Radio Navigation System

Project Managementpresented by Nicula Maria

8/2/2019 RNS Project Management

http://slidepdf.com/reader/full/rns-project-management 2/12

Radio Navigation System Description

The SW project that is implemented on the hardware system is going to

provide a smart, customer friendly and high quality Radio Navigation

system.

The SW project is very complex and it requires a large amount of resources.

In this presentation, the human resources are assigned for a smaller version

of the project.

8/2/2019 RNS Project Management

http://slidepdf.com/reader/full/rns-project-management 3/12

Project Objectives

The main objective was to develop a Software Management Plan for

the RNS project

The Software Management Plan was elaborated using Open Proj.

The Software Management Plan contains all the important phases of 

a Software Project.

8/2/2019 RNS Project Management

http://slidepdf.com/reader/full/rns-project-management 4/12

SW Project Phases

8/2/2019 RNS Project Management

http://slidepdf.com/reader/full/rns-project-management 5/12

SW Project Phases – Planning

8/2/2019 RNS Project Management

http://slidepdf.com/reader/full/rns-project-management 6/12

SW Project Phases – detailes tasks

8/2/2019 RNS Project Management

http://slidepdf.com/reader/full/rns-project-management 7/12

OpenProj Benefits

• OpenProj is a free, open source project management solution.

• OpenProj is OS independent because it runs on Java platform so can

run in different operating systems.

• Open Proj supports different views, each based on a specified

attribute.

• The tool has four simple reports: project details, resource

information, task information, and who does what.

8/2/2019 RNS Project Management

http://slidepdf.com/reader/full/rns-project-management 8/12

Open Proj - Gantt view

It is a bar chart which is used for project scheduling. It breaks down

the task into several subtasks and shows their relations, start and

end dates. 

8/2/2019 RNS Project Management

http://slidepdf.com/reader/full/rns-project-management 9/12

8/2/2019 RNS Project Management

http://slidepdf.com/reader/full/rns-project-management 10/12

OpenProj - Resources view

Resources Chart: Details of available recourses are listed here. Once

listed, the resources can be assigned in Gantt chart. 

8/2/2019 RNS Project Management

http://slidepdf.com/reader/full/rns-project-management 11/12

OpenProj - Histogram

• Open Proj offers various advantages provided by different options

selectable by user. One of the is the histogram, where you can track

down your resources availability on a specific period.

8/2/2019 RNS Project Management

http://slidepdf.com/reader/full/rns-project-management 12/12

Conclusions

In order to deliver a successful SW Project is necessary to knowand keep track of the tasks that need to be performed.

With OpenProj, a project manager establishes the list of projecttasks. Each can be assigned to resources and given an estimate of the completion effort. Tasks can be indented to be sub-tasks of aparent. OpenProj allows dynamic adjustment of tasks. Bychanging a duration, the effect on the whole project schedule canbe viewed at a glance.

Sub-project durations are accumulated into their parents. It is a

simple matter to either add a new project task at any level or tochange a task into a sub-task. The project resources can bemaintained in a list showing the resource name and availability.Additional resource details can be entered such as name, emailaddress, hourly cost, overtime or cost per use.