.ae/en/ehs/gb/Documents/Guidelines... · Revision 00 Page 14 of 102 B1 Compliance with Thermal Insulation system & Best Practices Energy](https://reader034.vdocuments.net/reader034/viewer/2022051909/5ffd9094e02b4e634174cabb/html5/thumbnails/10.jpg)
Revision 00 Page 10 of 102
Post Contract Green Briefing A2
Format ….Undertaking letter
![Page 11: Revision 00 Page 1 of 102 - Trakheestrakhees.ae/en/ehs/gb/Documents/Guidelines... · Revision 00 Page 14 of 102 B1 Compliance with Thermal Insulation system & Best Practices Energy](https://reader034.vdocuments.net/reader034/viewer/2022051909/5ffd9094e02b4e634174cabb/html5/thumbnails/11.jpg)
Revision 00 Page 11 of 102
Compliance with Thermal Insulation system & Best Practices Energy Conservation B1
Extract from Specifications
![Page 12: Revision 00 Page 1 of 102 - Trakheestrakhees.ae/en/ehs/gb/Documents/Guidelines... · Revision 00 Page 14 of 102 B1 Compliance with Thermal Insulation system & Best Practices Energy](https://reader034.vdocuments.net/reader034/viewer/2022051909/5ffd9094e02b4e634174cabb/html5/thumbnails/12.jpg)
Revision 00 Page 12 of 102
Compliance with Thermal Insulation system & Best Practices Energy Conservation B1
Building details
![Page 13: Revision 00 Page 1 of 102 - Trakheestrakhees.ae/en/ehs/gb/Documents/Guidelines... · Revision 00 Page 14 of 102 B1 Compliance with Thermal Insulation system & Best Practices Energy](https://reader034.vdocuments.net/reader034/viewer/2022051909/5ffd9094e02b4e634174cabb/html5/thumbnails/13.jpg)
Revision 00 Page 13 of 102
Compliance with Thermal Insulation system & Best Practices Energy Conservation B1
Building details
![Page 14: Revision 00 Page 1 of 102 - Trakheestrakhees.ae/en/ehs/gb/Documents/Guidelines... · Revision 00 Page 14 of 102 B1 Compliance with Thermal Insulation system & Best Practices Energy](https://reader034.vdocuments.net/reader034/viewer/2022051909/5ffd9094e02b4e634174cabb/html5/thumbnails/14.jpg)
Revision 00 Page 14 of 102
Compliance with Thermal Insulation system & Best Practices Energy Conservation B1
EXTERNAL WALL SEC NO 1
LAYER THK. DESCRIPTIONS
DENSITY R Mass
NO in Ib/ft3 oF ft2.h/Btu Ib/ft2
1.00 1.000 Out side surface resistance 0.000 0.250 0.000
442.02 3.400 2 IN RHP (Roof APPLY.) Rigid Polyurethane Insulation Panel with Steel & Alu.facing Sandwich Panel (RH-4''Box Rib) Registered
2007 2.188 21.334 0.620
26.00 0.500 Plaster (Cement / Sand) 116.250 0.100 4.844
2.00 1.000 Inside vertical surface resistance 0.000 0.680 0.000
1.000 0.000 0.000 0.000 0.000
0.00 1.000 0.000 0.000 0.000 0.000
0.00 1.000 0.000 0.000 0.000 0.000
0.00 1.000 0.000 0.000 0.000 0.000
0.00 1.000 0.000 0.000 0.000 0.000
0.00 1.000 0.000 0.000 0.000 0.000
0.00 1.000 #N/A #N/A 0.000 0.000
Sec.Thk 3.900 REV. 2 2007 15 2 2007
AS PER DM REGU. Outside color U (Btu / OF ft2 h)
R Mass
0.100 D 0.045 22.364 5.464
ROOF NO 4
LAYER THK. DESCRIPTIONS
DENSITY R Mass
NO in Ib/ft3 oF ft2.h/Btu Ib/ft2
1.00 1.000 1 IN Outside surface resistance 0.000 0.250 0.000
6.00 2.000 Terrazzo Tiles 160.000 0.160 26.667
12.00 0.500 .5 IN Plaster (Cement / Sand) 116.250 0.100 4.844
68.01 3.100 Rigid Polyfoam-50 ((Rcc Roof Slabs ) - Registered 2007 - Certified DCL 3.125 19.452 0.807
9.02 4.000 Light Weight Concrete (Light Weight Aggregate) 100.000 0.687 33.333
9.00 8.000 Reinforced Concrete 150.000 0.624 100.000
12.00 0.500 .5 IN Plaster (Cement / Sand) 116.250 0.100 4.844
3.00 1.000 1 IN Inside horizontal surface resistance 0.000 0.920 0.000
0.00 1.000 #N/A #N/A 0.000 0.000
0.00 1.000 #N/A #N/A 0.000 0.000
0.00 1.000 #N/A #N/A 0.000 0.000
Sec.Thk 18.100 REV. (1) 25 9 2007
AS PER DM REGU. Outside color U (Btu / OF ft2 h)
R Mass
0.078 D 0.045 22.294 170.495
Envelope U (thermal) Calculations and Sections
![Page 15: Revision 00 Page 1 of 102 - Trakheestrakhees.ae/en/ehs/gb/Documents/Guidelines... · Revision 00 Page 14 of 102 B1 Compliance with Thermal Insulation system & Best Practices Energy](https://reader034.vdocuments.net/reader034/viewer/2022051909/5ffd9094e02b4e634174cabb/html5/thumbnails/15.jpg)
July 2016 Revision 00 Page 15 of 102
Compliance with Thermal Insulation system & Best Practices Energy Consn B1
Envelope Sections - Wall
![Page 16: Revision 00 Page 1 of 102 - Trakheestrakhees.ae/en/ehs/gb/Documents/Guidelines... · Revision 00 Page 14 of 102 B1 Compliance with Thermal Insulation system & Best Practices Energy](https://reader034.vdocuments.net/reader034/viewer/2022051909/5ffd9094e02b4e634174cabb/html5/thumbnails/16.jpg)
Revision 00 Page 16 of 102
Envelope Sections - Roof
![Page 17: Revision 00 Page 1 of 102 - Trakheestrakhees.ae/en/ehs/gb/Documents/Guidelines... · Revision 00 Page 14 of 102 B1 Compliance with Thermal Insulation system & Best Practices Energy](https://reader034.vdocuments.net/reader034/viewer/2022051909/5ffd9094e02b4e634174cabb/html5/thumbnails/17.jpg)
Revision 00 Page 17 of 102
Glazing Details / Sections
![Page 18: Revision 00 Page 1 of 102 - Trakheestrakhees.ae/en/ehs/gb/Documents/Guidelines... · Revision 00 Page 14 of 102 B1 Compliance with Thermal Insulation system & Best Practices Energy](https://reader034.vdocuments.net/reader034/viewer/2022051909/5ffd9094e02b4e634174cabb/html5/thumbnails/18.jpg)
