THIS CONCEPTUAL STUDY IS FOR PLANNING PURPOSE ONLY.

SITE SPECIFIC INFORMATION SUCH AS SURVEY, EXISTING CONDITIONS, ZONING REQUIREMENTS MUST BE VERIFIED.DRAFT CONCEPT PLANS FOR DISCUSSION ONLY

SNELLING-MIDWAY SITE

RK MIDWAY REGIONAL CONTEXT

3

MIDWAY, ST. PAUL, MNJANUARY 7, 2016

THIS CONCEPTUAL STUDY IS FOR PLANNING PURPOSE ONLY.

SITE SPECIFIC INFORMATION SUCH AS SURVEY, EXISTING CONDITIONS, ZONING REQUIREMENTS MUST BE VERIFIED.DRAFT CONCEPT PLANS FOR DISCUSSION ONLY

SNELLING-MIDWAY SITE

LRT GREEN LINE

BRT A LINE

RK MIDWAY TRANSPORTATION CORRIDORS

4

MIDWAY, ST. PAUL, MNJANUARY 7, 2016

THIS CONCEPTUAL STUDY IS FOR PLANNING PURPOSE ONLY.

SITE SPECIFIC INFORMATION SUCH AS SURVEY, EXISTING CONDITIONS, ZONING REQUIREMENTS MUST BE VERIFIED.DRAFT CONCEPT PLANS FOR DISCUSSION ONLY

LRT GREEN LINE

BRT A LINE

RK MIDWAY NEIGHBORHOOD CONTEXT

ST. ANTHONY PARK NEIGHBORHOOD

THOMAS DALE / FROGTOWN NEIGHBORHOOD

SUMMIT-UNIVERSITY NEIGHBORHOOD

UNION PARK NEIGHBORHOOD

HAMLINE-MIDWAY NEIGHBORHOOD

SNELLING-MIDWAY SITE

UNIVERSITY AVE

LEXI

NG

TON

PK

WY

SNEL

LIN

G A

VE

INTERSTATE 94

5

MIDWAY, ST. PAUL, MNJANUARY 7, 2016

THIS CONCEPTUAL STUDY IS FOR PLANNING PURPOSE ONLY.

SITE SPECIFIC INFORMATION SUCH AS SURVEY, EXISTING CONDITIONS, ZONING REQUIREMENTS MUST BE VERIFIED.DRAFT CONCEPT PLANS FOR DISCUSSION ONLY

RK MIDWAY SITE AREA AND DIMENSIONS

SITE AREA34.4 AC

RK MIDWAY (24.6 AC)

MET COUNCIL (9.8 AC)

1230’

11

90

1240’

12

20

SNEL

LIN

G A

VE

PASC

AL

ST

N

ST. ANTHONY AVE

UNIVERSITY AVE

I-94

SHIELDS AVE

SPRUCE TREE AVE

6

MIDWAY, ST. PAUL, MNJANUARY 7, 2016

THIS CONCEPTUAL STUDY IS FOR PLANNING PURPOSE ONLY.

SITE SPECIFIC INFORMATION SUCH AS SURVEY, EXISTING CONDITIONS, ZONING REQUIREMENTS MUST BE VERIFIED.DRAFT CONCEPT PLANS FOR DISCUSSION ONLY

RK MIDWAY SITE VISIBILITY

SNEL

LIN

G A

VE

UNIVERSITY AVE

PASC

AL

ST N

ST. ANTHONY AVE

2

3 4

I-95

1

2

4

1

3

7

MIDWAY, ST. PAUL, MNJANUARY 7, 2016

THIS CONCEPTUAL STUDY IS FOR PLANNING PURPOSE ONLY.

SITE SPECIFIC INFORMATION SUCH AS SURVEY, EXISTING CONDITIONS, ZONING REQUIREMENTS MUST BE VERIFIED.DRAFT CONCEPT PLANS FOR DISCUSSION ONLY

RK MIDWAY EXISTING SITE CONDITIONS

SNEL

LIN

G A

VE

UNIVERSITY AVE

PASC

AL

ST N

ST. ANTHONY AVE

2

3 4

I-95

1 2

4

1

3

8

MIDWAY, ST. PAUL, MNJANUARY 7, 2016

THIS CONCEPTUAL STUDY IS FOR PLANNING PURPOSE ONLY.

