road and transportation masterplan · 012-2016) - kos and transportation ges and relat ecially road...
TRANSCRIPT
ROAD AND TRANSPORTATION MASTERPLAN
PALESTINE
TA 2012013 PS 00 F10 IV.2 – Rail Transport
SEPTEMBER 30,2016
Table
1
2 O
2.1 S
2.1.1 F
2.1.2 F
2.2 K
3 R
3.1 R
3.1.1 R
3.1.2 R
3.1.3 R
3.1.4 R
3.1.5 R
3.2
3.2.1
3.2.2
3.2.3 A
3.3 R
3.4 F
3.4.1 T
3.4.2 T
e of Conten
Introduction ..
Overview of R
SWOT Analys
Focus on Stre
Focus on We
Key-Level Fa
Rail Transpor
Rail Transpor
Rail Transpor
Rail Transpor
Rail Transpor
Rail Transpor
Rail Transpor
International
International
International
Additional Ra
Rail Traffic Fo
Functional an
Technical Sp
Technical Sp
IV.2 -1Road
nts
....................
Rail Transpor
sis of Existing
engths for Ra
eaknesses for
actors Definitio
rt Network Pr
rt Network De
rt Network in
rt Network in
rt Network in
rt Network in
rt Network in
Rail Key Link
Key Linkages
Key Linkages
ail Connection
orecasts .......
nd Technical S
ecifications fo
ecifications fo
and Transportation
.....................
rt Sector ........
g Rail Transp
ail Transport S
r Rail Transpo
on for Rail Tra
oposal ..........
evelopment by
Phase 1A (2-
Phase 1 (201
Phase 2 (202
Phase 3 (203
Phase 4 (203
kages ............
s in Phase 3 ..
s in Phase 4 ..
ns After 2045 .
.....................
Specifications
or Rail Netwo
or Rolling Sto
n Master Plan | Pal
.....................
.....................
ort Sector .....
Sector ...........
ort Sector ......
ansport .........
.....................
y Phase .......
-Year Investm
19 – 2024) ....
25 – 2031) ....
32 – 2037) ....
38 – 2045) ....
.....................
.....................
.....................
.....................
.....................
s ...................
ork .................
ock ................
estine – 30/09/201
.....................
.....................
.....................
.....................
.....................
.....................
.....................
.....................
ment Plan: En
.....................
.....................
.....................
.....................
.....................
.....................
.....................
.....................
.....................
.....................
.....................
.....................
6
....................
....................
....................
....................
....................
....................
....................
....................
d of 2016 – 2
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
.....................
.....................
.....................
................ 5
................ 6
.....................
.....................
.....................
2018) ...... 10
.............. 10
.............. 10
.............. 11
.............. 11
.....................
.............. 14
.............. 14
.............. 15
.....................
.....................
.............. 16
.............. 17
................. 4
................. 4
................. 4
................. 6
................. 8
................. 8
............... 14
............... 15
............... 16
List o
Figure
Figure
Figure
Figure
Figure
of Figures
1. Rail Tran
2. Railway S
3. Rail Tran
4. Single-de
5. Double-d
IV.2 -2Road
nsport Networ
Stations and
nsport Traffic
eck EMU: Als
deck EMU: Vi
and Transportation
rk (2045) .......
Network Sch
Forecast by P
stom Coradia
valto for Tren
n Master Plan | Pal
.....................
eme (2045) ..
Phase (passe
Meridian for T
nitalia ............
estine – 30/09/201
.....................
.....................
engers) .........
Trenitalia .....
.....................
6
....................
....................
....................
....................
....................
................ 9
.............. 13
.............. 15
.............. 19
.............. 21
List o
Tab 1.
Tab 2.
Tab 3.
Tab 4.
Tab 5.
Tab 6.
Tab 7.
Tab 8.
of Tables
SWOT A
Railway S
Railway S
Railway S
Railway S
Rail Rolli
Rail Rolli
Rail Rolli
IV.2 -3Road
Analysis of Ex
Stations in Ph
Stations in Ph
Stations in Ph
Stations in Ph
ing Stock Tec
ing Stock Tec
ing Stock Tec
and Transportation
isting Rail Tra
hase 1 ..........
hase 2 ..........
hase 3 ..........
hase 4 ..........
chnical Specs
chnical Specs
chnical Specs
n Master Plan | Pal
ansport Secto
.....................