Revision 00 Page 18 of 102
HAP Input summary sheet
![Page 19: Revision 00 Page 1 of 102 - Trakheestrakhees.ae/en/ehs/gb/Documents/Guidelines... · Revision 00 Page 14 of 102 B1 Compliance with Thermal Insulation system & Best Practices Energy](https://reader034.vdocuments.net/reader034/viewer/2022051909/5ffd9094e02b4e634174cabb/html5/thumbnails/19.jpg)
Revision 00 Page 19 of 102
HAP Input summary sheet
![Page 20: Revision 00 Page 1 of 102 - Trakheestrakhees.ae/en/ehs/gb/Documents/Guidelines... · Revision 00 Page 14 of 102 B1 Compliance with Thermal Insulation system & Best Practices Energy](https://reader034.vdocuments.net/reader034/viewer/2022051909/5ffd9094e02b4e634174cabb/html5/thumbnails/20.jpg)
Revision 00 Page 20 of 102
HAP Input summary sheet
![Page 21: Revision 00 Page 1 of 102 - Trakheestrakhees.ae/en/ehs/gb/Documents/Guidelines... · Revision 00 Page 14 of 102 B1 Compliance with Thermal Insulation system & Best Practices Energy](https://reader034.vdocuments.net/reader034/viewer/2022051909/5ffd9094e02b4e634174cabb/html5/thumbnails/21.jpg)
Revision 00 Page 21 of 102
Limiting / Reversing Thermal Bridges B2
Compliance Strategies
Thermal Bridging Concept Report
![Page 22: Revision 00 Page 1 of 102 - Trakheestrakhees.ae/en/ehs/gb/Documents/Guidelines... · Revision 00 Page 14 of 102 B1 Compliance with Thermal Insulation system & Best Practices Energy](https://reader034.vdocuments.net/reader034/viewer/2022051909/5ffd9094e02b4e634174cabb/html5/thumbnails/22.jpg)
July 2016 Revision 00 Page 22 of 102
All the Non-Repeating Thermal Bridges (i.e. junctions of floor and roof with the external wall, and details around
window and door openings) shall be reduced by designing all insulating building components to work in unison and
by creating barrier to heat flow in building envelope. The insulation shall be reviewed in relation to its location within
wall and roofs, its interface/connectivity with surrounding or penetration materials and connectivity within & between
insulating
components.
Following are the general strategies to be adopted at a minimum in order to achieve minimize thermal bridges:
- All the gaps between ceiling and walls shall be sealed with either plaster, adhesive or flexible sealant.
- All the gaps between walls and floor shall be sealed with either plaster, adhesive or flexible sealant.
- All the penetrations through air barrier shall be sealed by using a flexible sealant.
- All the penetrations around windows & door openings shall be sealed by using a flexible sealant.
- Partially filled insulation shall be secured firmly against inner leaf of wall.
- Provide full depth insulation between and over joists extending to inner edge of wall.
- Cavities shall be kept clean of mortar snots and other debris during construction.
- Provide a continuous air barrier of masonry inner leaf with wet-finish plaster alongside of internal wall, floor and
ceilings. Apply flexible sealant to all interfaces between internal air barriers and window/door frames.
Drawings for acceptable construction details shall be prepared by the contractor and approval has to be taken from
the consultant prior to proceed for the construction in relevance to the above
requirements.
Thermal Bridging Strategy
![Page 23: Revision 00 Page 1 of 102 - Trakheestrakhees.ae/en/ehs/gb/Documents/Guidelines... · Revision 00 Page 14 of 102 B1 Compliance with Thermal Insulation system & Best Practices Energy](https://reader034.vdocuments.net/reader034/viewer/2022051909/5ffd9094e02b4e634174cabb/html5/thumbnails/23.jpg)
Revision 00 Page 23 of 102
Envelope Tightness (Prescriptive Based) B3
Letter of Undertaking
Method Statement – From Qualified Thermographer
Extract from Specification
![Page 24: Revision 00 Page 1 of 102 - Trakheestrakhees.ae/en/ehs/gb/Documents/Guidelines... · Revision 00 Page 14 of 102 B1 Compliance with Thermal Insulation system & Best Practices Energy](https://reader034.vdocuments.net/reader034/viewer/2022051909/5ffd9094e02b4e634174cabb/html5/thumbnails/24.jpg)
Revision 00 Page 24 of 102
Envelope Tightness (Performance Based) B4
Letter of Undertaking
Method Statement – From Qualified Thermographer
Extract from Specification
THIS IS A VOLUNTARY CREDIT ……
![Page 25: Revision 00 Page 1 of 102 - Trakheestrakhees.ae/en/ehs/gb/Documents/Guidelines... · Revision 00 Page 14 of 102 B1 Compliance with Thermal Insulation system & Best Practices Energy](https://reader034.vdocuments.net/reader034/viewer/2022051909/5ffd9094e02b4e634174cabb/html5/thumbnails/25.jpg)
Revision 00 Page 25 of 102
Efficient sizing of HVAC system B5
Heat Load Calculations
![Page 26: Revision 00 Page 1 of 102 - Trakheestrakhees.ae/en/ehs/gb/Documents/Guidelines... · Revision 00 Page 14 of 102 B1 Compliance with Thermal Insulation system & Best Practices Energy](https://reader034.vdocuments.net/reader034/viewer/2022051909/5ffd9094e02b4e634174cabb/html5/thumbnails/26.jpg)
July 2016 Revision 00 Page 26 of 102
Heat load estimate should provide proof of the ENVELOPE
U values being used in the project.