SITE SPECIFIC INFORMATION SUCH AS SURVEY, EXISTING CONDITIONS, ZONING REQUIREMENTS MUST BE VERIFIED.DRAFT CONCEPT PLANS FOR DISCUSSION ONLY

RK MIDWAY SITE AREA AND DIMENSIONS

SITE AREA34.4 AC

RK MIDWAY (24.6 AC)

MET COUNCIL (9.8 AC)

1230’

11

90

1240’

12

20

SNEL

LIN

G A

VE

PASC

AL

ST

N

ST. ANTHONY AVE

UNIVERSITY AVE

I-94

SHIELDS AVE

SPRUCE TREE AVE

9

MIDWAY, ST. PAUL, MNJANUARY 7, 2016

THIS CONCEPTUAL STUDY IS FOR PLANNING PURPOSE ONLY.

SITE SPECIFIC INFORMATION SUCH AS SURVEY, EXISTING CONDITIONS, ZONING REQUIREMENTS MUST BE VERIFIED.DRAFT CONCEPT PLANS FOR DISCUSSION ONLY

RK MIDWAY PROPOSED STADIUM

1230’

11

90

1240’

12

20

SNEL

LIN

G A

VE

PASC

AL

ST

N

ST. ANTHONY AVE

UNIVERSITY AVE

I-94

SHIELDS AVE

SPRUCE TREE AVE EXISTING MIDWAY SHOPPING CENTER

APPROXIMATE LOCATION OF

PROPOSED SOCCER FIELD

10

MIDWAY, ST. PAUL, MNJANUARY 7, 2016

THIS CONCEPTUAL STUDY IS FOR PLANNING PURPOSE ONLY.

SITE SPECIFIC INFORMATION SUCH AS SURVEY, EXISTING CONDITIONS, ZONING REQUIREMENTS MUST BE VERIFIED.DRAFT CONCEPT PLANS FOR DISCUSSION ONLY

RK MIDWAY INPUT SOURCES REGARDING THE STADIUM, SITE AND NEIGHBORHOOD

Soccer• Supporter groups• Amateur community and recreational clubs• MYSA and youth clubs• Universities and colleges• Major League Soccer and select league teams• NSC (National Sports Center, Blaine)

Architecture• Stadium architects (Populous and others)• International soccer participants• Community planners and developers

Community• The CAC, neighborhood associations, local

residents• Multiple local, metro and regional community

groups• City and County leadership, public officials and

planning staff• State government and legislative officials• Local and regional businesses• Out-state business and community leaders

Construction• RK Midway and S9 Architects• Mortenson Construction• United Properties and other developers• Solar energy companies

Future Users and Occupants• Residential developers• Restaurants, food and beverage establishments• Grocery and food purveyors• Health and wellness facilities• Medical care service providers• Corporate offices• Hotel and related hospitality companies• Entertainment venues

11

MIDWAY, ST. PAUL, MNJANUARY 7, 2016

THIS CONCEPTUAL STUDY IS FOR PLANNING PURPOSE ONLY.

SITE SPECIFIC INFORMATION SUCH AS SURVEY, EXISTING CONDITIONS, ZONING REQUIREMENTS MUST BE VERIFIED.DRAFT CONCEPT PLANS FOR DISCUSSION ONLY

RK MIDWAY

Game Days

• Traffic flow and parking

• Pedestrian, bicylce, bus and light rail transportation use

• Pre- and post-game activities

• External light and noise (stadium related) abatement

• Activation of local and in-stadium amenities

The Superblock

• Retail enhancements

• Hospitality opportunities - food and beverage, hotel, meeting spaces

• Additional businesses and corporate offices

• Community uses - green spaces, meeting places, entertainment

• Enhanced, year-round activities

• Traffic flow and parking

MAJOR COMMUNITY-RELATED CONSIDERATIONS

12

MIDWAY, ST. PAUL, MNJANUARY 7, 2016

THIS CONCEPTUAL STUDY IS FOR PLANNING PURPOSE ONLY.

SITE SPECIFIC INFORMATION SUCH AS SURVEY, EXISTING CONDITIONS, ZONING REQUIREMENTS MUST BE VERIFIED.DRAFT CONCEPT PLANS FOR DISCUSSION ONLY

RK MIDWAY

• MLS (Domestic) and International stadiums

• “Urban Villages” and multi-faceted “24/7“ communities

INSPIRATIONS FOR THE STADIUM

13

MIDWAY, ST. PAUL, MNJANUARY 7, 2016

THIS CONCEPTUAL STUDY IS FOR PLANNING PURPOSE ONLY.

