rms six sigma training 2010 final

156
1 RMS Six Sigma Training Credit to multiple data sources including Villanova University Black Belt and Green Belt Courses, Six Sigma Memory Jogger I and II, and Lean Six Sigma Pocket Toolbook. Define Measur e Analyz e Improv e Contro l Measur e

Upload: michael-camp

Post on 13-Apr-2017

648 views

Category:

Documents


2 download

TRANSCRIPT

Page 1: RMS Six Sigma Training 2010 Final

1

RMS Six Sigma Training

Credit to multiple data sources including Villanova University Black Belt and Green Belt Courses, Six Sigma Memory Jogger I and II, and Lean Six Sigma Pocket Toolbook.

Define Measure Analyze Improve ControlMeasure

Page 2: RMS Six Sigma Training 2010 Final

2

Define Measure Analyze Improve Control

What is Six Sigma?

The Six Sigma methodologies are a business philosophy and initiative that enables world-class quality and continuous improvement to achieve the highest level of customer satisfaction. Metrics are established that align an Organizations’ strategic goals and values to that of their customer’s needs and expectations.

MeasureMeasure

Page 3: RMS Six Sigma Training 2010 Final

3

How Does it Work?

• Uses Data and Statistical Tools to Systematically Improve Processes and Sustain Results

• Process Metrics are Evaluated• Comparison of Average and Variation to Performance

Specifications or Targets• Methodology is a Project-Focused Approach

Consisting of Five Phases-DMAIC

Define Measure Analyze Improve ControlMeasure

Page 4: RMS Six Sigma Training 2010 Final

4

Who Uses Six Sigma?

Define Measure Analyze Improve Control

The following companies claim to have successfully implemented Six Sigma in some form or another:

• 3M

• Advanced Micro Devices

• Air Canada

• ALCAN

• Amazon.com

• Bank of America

• Boeing

• Caterpillar Inc.

• CIGNA

• Dell

• Delphi Corporation

• DHL

• Deutsche Telekom

• Dow Chemical Company

• DuPont

• Ecolab

• Ford Motor Company

• General Electric

• GlaxoSmithKline

• Heinz Co.

• Honeywell

• HSBC Group

• Ingram Micro

• LG Group

• Lockheed Martin

• Merrill Lynch

• Merck

• Motorola

• Nielsen Company

• Nortel Networks

• Northrop Grumman

• Penske Truck Leasing

• Quest Diagnostics

• Samsung Group

• Siemens AG

• Staples Inc.

• Target Corporation

• Teradyne

• The Hertz Corporation

• Toshiba

• United States

Armed Forces

• Vodafone

• Whirlpool

• Xerox

Source: Wikipedia

Measure

Page 5: RMS Six Sigma Training 2010 Final

5

Affinity Diagram

Comm Plan

Define Measure Analyze Improve Control

CTQ Tree

Data Collection

Kano Model

Pareto Chart

Run Chart

SIPOC

Tollgate

VOC

Control Charts

Frequency Plots

Check sheet

Flowchart

Histogram

Kano Model

Pareto Charts

Process Sigma

Run Chart

Loss Function

Tollgate Review

Brainstorming

Cause and Effect Diagram

Design of Experiments

Control Charts

Histogram

Hypothesis Test

Interrelationship Diagraph

Scatter chart

Tree Diagram

Tollgate Review

Gantt Chart

Brainstorming

Control Charts

FMEA

Histogram

Design of Experiments

Pareto Chart

PDCA

Prioritization Matrix

Process Sigma

Run Chart

Tollgate

Communication Plan

Control Charts

PDCA Cycle

Process Mgmt Chart

Run Chart

Six Sigma Storyboard

Pareto Chart

Prioritize Matrix

Affinity Chart

Pareto Chart

Activity Network

PDPCQFD

Tollgate Review

Control Charts

The Tools of Six Sigma

Define Measure Analyze Improve Control

Source: Villanova University Six Sigma Lectures

Measure

Page 6: RMS Six Sigma Training 2010 Final

6

Define Measure Analyze Improve Control

DMAIC Overview

DMAIC – Tollgate Subdivisions by George EckesSource: Villanova University Six Sigma Lectures

Measure

Project CharterID & validate customer needs and requirements

High level picture of the target processCreate a collection plan

Implement plan, compute baseline sigmaExamine data

Watch the processDetermine root cause

Generate solutionsSelect solutions

Implement solutionsPick the right control methodDocument the response planControl

Define

Measure

Analyze

Improve

Page 7: RMS Six Sigma Training 2010 Final

7

Define Measure Analyze Improve Control

Team Roles within a Six Sigma Organization

Master Black Belt

Trains and coaches Black Belts and Green Belts. Functions more at the Six Sigma program level by developing key metrics and strategic direction. Acts as an organization's Six Sigma technologist and internal consultant

Black Belt Leads problem solving projects. Trains and coaches project teams

Green BeltAssists with data collection and analysis for Black Belt projects. Leads Green Belt projects or teams.

Yellow BeltParticipates as a project team member. Reviews process improvements that support the project.

White BeltCan work on local problem-solving teams that support overall projects, but may not be part of a Six Sigma team. Understands basic Six Sigma concepts from an awareness perspective.

Measure

Page 8: RMS Six Sigma Training 2010 Final

8

Executive Roles within a Six Sigma Organization

Define Measure Analyze Improve Control

Champions

Translate the company's vision, mission, goals and metrics to create an organizational deployment plan and identify individual projects. Identify resources and remove roadblocks.

ExecutivesProvide overall alignment by establishing the strategic focus of the Six Sigma program within the organization's culture and vision.

Measure

Page 9: RMS Six Sigma Training 2010 Final

9

Purpose

• Define Business Metrics

• Identify Projects for Process Improvement

• Identify Resources for Process Improvement

Tools

• SIPOC

• Understanding the Voice of the Customer• Kano• QFD

Key Outputs

• Project Charter• Project Team• Management

Commitment

Define Measure Analyze Improve Control

Page 10: RMS Six Sigma Training 2010 Final

10

Projects and Process Improvements are based on Customer’s Needs and Requirements

Define Measure Analyze Improve Control

DefinitionNeeds Establishes the relationship between the company &

the customer

Requirements Characteristics that determine whether the customer is satisfied

Notes:• It is very important to

establish clear metrics and goals to validate satisfaction levels

Page 12: RMS Six Sigma Training 2010 Final

12

Define Measure Analyze Improve Control

In order to improve upon a process, you must first understand the process.The SIPOC Method can help…

SIPOC is used to document a process at a high level and visually show the process