Input sheet of the software can be submitted
Efficient sizing of HVAC system B5
![Page 27: Revision 00 Page 1 of 102 - Trakheestrakhees.ae/en/ehs/gb/Documents/Guidelines... · Revision 00 Page 14 of 102 B1 Compliance with Thermal Insulation system & Best Practices Energy](https://reader034.vdocuments.net/reader034/viewer/2022051909/5ffd9094e02b4e634174cabb/html5/thumbnails/27.jpg)
Revision 00 Page 27 of 102
Efficient sizing of HVAC system B5
Schedule of Equipment
![Page 28: Revision 00 Page 1 of 102 - Trakheestrakhees.ae/en/ehs/gb/Documents/Guidelines... · Revision 00 Page 14 of 102 B1 Compliance with Thermal Insulation system & Best Practices Energy](https://reader034.vdocuments.net/reader034/viewer/2022051909/5ffd9094e02b4e634174cabb/html5/thumbnails/28.jpg)
Revision 00 Page 28 of 102
Central Air-conditioning Units with Energy Recovery Units (ERV) B6
Ventilation / Exhaust Air Calculations
Air Balancing Calculations / Table
![Page 29: Revision 00 Page 1 of 102 - Trakheestrakhees.ae/en/ehs/gb/Documents/Guidelines... · Revision 00 Page 14 of 102 B1 Compliance with Thermal Insulation system & Best Practices Energy](https://reader034.vdocuments.net/reader034/viewer/2022051909/5ffd9094e02b4e634174cabb/html5/thumbnails/29.jpg)
Revision 00 Page 29 of 102
Central Air-conditioning Units with Energy Recovery Units (ERV) B6
Energy Recovery Table with Efficiency details
HVAC Drawings indicating the units
![Page 30: Revision 00 Page 1 of 102 - Trakheestrakhees.ae/en/ehs/gb/Documents/Guidelines... · Revision 00 Page 14 of 102 B1 Compliance with Thermal Insulation system & Best Practices Energy](https://reader034.vdocuments.net/reader034/viewer/2022051909/5ffd9094e02b4e634174cabb/html5/thumbnails/30.jpg)
Revision 00 Page 30 of 102
Selection of Air-conditioning Units with HIGH Energy Efficiency Ratio (EER) B7
Heat Load Summary with EER of the units for various areas 1 of 2
![Page 31: Revision 00 Page 1 of 102 - Trakheestrakhees.ae/en/ehs/gb/Documents/Guidelines... · Revision 00 Page 14 of 102 B1 Compliance with Thermal Insulation system & Best Practices Energy](https://reader034.vdocuments.net/reader034/viewer/2022051909/5ffd9094e02b4e634174cabb/html5/thumbnails/31.jpg)
Revision 00 Page 31 of 102
Selection of Air-conditioning Units with HIGH Energy Efficiency Ratio (EER) B7
Heat Load Summary with EER of the units for various areas 2 of 2
![Page 32: Revision 00 Page 1 of 102 - Trakheestrakhees.ae/en/ehs/gb/Documents/Guidelines... · Revision 00 Page 14 of 102 B1 Compliance with Thermal Insulation system & Best Practices Energy](https://reader034.vdocuments.net/reader034/viewer/2022051909/5ffd9094e02b4e634174cabb/html5/thumbnails/32.jpg)
July 2016 Revision 00 Page 32 of 102
Selection of Air-conditioning Units with HIGH Energy Efficiency Ratio (EER) B7
![Page 33: Revision 00 Page 1 of 102 - Trakheestrakhees.ae/en/ehs/gb/Documents/Guidelines... · Revision 00 Page 14 of 102 B1 Compliance with Thermal Insulation system & Best Practices Energy](https://reader034.vdocuments.net/reader034/viewer/2022051909/5ffd9094e02b4e634174cabb/html5/thumbnails/33.jpg)
Revision 00 Page 33 of 102
Energy Efficient Auxiliary Systems of HVAC – Blowers and Pumps B8
NOT APPLICABLE ……
![Page 34: Revision 00 Page 1 of 102 - Trakheestrakhees.ae/en/ehs/gb/Documents/Guidelines... · Revision 00 Page 14 of 102 B1 Compliance with Thermal Insulation system & Best Practices Energy](https://reader034.vdocuments.net/reader034/viewer/2022051909/5ffd9094e02b4e634174cabb/html5/thumbnails/34.jpg)
July 2016 Revision 00 Page 34 of 102
Interior Lighting Levels B9
Lighting Drawing along with Notes / Legend
LPD Calculation and Reduction Chart
![Page 35: Revision 00 Page 1 of 102 - Trakheestrakhees.ae/en/ehs/gb/Documents/Guidelines... · Revision 00 Page 14 of 102 B1 Compliance with Thermal Insulation system & Best Practices Energy](https://reader034.vdocuments.net/reader034/viewer/2022051909/5ffd9094e02b4e634174cabb/html5/thumbnails/35.jpg)
July 2016 Revision 00 Page 35 of 102
Interior Lighting Levels B9
LPD Calculation and Reduction Chart
![Page 36: Revision 00 Page 1 of 102 - Trakheestrakhees.ae/en/ehs/gb/Documents/Guidelines... · Revision 00 Page 14 of 102 B1 Compliance with Thermal Insulation system & Best Practices Energy](https://reader034.vdocuments.net/reader034/viewer/2022051909/5ffd9094e02b4e634174cabb/html5/thumbnails/36.jpg)
July 2016 Revision 00 Page 36 of 102
Exterior Lighting Levels B10
Lighting Drawing along with Notes / Legend
LPD Calculation and Reduction Chart
![Page 37: Revision 00 Page 1 of 102 - Trakheestrakhees.ae/en/ehs/gb/Documents/Guidelines... · Revision 00 Page 14 of 102 B1 Compliance with Thermal Insulation system & Best Practices Energy](https://reader034.vdocuments.net/reader034/viewer/2022051909/5ffd9094e02b4e634174cabb/html5/thumbnails/37.jpg)
July 2016 Revision 00 Page 37 of 102
Exterior Lighting Levels B10
LPD Calculation and Reduction Chart
![Page 38: Revision 00 Page 1 of 102 - Trakheestrakhees.ae/en/ehs/gb/Documents/Guidelines... · Revision 00 Page 14 of 102 B1 Compliance with Thermal Insulation system & Best Practices Energy](https://reader034.vdocuments.net/reader034/viewer/2022051909/5ffd9094e02b4e634174cabb/html5/thumbnails/38.jpg)
July 2016 Revision 00 Page 38 of 102
LPD Calculation and Reduction Chart
![Page 39: Revision 00 Page 1 of 102 - Trakheestrakhees.ae/en/ehs/gb/Documents/Guidelines... · Revision 00 Page 14 of 102 B1 Compliance with Thermal Insulation system & Best Practices Energy](https://reader034.vdocuments.net/reader034/viewer/2022051909/5ffd9094e02b4e634174cabb/html5/thumbnails/39.jpg)
July 2016 Revision 00 Page 39 of 102
Notes in Electrical Drawing
LPD Calculation and Reduction Chart