SITE SPECIFIC INFORMATION SUCH AS SURVEY, EXISTING CONDITIONS, ZONING REQUIREMENTS MUST BE VERIFIED.DRAFT CONCEPT PLANS FOR DISCUSSION ONLYMINNESOTA SOCCER

12|09|2015

STADIA COMPARISONMLS STADIA

DICK’S SPORTING GOODS PARK | COLORADO RAPIDS18,086 CAPACITY

AVAYA STADIUM | SAN JOSE EARTHQUAKES18,000 CAPACITY

SPORTING PARK | SPORTING KANSAS CITY18,467 CAPACITY

PPL PARK | PHILADELPHIA UNION18,500 CAPACITY

TOYOTA PARK | CHICAGO FIRE20,000 CAPACITY

MAPFRE STADIUM | COLUMBUS CREW SC20,145 CAPACITY

RK MIDWAY STADIA COMPARISON: MLS STADIA

14

MIDWAY, ST. PAUL, MNJANUARY 7, 2016

THIS CONCEPTUAL STUDY IS FOR PLANNING PURPOSE ONLY.

SITE SPECIFIC INFORMATION SUCH AS SURVEY, EXISTING CONDITIONS, ZONING REQUIREMENTS MUST BE VERIFIED.DRAFT CONCEPT PLANS FOR DISCUSSION ONLYMINNESOTA SOCCER

12|09|2015

STADIA COMPARISONMLS STADIA

TOYOTA STADIUM | FC DALLAS`20,500 CAPACITY

RIO TINTO STADIUM | REAL SALT LAKE20,213 CAPACITY

SAPUTO STADIUM | MONTREAL IMPACT20,801 CAPACITY

PROVIDENCE PARK | PORTLAND TIMBERS21,144 CAPACITY

BBVA COMPASS STADIUM | HOUSTON DYNAMO22,038 CAPACITY

RED BULL ARENA | NEW YORK RED BULLS25,000 CAPACITY

RK MIDWAY STADIA COMPARISON: MLS STADIA

15

MIDWAY, ST. PAUL, MNJANUARY 7, 2016

THIS CONCEPTUAL STUDY IS FOR PLANNING PURPOSE ONLY.

SITE SPECIFIC INFORMATION SUCH AS SURVEY, EXISTING CONDITIONS, ZONING REQUIREMENTS MUST BE VERIFIED.DRAFT CONCEPT PLANS FOR DISCUSSION ONLYMINNESOTA SOCCER

12|09|2015

STADIA COMPARISONMLS STADIA

BMO FIELD | TORONTO FC30,991 CAPACITY

STUBHUB CENTER | LA GALAXY27,000 CAPACITY

ORLANDO CITY STADIUM | ORLANDO CITY SOCCER25,000 CAPACITY

SACRAMENTO | SACRAMENTO REPUBLIC FC22,000 [PROPOSED] CAPACITY

SOUTH LOS ANGELES | LA FC22,000 [PROPOSED] CAPACITY

RK MIDWAY STADIA COMPARISON: MLS STADIA

16

MIDWAY, ST. PAUL, MNJANUARY 7, 2016

THIS CONCEPTUAL STUDY IS FOR PLANNING PURPOSE ONLY.

SITE SPECIFIC INFORMATION SUCH AS SURVEY, EXISTING CONDITIONS, ZONING REQUIREMENTS MUST BE VERIFIED.DRAFT CONCEPT PLANS FOR DISCUSSION ONLYMINNESOTA SOCCER

12|09|2015

STADIA COMPARISONINTERNATIONAL STADIA

MARACANA STADIUM | RIO DE JANEIRO, BRAZIL78,838 CAPACITY

FNB STADIUM | JOHANNESBURG, SOUTH AFRICA94,736 CAPACITY

ALLIANZ ARENA | MUNICH, GERMANY75,024 CAPACITY

CAPE TOWN STADIUM | CAPTE TOWN, SOUTH AFRICA55,000 CAPACITY

AVIVA STADIUM | DUBLIN, IRELAND50,000 CAPACITY

HBZ STADIUM | AL AIN, UAE25,000 CAPACITY

RK MIDWAY STADIA COMPARISON: INTERNATIONAL STADIA

17

MIDWAY, ST. PAUL, MNJANUARY 7, 2016

THIS CONCEPTUAL STUDY IS FOR PLANNING PURPOSE ONLY.

SITE SPECIFIC INFORMATION SUCH AS SURVEY, EXISTING CONDITIONS, ZONING REQUIREMENTS MUST BE VERIFIED.DRAFT CONCEPT PLANS FOR DISCUSSION ONLYMINNESOTA SOCCER

12|09|2015

TOTTENHAM STADIUM | LONDON, ENGLAND61,000 CAPACITY

CHELSEA STADIUM | LONDON, ENGLAND60,000+ CAPACITY

STADE DES LUMIERES | LYON, FRANCE58,927 CAPACITY

CRAIOVA STADIUM | CRAIOVA, ROMANIA40,000 CAPACITY

STADIA COMPARISONNEW INTERNATIONAL STADIA

LEVBERDON ARENA | ROSTOV-ON-DON, RUSSIA43,702 CAPACITY

RK MIDWAY STADIA COMPARISON: NEW INTERNATIONAL STADIA

18

MIDWAY, ST. PAUL, MNJANUARY 7, 2016

THIS CONCEPTUAL STUDY IS FOR PLANNING PURPOSE ONLY.