Source: Villanova University Six Sigma Lectures

Page 14: RMS Six Sigma Training 2010 Final

14

Define Measure Analyze Improve Control

Supplier Inputs Process Outputs Customer

News Newspaper / Internet

Select Dealership

Dealership Car Test Drive

Manufacturer Brochure Select Option Package

Car Chosen Purchaser

Customer Information / Offer

Negotiate Financing / Price

Purchaser’s Family

Finance Company

Credit Info Finance Contract

SIPOC Diagram

Source: Villanova University Six Sigma Lectures

Page 16: RMS Six Sigma Training 2010 Final

16

Define Measure Analyze Improve Control

Another SIPOC Example

Inputs Process Output CustomerSuppliers

Nurse

Doctor

Diagnosis

Admis

Discharge

Prescrip

Billing

Referral

Treatment

Hospital

Patient

Family

Insurance

Drugs

MedicalEquip

Patientrecords

911

Paramedic

Drug man

MedicalEquip man

Inputs Process Output CustomerSuppliers

Nurse

Doctor

Diagnosis

Admis

Discharge

Prescrip

Billing

Referral

Treatment

Hospital

Patient

Family

Insurance

Drugs

MedicalEquipmentSupplier

Patientrecords

911

Paramedic

PharmaceuticalSupplier

MedicalSupplier

Source: Villanova University Six Sigma Lectures

Page 18: RMS Six Sigma Training 2010 Final

18

Define Measure Analyze Improve Control

Take care of your customers’ expectations in sequence from expected to normal to exciting!

• Our customer’s basic servicing expectations

Source: Villanova University Six Sigma Lectures

Page 31: RMS Six Sigma Training 2010 Final

31

Define Measure Analyze Improve Control

Post the QFD where all the teams can refer to it often, to better understand why decisions are made!

Usage:

• Fully understand BPO customer needs at initiation of services

• Clearly prioritize key requirements (DSO, Aging Reduction, AHT)

• If possible, learn from competition

Source: Villanova University Six Sigma Lectures

Page 32: RMS Six Sigma Training 2010 Final

32

What is a Project Charter?

The project charter defines all interactions of the project and sets the stage for a successful completion.

A project charter is the first step in the Six Sigma methodology. It takes place in the Define step of DMAIC, and the charter can make or break a successful project. It can make it by specifying necessary resources and boundaries that will in turn ensure success; it can break it by reducing team focus, effectiveness and motivation.

Define Measure Analyze Improve Control

Usage:

• Provides written and agreed upon details for short term projects

Page 33: RMS Six Sigma Training 2010 Final

33

Define Measure Analyze Improve Control

Project Title: Sales Analysis

Business Case:

(A broad definition of the issue as well as therationale for why this project should be a business priority.)

Sales at Company X has been growing annually, but it has experienced unusually low sales during July/Aug. Management is concerned about implications to their stock price.

Document Your Project Using a Project Charter

Source: Villanova University Six Sigma Lectures

Page 34: RMS Six Sigma Training 2010 Final

34

Define Measure Analyze Improve Control

Project Title: Sales Analysis

Problem/Opportunity Statement:

1 or 2 sentences describing the symptoms, such as where is the problem, how big is the problem, or what is the impact.

Low July/Aug sales in the eastern region have declined 20%. Other regions have not seen a decline in sales.

Gap between desired state and current state

Source: Villanova University Six Sigma Lectures

Page 35: RMS Six Sigma Training 2010 Final

35

Define Measure Analyze Improve Control

Problem/Opportunity Statement:Low July/Aug sales in the eastern region have declined 20%.

Goal Statement

Problem Statement and Goal statement are a matched pair. Measurable target for desired results and completion target date.

SMART – Simple, measurable, accurate, realistic, timely

Identify & eliminate the cause of low sales in the Eastern region by December 1 so that Eastern region sales rebound by 25% by the end of 1st quarter 2007.

Benchmark – George Eckes – 50% improvement

Usage:

• Use the “SMART” tip when writing goals for clear down and backlog reduction plans

Source: Villanova University Six Sigma Lectures

Page 36: RMS Six Sigma Training 2010 Final

36

Define Measure Analyze Improve Control

Project Title: Sales Analysis

Project Scope:

Where does the project start and stop? Where does the process start and stop? Identifyconstraints and assumptions.

The 7 member team will begin analysis of the Eastern sales process on September 1 and report their findings on November 1.Budget $25,000. Analyze process from 1st sales call to thru close of sale. Does notincludes all sales leads.

Usage:• Very important in the front end of initiating services with new customers• FTE Analysis• Scope Creep• Clearly defined for the customer

Source: Villanova University Six Sigma Lectures

Page 37: RMS Six Sigma Training 2010 Final

37

Purpose•Establish Baseline Performance•Identify Validate Measurements for Project Improvement

Tools•Descriptive Statistics•Central Tendency•Dispersion•Basic Statistical Process Control SPC•Process Flow Diagram

Key Outputs•Data Collection Plan•Performance Baseline-DPMO•Six Sigma Level•Current Process Flow Chart

Define Measure Analyze Improve ControlMeasure

Page 38: RMS Six Sigma Training 2010 Final

38

Define Measure Analyze Improve Control

A Data Collection Plan will help organize and validate what is to be measured.

Data Collection Plan

What to M

easure

Type of measure

Type of Data

Operational D

efinition

Specification

Target

Data C

ollection Form

Sampling

Baseline Sigm

a

Data Collection Plan

What to M

easure

Type of measure

Type of Data

Operational D

efinition

Specification

Target

Data C

ollection Form

Sampling

Baseline Sigm

a

Source: Villanova University Six Sigma Lectures

Measure

Page 39: RMS Six Sigma Training 2010 Final

39

Define Measure Analyze Improve Control

Usage:

• ACD Stats• Aging Reduction• AR Roll• DSO• Productivity

ExamplesQuality • Product or Service Features

• Attributes• Dimensions

• Scrap• Rework• Reliability

Cost • Labor• Material• Overhead• Repair Costs

Speed • Lead Times• Delivery Times• Turnaround Times• Setup Times• Cycle Times• Delays

What to Measure?

Measure

Page 41: RMS Six Sigma Training 2010 Final

41

Define Measure Analyze Improve Control

Input Metrics Process Metrics Output Metrics

• Accuracy of Customer Order• Quality of Ingredients

• Cooking Time• Preparation Sequence

Taste Quality

• Time to Receive Order• Time to Gather Ingredients• Time to Prep Food

• # of Process Steps• Time to Cook Food• Wait Time between Steps

Door to Door lead time Speed

• # and $ of Ingredients • # of Process Steps $$$ Cost

What is Important to the Customer?Source: Villanova University Six Sigma Lectures

Measure

Page 48: RMS Six Sigma Training 2010 Final

48

Define Measure Analyze Improve Control

Operational definitions are clear and precise instructions on how to take a particular measurement.