![Page 40: Revision 00 Page 1 of 102 - Trakheestrakhees.ae/en/ehs/gb/Documents/Guidelines... · Revision 00 Page 14 of 102 B1 Compliance with Thermal Insulation system & Best Practices Energy](https://reader034.vdocuments.net/reader034/viewer/2022051909/5ffd9094e02b4e634174cabb/html5/thumbnails/40.jpg)
July 2016 Revision 00 Page 40 of 102
Use of Renewable Sources of Energy for domestic heating B11
Extract from Specification
![Page 41: Revision 00 Page 1 of 102 - Trakheestrakhees.ae/en/ehs/gb/Documents/Guidelines... · Revision 00 Page 14 of 102 B1 Compliance with Thermal Insulation system & Best Practices Energy](https://reader034.vdocuments.net/reader034/viewer/2022051909/5ffd9094e02b4e634174cabb/html5/thumbnails/41.jpg)
July 2016 Revision 00 Page 41 of 102
Use of Renewable Sources of Energy for domestic heating B11
Hot Water Calculation
![Page 42: Revision 00 Page 1 of 102 - Trakheestrakhees.ae/en/ehs/gb/Documents/Guidelines... · Revision 00 Page 14 of 102 B1 Compliance with Thermal Insulation system & Best Practices Energy](https://reader034.vdocuments.net/reader034/viewer/2022051909/5ffd9094e02b4e634174cabb/html5/thumbnails/42.jpg)
July 2016 Revision 00 Page 42 of 102
Use of Renewable Sources of Energy for domestic heating B11
Hot Water Calculation / Notes in the drawing
![Page 43: Revision 00 Page 1 of 102 - Trakheestrakhees.ae/en/ehs/gb/Documents/Guidelines... · Revision 00 Page 14 of 102 B1 Compliance with Thermal Insulation system & Best Practices Energy](https://reader034.vdocuments.net/reader034/viewer/2022051909/5ffd9094e02b4e634174cabb/html5/thumbnails/43.jpg)
July 2016 Revision 00 Page 43 of 102
Use of Renewable Sources of Energy for domestic heating B11
Roof Top Water Supply Layout with Solar System Notes / Legend in the Drawing
![Page 44: Revision 00 Page 1 of 102 - Trakheestrakhees.ae/en/ehs/gb/Documents/Guidelines... · Revision 00 Page 14 of 102 B1 Compliance with Thermal Insulation system & Best Practices Energy](https://reader034.vdocuments.net/reader034/viewer/2022051909/5ffd9094e02b4e634174cabb/html5/thumbnails/44.jpg)
July 2016 Revision 00 Page 44 of 102
Use of Renewable Sources of Energy for domestic heating B11
Roof Top Water Supply Layout with Solar System Notes / Legend in the Drawing
![Page 45: Revision 00 Page 1 of 102 - Trakheestrakhees.ae/en/ehs/gb/Documents/Guidelines... · Revision 00 Page 14 of 102 B1 Compliance with Thermal Insulation system & Best Practices Energy](https://reader034.vdocuments.net/reader034/viewer/2022051909/5ffd9094e02b4e634174cabb/html5/thumbnails/45.jpg)
Revision 00 Page 45 of 102
Use of Renewable Sources of Energy for Power B12
Solar PV system layout
Notes in the Electrical Drawing
THIS IS A VOLUNTARY CREDIT ……
![Page 46: Revision 00 Page 1 of 102 - Trakheestrakhees.ae/en/ehs/gb/Documents/Guidelines... · Revision 00 Page 14 of 102 B1 Compliance with Thermal Insulation system & Best Practices Energy](https://reader034.vdocuments.net/reader034/viewer/2022051909/5ffd9094e02b4e634174cabb/html5/thumbnails/46.jpg)
July 2016 Revision 00 Page 46 of 102
Energy Metering B13
Single Line Diagram
![Page 47: Revision 00 Page 1 of 102 - Trakheestrakhees.ae/en/ehs/gb/Documents/Guidelines... · Revision 00 Page 14 of 102 B1 Compliance with Thermal Insulation system & Best Practices Energy](https://reader034.vdocuments.net/reader034/viewer/2022051909/5ffd9094e02b4e634174cabb/html5/thumbnails/47.jpg)
July 2016 Revision 00 Page 47 of 102
Energy Metering B13
Metering Schedule
Extract of Specification
![Page 48: Revision 00 Page 1 of 102 - Trakheestrakhees.ae/en/ehs/gb/Documents/Guidelines... · Revision 00 Page 14 of 102 B1 Compliance with Thermal Insulation system & Best Practices Energy](https://reader034.vdocuments.net/reader034/viewer/2022051909/5ffd9094e02b4e634174cabb/html5/thumbnails/48.jpg)
Revision 00 Page 48 of 102
COMMISSIONING B14
Commissioning Specifications (Extract)
![Page 49: Revision 00 Page 1 of 102 - Trakheestrakhees.ae/en/ehs/gb/Documents/Guidelines... · Revision 00 Page 14 of 102 B1 Compliance with Thermal Insulation system & Best Practices Energy](https://reader034.vdocuments.net/reader034/viewer/2022051909/5ffd9094e02b4e634174cabb/html5/thumbnails/49.jpg)
Revision 00 Page 49 of 102
COMMISSIONING B14
Commissioning Specifications (Extract)
![Page 50: Revision 00 Page 1 of 102 - Trakheestrakhees.ae/en/ehs/gb/Documents/Guidelines... · Revision 00 Page 14 of 102 B1 Compliance with Thermal Insulation system & Best Practices Energy](https://reader034.vdocuments.net/reader034/viewer/2022051909/5ffd9094e02b4e634174cabb/html5/thumbnails/50.jpg)
Revision 00 Page 50 of 102
COMMISSIONING B14
Commissioning Specifications (Extract)
![Page 51: Revision 00 Page 1 of 102 - Trakheestrakhees.ae/en/ehs/gb/Documents/Guidelines... · Revision 00 Page 14 of 102 B1 Compliance with Thermal Insulation system & Best Practices Energy](https://reader034.vdocuments.net/reader034/viewer/2022051909/5ffd9094e02b4e634174cabb/html5/thumbnails/51.jpg)
July 2016 Revision 00 Page 51 of 102
COMMISSIONING B14
Details of Training proposed
![Page 52: Revision 00 Page 1 of 102 - Trakheestrakhees.ae/en/ehs/gb/Documents/Guidelines... · Revision 00 Page 14 of 102 B1 Compliance with Thermal Insulation system & Best Practices Energy](https://reader034.vdocuments.net/reader034/viewer/2022051909/5ffd9094e02b4e634174cabb/html5/thumbnails/52.jpg)
July 2016 Revision 00 Page 52 of 102
BUILDING ENERGY SIMULATION REPORT [Conditioned areas > 2000 m2] B15
A copy of the Energy Modeling Report
A copy of the Simulation output from software
General
1. GB consultant to follow same requirements as LEED based regulation.
2. GB should be from EHS re qualified list.
![Page 53: Revision 00 Page 1 of 102 - Trakheestrakhees.ae/en/ehs/gb/Documents/Guidelines... · Revision 00 Page 14 of 102 B1 Compliance with Thermal Insulation system & Best Practices Energy](https://reader034.vdocuments.net/reader034/viewer/2022051909/5ffd9094e02b4e634174cabb/html5/thumbnails/53.jpg)