SITE SPECIFIC INFORMATION SUCH AS SURVEY, EXISTING CONDITIONS, ZONING REQUIREMENTS MUST BE VERIFIED.DRAFT CONCEPT PLANS FOR DISCUSSION ONLY

RK MIDWAY

• 20,000 guests

• 25-35 soccer events yearly (March to early December)

• Partial roof covering for weather protection and light and noise abatement

• Year-round and daily use elements

• Adjacent green spaces

• Beautiful and inspiring

• Complements and elevates the neighborhood

• Approachable and accessible - physically and economically

• Recognizable and appreciated

KEY STADIUM ELEMENTS AND FEATURES

20

MIDWAY, ST. PAUL, MNJANUARY 7, 2016

THIS CONCEPTUAL STUDY IS FOR PLANNING PURPOSE ONLY.

SITE SPECIFIC INFORMATION SUCH AS SURVEY, EXISTING CONDITIONS, ZONING REQUIREMENTS MUST BE VERIFIED.DRAFT CONCEPT PLANS FOR DISCUSSION ONLYMINNESOTA SOCCER

12|09|2015

SECTION OVERLAY - BOWLEAST SECTION - TARGET FIELD

RK MIDWAY SECTION OVERLAY - BOWL: EAST SECTION - TARGET FIELD

21

MIDWAY, ST. PAUL, MNJANUARY 7, 2016

THIS CONCEPTUAL STUDY IS FOR PLANNING PURPOSE ONLY.

SITE SPECIFIC INFORMATION SUCH AS SURVEY, EXISTING CONDITIONS, ZONING REQUIREMENTS MUST BE VERIFIED.DRAFT CONCEPT PLANS FOR DISCUSSION ONLYMINNESOTA SOCCER

12|09|2015

SECTION OVERLAY - BOWLEAST SECTION - TCF BANK STADIUM

RK MIDWAY SECTION OVERLAY - BOWL: EAST SECTION - TCF BANK STADIUM

22

MIDWAY, ST. PAUL, MNJANUARY 7, 2016

THIS CONCEPTUAL STUDY IS FOR PLANNING PURPOSE ONLY.

SITE SPECIFIC INFORMATION SUCH AS SURVEY, EXISTING CONDITIONS, ZONING REQUIREMENTS MUST BE VERIFIED.DRAFT CONCEPT PLANS FOR DISCUSSION ONLYMINNESOTA SOCCER

12|09|2015

SECTION OVERLAY - BOWLEAST SECTION - US BANK STADIUM

RK MIDWAY SECTION OVERLAY - BOWL: EAST SECTION - US BANK STADIUM

23

MIDWAY, ST. PAUL, MNJANUARY 7, 2016

THIS CONCEPTUAL STUDY IS FOR PLANNING PURPOSE ONLY.

SITE SPECIFIC INFORMATION SUCH AS SURVEY, EXISTING CONDITIONS, ZONING REQUIREMENTS MUST BE VERIFIED.DRAFT CONCEPT PLANS FOR DISCUSSION ONLYMINNESOTA SOCCER

12|09|2015

SECTION OVERLAY - BOWLEAST SECTION - TARGET CENTER

RK MIDWAY SECTION OVERLAY - BOWL: EAST SECTION - TARGET CENTER

24

MIDWAY, ST. PAUL, MNJANUARY 7, 2016

THIS CONCEPTUAL STUDY IS FOR PLANNING PURPOSE ONLY.

SITE SPECIFIC INFORMATION SUCH AS SURVEY, EXISTING CONDITIONS, ZONING REQUIREMENTS MUST BE VERIFIED.DRAFT CONCEPT PLANS FOR DISCUSSION ONLYMINNESOTA SOCCER

12|09|2015

SECTION OVERLAY - BOWLEAST SECTION - EXCEL ENERGY CENTER

RK MIDWAY SECTION OVERLAY - BOWL: EAST SECTION - EXCEL ENERGY CENTER

25

MIDWAY, ST. PAUL, MNJANUARY 7, 2016

THIS CONCEPTUAL STUDY IS FOR PLANNING PURPOSE ONLY.

