rigless well intervention - barge- · pdf filelift modular equipment onto platform well...

1
Lift modular equipment onto platform Well service equipment up to 160 mT Setup can be used with any type of crane *) vessel + crew + equipment Jack-up rig High mobilization and day rates Limited by water depth, soil conditions and subsea obstructions Often oversized for well intervention work Barge with motion compensated crane High workability: stabilised crane, hook and load Low day rate Fast mobilization, independent of water depth Conventional accommodation barge Low workability: long crane boom causes swinging load Fast mobilization, independent of water depth Low day rate 10% waiting on the weather 70% waiting on the weather BM-T700 motion compensated lifting Accelerate your project Barge with BM-T700 (H s < 2.5 m) Jack-up rig (H s < 2.5 m) Conventional tender barge (H s < 0.8 m) 111 days actual rental period 111 days actual rental period 333 days actual rental period 100 day job 100 day job 100 day job 10% waiting on the weather Benefits of motion compensated lifting for well intervention Casestudy Malaysia: Work throughout the Monsoon Workability barge with BM-T700 (H s = max 2.5 m) 90 % Workability conventional barge (H s = max 0.8 m) 30 % 100 % 80 % 60 % 40 % 20 % 0 % RIGLESS WELL INTERVENTION Safe and efficient intervention, workover and abandonment of topside wells Daily costs* Actual rental period Total costs per job Savings with Barge Master Cost efficiency improvement Jack-up rig Barge with BM-T700 250.000 111 days 27.750.000 16.650.000 250 % 100.000 111 days 11.100.000 90.000 333 days 29.970.000 18.870.000 270 % Conventional barge • No swinging loads while lifting • Low risk operations • BM-T700 is man-riding certified Safety • No waiting on weather • Use locally sourced vessel / barge with any type of crane • Same setup can be used for platform maintenance Efficiency • Fast and predicable offshore operations • Controlled well shutdown period • Workability of 300+ days a year on average worldwide Reliability Contact us if you want to explore the added value for your well service project +31 (0) 10 409 00 60 [email protected] CTU Coiled Tubing Unit HWO Hydraulic Workover Unit

Upload: hanhan

Post on 09-Mar-2018

223 views

Category:

Documents


1 download

TRANSCRIPT

Page 1: RIGLESS WELL INTERVENTION - barge- · PDF fileLift modular equipment onto platform Well service equipment up to 160 mT Setup can be used with any type of crane *) vessel + crew + equipment

Lift modular equipment onto platform

► Well service equipment up to 160 mT ► Setup can be used with any type of crane

*) vessel + crew + equipment

Jack-up rig

High mobilization and day rates

Limited by waterdepth, soil conditions

and subsea obstructions

Often oversized for well intervention work

Barge with motion compensated crane

High workability: stabilised crane, hook and load

Low day rate

Fast mobilization, independent of water depth

Conventionalaccommodation barge

Low workability: long craneboom causes swinging load

Fast mobilization,independent of water depth

Low day rate

10% waiting on the weather

70% waiting on the weather

BM-T700 motion compensated lifting

Accelerate your project

Barge with BM-T700 (Hs < 2.5 m)

Jack-up rig (Hs < 2.5 m)

Conventional tender barge (Hs < 0.8 m)

111 days actual rental period

111 days actual rental period

333 days actual rental period

100 day job

100 day job

100 day job 10% waiting on the weather

Benefits of motion compensated lifting for well intervention

Casestudy Malaysia: Work throughout the Monsoon

Workability barge with BM-T700(Hs = max 2.5 m)

90 %

Workabilityconventional barge

(Hs = max 0.8 m)

30 %

DNOSAAJJMAMFJ

100 %

80 %

60 %

40 %

20 %

0 %

RIGLESS WELL INTERVENTION Safe and efficient intervention, workover and abandonment of topside wells

Daily costs*Actual rental period

Total costs per job

Savings with Barge Master

Cost efficiency improvement

Jack-up rig

Barge with BM-T700

250.000111 days

27.750.000

16.650.000

250 %

100.000111 days

11.100.000

90.000333 days

29.970.000

18.870.000

270 %

Conventional barge

• No swinging loads while lifting

• Low risk operations• BM-T700 is man-riding

certified

Safety• No waiting on weather• Use locally sourced vessel /

barge with any type of crane• Same setup can be used for

platform maintenance

Efficiency• Fast and predicable offshore

operations• Controlled well shutdown period• Workability of 300+ days a year

on average worldwide

Reliability

Contact us if you want to explore the added value for your well service project +31 (0) 10 409 00 60 [email protected]

CTUCoiled Tubing Unit

HWOHydraulic Workover Unit