Connection:

• 8 hour day vs. 7.5 hour day

• Productivity Calculation:• Unique Touches by Account

• Touches per Week at Invoice Level

Source: http://www.isixsigma.com/index.php?option=com_k2&view=item&id=1265:&Itemid=49

Measure

Page 49: RMS Six Sigma Training 2010 Final

49

Define Measure Analyze Improve Control

The customer’s ideal performanceThe customer’s least

acceptable product or service

VOC: Voice of the CustomerSource: Villanova University Six Sigma Lectures

Measure

Page 63: RMS Six Sigma Training 2010 Final

63

Define Measure Analyze Improve Control

= level of precision (margin of error) desired from the sample in the same units as the “s” measurement

Example:

• The standard deviation for collector production is +/- 4

calls per hour. Average is 10 calls per hour

• See page 80 for a simple definition of standard deviation

Source: Villanova University Six Sigma Lectures

Measure

Page 66: RMS Six Sigma Training 2010 Final

66

Define Measure Analyze Improve Control

What is Sigma?A Simple Definition

• Six Sigma is a statistical term that equates to 3.4 defects per one million opportunities.

• Today, most organizations operate at around three sigma, which translates into roughly 67,000 defects per million opportunities.

• This methodology eliminates defects from existing processes, products, and services, saving millions of dollars every year and increasing customer satisfaction.

Measure

Page 68: RMS Six Sigma Training 2010 Final

68

Define Measure Analyze Improve Control

What is an Opportunity?

Opportunity is any area in a product or service where a defect couldbe produced. Opportunities are things which must go right to satisfy the customer.

• Exact name on credit card• Billing address of credit card• Credit card number• Expiration date• Product ID being ordered• Quantity

Six Sigma Term

• DPMO = Defects per Million Opportunities

Measure

Page 70: RMS Six Sigma Training 2010 Final

70

Define Measure Analyze Improve Control

Simplify Sigma

±6smLSL USL1s 2s 3s 4s 5s 6s1s2s3s4s5s6s

As my sigma (standard deviation of my data set) gets smaller, I am able to ‘fit in’ more sigmas before I reach my customer specs.

The sigma value (or the standard deviation) gets smaller (3.2 to 1.6), but the sigma levels gets larger. We want the sigma level to increase.

Sigm

a Va

lue

/ S

tand

ard

Dev

iatio

n

Customer SpecificationUpper Limit

Customer SpecificationLower Limit

Average

Source: Villanova University Six Sigma Lectures

Measure

Page 71: RMS Six Sigma Training 2010 Final

71

Define Measure Analyze Improve Control

What is Standard Deviation?A Simple Definition

• The statistical measure of spread and variability in a distribution of data. (Variability will always exist in a data set because not every individual is going to have the exact same value)

Examples:• Prices of Homes vary from House to House and Year to Year• Grades in a Class vary among Students• Household Income varies from Household to Household

• Standard Deviation represents the typical distance from any point in the data set to the center

Do Not Get Overwhelmed!Formula

S=

Source: Villanova University Six Sigma Lectures

Measure

Page 72: RMS Six Sigma Training 2010 Final

72

Define Measure Analyze Improve Control

Standard Deviation - A Simple Example

S=2

2 2

64 8

X = Average = (4+8) / 2 = 6

Steps:1. Find the arithmetic mean (or average) of 4 and 8

(4+8) / 2 = 6

2. Find the deviation of each number from the mean4-6= -2 and 8-6 = 2

3. Square each of the deviations (amplifying larger deviations and making negative values positive)(-2) * (-2) = 42 * 2 = 4

4. Sum the obtained squares (as the 1st step to obtain an average)4+4 = 8

5. Divide the sum by the number of values, which here is 2 (giving an average)8 / 2 = 4

6. Take the non-negative square root of the quotient (converting squared units back to regular units) 4 = 2

Suppose we wished to find the standard deviation of the set of the numbers 4 and 8.

So, the standard deviation of the set = 2.

Mean

Source: Wikipedia

Measure

Page 73: RMS Six Sigma Training 2010 Final

73

Define Measure Analyze Improve Control

Standard Deviation – Calls per HourJan Feb Mar Apr

Mary 21 18 23 20John 20 21 19 23Joe 19 22 21 N/ASandy 22 19 23 21Melissa 20 22 24 20Dave N/A N/A 21 22

NameMonth

Dat

aC

alcu

latio

n

X X X-X (X-X)Result Average Deviation Deviation Squared

21 21 0 020 21 1 119 21 2 422 21 -1 120 21 1 118 21 3 921 21 0 022 21 -1 119 21 2 422 21 -1 123 21 -2 419 21 2 421 21 0 023 21 -2 424 21 -3 921 21 0 020 21 1 123 21 -2 421 21 0 020 21 1 122 21 -1 1

441 50

1) Calculate the Average. This is done by dividing the Sample Size by the Number of Results. The calculation is 441/21=21. The average is 21. All information used to calculate the Average is located in the Data Table.

2) Calculate the Deviation for each Result. This done by subtracting each Result from the

Average. Examples of these calculations are 21-20 = 1 (1 is the deviation), 21-21=0 (0 is the deviation) etc. The Deviation for each Result is located in the Deviation Column on the Calculation Table.

3) Square each Deviation. The Squared Deviation for each Result is located in Deviation Squared

Column on the Calculation Table.

4) Total the Squared Deviation. In our example the total is 50. The Total Squared Deviation is located at the bottom of the in Deviation Squared Column on the Calculation Table.

5) Calculate the total sample size (N), and subtract 1. The calculation is 21-1=20. The information used to calculate N is located in the Data Table.

6) Calculate the Standard Deviation. This is done by dividing the Total Square Deviation by the

total Sample Size –1, and then taking the square root. The calculation in our example would be 50/20. The Standard Deviation is 1.58

7) Calculate Sigma Level. How many standard deviations can fit between the average and upper limit, and the average and lower limit? Take the average and subtract the lower limit. Take this value and divide by the standard deviation. The answer is how many sigma can fit between the lower limit and the average. Repeat the same step for the upper limit. In our example, the calculations are as follows:

21 - 11.5 (lower limit) / 1.58 = 6.012 (# of Std. Deviations between average & lower limit) 30.5 (upper limit) - 21/ 1.58 = 6.012 (# of Std. Deviations between average & upper limit)

Measure

2

Page 74: RMS Six Sigma Training 2010 Final

74

Define Measure Analyze Improve Control

Standard Deviation – Calls per HourJan Feb Mar Apr

Mary 21 18 23 20John 20 21 19 23Joe 19 22 21 N/ASandy 22 19 23 21Melissa 20 22 24 20Dave N/A N/A 21 22

NameMonth

Dat

aC

alcu

latio

n

LSL USL

11.5 30.521

X X X-X (X-X)Result Average Deviation Deviation Squared

21 21 0 020 21 1 119 21 2 422 21 -1 120 21 1 118 21 3 921 21 0 022 21 -1 119 21 2 422 21 -1 123 21 -2 419 21 2 421 21 0 023 21 -2 424 21 -3 921 21 0 020 21 1 123 21 -2 421 21 0 020 21 1 122 21 -1 1

441 50

Sum of all Results 441

Number of Results 21

Average 21

Sample Size 20

Upper Limit 30.5

Lower Limit 11.5

Standard Deviation 1.58

Sigma Level 6 Sigma

2120 21 22

19 20 21 22 2319 20 21 22 23

18 19 20 21 22 23 24

Measure

2

Page 76: RMS Six Sigma Training 2010 Final

76

Define Measure Analyze Improve Control

In order to apply Six Sigma, you must understand the impact of Variation…

What is Variation?