SITE SPECIFIC INFORMATION SUCH AS SURVEY, EXISTING CONDITIONS, ZONING REQUIREMENTS MUST BE VERIFIED.DRAFT CONCEPT PLANS FOR DISCUSSION ONLY

MINNESOTA SOCCER12|09|2015

RK MIDWAY

26

MIDWAY, ST. PAUL, MNJANUARY 7, 2016

THIS CONCEPTUAL STUDY IS FOR PLANNING PURPOSE ONLY.

SITE SPECIFIC INFORMATION SUCH AS SURVEY, EXISTING CONDITIONS, ZONING REQUIREMENTS MUST BE VERIFIED.DRAFT CONCEPT PLANS FOR DISCUSSION ONLY

RK MIDWAY

• A great stadium for the sport - both players and fans

• An exciting area to live, work, visit, shop and enjoy

• An enhanced, dynamic and progressive community

• A catalyst for continued improvement in our lives

• A cornerstone for the future of the World’s sport in Minnesota

THE IDEAL END RESULT

27

MIDWAY, ST. PAUL, MNJANUARY 7, 2016

THIS CONCEPTUAL STUDY IS FOR PLANNING PURPOSE ONLY.

SITE SPECIFIC INFORMATION SUCH AS SURVEY, EXISTING CONDITIONS, ZONING REQUIREMENTS MUST BE VERIFIED.DRAFT CONCEPT PLANS FOR DISCUSSION ONLY

RK MIDWAY

28

MIDWAY, ST. PAUL, MNJANUARY 7, 2016

THIS CONCEPTUAL STUDY IS FOR PLANNING PURPOSE ONLY.

SITE SPECIFIC INFORMATION SUCH AS SURVEY, EXISTING CONDITIONS, ZONING REQUIREMENTS MUST BE VERIFIED.DRAFT CONCEPT PLANS FOR DISCUSSION ONLY

RK MIDWAY

SNELLING MIDWAY MASTER PLAN

29

MIDWAY, ST. PAUL, MNJANUARY 7, 2016

THIS CONCEPTUAL STUDY IS FOR PLANNING PURPOSE ONLY.

SITE SPECIFIC INFORMATION SUCH AS SURVEY, EXISTING CONDITIONS, ZONING REQUIREMENTS MUST BE VERIFIED.DRAFT CONCEPT PLANS FOR DISCUSSION ONLY

RK MIDWAY DESIGN PRINCIPLES

1. TOD - Pedestrian first (walkable neighborhood)• Direct link to Green Line train stations and BRT

stops• Public open spaces for citizens of the Twin Cities• Creation of new mixed use neighborhood

2. Amending the street grid and urban fabric• Creation of a new neighborhood district respective

to surrounding existing neighborhoods• Walkable block dimensions

3. Emphasizing public open spaces• Creation of open space network• Connecting parks and bike paths• Creation of new public open spaces for four

season use

4. Mixed-use• Mix of 24/7 uses including stadium, office,

retail, residential, entertainment, hotel, and open space

• Active retail street fronts on principal streets

• Day and night uses• Mix of international, regional, and local

programs

5. Sustainable stormwater management• Green infrastucture such as tree trenches,

rain gardens, boulevard swales, and green roofs

• Sustainable landscape• Permeable paving surface• Irrigation cistern• Grey water recycling station• Water feature incorporating stormwater

management system.

SNELLING-MIDWAY REDEVELOPMENT DESIGN PRINCIPLES

30

MIDWAY, ST. PAUL, MNJANUARY 7, 2016

THIS CONCEPTUAL STUDY IS FOR PLANNING PURPOSE ONLY.

SITE SPECIFIC INFORMATION SUCH AS SURVEY, EXISTING CONDITIONS, ZONING REQUIREMENTS MUST BE VERIFIED.DRAFT CONCEPT PLANS FOR DISCUSSION ONLY

RK MIDWAY SITE AREA AND DIMENSIONS

SITE AREA34.4 AC

RK MIDWAY (24.6 AC)

MET COUNCIL (9.8 AC)

1230’

11

90

1240’

12

20

SNEL

LIN

G A

VE

PASC

AL

ST

N

ST. ANTHONY AVE

UNIVERSITY AVE

I-94

SHIELDS AVE

SPRUCE TREE AVE

31

MIDWAY, ST. PAUL, MNJANUARY 7, 2016

THIS CONCEPTUAL STUDY IS FOR PLANNING PURPOSE ONLY.