.....................
.....................
.....................
s: Single-Deck
s: Double-Dec
s: Single-Deck
estine – 30/09/201
or ..................
.....................
.....................
.....................
.....................
k EMU ..........
ck EMU ........
k EMU 1st/ 2n
6
....................
....................
....................
....................
....................
....................
....................d Class ........
................ 5
.............. 10
.............. 10
.............. 11
.............. 11
.............. 17
.............. 19
.............. 21
The protranspoin a SW
2
At presNevertrecentlstakehConneconditiofastrailboost tRail traPalesticountrisocio-e
2
The SWa prelimon the and weenvisioThe SW
• Identchan
• Activ• Defin
with s
Before
• Geogsituat
• Curre• Intero
1 At the balong Ga
1 Introdu
oposal for raiort sector proWOT analysis
2 Overvi
sent, the transtheless, in they the interestolders involvecting W est Baons of two Pa transport systhe improvemansport is herinian Regionses (i.e. Egypt
economic fram
2.1 SWOT A
WOT analysisminary evaluacooperation b
eaknesses aron future persWOT includes
tification and sgesin modal sities and initia
nition of long-tshort and mid
presenting th
graphy, demotion and prosent transport operability, m
beginning of the aza Strip; these r
IV.2 -4Road
uction
l transport seposal is introd
s and the defin
iew of RailT
sport system e past1, some ts towards raied in the sectank and Gazaalestinian Regstem is deem
ment process. rein consideres but also at wt and Jordan)mework of Mi
Analysis of
s of rail transpation of compbetween invoe aimed at de
spectives for rs:
suggestion ofshift, from roaatives to achieterm strategicd-term priority
he SWOT An
ography and epective develinfrastructure
multi-modality a
last century, somrailways are curr
and Transportation
ector envisionduced with a nition of key-l
Transport
in West Bank railways werl transport hator. a Strip appeagions; providied vital for cr
ed not only at wider scale, fo)hence contribddle East.
f Existing R
port sector in etitiveness of
olved stakehoetermining therail transport s
f issues for imad to rail transeve synergiesc measures foy action plans
alysis, the fol
economy of inlopment;
e, primarily forand accessib
me sections of thrently abandoned
n Master Plan | Pal
ed by NTMP brief overviewlevel factors.
Sector
k and Gaza Sre operating aas risen again
ars fundamentng the consid
reating an effi
national scalor connectingbuting to the d
Rail Transpo
West Bank af this transporlders atregione current situasector.
mproving staksport; s with neighbor efficient ma.
lowing points
nvolved areas
r rail transportbility;
he Hijaz Railwaywd and/or disused
estine – 30/09/201
is presented w on the exist
Strip does not across the Pan among local
tal for improvdered conneccient link, cap
le, with the go the latter onedevelopment
ort Sector
and Gaza Striprt sub-sector, nal and local sation, opportu
keholders colla
oring countrieanagement of
s has to be tak
s, in order to d
t;
were opened in t.
6
in this chapteting situation,
offer any rail lestinian territ Authorities a
ing socio-ecotion with a mopable to signi
oal of linking tes to the neigof a more int
p is to be concarried out w
scale. While sunities and th
aboration toe
es; f rail transport
ken in to cons
describe a ge
the North of the W
er. Rail , consisting
service. tories and
and
onomic odern,and ficantly
the two ghbouring tegrated
nsidered as with a focus strengths reats
nhance
t sector,
sideration:
neral
West Bank and
• Transto tra
• Logissecto
• Envir
• Po
• Poswit
• Pos
• Total in t
Conce
• NePossib
• Possys
• Po• P• •
• The
• Glob
• Furt
• Postran
• Co
2.1.1 F
The modetails
2 PCBS –http://ww3 Some dpartially http://geo
sport performansport demastics managemor; ronment and s
S
otential social ecointernal and
sibility to evaluatth different transsibility to evaluatwith different trapopulation of the
the West Bank aentration of popu
most iecessity of a modbility of participat
and/ or ssibility of designstem that meets otential high demPotential good deIncrease of globFast transport sy
co• Increase o
need for a more
al transport costterm (ec
Opp
ther population g/externa
ssibility of furthensport capacity, ontinuous moder
interm
Focus on Str
ost relevant itbelow:3
– Palestinian Ceww.pcbs.gov.ps/Pdefinitions and teextracted from thographymaterial
IV.2 -5Road
mance, to be innd; ment, sincelo
safety.