Simply stated, Variation is the degree to which something differs from a former state or value, from others of the same type, or froma standard.

Formal Definition:

Variation: Inevitable change in the output or result of a system (process) because all systems vary over time. Two major types of variations are (1) Common, which is inherent in a system, and (2) Special, which is caused by changes in the circumstances or environment.

Measure

Page 79: RMS Six Sigma Training 2010 Final

79

Define Measure Analyze Improve Control

Connection:• Excessive tardiness• Personal Calls• Invoice Issues• System Issue• Misapplied Payments• Incorrect Terms

Source: Villanova University Six Sigma Lectures

Measure

Page 81: RMS Six Sigma Training 2010 Final

81

Define Measure Analyze Improve Control

• Tells you how tightly data is clustered around a center point.

Usage:• Analyzing Average Calls per Hour• Analyzing Average Promises to Pay• Analyzing Synergy

Actions• RMS Salaries

Source: Villanova University Six Sigma Lectures

Measure

Page 82: RMS Six Sigma Training 2010 Final

82

Define Measure Analyze Improve Control

Definitions

MeanSum total of all data values divided by

# of data points (the average)

MedianMiddle value when data is ascending

or descending (midpoint)

Mode Value occuring most frequently

Measure

Page 93: RMS Six Sigma Training 2010 Final

93

Define Measure Analyze Improve Control

Additional CommentsThe Mean:

• Is Sensitive to Extreme Observations/data

• Most Affected by Skewed Data

• Most Frequently Used

The Median:

• Is Most Effective When Data is Skewed

• Is Best if Data is “Messy”

• Not Affected as Much by Outliers

Source: Villanova University Six Sigma Lectures

Measure

Page 94: RMS Six Sigma Training 2010 Final

94

Define Measure Analyze Improve Control

• Tells you how data is distributed around a center point

• Describes expected amount of variation (variability) in

normally distributed data.

= Population

= SampleExamples:• On average, what is the variability in calls per hour?• On average, what is the variability in Synergy actions per hour?

Source: Villanova University Six Sigma Lectures

Measure

Page 95: RMS Six Sigma Training 2010 Final

95

Define Measure Analyze Improve Control

S =

Note: In most cases data used in process improvement is a sample (subset) taken from a population.

Source: Villanova University Six Sigma Lectures

Measure

Page 96: RMS Six Sigma Training 2010 Final

96

Define Measure Analyze Improve Control

Recap

• Tells you how tightly data is clustered around a center point.

• Tells you how the data is distributed

around the center point.• Large Amount of Variation =

Large Spread Why is this important?

Connection:

Example: Calls per Hour• If tightly centered: - Effective training• If skewed: - Time of day? - Skill set of employees• Are the calls inbound or outbound?

Source: Villanova University Six Sigma Lectures

Cen

tral

Te

nden

cy MeanMedianMode

Spread(Standard Deviation)

Measure

Page 97: RMS Six Sigma Training 2010 Final

97

Define Measure Analyze Improve Control

Flowchart Techniques - Overview• Prepare a Current State Map to Document the Current Process

• Identify all Decision Points to Ensure Path Leads to Final Outcome

• Strive for the Proper Level of Detail• Too Little-Flowchart Useless• Too Much-Bog Down the Process

• Tip: If mapping out process documentation, you can never have enough detail

• Use Supplemental Charts to Limit Size

• Keep the Flowchart Moving in One Direction-Top to Bottom / Left to Right

Measure

Page 98: RMS Six Sigma Training 2010 Final

98

Define Measure Analyze Improve Control

Flowchart Techniques - Create a Process Map

Source: George, M.L., Rowlands, D., Price, M., & Maxey, J. (2005). The Lean Six Sigma Pocket Toolbook, 40 – 41, 43 – 44.

Measure

Page 99: RMS Six Sigma Training 2010 Final

99

Define Measure Analyze Improve Control

Flowchart Techniques - Tips

Source: George, M.L., Rowlands, D., Price, M., & Maxey, J. (2005). The Lean Six Sigma Pocket Toolbook, 40 – 41, 43 – 44.

Measure

Page 100: RMS Six Sigma Training 2010 Final

100

Define Measure Analyze Improve Control

Another Type of Process Map – Swim-lane Flowchart

Source: George, M.L., Rowlands, D., Price, M., & Maxey, J. (2005). The Lean Six Sigma Pocket Toolbook, 40 – 41, 43 – 44.

Measure

Page 101: RMS Six Sigma Training 2010 Final

101

Define Measure Analyze Improve Control

Another Type of Process Map – Swim-lane Flowchart

Source: George, M.L., Rowlands, D., Price, M., & Maxey, J. (2005). The Lean Six Sigma Pocket Toolbook, 40 – 41, 43 – 44.

Measure

Page 103: RMS Six Sigma Training 2010 Final

103

Purpose•Set Performance Objectives•Indentify Sources of Variation

Tools•Control Charts•Hypothesis Testing•Cause and Effect Diagrams•FMEA•Value Stream Mapping

Key Outputs

•Defined List of Potential Sources of Variation•Cost Benefit Analysis

Define Measure Analyze Improve ControlAnalyze

Page 105: RMS Six Sigma Training 2010 Final

105

Define Measure Analyze Improve ControlAnalyze

Strategies to Control Variation

Common Cause Special CauseReduce common cause variation by reducing the spread of the process.No one factor is unduly influencing the process. Numerous small factors.

Reduce special cause variation by identifying it and eliminating it – 6M’s – key source of special cause variation.

Common Cause Special CauseReduce common cause variation by reducing the spread of the process.No one factor is unduly influencing the process. Numerous small factors.

Reduce special cause variation by identifying it and eliminating it – 6M’s – key source of special cause variation.

Six Sigma team will analyze 6M’sIdentify the source of variation and eliminate it.

Six Sigma team will analyze 6M’sIdentify the source of variation and eliminate it.

Design of Experiments –Lecture 68-75 – Systematically test influence of various factors

Expected Variation Six Sigma team will analyze 6M’s, identify the source of the variation,

and eliminate it.