SITE SPECIFIC INFORMATION SUCH AS SURVEY, EXISTING CONDITIONS, ZONING REQUIREMENTS MUST BE VERIFIED.DRAFT CONCEPT PLANS FOR DISCUSSION ONLY

RK MIDWAY ST. PAUL DOWNTOWN BLOCKS OVERLAY

NEARLY 12 BLOCKS OF ST. PAUL DOWNTOWN BLOCK

N S

IBLE

Y ST

MEARS PARK

JAC

KSO

N S

T

ROBE

RT S

T N

MIN

NES

OTA

ST

CED

AR

ST

WA

BASH

A S

T N

6TH ST E

7TH PL E

FORT RD

5TH ST E

4TH ST E

CENTRAL STATION

UNION DEPOT STATION

LANDMARKPLAZA

ST P

ETER

ST

7TH ST W

7TH PL W

MINNESOTTA STATE COLLEGES & UNIVERSITIES

MINNESOTTA CHILDREN’S MUSEUM

32

MIDWAY, ST. PAUL, MNJANUARY 7, 2016

THIS CONCEPTUAL STUDY IS FOR PLANNING PURPOSE ONLY.

SITE SPECIFIC INFORMATION SUCH AS SURVEY, EXISTING CONDITIONS, ZONING REQUIREMENTS MUST BE VERIFIED.DRAFT CONCEPT PLANS FOR DISCUSSION ONLY

TOD REDEVELOPMENT STRATEGY REPORT OF F IND INGS AND RECOMMENDAT IONS

JUNE 17 , 2014

SNELL ING– MIDWAY SMARTS ITE

RK MIDWAY “SNELLING-MIDWAY SMARTSITE”

33

MIDWAY, ST. PAUL, MNJANUARY 7, 2016

THIS CONCEPTUAL STUDY IS FOR PLANNING PURPOSE ONLY.

SITE SPECIFIC INFORMATION SUCH AS SURVEY, EXISTING CONDITIONS, ZONING REQUIREMENTS MUST BE VERIFIED.DRAFT CONCEPT PLANS FOR DISCUSSION ONLY

RK MIDWAY PUBLIC TRANSIT & PEDESTRIAN ENTRIES

LRT GREEN LINE

LRT PLATFORM

BRT A LINE

BRT STOP

PEDESTRIAN CIRCULATION EXISTING TRAFFICE SIGNAL

UNIVERSITY AVE

SIM

PSO

N S

T

N A

SBU

RY S

T

SNEL

LIN

G A

VE

PASC

AL

ST N

ST. ANTHONY AVE

I-94

SHIELDS AVE

SPRUCE TREE AVE

APPROXIMATE LOCATION OF

PROPOSED SOCCER FIELD

34

MIDWAY, ST. PAUL, MNJANUARY 7, 2016

THIS CONCEPTUAL STUDY IS FOR PLANNING PURPOSE ONLY.

SITE SPECIFIC INFORMATION SUCH AS SURVEY, EXISTING CONDITIONS, ZONING REQUIREMENTS MUST BE VERIFIED.DRAFT CONCEPT PLANS FOR DISCUSSION ONLY

RK MIDWAY PRIMARY VEHICLE ACCESS ROUTES

LRT GREEN LINE

BRT A LINE

VEHICULAR CIRCULATION EXISTING TRAFFICE SIGNAL

UNIVERSITY AVE

SIM

PSO

N S

T

N A

SBU

RY S

T

SNEL

LIN

G A

VE

PASC

AL

ST N

ST. ANTHONY AVE

I-94

SHIELDS AVE

SPRUCE TREE AVE

35

MIDWAY, ST. PAUL, MNJANUARY 7, 2016

THIS CONCEPTUAL STUDY IS FOR PLANNING PURPOSE ONLY.

SITE SPECIFIC INFORMATION SUCH AS SURVEY, EXISTING CONDITIONS, ZONING REQUIREMENTS MUST BE VERIFIED.DRAFT CONCEPT PLANS FOR DISCUSSION ONLY

CONNECTION TO SNELBY DEVELOPMENT

CONNECTION TO LEXINGTON PARKWAY

CONNECTION TO CHARLES AVE BIKE ROUTE

CONNECTION TO ALDINE ST BIKE ROUTE

RK MIDWAY

UNIVERSITY AVE

SIM

PSO

N S

T

N A

SBU

RY S

T

PASC

AL

ST N

ST. ANTHONY AVE

I-94

SPRUCE TREE AVE

SHIELDS AVE

BIKE ROUTES

SNEL

LIN

G A

VE LRT GREEN LINE

LRT PLATFORM

BRT A LINE

BRT STOP

BICYCLE CIRCULATION EXISTING TRAFFICE SIGNAL

36

MIDWAY, ST. PAUL, MNJANUARY 7, 2016

THIS CONCEPTUAL STUDY IS FOR PLANNING PURPOSE ONLY.

SITE SPECIFIC INFORMATION SUCH AS SURVEY, EXISTING CONDITIONS, ZONING REQUIREMENTS MUST BE VERIFIED.DRAFT CONCEPT PLANS FOR DISCUSSION ONLY

RK MIDWAY

UNIVERSITY AVE

SIM

PSO

N S

T

N A

SBU

RY S

T

SNEL

LIN

G A

VE

PASC

AL

ST N

ST. ANTHONY AVE

I-94

SPRUCE TREE AVE

SHIELDS AVE

MENDING THE STREET GRID (CONNECTING THE NEIGHBORHOODS)

37

MIDWAY, ST. PAUL, MNJANUARY 7, 2016

THIS CONCEPTUAL STUDY IS FOR PLANNING PURPOSE ONLY.

SITE SPECIFIC INFORMATION SUCH AS SURVEY, EXISTING CONDITIONS, ZONING REQUIREMENTS MUST BE VERIFIED.DRAFT CONCEPT PLANS FOR DISCUSSION ONLY

RESIDENTIAL

OFFICE OPEN SPACE RETAIL

ENTERTAINMENT HOTEL

RK MIDWAY EXAMPLES OF MIXED-USE

38

MIDWAY, ST. PAUL, MNJANUARY 7, 2016

THIS CONCEPTUAL STUDY IS FOR PLANNING PURPOSE ONLY.

SITE SPECIFIC INFORMATION SUCH AS SURVEY, EXISTING CONDITIONS, ZONING REQUIREMENTS MUST BE VERIFIED.DRAFT CONCEPT PLANS FOR DISCUSSION ONLY

RK MIDWAY FOUR SEASON FESTIVALS

39

MIDWAY, ST. PAUL, MNJANUARY 7, 2016

THIS CONCEPTUAL STUDY IS FOR PLANNING PURPOSE ONLY.

SITE SPECIFIC INFORMATION SUCH AS SURVEY, EXISTING CONDITIONS, ZONING REQUIREMENTS MUST BE VERIFIED.DRAFT CONCEPT PLANS FOR DISCUSSION ONLY

OPEN SPACE OVERLAY - MEARS PARK, ST. PAUL

BUILDING OUTLINE OPEN SPACE

405’

400’

RK MIDWAY

40

MIDWAY, ST. PAUL, MNJANUARY 7, 2016

THIS CONCEPTUAL STUDY IS FOR PLANNING PURPOSE ONLY.

SITE SPECIFIC INFORMATION SUCH AS SURVEY, EXISTING CONDITIONS, ZONING REQUIREMENTS MUST BE VERIFIED.DRAFT CONCEPT PLANS FOR DISCUSSION ONLY

OPEN SPACE OVERLAY - PEAVEY PLAZA, MINNEAPOLIS

BUILDING OUTLINE OPEN SPACE

250’

475’

RK MIDWAY

41

MIDWAY, ST. PAUL, MNJANUARY 7, 2016

THIS CONCEPTUAL STUDY IS FOR PLANNING PURPOSE ONLY.

SITE SPECIFIC INFORMATION SUCH AS SURVEY, EXISTING CONDITIONS, ZONING REQUIREMENTS MUST BE VERIFIED.DRAFT CONCEPT PLANS FOR DISCUSSION ONLY

355’450’

BUILDING OUTLINE OPEN SPACE

RK MIDWAY OPEN SPACE OVERLAY - RICE PARK ST. PAUL

42

MIDWAY, ST. PAUL, MNJANUARY 7, 2016

THIS CONCEPTUAL STUDY IS FOR PLANNING PURPOSE ONLY.

SITE SPECIFIC INFORMATION SUCH AS SURVEY, EXISTING CONDITIONS, ZONING REQUIREMENTS MUST BE VERIFIED.DRAFT CONCEPT PLANS FOR DISCUSSION ONLY

OPEN SPACE OVERLAY - LANSDOWNE, OTTAWA

180’

155’

105’

180’

515’

460’

BUILDING OUTLINE OPEN SPACE

RK MIDWAY

43

MIDWAY, ST. PAUL, MNJANUARY 7, 2016

THIS CONCEPTUAL STUDY IS FOR PLANNING PURPOSE ONLY.

SITE SPECIFIC INFORMATION SUCH AS SURVEY, EXISTING CONDITIONS, ZONING REQUIREMENTS MUST BE VERIFIED.DRAFT CONCEPT PLANS FOR DISCUSSION ONLY

LA LIVE, LOS ANGELES, CA STE. CATHERINE STREET, MONTRÉAL, CANADA

PORTLAND STADIUM, PORTLAND, OR

RK MIDWAY EXAMPLES OF PLACES DURING EVENT

44

MIDWAY, ST. PAUL, MNJANUARY 7, 2016

THIS CONCEPTUAL STUDY IS FOR PLANNING PURPOSE ONLY.