Revision 00 Page 53 of 102
INDEPENDENT COMMISSIONING AGENT [Conditioned area >2000 m2] B16
General
1. Commissioning Specialist should follow same requirements as LEED based regulation.
2. Commissioning specialist should be from EHS re qualified list.
![Page 54: Revision 00 Page 1 of 102 - Trakheestrakhees.ae/en/ehs/gb/Documents/Guidelines... · Revision 00 Page 14 of 102 B1 Compliance with Thermal Insulation system & Best Practices Energy](https://reader034.vdocuments.net/reader034/viewer/2022051909/5ffd9094e02b4e634174cabb/html5/thumbnails/54.jpg)
July 2016 Revision 00 Page 54 of 102
C. LIGHTING
![Page 55: Revision 00 Page 1 of 102 - Trakheestrakhees.ae/en/ehs/gb/Documents/Guidelines... · Revision 00 Page 14 of 102 B1 Compliance with Thermal Insulation system & Best Practices Energy](https://reader034.vdocuments.net/reader034/viewer/2022051909/5ffd9094e02b4e634174cabb/html5/thumbnails/55.jpg)
July 2016 Revision 00 Page 55 of 102
Use of Solar Day lighting technologies C1
Sky lighting THIS IS A VOLUNTARY CREDIT ……
Relevant Extract / Section of Specification
Design Drawings showing Skyllights along with Clear LEGEND
![Page 56: Revision 00 Page 1 of 102 - Trakheestrakhees.ae/en/ehs/gb/Documents/Guidelines... · Revision 00 Page 14 of 102 B1 Compliance with Thermal Insulation system & Best Practices Energy](https://reader034.vdocuments.net/reader034/viewer/2022051909/5ffd9094e02b4e634174cabb/html5/thumbnails/56.jpg)
Revision 00 Page 56 of 102
Use of Energy Saving High Performance Lamps C2
Villa Lighting Layout Drawings
Relevant Extract / Section of Specification
![Page 57: Revision 00 Page 1 of 102 - Trakheestrakhees.ae/en/ehs/gb/Documents/Guidelines... · Revision 00 Page 14 of 102 B1 Compliance with Thermal Insulation system & Best Practices Energy](https://reader034.vdocuments.net/reader034/viewer/2022051909/5ffd9094e02b4e634174cabb/html5/thumbnails/57.jpg)
July 2016 Revision 00 Page 57 of 102
Use of Energy Saving High Performance Lamps [OFFICE Portion] C2
Notes / Legend in the Electrical Drawing
![Page 58: Revision 00 Page 1 of 102 - Trakheestrakhees.ae/en/ehs/gb/Documents/Guidelines... · Revision 00 Page 14 of 102 B1 Compliance with Thermal Insulation system & Best Practices Energy](https://reader034.vdocuments.net/reader034/viewer/2022051909/5ffd9094e02b4e634174cabb/html5/thumbnails/58.jpg)
July 2016 Revision 00 Page 58 of 102
Use of Electronic Ballast C3
Relevant Extract / Section of Specification
Electrical Drawing
![Page 59: Revision 00 Page 1 of 102 - Trakheestrakhees.ae/en/ehs/gb/Documents/Guidelines... · Revision 00 Page 14 of 102 B1 Compliance with Thermal Insulation system & Best Practices Energy](https://reader034.vdocuments.net/reader034/viewer/2022051909/5ffd9094e02b4e634174cabb/html5/thumbnails/59.jpg)
July 2016 Revision 00 Page 59 of 102
Use of Electronic Ballast C3
Notes / Legend in the Electrical Drawing
![Page 60: Revision 00 Page 1 of 102 - Trakheestrakhees.ae/en/ehs/gb/Documents/Guidelines... · Revision 00 Page 14 of 102 B1 Compliance with Thermal Insulation system & Best Practices Energy](https://reader034.vdocuments.net/reader034/viewer/2022051909/5ffd9094e02b4e634174cabb/html5/thumbnails/60.jpg)
July 2016 Revision 00 Page 60 of 102
Use of Programmable thermostat for HVAC system D1
Relevant Extract / Section of Specification
![Page 61: Revision 00 Page 1 of 102 - Trakheestrakhees.ae/en/ehs/gb/Documents/Guidelines... · Revision 00 Page 14 of 102 B1 Compliance with Thermal Insulation system & Best Practices Energy](https://reader034.vdocuments.net/reader034/viewer/2022051909/5ffd9094e02b4e634174cabb/html5/thumbnails/61.jpg)
July 2016 Revision 00 Page 61 of 102
Use of Programmable thermostat for HVAC system D1
Drawing indicating Thermostat location Programmable Thermostat with Timer
controls at a basic level T
![Page 62: Revision 00 Page 1 of 102 - Trakheestrakhees.ae/en/ehs/gb/Documents/Guidelines... · Revision 00 Page 14 of 102 B1 Compliance with Thermal Insulation system & Best Practices Energy](https://reader034.vdocuments.net/reader034/viewer/2022051909/5ffd9094e02b4e634174cabb/html5/thumbnails/62.jpg)
July 2016 Revision 00 Page 62 of 102
Use of Programmable thermostat for HVAC system D1
Notes / Legend in the Electrical Drawing
Programmable Thermostat with Timer
controls at a basic level T
![Page 63: Revision 00 Page 1 of 102 - Trakheestrakhees.ae/en/ehs/gb/Documents/Guidelines... · Revision 00 Page 14 of 102 B1 Compliance with Thermal Insulation system & Best Practices Energy](https://reader034.vdocuments.net/reader034/viewer/2022051909/5ffd9094e02b4e634174cabb/html5/thumbnails/63.jpg)
July 2016 Revision 00 Page 63 of 102
Control of External Lights D2
Relevant Extract / Section of Specification
![Page 64: Revision 00 Page 1 of 102 - Trakheestrakhees.ae/en/ehs/gb/Documents/Guidelines... · Revision 00 Page 14 of 102 B1 Compliance with Thermal Insulation system & Best Practices Energy](https://reader034.vdocuments.net/reader034/viewer/2022051909/5ffd9094e02b4e634174cabb/html5/thumbnails/64.jpg)
July 2016 Revision 00 Page 64 of 102
Electrical Drawing Notes / Legend in the Electrical Drawing
Control of External Lights D2
![Page 65: Revision 00 Page 1 of 102 - Trakheestrakhees.ae/en/ehs/gb/Documents/Guidelines... · Revision 00 Page 14 of 102 B1 Compliance with Thermal Insulation system & Best Practices Energy](https://reader034.vdocuments.net/reader034/viewer/2022051909/5ffd9094e02b4e634174cabb/html5/thumbnails/65.jpg)
July 2016 Revision 00 Page 65 of 102
Interlock of Toilet / Bathroom Fans D3
Relevant Extract / Section of Specification
![Page 66: Revision 00 Page 1 of 102 - Trakheestrakhees.ae/en/ehs/gb/Documents/Guidelines... · Revision 00 Page 14 of 102 B1 Compliance with Thermal Insulation system & Best Practices Energy](https://reader034.vdocuments.net/reader034/viewer/2022051909/5ffd9094e02b4e634174cabb/html5/thumbnails/66.jpg)
July 2016 Revision 00 Page 66 of 102
Interlock of Toilet / Bathroom Fans D3
Electrical Drawing / Thermostat location Notes / Legend in the Electrical Drawing
![Page 67: Revision 00 Page 1 of 102 - Trakheestrakhees.ae/en/ehs/gb/Documents/Guidelines... · Revision 00 Page 14 of 102 B1 Compliance with Thermal Insulation system & Best Practices Energy](https://reader034.vdocuments.net/reader034/viewer/2022051909/5ffd9094e02b4e634174cabb/html5/thumbnails/67.jpg)
July 2016 Revision 00 Page 67 of 102