Strategies to Control Variation

Source: Villanova University Six Sigma Lectures

Page 106: RMS Six Sigma Training 2010 Final

106

Define Measure Analyze Improve ControlAnalyze

Normal Curve

50%50%

Common Cause Bell CurveNormal Curve Normal DistributionGaussian Curve ChanceRandom variation Expected variation

Most commonly used distribution in Six Sigma

Source: Villanova University Six Sigma Lectures

Page 107: RMS Six Sigma Training 2010 Final

107

Define Measure Analyze Improve ControlAnalyze

VARIATION - 6 M’s• Man• Machine• Material• Method• Measurement• Mother Nature

Bonus points – Money, Mgmt

Drivers of Special Cause Variation

Variation - 6M’s

Source: Villanova University Six Sigma Lectures

Page 108: RMS Six Sigma Training 2010 Final

108

Define Measure Analyze Improve ControlAnalyze

Run Charts

1 91 71 51 31 197531

6

5

4

3

2

1

0

1 91 71 51 31 197531

6

5

4

3

2

1

0

Tools to Control Variation

Basic – preliminary analysis – least sensitive of SPC

Sketch a quick run chart before more complex analysis

Tools to Analyze Variation

Source: Villanova University Six Sigma Lectures

Page 109: RMS Six Sigma Training 2010 Final

109

Define Measure Analyze Improve ControlAnalyze

Run Charts

1. Allows team to study data for trends or patterns2. No control limits are drawn – no points out of control3. Data collected in order of occurrence4. Collected over a specified time period

191715131197531

6

5

4

3

2

1

0

191715131197531

6

5

4

3

2

1

0

X axis (time or sequence scale)

Y

axis

scale

Usage:

• Analyzing Calls/Actions per Hour against the average over time, in order to identify variation

X Axis (time or sequence scale)

Y A

xis

(res

ults

)

Source: Villanova University Six Sigma Lectures

Page 110: RMS Six Sigma Training 2010 Final

110

Define Measure Analyze Improve ControlAnalyze

Run Chart with statisticallybased limits

Control Chart – Sophisticated

S ample

Sam

ple

Mea

n

191715131197531

602

601

600

599

598

__X= 600.072

UCL= 601.722

LCL= 598.422

1

X bar C ha r t of L eng th

S ample

Sam

ple

Mea

n

191715131197531

602

601

600

599

598

__X= 600.072

UCL= 601.722

LCL= 598.422

1

X bar C ha r t of L eng th

Upper and Lower Control limitsSource: Villanova University Six Sigma Lectures

Page 111: RMS Six Sigma Training 2010 Final

111

Define Measure Analyze Improve ControlAnalyze

A Little History on Control Charts…

Walter Shewhart, 1891-1967

Shewhart Control Chart

Responsible for defining…

assignable cause variation

chance cause variation

Developed the control chart specifically to distinguish between the two.

Source: Villanova University Six Sigma Lectures

Page 112: RMS Six Sigma Training 2010 Final

112

Define Measure Analyze Improve ControlAnalyze

Understanding Variation

Two types of Variation we are looking for in control charts

• Special Cause• Detrimental• Beneficial

• Common Cause

The goal is a stable and predictable process!

Connection:

• Provide an example of a special cause variation with a beneficial outcome.

Page 118: RMS Six Sigma Training 2010 Final

118

Define Measure Analyze Improve ControlAnalyze

Control Chart – Objectives

1. Study variation and its source

2. Monitors process behavior

3. Identifies if operating as expected or if corrective action is needed

4. Changes are only made when a) pointson the control chart are outside acceptable ranges or b) freak patterns – otherwise leave alone

Sample

Sam

ple

Mea

n

191715131197531

602

601

600

599

598

__X= 600.072

UCL= 601.722

LCL= 598.4221

Xbar C hart of L ength

Source: Villanova University Six Sigma Lectures

Page 120: RMS Six Sigma Training 2010 Final

120

Define Measure Analyze Improve ControlMeasure ImproveDefine Measure Analyze Improve Control

Six Sigma Tools & Techniques

Analyze

Tool Hypothesis TestingProcess Overview Used to evaluate whether making a change to a process input (x) significantly changes the output (y) of a

process. Hypothesis testing assists in using sample data to make decisions about population parameters such as averages, standard deviations and proportions. Testing a hypothesis using statistical methods is equivalent to making an educated guess based on probabilities associated with being correct.

Process Steps 1.Define the problem or issue to be studied.2.Define the objective.3.State the null hypothesis, identified as Ho. A null hypothesis is a statement of no difference between the before and after states. (Similar to a defendant being not guilty in court. The goal of the test is to either reject or not reject Ho.4.State the alternative hypothesis, identified as Ha.5.Determine the practical difference.6.Establish the risk levels and the number of samples needed to obtain the desired risk levels.7.Collect the samples and conduct the test.8.Determine whether to reject or not reject the null hypothesis Ho.

Examples Analyzing the impact of training on associate performance. Null Hypothesis-Ho: Productivity levels did not significantly change after training program. Example of Impact of Teachers on Grade Average: Within a school district, students were randomly assigned to one of two Math teachers - Mrs. Smith and Mrs. Jones. After the assignment, Mrs. Smith had 30 students, and Mrs. Jones had 25 students. At the end of the year, each class took the same standardized test. Mrs. Smith's students had an average test score of 78, with a standard deviation of 10; and Mrs. Jones' students had an average test score of 85, with a standard deviation of 15.Test the hypothesis that Mrs. Smith and Mrs. Jones are equally effective teachers. Use a 0.10 level of significance. (Assume that student performance is approximately normal.)

Page 121: RMS Six Sigma Training 2010 Final

121

Define Measure Analyze Improve ControlMeasure ImproveDefine Measure Analyze Improve Control

Six Sigma Tools & Techniques

Analyze

Tool Hypothesis TestingExamples Bon Air Elementary School has 300 students. The principal of the school thinks that the average IQ of

students at Bon Air is at least 110. To prove her point, she administers an IQ test to 20 randomly selected students. Among the sampled students, the average IQ is 108 with a standard deviation of 10. Based on these results, should the principal accept or reject her original hypothesis? Assume a significance level of 0.01.

An inventor has developed a new, energy-efficient lawn mower engine. He claims that the engine will run continuously for 5 hours (300 minutes) on a single gallon of regular gasoline. Suppose a simple random sample of 50 engines is tested. The engines run for an average of 295 minutes, with a standard deviation of 20 minutes. Test the null hypothesis that the mean run time is 300 minutes against the alternative hypothesis that the mean run time is not 300 minutes. Use a 0.05 level of significance. (Assume that run times for the population of engines are normally distributed.)

Page 122: RMS Six Sigma Training 2010 Final

122

Define Measure Analyze Improve ControlAnalyze

0

-3 -2 -1 1 2 3

Critical region to reject the null

Our t test statistic must be > our t critical value in order to conclude that the difference in the means of the two sets of data is statistically significant.

The light yellow part is not enough evidence due to the small sample size.Cannot say two data set are different unless they pass the critical value.

Critical region to reject the null

t=X-m

s/ √√ nHypothesis Testing

Connection:

• Confidence on Conclusion• Analyze Risk Levels

Source: Villanova University Six Sigma Lectures

Page 124: RMS Six Sigma Training 2010 Final

124

Define Measure Analyze Improve ControlAnalyze

Sample Fishbone Diagram(Collections / Customer Service)

Inconsistent Measurements Lack of Training Material Lack of Documented Procedures

High Level of Noise on Floor

Lack of Training

Measurement Materials Methods

Environment Man Power Machines

Phone Outages

Not Including

Breaks & Lunch

OTManuals

Job Aides

Scripts

Warm Transfers

Lack of Contiguous Seats Employee Turnover

Time

System Downtime

Client_

____

___

SAP

RMS ____

____

_

Synergy

Low ProductionNot Making Production

Goals

Page 125: RMS Six Sigma Training 2010 Final

125

Define Measure Analyze Improve ControlAnalyze

Determine the Root Cause (the 5 Whys)5 whys as part of lean manufacturing is a problem solving technique that allows you to get at the root cause of a problem fairly quickly. It was made popular as part of the Toyota Production System (1970’s.) Application of the strategy involves taking any problem and asking “Why - what caused this problem?”