SITE SPECIFIC INFORMATION SUCH AS SURVEY, EXISTING CONDITIONS, ZONING REQUIREMENTS MUST BE VERIFIED.DRAFT CONCEPT PLANS FOR DISCUSSION ONLY

EXAMPLES OF OPEN SPACE: FORMAL PLAZA

RK MIDWAY

45

MIDWAY, ST. PAUL, MNJANUARY 7, 2016

THIS CONCEPTUAL STUDY IS FOR PLANNING PURPOSE ONLY.

SITE SPECIFIC INFORMATION SUCH AS SURVEY, EXISTING CONDITIONS, ZONING REQUIREMENTS MUST BE VERIFIED.DRAFT CONCEPT PLANS FOR DISCUSSION ONLY

EXAMPLES OF OPEN SPACE: MORE SOFTSCAPE

RK MIDWAY

46

MIDWAY, ST. PAUL, MNJANUARY 7, 2016

THIS CONCEPTUAL STUDY IS FOR PLANNING PURPOSE ONLY.

SITE SPECIFIC INFORMATION SUCH AS SURVEY, EXISTING CONDITIONS, ZONING REQUIREMENTS MUST BE VERIFIED.DRAFT CONCEPT PLANS FOR DISCUSSION ONLY

EXAMPLES OF OPEN SPACE: MORE HARDSCAPE (ACTIVE USE W/ SEASONAL EVENTS)

RK MIDWAY

47

MIDWAY, ST. PAUL, MNJANUARY 7, 2016

THIS CONCEPTUAL STUDY IS FOR PLANNING PURPOSE ONLY.

SITE SPECIFIC INFORMATION SUCH AS SURVEY, EXISTING CONDITIONS, ZONING REQUIREMENTS MUST BE VERIFIED.DRAFT CONCEPT PLANS FOR DISCUSSION ONLY

EXAMPLES OF URBAN SPACES WITH FOOD AND OTHER PROGRAMS

RK MIDWAY

48

MIDWAY, ST. PAUL, MNJANUARY 7, 2016

THIS CONCEPTUAL STUDY IS FOR PLANNING PURPOSE ONLY.

SITE SPECIFIC INFORMATION SUCH AS SURVEY, EXISTING CONDITIONS, ZONING REQUIREMENTS MUST BE VERIFIED.DRAFT CONCEPT PLANS FOR DISCUSSION ONLY

EXAMPLES OF BOULEVARD STREETSCAPERK MIDWAY

49

MIDWAY, ST. PAUL, MNJANUARY 7, 2016

THIS CONCEPTUAL STUDY IS FOR PLANNING PURPOSE ONLY.

SITE SPECIFIC INFORMATION SUCH AS SURVEY, EXISTING CONDITIONS, ZONING REQUIREMENTS MUST BE VERIFIED.DRAFT CONCEPT PLANS FOR DISCUSSION ONLY

EXAMPLES OF PEDESTRIAN 1ST STREETSCAPERK MIDWAY

50

MIDWAY, ST. PAUL, MNJANUARY 7, 2016

THIS CONCEPTUAL STUDY IS FOR PLANNING PURPOSE ONLY.

SITE SPECIFIC INFORMATION SUCH AS SURVEY, EXISTING CONDITIONS, ZONING REQUIREMENTS MUST BE VERIFIED.DRAFT CONCEPT PLANS FOR DISCUSSION ONLY

EXAMPLES OF CURBLESS STREETSCAPE:LANSDOWNE PARK, OTTAWA, CANADA

RK MIDWAY

51

MIDWAY, ST. PAUL, MNJANUARY 7, 2016

THIS CONCEPTUAL STUDY IS FOR PLANNING PURPOSE ONLY.

SITE SPECIFIC INFORMATION SUCH AS SURVEY, EXISTING CONDITIONS, ZONING REQUIREMENTS MUST BE VERIFIED.DRAFT CONCEPT PLANS FOR DISCUSSION ONLY

SUSTAINABLE LANDSCAPERK MIDWAY

52

MIDWAY, ST. PAUL, MNJANUARY 7, 2016

THIS CONCEPTUAL STUDY IS FOR PLANNING PURPOSE ONLY.

SITE SPECIFIC INFORMATION SUCH AS SURVEY, EXISTING CONDITIONS, ZONING REQUIREMENTS MUST BE VERIFIED.DRAFT CONCEPT PLANS FOR DISCUSSION ONLY

RK MIDWAY