Tab 1.
Strengths
onomic developm external connecte a railway integport systems for te a railway integ
ansport systems fe area about (2,9nd 1,8 million in lation in coastal mportant towns;
dern railway transtion/intervention oforeign investorsing and building the satisfaction o
mand for passengemand for freigh
bal safety in transystem reducing roncentration; of transport capae environment frie
system; t reduction on meonomic feasibilityportunities
growth with increal mobility demanr investments analso with borderi
rnization of infrasmodal capability.
rengths for R
tems reported
entral Bureau of SPortals/_Rainbowerms about SWOhe following sours.blogspot.it/201
and Transportation
ntended as pa
ogistics chain
SWOT Analysis
Rail Transpor
ment through ctions; gration system passengers;
gration system for freight; 9 million people Gaza Strip)2; areas and in the sport system; of public, privates; a new railway of the public;
ger transport; t transport; sportation; road traffic
city; endly transport
edium and long y).
ase of internal nd; nd increase in ing countries; structure and
Rail Transpo
d as strengths
Statistics (2016):w/Documents/goOT and its applicarces: 5/08/rail-transpo
n Master Plan | Pal
assenger and
is a key-level
of Existing Rail
rt SWOT Analysis
e
e
•
• Possible
The differe
• Traditional
•• Necessit
• Less Possibility
• Difficulty
• Difficulty
• R
ort Sector
s in the SWO
: ver_e.htm ation in this para
ort-is-means-of-c
estine – 30/09/201
d freight trans
l factor in con
Transport Sector
s
Weakne
Difficulty in invo• Labour
resistance from trans
• Large capent existing railwa
may createStrong competit
l lorries transportreached
Increase of maty of modern infra
exchanges flexibility in tranof transport cos
are
Thre
to perform good political i
y to attract investpolitical i
isk of uncontrolle
T analysis are
graph and in the
conveyance.html
6
sport supply w
ntemporary ra
r
esses
lving rural areasr policy; sectors of traditi
sport; pital outlay; ay gauge and infe difficulties; tion of bus lines;t can reach desti
d by rails; anagement cost; astructure and ine system; nsportation covert unbalance in no
eas.
eats
provisions due tnstability; tment due to thenstability;
ed increase in co
e described w
e following derive
with respect
ail transport
;
ional road
frastructure
inations not
ntermodal
rage; on-covered
to regional
regional
ost.
with more
eand/or are
• Safetinoth
• Fast anothconti
• Capagood
• Comfcars.
• Envircar none k
• Econtrans
2.1.2 F
Detaile
• Railwwherincon
• LargemainInvescreatmanaopera
• Strondoor
• Strontermibase
• Low cfor sh
2
A list o
• Comservicsched
Baltic TrMORECSupport 2021) an 4Ibidem
ty. Railway acer modes of ttransport sys
her by railwaynuously impro
acity. Trains as that other mfort.Trains off ronmental Proeeds from twkilometer;the nomic Feasibisporting passe
Focus on We
ed description
way Operationre transport denveniences toe Capital Outtenance and stments are stion of monopaged by the gational costs. ng competitionservice as it
ng competitionnal operationd ones. competitivenehort distances
2.2 Key-Lev
of key-level fa
petitive Travece helps to enduling and tim
ransport Outlook CO Mobility and re
in the Implemennd Action Plan (2
IV.2 -6Road
ccident averatransport, espstem. Averagey has becomeoved by incre
are capable ofmodes of tranfer passenger
otection. Trainwice to five tim
ratio increaselity. Based onengers and m
eaknesses fo
ns of the most
nal in Rural Aemand is low
o rural populatlay. Railway roverhead exppecific and im
polies operatingovernment, la
n of bus line fis tied to a pan with traditio
nsare high, sin
ess for short-ds and low freig
vel Factors
ctors, importa
el Times and ncourage the
metable minim
2030 Main Taskesidential costs:
ntation of Transpo2012-2016) - Kos
and Transportation
ages and relatpecially road te time needede quite compeeasing train spf carrying largsport cannot rs more comf
ns are amongmes the energes from four tn the above b
materials as w
or Rail Trans
t relevant wea
Areas. Railwayw. Thus, large
tion that can requires a larpenses are hi
mmobile,requing in conflict wack of compe
for passengerarticular track onal lorries trance rail-based
distance-tripsght traffic volu
s Definition
ant for the suc
Costs (vs oth use of train a
mize user’s wa
k 5: SWOT AnalySWAT Analysis ort - Community sovo - Version 0.
