Page 1: River Basin Characterisation 2 Risk Assessment outputs River Basin Management Team Environment Agency

River Basin Characterisation 2 Risk Assessment outputs

River Basin Management TeamEnvironment Agency

Page 2: River Basin Characterisation 2 Risk Assessment outputs River Basin Management Team Environment Agency

Combined source assessments (ammonia, biochemical oxygen demand & phosphorus) via National SIMCAT models for rivers

Combined source assessment (total oxidised nitrogen) for rivers

Mines and mine waters for transitional and coastal waters (TraC)

WHAT IS NEW ? New assessment or completely different method

Page 3: River Basin Characterisation 2 Risk Assessment outputs River Basin Management Team Environment Agency

WHAT HAS BEEN REVISED ?

Abstraction and flow regulation (rivers, lakes and transitional)Drafts have been shared with DEFRA/WAG, final version will be made publicly available, shortly

Acidification (rivers)

Mines and mine waters (rivers)

Pesticides (diffuse) in drinking water sources

Sediment (rivers)

Sheep dip (rivers)

Page 5: River Basin Characterisation 2 Risk Assessment outputs River Basin Management Team Environment Agency

Supporting text includingSummary of method changes

Map of risk status for waterbodies in England & Wales

Table- numbers of waterbodies against eachRisk category

Page 6: River Basin Characterisation 2 Risk Assessment outputs River Basin Management Team Environment Agency

ABOUT THE RESULTS Risk is not the same as compliance/classification. Risk should be

linked to an activity/activities & provide a forecast based on

predicted changes to pressures (e.g. to 2015)

Risk categories are the same as used for Article 5 reporting

o 1a- At risk

o 1b- Probably at risk

o 2a- Probably not at risk

o 2b- Not at risk

o Not assessed/not able to assess

Page 7: River Basin Characterisation 2 Risk Assessment outputs River Basin Management Team Environment Agency

WHAT ARE THE ASSESSMENTS BEING USED FOR ?

Development of measures to help achieve WFD objectives