DALIA Project Doc. N: N/A
Rig Handling and Installation Procedure, CLS & CS, Total Dalia Class: 1 Phase: DE
Document Type: PRO System: Discipline: WOP Revision: 01 Status: ASB
Contract No: N/A Contract Type: SER Rev. Date: 6-JULY-12
Contractor document number: 101100943_REV AB Page 1 of 271
This document is the property of COMPANY. It must not be stored, reproduced or disclosed to others without written authorisation from the Company.
RIG HANDLING AND INSTALLATION PROCEDURE,
CLS & CS TOTAL DALIA
Rev. Status Date Revision memo Issued by Checked by Approved by
01 ASB 6-JULY-12 As Built C. Mahoney M. Meador J. Ninan
00 IFA 4-JUNE-12 Issued for Acceptance C. Mahoney M. Meador J. Ninan
This document has been generated by an Electronic Document Management System. When printed it is considered as a for information only copy. The controlled copy is the screen version and it is the holder's responsibility that he/she holds the latest valid version.
-
DALIA Project Doc. N: N/A
Rig Handling and Installation Procedure, CLS & CS, Total Dalia Class: 1 Phase: DE
Document Type: PRO System: Discipline: WOP Revision: 01 Status: ASB
Contract No: N/A Contract Type: SER Rev. Date: 6-JULY-12
Contractor document number: 101100943_REV AB Page 2 of 271
This document is the property of COMPANY. It must not be stored, reproduced or disclosed to others without written authorisation from the Company.
Table of contents
............................................... 3-2
1. Rig Handling and Installation Procedure 69............
-
DALIA Project Doc. N: N/A
Rig Handling and Installation Drawing, ENSCO DS-2, CLS & CS, Total DALIA
Class: 2 Phase: DE
Document Type: LAY System: Discipline: WOP Revision: 02 Status: ASB Contract No: N/A Contract Type: SER Rev. Date: 26-July-2012 Contractor document number: 101100941_REV AC Page 1 of 89
This document is the property of COMPANY. It must not be stored, reproduced or disclosed to others without written authorisation from the Company.
Rig Handling and Installation Drawing, ENSCO DS-2, CLS & CS, Total Dalia
Rev. Status Date Revision memo Issued by Checked by Approved by
02 ASB 26-JULY-12 As Built C. Mahoney M. Meador J. Ninan
01 AFC 14-MAY-12 Accepted for Construction C. Mahoney M. Meador J. Ninan
00 IFA 7-MAY-10 Issued for Acceptance C. Mahoney M. Meador J. Ninan
-
DALIA Project Doc. N: N/A
Rig Handling and Installation Drawing, ENSCO DS-2, CLS & CS, Total DALIA
Class: 2 Phase: DE
Document Type: LAY System: Discipline: WOP Revision: 02 Status: ASB Contract No: N/A Contract Type: SER Rev. Date: 26-July-2012 Contractor document number: 101100941_REV AC Page 2 of 89
This document is the property of COMPANY. It must not be stored, reproduced or disclosed to others without written authorisation from the Company.
Table of contents
1. Ensco DS-2 Run in Hole ................................................................................
2. Ensco DS-2 Pull Out of Hole ........................................................................
This document has been generated by an Electronic Document Management System. When printed it is considered as a for information only copy. The controlled copy is the screen version and it is the holder's responsibility that he/she holds the latest valid version.
142-194
195-269
-
101100943 cover_no1101100943_AB_no2101100943_AB_BETWEEN2and3101093224_REV AC_no31.pdf2.pdf3.pdf4.pdf5.pdf
101096290_REV AC_no5123
101093609_REV AC_no6123
101100944_REV AC_no7100978862_REV AFno81234
Reelers, neumatic, specs, no_9101100943_AB_BETWEEN9and11101100941_REV AC_no11101100943_AB_BETWEEEN11and12101128555_REV AB_no12