n Master Plan | Pal
ted injuries antransport. d to transport etitive with othpeeds, and reger number ofhandle.
fort and freed
g the most eny consumed o eight times
benefits, railwawell as road m
sport Sector
aknesses follo
ycannot be oprural areas hbe considerege investmenigh, when comiring huge capwith public int
etition may pro
r transport. Rand number
ansport.As it cd logistics act
s. Rail transpoumes.
for Rail Tra
ccess of rail t
her transport mas main modeaiting times fo
ysis and Multi-Cr- June 2012 Agreement EU-T4 Egis Internatio
estine – 30/09/201
nd deaths are
people or maher modes of educing the trf passengers
om of movem
ergy-efficientby a train to tin the case oay transportaaintenance c
ows:4
perated econoave no railwad one of the w
nt of capital. Tmpared with opital outlays tterest at largeovoke inefficie
Rail transport cof stations.
concerns freigtivities take lo
ort is unsuitab
ansport
ransport sect
modes).Ensure of transportor train chang
iteria Analysis - F
TCA -Multimodaonal
6
e much lower
aterials from otransport, anip lengths. and greater v
ment inside th
t modes of tratransport one of an aircraft. ation reduces osts.
omically in ruays, causing weakest sociaThe costs of cother modes othat may leade. Even if conency and high
cannot provid
ght transport, onger time tha
ble and not co
tor, follows.
ring a suitableation. Efficien
ges between l
Final report - De
l Transport - Stra
than
one point to d is being
volumes of
e trains’
ansport. A passenger
the cost of
ral areas
al groups. construction, of transport. to the
ntrolled and h
de door-to-
the costs of anroad-
onvenient
e cost of nt lines.
cember 2011
ategy (2012-
• Serviservic
• Multi-othergene
• Accebe pl
• Cleannumbencoexpedevic
• Serviofrail smarare k
• Servistrucand o
• Envirlike eadopban t
• Safettechnenvirsoftw
ice Flexibility.ce, which freq-modal Transr transport moeral level of seessibility. Sincacedat stratenliness and Cber of users isuraged to prectations of co
ces; clean andice Reliabilitytransport saf
rt technologiekey-level factoice Capacity.Cture, adequatother personaronmental Impemissions andption of pollutiothe use of polty: Train safetnologies are aronmental or swareproviding
IV.2 -7Road
. Efficient schquency needssport Integratiodes to createervice and thece service’s beegic and easy-Comfort.The ds strongly inteefer rail transpomfort (i.e. cod accessible r
y.In the last fefety. Technolos, have made
ors in buildingCapacity shate to load the al belongings.pact: Attentiod recyclable mon preventionlutants and intycan be ensuapplied to asssystem circumthe best solu
and Transportation
heduling of tras to be adequon and Multi-e multi-modalerefore encouenefits strictly-to-access po
development aertwined with port when themfortable searestroom; etcw decadesintogical progrese rail transporg customer loyll be properly highest num
. n has been in
materials, in ren and monitorndicate how toured by highlysist the driver mstances. All utions for safe
n Master Plan | Pal
ain timetable iuate to user’s -modal Transfl transport sysuraging users y depends onoints of intereand diffusion the quality of
e latter adaptsats; electrical
c...); ternational stasses, such asrt more reliabyalty. dimensionedbers of passe
ncreasingly paecent time. Inring measureso ensure respy reliable dataand give the trainsystems
ety in the shor
estine – 30/09/201
s required to needs and g
fer Capacity (stem is requirtowards sharthe number ost. of rail transpo
f service provs to users’ neesockets to re
andards haves the use of sle and safe: r
d to ensure enengers, along
aid towards enternational sts. Moreover, pect for the ena processing best solution
sare constantlrtest time.