Use of Occupancy Sensor / Motion Sensor for internal lighting devices D4
Relevant Extract / Section of Specification
![Page 68: Revision 00 Page 1 of 102 - Trakheestrakhees.ae/en/ehs/gb/Documents/Guidelines... · Revision 00 Page 14 of 102 B1 Compliance with Thermal Insulation system & Best Practices Energy](https://reader034.vdocuments.net/reader034/viewer/2022051909/5ffd9094e02b4e634174cabb/html5/thumbnails/68.jpg)
July 2016 Revision 00 Page 68 of 102
Use of Occupancy Sensor / Motion Sensor for internal lighting devices D4
![Page 69: Revision 00 Page 1 of 102 - Trakheestrakhees.ae/en/ehs/gb/Documents/Guidelines... · Revision 00 Page 14 of 102 B1 Compliance with Thermal Insulation system & Best Practices Energy](https://reader034.vdocuments.net/reader034/viewer/2022051909/5ffd9094e02b4e634174cabb/html5/thumbnails/69.jpg)
July 2016 Revision 00 Page 69 of 102
Use of Occupancy Sensor / Motion Sensor for internal lighting devices D4
Extract from Specification – Motion Sensor
![Page 70: Revision 00 Page 1 of 102 - Trakheestrakhees.ae/en/ehs/gb/Documents/Guidelines... · Revision 00 Page 14 of 102 B1 Compliance with Thermal Insulation system & Best Practices Energy](https://reader034.vdocuments.net/reader034/viewer/2022051909/5ffd9094e02b4e634174cabb/html5/thumbnails/70.jpg)
July 2016 Revision 00 Page 70 of 102
Use of Occupancy Sensor / Motion Sensor for internal lighting devices D4
Electrical Drawing / Motion Sensor location
Notes / Legend in the Electrical Drawing
![Page 71: Revision 00 Page 1 of 102 - Trakheestrakhees.ae/en/ehs/gb/Documents/Guidelines... · Revision 00 Page 14 of 102 B1 Compliance with Thermal Insulation system & Best Practices Energy](https://reader034.vdocuments.net/reader034/viewer/2022051909/5ffd9094e02b4e634174cabb/html5/thumbnails/71.jpg)
July 2016 Revision 00 Page 71 of 102
PART - 7
E. WATER
![Page 72: Revision 00 Page 1 of 102 - Trakheestrakhees.ae/en/ehs/gb/Documents/Guidelines... · Revision 00 Page 14 of 102 B1 Compliance with Thermal Insulation system & Best Practices Energy](https://reader034.vdocuments.net/reader034/viewer/2022051909/5ffd9094e02b4e634174cabb/html5/thumbnails/72.jpg)
July 2016 Revision 00 Page 72 of 102
Usage of STP for treating Grey Water & Reuse of treated water E1
Relevant Extract / Section of Specification
THIS IS A VOLUNTARY CREDIT ……
Drawings indicating the proposed STP
![Page 73: Revision 00 Page 1 of 102 - Trakheestrakhees.ae/en/ehs/gb/Documents/Guidelines... · Revision 00 Page 14 of 102 B1 Compliance with Thermal Insulation system & Best Practices Energy](https://reader034.vdocuments.net/reader034/viewer/2022051909/5ffd9094e02b4e634174cabb/html5/thumbnails/73.jpg)
July 2016 Revision 00 Page 73 of 102
Performance Requirements of Sanitary Fittings E2
Relevant Extract / Section of Specification Comprising the flow rates
![Page 74: Revision 00 Page 1 of 102 - Trakheestrakhees.ae/en/ehs/gb/Documents/Guidelines... · Revision 00 Page 14 of 102 B1 Compliance with Thermal Insulation system & Best Practices Energy](https://reader034.vdocuments.net/reader034/viewer/2022051909/5ffd9094e02b4e634174cabb/html5/thumbnails/74.jpg)
July 2016 Revision 00 Page 74 of 102
Performance Requirements of Sanitary Fittings E2
Notes from the Water Supply Layout Drawing
![Page 75: Revision 00 Page 1 of 102 - Trakheestrakhees.ae/en/ehs/gb/Documents/Guidelines... · Revision 00 Page 14 of 102 B1 Compliance with Thermal Insulation system & Best Practices Energy](https://reader034.vdocuments.net/reader034/viewer/2022051909/5ffd9094e02b4e634174cabb/html5/thumbnails/75.jpg)
July 2016 Revision 00 Page 75 of 102
Water Efficient landscaping & Irrigation Systems E3
Relevant Extract / Section of Specification
![Page 76: Revision 00 Page 1 of 102 - Trakheestrakhees.ae/en/ehs/gb/Documents/Guidelines... · Revision 00 Page 14 of 102 B1 Compliance with Thermal Insulation system & Best Practices Energy](https://reader034.vdocuments.net/reader034/viewer/2022051909/5ffd9094e02b4e634174cabb/html5/thumbnails/76.jpg)
July 2016 Revision 00 Page 76 of 102
Water Efficient landscaping & Irrigation Systems E3
Landscape layout / Setting out drawing
![Page 77: Revision 00 Page 1 of 102 - Trakheestrakhees.ae/en/ehs/gb/Documents/Guidelines... · Revision 00 Page 14 of 102 B1 Compliance with Thermal Insulation system & Best Practices Energy](https://reader034.vdocuments.net/reader034/viewer/2022051909/5ffd9094e02b4e634174cabb/html5/thumbnails/77.jpg)
July 2016 Revision 00 Page 77 of 102
Water Efficient landscaping & Irrigation Systems E3
Relevant Notes in the Drawing
![Page 78: Revision 00 Page 1 of 102 - Trakheestrakhees.ae/en/ehs/gb/Documents/Guidelines... · Revision 00 Page 14 of 102 B1 Compliance with Thermal Insulation system & Best Practices Energy](https://reader034.vdocuments.net/reader034/viewer/2022051909/5ffd9094e02b4e634174cabb/html5/thumbnails/78.jpg)
July 2016 Revision 00 Page 78 of 102
Water Efficient landscaping & Irrigation - Eliminate Potable Water E4
Relevant Extract / Section of Specification
Landscape layout / Setting out drawing
THIS IS A VOLUNTARY CREDIT ……
![Page 79: Revision 00 Page 1 of 102 - Trakheestrakhees.ae/en/ehs/gb/Documents/Guidelines... · Revision 00 Page 14 of 102 B1 Compliance with Thermal Insulation system & Best Practices Energy](https://reader034.vdocuments.net/reader034/viewer/2022051909/5ffd9094e02b4e634174cabb/html5/thumbnails/79.jpg)
July 2016 Revision 00 Page 79 of 102
Water Efficient landscaping & Irrigation - Eliminate Potable Water E4
Drawings indicating the proposed STP
Landscape layout / Setting out drawing
THIS IS A VOLUNTARY CREDIT ……
![Page 80: Revision 00 Page 1 of 102 - Trakheestrakhees.ae/en/ehs/gb/Documents/Guidelines... · Revision 00 Page 14 of 102 B1 Compliance with Thermal Insulation system & Best Practices Energy](https://reader034.vdocuments.net/reader034/viewer/2022051909/5ffd9094e02b4e634174cabb/html5/thumbnails/80.jpg)
July 2016 Revision 00 Page 80 of 102
PART - 8
F. ENVIRONMENT & INDOOR AIR QUALITY
![Page 81: Revision 00 Page 1 of 102 - Trakheestrakhees.ae/en/ehs/gb/Documents/Guidelines... · Revision 00 Page 14 of 102 B1 Compliance with Thermal Insulation system & Best Practices Energy](https://reader034.vdocuments.net/reader034/viewer/2022051909/5ffd9094e02b4e634174cabb/html5/thumbnails/81.jpg)
July 2016 Revision 00 Page 81 of 102
Building Ventilation and Minimum Indoor Air Quality (IAQ) F1
Relevant Extract / Section of Specification
