riding redistribution process
DESCRIPTION
RIDING REDISTRIBUTION PROCESS. Projected Number of Seats. New formula: An increase of 30 seats to be allocated between: Ontario (15), Alberta (6), BC (6) and QC (3) For a new total of 338 seats 92% of ridings affected by last riding redistribution . Projected Timeline. - PowerPoint PPT PresentationTRANSCRIPT
RIDING REDISTRIBUTION PROCESS
Projected Number of Seats New formula: An increase of 30 seats to be
allocated between:◦ Ontario (15), Alberta (6), BC (6) and QC (3)◦ For a new total of 338 seats
92% of ridings affected by last riding redistribution
Projected Timeline Spring 2012: Establish boundary
commissions- Completed Spring/Summer 2012: Proposals and public
hearings Fall 2012: Initial reports Spring 2013: Objections (Committee/MPs) Sept 2013: Proclamation of draft
Representation order, 7 month waiting period
What We Are Doing Maps National Working Group
◦ Identify groups of interest◦ Process affecting the actual riding association ◦ Initial feedback letter
Ask MPs to speak on our behalf when the process is in the House
Ottawa Valley
Toronto
Southern Ontario
Southwestern
Northern
Contact information Mailing Address130 King Street West
36th Floor, Suite 3670P.O. Box 368Toronto, OntarioM5X 2A2
E-mail [email protected] Telephone (toll-free) 1-855-747-7224