6
ensure good eneral travel (P+R).Integrared for enhanred services. of users,rail st
ort to an increvided. Users aeds and satis
echarge electr
e led to an imoftware, sens
reliability and
nough space with luggage
environmentatandards requinternational nvironment. systems. The
n, even in the ly monitored b
level of demand.
ation with cing the
tations shall
eased are sfy user’s ronic
provement sors and punctuality
and e, stroller
l issues, uire also the standards
e best worst by complex
3
Rail traaspect
• Rail T• Intern• Rail T
3
The ovdeveloRoad adevelofigure.F Rail trabe comsouthwbefore implemin Gazacomple
3 Rail Tr
ansport netwots:
Transport Netnational Rail KTransport Net
3.1 Rail Tra
verall supply pps and exten
and Transporpment of rail For more deta
ansport netwomplete during wards to BaniN
the end of Phmentation of aa Strip, to Teeted in Phase
IV.2 -8Road
ransport Ne
ork proposale
twork ProposKey Linkagestwork Propos
ansport Net
proposed for rds according
rtation Mastertransport by ails, refer to:¶
ork develops sPhase 1. ThiNa’im-Hebronhase 2. The n
an internationall Al Bayda BC
e 4 to include
and Transportation
etwork Pro
nvisaged by
sal Developmes, and; sal Technical
twork Devel
rail transport to the alread
r Plan OverviePhase, the en
¶AX.4 – Maps
starting from s develops fu
n and surrounnetwork is theal link betweeCP, in West Borbital movem
n Master Plan | Pal
oposal
NTMP issum
ent by Phase
Specifications
lopment by
does not becdy introduced ew.Before prontire proposeds by Phase an
the domestic urther to connnding cities; then expanded en Gaza StripBank, and beyments in the n
estine – 30/09/201
marized in the
;
s.
y Phase
come operativPhases.For m
oceeding to dd system is ilnd Sector.
line linking Rnect northwardhis connectionin Phase 3, th
p and West Bayond. Finally,northern part
6
e following m
ve at the samemore detail, reescribe in detlustrated in th
Ramallah and ds to Jenin ann is to be comhrough the ank linking Ra, the network of West Bank
ain
e time but efer to:¶III – tails the he following
Nablus, to nd mplete
afah BCP, is k.
IV.2 -9Road and Transportation
Figure 1. Rail
n Master Plan | Pal
Transport Netwo
estine – 30/09/201
ork (2045)
6
3.
The carailwayRamal
3.
In PhasRamal30km aThe rapassen
3
In PhasNablusdirectioand; (nThe exincludin
A
In PhasBank ra(ISR). The raas an e
1.1 Rail Tr2018)
apacitation of y network andlah – Nablus
1.2 Rail Tr
se 1, the conslah-Al Bireh-Band includes4il infrastructurnger service,
3.1.3 Rail Tr
se 2, while ans, the extensioons: (southwanorthwards) frxtension of raing the station
Already Operativ
1. Ram2. BirZ
4
se 2, the first ail transport n
il infrastructurexpress pass
IV.2 -10Road
ransport Netw
the railway md internationarail connectio
ransport Netw
struction of raBeitunia with 4 stations in tore becomes owith limited s
ransport Netw
n inter-city raion of railway ards) from Rarom Nablus toil infrastructurns listed below
ve from Preceden
mallah-Al Bireh Zayt University 3. Salfit
4. Nablus
international network can e
re implementenger service
d and Transportatio
work in Phas
management al railway netwon is to be do
work in Phas
ailway infrastrNablus. The potal: Ramallaoperative throtops and cov
Tab 2. Railw
Start Oper
1. Ram2. BirZa
34
work in Phas
il line is alreadinfrastructure
amallah-Al Biro Jenin and Are will allow fow:
Tab 3. Railw
nt Phases
rail exchangeexchange with
edbecomes oe with limited
on Master Plan | Pa
se 1A (2-Yea
and operationwork as well ane during this
se 1 (2019 –
ructureis propproposed rail h-Al Bireh, Bi
ough an Inter-ering medium
way Stations in Ph
rating in Phase 1
mallah-Al Bireh ayt University 3. Salfit . Nablus
se 2 (2025 –
dy operative,e starts along reh-Beitunia to
Al Jalameh BCor a longer an
way Stations in Ph
e is provided h the internat
operative throstops and cov
alestine – 30/09/201
arInvestment
n units, feasibas the plannins phase.