By repeatedly asking the question "Why" (five is a good rule), you can peel away the layers of symptoms that can lead to the root cause of a problem. Very often the first reason for a problem will lead you to another question and then to another. Although this technique is called "5 Whys," you may find that you will need to ask the question fewer or more times than five before you find the issue related to a problem.

Benefits Of The 5 Whys.• It helps to quickly identify the root cause of a problem. • It helps determine the relationship between different root causes of a problem.• It can be learned quickly and doesn't require statistical analysis to be used.• Can be used with the Fishbone Diagram

When Is 5 Whys Most Useful?• When problems involve human factors or interactions.• In all types of business situations whether solving a lean manufacturing or for any other business problem.

Source: http://www.govcomm.harris.com/suppliers/become/Problem_Solving_Tools.pdf

Page 126: RMS Six Sigma Training 2010 Final

126

Define Measure Analyze Improve ControlAnalyze

Example of a Five Whys Analysis… Here is our “Wheel” Life Example:

1. Why is our largest customer unhappy? Because our deliveries of bicycles have been late for the last month

2. Why have our bicycle deliveries been late for the last month? Because production has been behind schedule.

3. Why has production been behind schedule? Because there is a shortage of wheels.

4. Why are we having a shortage of wheels? Because incoming inspection has rejected a large number of wheels for not being round.

5. Why are we rejecting so many parts? Because purchasing switched to a cheaper wheel supplier that has inconsistent quality.

Source: http://www.govcomm.harris.com/suppliers/become/Problem_Solving_Tools.pdf

Page 127: RMS Six Sigma Training 2010 Final

127

Purpose•Prioritize the Vital Few Causes of Variation•Establish Relationships between Output and Input Variables

Tools•FMEA•Design of Experiments•Principles of Lean Manufacturing•Process Capability Analysis

Key Outputs•Proposed Process Settings•Impact of Proposed Solutions•Improved Processes and /or Products

Define Measure Analyze Improve ControlImprove

Page 128: RMS Six Sigma Training 2010 Final

128

Define Measure Analyze Improve ControlMeasure ImproveDefine Measure Analyze Improve Control

FMEA – A Simple Explanation

Improve

FMEA is a disciplined approach used to identify possible failures of a product or service and then determine the frequency and impact of the failure.

• FMEA relies on team experience to put safeguards in place.

• FMEA is applicable to any system

Page 129: RMS Six Sigma Training 2010 Final

129

Define Measure Analyze Improve ControlMeasure ImproveDefine Measure Analyze Improve Control

Six Sigma Tools & TechniquesTool FMEA-Failure Mode Effects Analysis

Process Overview

Methodical approach to examine proposed designs for potential points of failure. Uses a Risk Priority Number to Identify the critical focus areas.

o RPN= FOC x SEV x COD o FOC=Frequency of Occurrence, SEV=Severity, COD=Chance of Detection

Identifies the actions which could prevent failures.

Process Steps

1.List the key process steps in the first column.2.List the potential failure mode for each process step. (How could this process step fail?)3.List the effects of this failure mode.4.Rate how severe this effect is (SEV). (1 Not Severe, 10 Most Severe)5.Identify the causes of the failure mode/effect and rank how likely this cause will occur in the occurrence column (FOC).6.Identify the controls in place to detect the issue and rank its effectiveness in the detection column (COD).7.Calculate the RPN by multiplying FOC x SEV x COD. 8.Sort by RPN number to identify the most critical issues.9.Take action and access results.

Example The aerospace industry used the FMEA during the Apollo missions in the 1960 ’s. 1974-US Navy developed MIL-STD-1629 which is a document that outlines the standards and proper use of the FMEA process. A new toaster design team uses FMEA to identify flaws in the design. This highlights ways in which the handle can stick and cause the toast to catch fire. This is prevented by adding a specific thermostatic safety release to the design. A secretary uses FMEA to highlight the possible undesirable effects of a room booking system not working properly, and consequently includes checks to reduce the chance of key effects of overbooking and key staff not being able to find rooms.

Improve

Page 130: RMS Six Sigma Training 2010 Final

130

Define Measure Analyze Improve ControlMeasure Improve

SeveritySeriousness of

impact

OccurrenceLikelihood will

occur

DetectionAbility to detect

10 Hazardous Very high >1/day Cannot detect

9 Illegal Every 3-4 days Spot checks

8 Unfit for use Once/week Samples

7 Dissatisfaction Once a month Inspected

6 Malfunction Once 3 months Mistake proof

5 Complaint Once 6 months SPC

4 Minor loss Once/year SPC+

3 Nuisance Once 1-3 years SPC++

2 Unnoticed Once 3-6 years All inspected

1 No effect Failure unlikely Certain detect

SeveritySeriousness of

impact

OccurrenceLikelihood will

occur

DetectionAbility to detect

10 Hazardous Very high >1/day Cannot detect

9 Illegal Every 3-4 days Spot checks

8 Unfit for use Once/week Samples

7 Dissatisfaction Once a month Inspected

6 Malfunction Once 3 months Mistake proof

5 Complaint Once 6 months SPC

4 Minor loss Once/year SPC+

3 Nuisance Once 1-3 years SPC++

2 Unnoticed Once 3-6 years All inspected

1 No effect Failure unlikely Certain detect

Which of the 3 columns is your priority?

Define Measure Analyze Improve Control

Risk Priority Number (RPN)

Source: Villanova University Six Sigma Lectures

Improve

Page 131: RMS Six Sigma Training 2010 Final

131

Define Measure Analyze Improve ControlMeasure Improve

Self –Service Gas - FMEA

FindGas

PumpCreditCard

Select Gastype

Return Hose

InitializePump

1. Team familiar with the process2. Brainstorm failure modes or points (may be lengthy)

Tip – Look at desired outcome of each stepthen consider 6Ms to identify possible failures

6 Ms - list

Define Measure Analyze Improve Control

FMEA Example – Self Service Gas

Usage:

• Collection Process Potential Failure

Points• File Drop not Received/Processed• Attrition/Turnover• Hiring Issues• Letter Issues• Synergy Issues• Lack of Client System Access• Plan for Failures and take Preventative Measures• Client Start-Up and Giving ETA’s

Source: Villanova University Six Sigma Lectures

Improve

Page 132: RMS Six Sigma Training 2010 Final

132

Define Measure Analyze Improve ControlMeasure ImproveDefine Measure Analyze Improve Control

FMEA (Failure Mode & Effects Analysis)

Responsible : Name Prepared by: NameOriginal Date: Date Revised Date: Date

Process Step/ Input

Potential Failure Mode

Potential Failure Effects Se

verit

y (S

EV)

Potential Causes Occ

uran

ce (F

OC)

Current Controls De

tecti

on (C

OD)

RPN Actions Recommended Resp. Actions Taken

Add Milk to Cake Mix

Wrong amount of Milk

Cake too Dry of too Soggy 5

Samll Marks on Measuring Cup 10 None 6 300

Use Large Print on Measuring Cups JW Replacing Measuring Cups

5Faded Marks on Measuring Cup 5

Visual Inspection 3 75

Replace Faded Measuring Cups JW

Replaced Cups and Retrained Inspectors

5 Milk Spilled 4 None 8 160 Train Bakers HH Not Yet Complete

Flour Still in Measuring Cup

Too Little Milk-Cake to Dry or too Soggy 5

Employee Careleness 5

Training (Appears to be Ineffective) 9 225

Create Standard Operating Procedure and Improve Training Program HH

Created Documented SOP's and Scheduled Refresher Training

Lumps in Cake 6Employee Careleness 2

Training (Appears to be Ineffective) 9 108

Create Standard Operating Procedure and Improve Training Program HH

Created Documented SOP's and Scheduled Refresher Training

A Simple Example-Baking a Cake

Notice that ther can be several failure modes per step and several effercts and causes per failure mode.

Risk Priority Number (RPN)= Severity X Occurrence X Detection

Plan for both preventative actions and contingent actions (how to limit damage if it happens)

Improve

Page 133: RMS Six Sigma Training 2010 Final

133

Define Measure Analyze Improve Control

Strategies to Control Variation

Common Cause Special CauseReduce common cause variation by reducing the spread of the process.No one factor is unduly influencing the process. Numerous small factors.

Reduce special cause variation by identifying it and eliminating it – 6M’s – key source of special cause variation.

Common Cause Special CauseReduce common cause variation by reducing the spread of the process.No one factor is unduly influencing the process. Numerous small factors.

Reduce special cause variation by identifying it and eliminating it – 6M’s – key source of special cause variation.

Six Sigma team will analyze 6M’sIdentify the source of variation and eliminate it.

Six Sigma team will analyze 6M’sIdentify the source of variation and eliminate it.

Design of Experiments–Lecture 68-75 – Systematically test influence of various factorsSystematically test influence of various factors

Source: Villanova University Six Sigma Lectures

Improve

Page 134: RMS Six Sigma Training 2010 Final

134

Define Measure Analyze Improve ControlMeasure ImproveDefine Measure Analyze Improve Control

Six Sigma Tools & TechniquesTool DOE-Design of Experiments

Process Overview

Manipulating factors at different levels to see their effect on a desired result. DOE investigates a list of potential factors whose variation might impact the process output. Enables the study of multiple factors simultaneously. These factors can be derived from a variety of sources including process maps, Fishbone Diagrams, brainstorming techniques and Cause and Effect Matrices. Factors are set at usually two levels (High and Low) and multiple tests are conducted to evaluate the output level based upon the factor changes. DOE is an expensive evaluation process but can be very effective.

Process Steps 1.Define Objective2.Gather Knowledge about Process3.Develop List of Variables4.Assign Levels to Variables5.Conduct Experiments6.Data Analysis and Conclusions

Example Testing the impact of call scripts on call outcome. Does Script A have more of an impact than script B? Health Care Examples: Investigating the causes for emergency room wait times and determining which treatments in the operating room yield the fastest patient recover times. Improve Yield by Investigating Factor A (Temperature) and Factor B (Pressure) Output=Popped Kernels / Factors: Coil Temperature, Pan Type, Cooking Time

oExamples of LevelsCoil Temperature: High / LowPan Type: Copper / Stainless SteelCooking Time: 4 Minutes/ 3 Minutes

Improve

Page 136: RMS Six Sigma Training 2010 Final

136

Define Measure Analyze Improve Control

• Taguchi’s methods and DOE are tools that “make something happen,”

unlike many statistical methods that tell us “what happened.” They are PROACTIVE instead of REACTIVE.

• Meeting customer specifications is not enough – the benefit of continually reducing variation

• Xerox is the most advanced user of Taguchi’s methods

“Variation is the Enemy!”

Dr. Genichi Taguchi

1 • Popularized the concept of robust design in Japan – Robustness derives from consistency or lack of variation– Robustness is a function of product design

2 • Popularized quality loss function

3 • Popularized the signal-to-noise ratio – Noise factors are uncontrollable influences

Improve

Page 137: RMS Six Sigma Training 2010 Final

137

Define Measure Analyze Improve Control

$ Loss

500 600 700

$ $

Target

Quality Loss

• Quality loss increases as the product or service stray from its target

• $ Loss any time a product or service varies from a defined target

• Loss to Society• Capital ($)• Natural Resources• Human Capital

Taguchi’s Loss Function

Source: Villanova University Six Sigma Lectures

Improve

Page 138: RMS Six Sigma Training 2010 Final

138

Define Measure Analyze Improve Control

Lean Overview• Lean is a systematic approach to identifying and eliminating waste through continuous improvement, flowing the product at the pull of the customer in pursuit of perfection.”

Source: National Institute of Standards and Technology NIST

• More value to the customer and the company, with less of everything

that negatively impacts profits

• The Lean Approach:• Identifies and eliminates waste• Reduces cost• Improves quality• Generates new profit• Improves delivery & customer satisfaction• Empowers employees to make improvements

Connection:• FTE Analysis• Increase Production (more with

less)• Quality Reviews (eliminate re-

work)

Improve

Page 139: RMS Six Sigma Training 2010 Final

139

Define Measure Analyze Improve Control

Lean Overview – Batch Processing vs. Continuous Flow

Batch ContinuousConsidered to be convenient for the company, but not for the customer

Each process makes or completes only the one piece that the next process

needs

Makes a company less agile/flexible in the marketplace

The batch size is one

More sensitive to variables (time sequencing, process routing, etc.)

Each item is passed immediately from one process step to the next without

any stagnation

Inventory = Possible Waste No inventory = No waste

Also known as “Just in Time”

Improve

Page 140: RMS Six Sigma Training 2010 Final

140

Define Measure Analyze Improve ControlControl

Process CapabilityDefinition: The Ability of the Process to Meet Customer Requirements

USLLSLVoice of the Customer

(Specifications)

Leeway Created

by Tighter Controls and Less Variation

Leeway Created

by Tighter Controls and Less Variation

Voice of the Process(Process Variation)

• Is Your Process Capable?• Use Process Capability Studies• The Ideal Situation is to

Have Some Leeway between Performance and Specification Limits (Customer Goals)

Actions

• Center the Process• Modify the Process• Purchase New Equipment• Use Problem Solving to Improve Capability• Revise Specification Limits• Inspect 100%

Connection:

• Tighten Your Processes to Perform Well within Goal Range and Decrease Variation in Performance

• Look at the 6M’s for Drivers of Variation

Improve

Page 141: RMS Six Sigma Training 2010 Final

141

Purpose•Ensure Solutions are Sustained•Document Case Studies and Lessons Learned

Tools•Mistake Proofing•5S Organization Approach•Documentation

Key Outputs

•Improved Processes (In Control)•Robust Products•Project Documentation•Opportunity to Transfer Lessons Learned

Define Measure Analyze Improve ControlControl

Page 142: RMS Six Sigma Training 2010 Final

142

Define Measure Analyze Improve Control

• Poka Yoke is a Japanese term that translates into “Avoid Inadvertent Errors,” or “Mistake Proofing.”

• Poka Yoke is a technique that ensures that an operation cannot be performed incorrectly

• Poka Yoke makes mistakes obvious at a glance so that the error does not turn into a defect for the customer

Preventative Measures – Poka Yoke

Usage:• Benefits Wizard Vista Templates• Required Fields• Sign Offs• Audits

Control

Page 143: RMS Six Sigma Training 2010 Final

143

Define Measure Analyze Improve ControlControl

Future State Process Map• Don’t Wait Until Your Current State Process Map is Perfect

• Your Current State Process Map Will Never be Perfect

• You Want Your Future State Process Map to Produce Product or Services Based on the Rate of Sales (Takt Time)

• If You Build Faster, You Build Inventory

Page 144: RMS Six Sigma Training 2010 Final

144

Define Measure Analyze Improve ControlControl

Treatedpatient

Billings toIns Co.

Health Insurance Claim Processing

Receipt Verify Claim

Calculatepayment

Print &Mail check

Doctor

Hospital

Doctor

Hospital

2 min2 days

10 min2 days

1 min2 days

1 min6 days

14 min

6 days

14 min

InsuranceCompany Database

Source: Villanova University Six Sigma Lectures

Page 145: RMS Six Sigma Training 2010 Final

145

Define Measure Analyze Improve ControlControl

• 5 S - Method of creating a clean and orderly workplace that exposes waste and errors

• Elements of a 5S program– Sort – Straighten/Store (Set in order) – Shine– Standardize – Sustain/Self Discipline– Safety (+1)

Organize Your EnvironmentThe 5S Approach

Source: Villanova University Six Sigma Lectures

Page 146: RMS Six Sigma Training 2010 Final

146

• Do Not Rely on Associates to Remember Critical Processes

• Lack of Documentation puts you at Major Risk during Attrition

• Obtain Customer Sign-off where Possible

• Start with High Level Flow-Charts

• Use Screen Prints for Each Step

• Create a Wrap-up Sheet Showing all Steps • Job Aide / Quick Reference

• Schedule Process Review and Refresh Often

• Post on Intranet Site when Possible

Document Your Processes

Define Measure Analyze Improve ControlControl

Page 147: RMS Six Sigma Training 2010 Final

147

Define Measure Analyze Improve Control

• Step 1 – Create Process Flow

• Step 2 – Document Each Step with Screen Prints

• Step 3 – Create Condensed Step by Step Reference Guide

Documentation

Control

Page 148: RMS Six Sigma Training 2010 Final

148

• Always include a Table of Contents• Create sections in logical order and group by topic

1. Company Overview

2. Contacts• RMS & Client

3. Treatment Overview• Matrix• Rules

4. Letters• Samples• Process

5. Disputes / Research• Types• Codes• Process / SLA’s

6. Systems• Synergy Reference• Client System Reference

7. Common Forms / Samples

8. Glossary of Common Terms

Goal:

Goal:Your manual should be so good that it would be titled “Collections Process for Dummies.”

Documentation – Manual Tips

Do not skip steps or combine too many on one page.

Define Measure Analyze Improve ControlControl

Page 149: RMS Six Sigma Training 2010 Final

149

Relevance of Change to Six Sigma?

• Six Sigma philosophy demands we look for opportunities to initiate change

• Responsible for managing change in a systematic way

• Make ‘change routine’

Define Measure Analyze Improve Control

Source: Villanova University Six Sigma Lectures

Measure

Page 150: RMS Six Sigma Training 2010 Final

150

Change Management

DefineChange

Communicateand train

End ofold way

Duration of disruptionDue to change

Valley ofdespair Clim

b to new

producti

vity

This is normalPrepare for it!

Source: http://www.isixsigma.com/library/content/c020812a.asp

Define Measure Analyze Improve ControlMeasure

Page 151: RMS Six Sigma Training 2010 Final

151

PlanChange

Communicateand train

End ofold way

Duration of disruptionDue to change

Valley ofdiscomfort

Climb to new productivity

Agile company

Change Management

Define Measure Analyze Improve Control

Source: http://www.isixsigma.com/library/content/c020812a.asp

Measure

Page 152: RMS Six Sigma Training 2010 Final

152

8 Stage Process of Creating Change

1) Sense of Urgency2) Powerful Coalition3) Vision4) Communication5) Empower Action – training, coaching participation 6) Short term wins - metrics7) Momentum of change8) Anchor in culture - celebrate

Warm up or defrosting activitiesNecessary to real change

Define Measure Analyze Improve Control

Source: Leading Change by John Kotter, 1996

Measure

Page 153: RMS Six Sigma Training 2010 Final

153

Raise Urgency for Change

1) Expose employees to competitive data

2) Expose employees to unsatisfied customers

3) Limit ‘Happy Talk’ from senior management -honest discussion of problems

4) Set targets so high can’t reach by doing business as usual

5) Hold people accountable for broader measures – no subunit goals

6) Bombard with ideas on opportunities in marketplace

Define Measure Analyze Improve Control

Source: Leading Change by John Kotter, 1996

Measure

Page 154: RMS Six Sigma Training 2010 Final

154

• In 1962, Thomas Kuhn wrote The Structure of Scientific Revolution, and popularized the concept of "paradigm shift”

• Think of a Paradigm Shift as a change from one way of thinking to another.

• It just does not happen, but rather it is driven by agents of change.

Paradigm Shift

Define Measure Analyze Improve ControlMeasure

Page 155: RMS Six Sigma Training 2010 Final

155

Negotiation• Change agent has to be skilled in negotiation – strive for

win-win

• Negotiation is a business decision-making process not a competition

(This is NOT desirable)

Do’s and Don’ts

Do not negotiate in a hurry, nor under pressure. Know what you want and what the other party wants. Prepare thoroughly and comprehensively – fact & figures. Listen, empathize and observe. Be optimistic and never give up.

Define Measure Analyze Improve Control

Source: Villanova University Six Sigma Lectures

Measure

Page 156: RMS Six Sigma Training 2010 Final

156

Negotiation Techniques

“Going to the balcony” – Strategic Break

Mental position from where you can view the action up to a certain point, regain your composure and plan positive further action.

a) Brief pause or silenceb) Rewind – “Let me make sure I understand what you’re saying”c) Remove yourself – get a drink of water

Define Measure Analyze Improve Control

Source: Villanova University Six Sigma Lectures

Measure