![Page 82: Revision 00 Page 1 of 102 - Trakheestrakhees.ae/en/ehs/gb/Documents/Guidelines... · Revision 00 Page 14 of 102 B1 Compliance with Thermal Insulation system & Best Practices Energy](https://reader034.vdocuments.net/reader034/viewer/2022051909/5ffd9094e02b4e634174cabb/html5/thumbnails/82.jpg)
July 2016 Revision 00 Page 82 of 102
Building Ventilation and Minimum Indoor Air Quality (IAQ) F1
Fresh Air Calculations (sample)
![Page 83: Revision 00 Page 1 of 102 - Trakheestrakhees.ae/en/ehs/gb/Documents/Guidelines... · Revision 00 Page 14 of 102 B1 Compliance with Thermal Insulation system & Best Practices Energy](https://reader034.vdocuments.net/reader034/viewer/2022051909/5ffd9094e02b4e634174cabb/html5/thumbnails/83.jpg)
July 2016 Revision 00 Page 83 of 102
Building Ventilation and Minimum Indoor Air Quality (IAQ) F1
Fresh Air Calculations (sample)
![Page 84: Revision 00 Page 1 of 102 - Trakheestrakhees.ae/en/ehs/gb/Documents/Guidelines... · Revision 00 Page 14 of 102 B1 Compliance with Thermal Insulation system & Best Practices Energy](https://reader034.vdocuments.net/reader034/viewer/2022051909/5ffd9094e02b4e634174cabb/html5/thumbnails/84.jpg)
July 2016 Revision 00 Page 84 of 102
Building Ventilation and Minimum Indoor Air Quality (IAQ) F1
Drawing / Layout showing FAHU
![Page 85: Revision 00 Page 1 of 102 - Trakheestrakhees.ae/en/ehs/gb/Documents/Guidelines... · Revision 00 Page 14 of 102 B1 Compliance with Thermal Insulation system & Best Practices Energy](https://reader034.vdocuments.net/reader034/viewer/2022051909/5ffd9094e02b4e634174cabb/html5/thumbnails/85.jpg)
July 2016 Revision 00 Page 85 of 102
Building Ventilation and Minimum Indoor Air Quality (IAQ) F1
Fresh Air Schematic
![Page 86: Revision 00 Page 1 of 102 - Trakheestrakhees.ae/en/ehs/gb/Documents/Guidelines... · Revision 00 Page 14 of 102 B1 Compliance with Thermal Insulation system & Best Practices Energy](https://reader034.vdocuments.net/reader034/viewer/2022051909/5ffd9094e02b4e634174cabb/html5/thumbnails/86.jpg)
Revision 00 Page 86 of 102
Control of Environmental Tobacco Smoke F2
NOT APPLICABLE ……
![Page 87: Revision 00 Page 1 of 102 - Trakheestrakhees.ae/en/ehs/gb/Documents/Guidelines... · Revision 00 Page 14 of 102 B1 Compliance with Thermal Insulation system & Best Practices Energy](https://reader034.vdocuments.net/reader034/viewer/2022051909/5ffd9094e02b4e634174cabb/html5/thumbnails/87.jpg)
July 2016 Revision 00 Page 87 of 102
Low Emitting Paints, Coatings, Adhesives and Sealants F3
Relevant Extract / Section of Specification mentioning the requirements
Drawing indicating the requirements under GENERAL NOTES / GENERL REQUIREMENTS
![Page 88: Revision 00 Page 1 of 102 - Trakheestrakhees.ae/en/ehs/gb/Documents/Guidelines... · Revision 00 Page 14 of 102 B1 Compliance with Thermal Insulation system & Best Practices Energy](https://reader034.vdocuments.net/reader034/viewer/2022051909/5ffd9094e02b4e634174cabb/html5/thumbnails/88.jpg)
Revision 00 Page 88 of 102
Use of Ozone Friendly materials in AC Eqpts,Thermal Insulation, Foam & FF Eqpts F4
Relevant Extract / Section of Specification mentioning the requirements
Relevant Notes in the Drawing
![Page 89: Revision 00 Page 1 of 102 - Trakheestrakhees.ae/en/ehs/gb/Documents/Guidelines... · Revision 00 Page 14 of 102 B1 Compliance with Thermal Insulation system & Best Practices Energy](https://reader034.vdocuments.net/reader034/viewer/2022051909/5ffd9094e02b4e634174cabb/html5/thumbnails/89.jpg)
July 2016 Revision 00 Page 89 of 102
PART -9
G. SUSTAINABLE SITE AND MANAGEMENT
![Page 90: Revision 00 Page 1 of 102 - Trakheestrakhees.ae/en/ehs/gb/Documents/Guidelines... · Revision 00 Page 14 of 102 B1 Compliance with Thermal Insulation system & Best Practices Energy](https://reader034.vdocuments.net/reader034/viewer/2022051909/5ffd9094e02b4e634174cabb/html5/thumbnails/90.jpg)
July 2016 Revision 00 Page 90 of 102
Construction Activity Pollution Prevention (CAPP) / (ESC) G1
Draft template of Erosion & Sedimentation Control Plan
![Page 91: Revision 00 Page 1 of 102 - Trakheestrakhees.ae/en/ehs/gb/Documents/Guidelines... · Revision 00 Page 14 of 102 B1 Compliance with Thermal Insulation system & Best Practices Energy](https://reader034.vdocuments.net/reader034/viewer/2022051909/5ffd9094e02b4e634174cabb/html5/thumbnails/91.jpg)
July 2016 Revision 00 Page 91 of 102
Construction Activity Pollution Prevention (CAPP) / (ESC) G1
Relevant Extract / Section of Specification mentioning the requirements
![Page 92: Revision 00 Page 1 of 102 - Trakheestrakhees.ae/en/ehs/gb/Documents/Guidelines... · Revision 00 Page 14 of 102 B1 Compliance with Thermal Insulation system & Best Practices Energy](https://reader034.vdocuments.net/reader034/viewer/2022051909/5ffd9094e02b4e634174cabb/html5/thumbnails/92.jpg)
July 2016 Revision 00 Page 92 of 102
Heat Island Effect – Non Roof G2
Relevant Extract / Section of Specification mentioning the SRI requirements
![Page 93: Revision 00 Page 1 of 102 - Trakheestrakhees.ae/en/ehs/gb/Documents/Guidelines... · Revision 00 Page 14 of 102 B1 Compliance with Thermal Insulation system & Best Practices Energy](https://reader034.vdocuments.net/reader034/viewer/2022051909/5ffd9094e02b4e634174cabb/html5/thumbnails/93.jpg)
July 2016 Revision 00 Page 93 of 102
Heat Island Effect – Non Roof G2
Drawings Highlighting the requirement
Relevant Notes in the Drawing
![Page 94: Revision 00 Page 1 of 102 - Trakheestrakhees.ae/en/ehs/gb/Documents/Guidelines... · Revision 00 Page 14 of 102 B1 Compliance with Thermal Insulation system & Best Practices Energy](https://reader034.vdocuments.net/reader034/viewer/2022051909/5ffd9094e02b4e634174cabb/html5/thumbnails/94.jpg)
July 2016 Revision 00 Page 94 of 102
Heat Island Effect –Roof G3
Relevant Extract / Section of Specification mentioning the SRI requirements
Roof Plan Relevant Notes in the Drawing
![Page 95: Revision 00 Page 1 of 102 - Trakheestrakhees.ae/en/ehs/gb/Documents/Guidelines... · Revision 00 Page 14 of 102 B1 Compliance with Thermal Insulation system & Best Practices Energy](https://reader034.vdocuments.net/reader034/viewer/2022051909/5ffd9094e02b4e634174cabb/html5/thumbnails/95.jpg)
July 2016 Revision 00 Page 95 of 102
PART - 10
H. OPERATIONAL SUSTAINABILIY