2024)
posed to conninfrastructure
irZayt Univers-city rail line, cm/long-distanc
hase 1
1
2031)
to connect Rthe main N-So BaniNa’im (
CP. nd more wide
hase 2
Start Operating 5. BaniN6. Bethle
7. East Jeru8. Qalandiya/
9. Nablus 10. Tub
11. Zaba12. Qaba
13. Jen14. Al Jalam
in Al Jalamehional rail line
ough an Inter-vering mediu
16
t Plan: End o
bility study of tg and design
nect the conueextends for asity, Salfit, anconceived as ce travels.
Ramallah-Al BS axis and tow(Hebron Gove
spread netwo
in Phase 2 a’im
ehem usalem / Al Ram North
bas abida atiya nin
meh BCP
h BCP, whereIrbid (JOR) –
-city rail line, cm/long-distan
of 2016 –
the national n of the
rbation of almost d Nablus. an express
Bireh- with wards two ernorate),
ork,
e West – Haifa
conceived nce travels.
3
In Phascities. Mof allow
• Dome
• Intern
• Intern
While dorienteThe sonetwor
A
The ra
• Inter-medi
• Com
3
In Phasnow linrunningpopulaIn PhasmovemFaroun The sonetwor
3.1.4 Rail Tr
se3rail netwoMeanwhile, thwing the follow
estic ConnecWest Bank
national Link Gaza Strip i
national Link(West Bank
domestic rail ed.(formore deo-defined exterk, including th
Already Operativ
1. Ram2. BirZ
45.6.
7. Ea8. Qala
9. N1
1112
14.
il infrastructur
-city rail line, cum/long-distabined freight
3.1.5 Rail Tr
se 4, both donks West Bang along the m
ation. se 4, domest
ments in the nnBCP is locat
o-defined exterk, including th
IV.2 -11Road
ransport Netw
ork is already he first implemwing three ma
tion and Gaza Str(Gaza Strip –is connected (West Bank –is connectedt
system is moetails, refer toension of railwhe stations lis
ve from Preceden
mallah-Al Bireh Zayt University 3. Salfit
4. Nablus BaniNa’im Bethlehem
ast Jerusalem andiya/ Al Ram
Nablus North 10. Tubas 1. Zababida 2. Qabatiya 13. Jenin Al Jalameh
re completed
conceived asance travels, + passenger
ransport Netw
mestic and innk and Gaza Smain urbanized
ic rail systemnorthern part oed.
ension of railwhe stations lis
d and Transportatio
work in Phas
operative in Wmentation of iain multi-scal
rip are conne– EGY) to Egyptian r
– JOR+ISR) to the interna
ore passengero: ¶VI – Logisway infrastrucsted below:
Tab 4. Railw
nt Phases
during Phase
s an express palong domestservices, alo
work in Phas
nternational raStrip, extendind areas and t
undergoes fuof West Bank
way infrastrucsted in the fol
Tab 5. Railw
on Master Plan | Pa
se 3 (2032 –
West Bank, cnternational re connections
cted with railw
ail system at
tional rail line
r-oriented, intstics, BCPs ancture will allow
way Stations in Ph
19
24
e 3 becomes
passenger setic routes, anng the interna
se 4 (2038 –
ail systems arng from Rafatherefore serv
urther thelast k, involving Qa
cture will allowlowing table:
way Stations in Ph
alestine – 30/09/201
2037)
onnecting 14rail system is s:
ways;
Rafah BCP S
e Irbid – Haifa
ternational raind West Bankw for a longer
hase 3
Start Operating
15. Rafah16. Y. Arafat In
17. Khan Y18. Al Nou
9. New Gaza Com20. Gaza
21. Bayt H22. Tarqumiy
23. Heb4. New West Ban
25. Jeric26. Damyeh
27. Tell Al Ba
operative in P
ervice with limd; ational lines.
2045)
re operative. hBCP, to Jenvicing major p
extension, aalqiliya and T
w for a longer
hase 4
16
of the most pproposed, wi
Station;
a at Tell al Bay
il system is mk – