Riverbanks Zoo and Garden Phase II, Seals and Sea Lions
02.15-02.19
2016
RIVERBANKS ZOO AND GARDEN PHASE II, SEALS AND SEA LION EXHIBIT:
EXHIBIT POOL, VIEWING & HOLDING BUILDINGS
Perspective of the New SSL Exhibit from the Main Entrance Plaza
Perspective of the North End Of the SSL Exhibit
Perspective of the Exhibit from the Stadium Seating
Perspective of the West Entrance to the Viewing Building
Finishes Within the Viewing Building Completed
Final Architectural Inspection Complete Within the Viewing Building
Final Clean In Progress for the Interior of the Viewing Building
West End of the Upper Viewing Deck
South End of the Upper Viewing Deck
Entrance to the Keeper Platform at Upper Viewing
View of the Exhibit Pool from the Keeper Platform
View of the Holding Building from the Keeper Platform at Viewing
View of the Exhibit Pool Rockwork Entrance Stairs
Final Finishes Around the Exhibit Pool Underway
The Submerged Curing Process for the WetEdge Pool Bottom
Aluminum Ships Ladder Installed at the Shipping Container
Perspective of the Southwest Corner of the Viewing Building
New Hard and Softscape completed behind the Viewing Building
Perspective of the South Entrance to the Viewing Building
Softscape complete between the Holding and Viewing Buildings
Eastern Perspective of the Holding Building
Caging at the Holding Building Completed
Northeastern Perspective of the Holding Building
Architectural Punch of the Holding Building Complete
Final Clean Underway at the Holding Building
Architectural Punch of the Holding Building Complete
Hardscape Progressing Around the Holding Building
SSL Life Support Systems Completed
SSL Life Support Systems Completed
SSL Life Support Systems Completed
SSL Life Support Systems Completed
SSL Life Support Systems Completed
Riverbanks Zoo and Garden Phase III, Pedestrian Bridge
02.15-02.19
2016
RIVERBANKS ZOO AND GARDEN PHASE III, PEDESTRIAN BRIDGE PROJECT
Foundation Excavations Have Begun for the North Tower
Perspective of the New Front Entry from the North Tower Site
One Week Look Ahead The Architectural Punch Lists have been
created for the interior and exterior of both
the Holding and Viewing Buildings this
week. Final Clean is being performed on
both buildings as those items are being
worked off. The Hard and Softscape is
progressing around the site, working
towards the construction entrance behind
the LSS Building. The Commissioning for
the SSL Life Support Systems has begun
with Ted Maranda’s first visit to the site this
week.
Now that the clearing has been completed
and the erosion control measures placed,
the first footings for the Pedestrian Bridge
have been excavated on the North Elevator
Tower Side of the Rail Road tracks .