![Page 96: Revision 00 Page 1 of 102 - Trakheestrakhees.ae/en/ehs/gb/Documents/Guidelines... · Revision 00 Page 14 of 102 B1 Compliance with Thermal Insulation system & Best Practices Energy](https://reader034.vdocuments.net/reader034/viewer/2022051909/5ffd9094e02b4e634174cabb/html5/thumbnails/96.jpg)
July 2016 Revision 00 Page 96 of 102
Recycling Facility – Storage & Collection of Recyclables H1
Relevant Extract / Section of Specification mentioning the SRI requirements
Drawing indicating the location of Bins
![Page 97: Revision 00 Page 1 of 102 - Trakheestrakhees.ae/en/ehs/gb/Documents/Guidelines... · Revision 00 Page 14 of 102 B1 Compliance with Thermal Insulation system & Best Practices Energy](https://reader034.vdocuments.net/reader034/viewer/2022051909/5ffd9094e02b4e634174cabb/html5/thumbnails/97.jpg)
July 2016 Revision 00 Page 97 of 102
Energy Efficient Equipments (White Goods) H2
Relevant Extract / Section of Specification
![Page 98: Revision 00 Page 1 of 102 - Trakheestrakhees.ae/en/ehs/gb/Documents/Guidelines... · Revision 00 Page 14 of 102 B1 Compliance with Thermal Insulation system & Best Practices Energy](https://reader034.vdocuments.net/reader034/viewer/2022051909/5ffd9094e02b4e634174cabb/html5/thumbnails/98.jpg)
July 2016 Revision 00 Page 98 of 102
Energy Efficient Equipments (White Goods) H2
Letter of Undertaking by the client (where relevant)
![Page 99: Revision 00 Page 1 of 102 - Trakheestrakhees.ae/en/ehs/gb/Documents/Guidelines... · Revision 00 Page 14 of 102 B1 Compliance with Thermal Insulation system & Best Practices Energy](https://reader034.vdocuments.net/reader034/viewer/2022051909/5ffd9094e02b4e634174cabb/html5/thumbnails/99.jpg)
July 2016 Revision 00 Page 99 of 102
Building User Guide H3
Extract of specification mentioning this requirement
Draft structure / format of the proposed building user guide
![Page 100: Revision 00 Page 1 of 102 - Trakheestrakhees.ae/en/ehs/gb/Documents/Guidelines... · Revision 00 Page 14 of 102 B1 Compliance with Thermal Insulation system & Best Practices Energy](https://reader034.vdocuments.net/reader034/viewer/2022051909/5ffd9094e02b4e634174cabb/html5/thumbnails/100.jpg)
July 2016 Revision 00 Page 100 of 102
Building User Guide H3
Draft structure / format of the proposed
building user guide
![Page 101: Revision 00 Page 1 of 102 - Trakheestrakhees.ae/en/ehs/gb/Documents/Guidelines... · Revision 00 Page 14 of 102 B1 Compliance with Thermal Insulation system & Best Practices Energy](https://reader034.vdocuments.net/reader034/viewer/2022051909/5ffd9094e02b4e634174cabb/html5/thumbnails/101.jpg)
July 2016 Revision 00 Page 101 of 102
Facility / Building Services Tuning H4
NOT APPLICABLE ……
![Page 102: Revision 00 Page 1 of 102 - Trakheestrakhees.ae/en/ehs/gb/Documents/Guidelines... · Revision 00 Page 14 of 102 B1 Compliance with Thermal Insulation system & Best Practices Energy](https://reader034.vdocuments.net/reader034/viewer/2022051909/5ffd9094e02b4e634174cabb/html5/thumbnails/102.jpg)
July 2016 Revision 00 Page 102 of 102
Disclaimer
This Guideline has been issued by EHS to assist the stakeholders in gaining an understanding of the submission requirements . As such, this
is an attempt to disseminate the information EHS has gathered from the stakeholders and its limited research of the documents that it has
reviewed in the course of its regulatory activities.
Trakhees-EHS does not accept responsibility, including for negligence, for any inaccuracy in the nature and the content of this guideline and
makes no warranty, expressed or implied, including the warranties of merchantability and fitness for a particular purpose, nor assumes any
legal liability or responsibility to you or any third parties for the accuracy, completeness, or use of, or reliance on, any information contained in
the document for any injuries, losses or damages (including, without limitation, equitable relief and economic loss) arising out of such use or
reliance.
This guideline is not proposed to serve as a vehicle for the adjudication of disputes between third parties, including without limitation,
contractual disputes that arise between Clients, developers, project teams, Architectural Engineering consultants, Green building consultants,
other 3rd party specialists, Contractors etc. Accordingly, this guideline provided by EHS Sustainability Department staff does not replace the
applicable judicial or other alternative dispute resolution processes that such third parties may have available to resolve such disputes
between themselves. Nothing about this program is intended to replace, override, or conflict with licensing requirements for design engineers,
architects, or other building professionals.
This Guideline is provided “AS IS” without warranty of any kind, express or implied, including but not limited to the building’s performance,
success in Measurement & Verification and fitness for a particular purpose Further, EHS makes no warranty with respect to any of the
initiatives used in any of the projects, including any warranty of habitability, merchantability, or fitness for a particular purpose. There are no
warranties, express or implied, written or oral, statutory or otherwise, with respect to the guidelines provided by EHS. By way of example only,
and without limiting the broad scope of the foregoing, it is understood that the strategies provided in this guideline, be it at any level, does not
mean that the project embracing those strategies is structurally sound or safe, constructed in accordance with applicable laws, regulations or
codes, free of mold or mildew, free of volatile organic compounds or allergens, or free of soil gases including radon. In no event shall EHS or
its staff be liable for any claim, damages or other liability whether in an action of contract, tort or otherwise arising out of or in connection with
the use of the strategy.
To the maximum extent permitted by law, Trakhees-EHS does not accept responsibility, including for negligence, for any inaccuracy within this
document and makes no warranty, expressed or implied, including the warranties of merchantability and fitness for a particular purpose, nor
assumes any legal liability or responsibility to you or any third parties for the accuracy, completeness, or use of, or reliance on, any information
contained in this tool, or for any injuries, losses or damages (including, without limitation, equitable relief and economic loss) arising out of
such use or reliance
END OF DOCUMENT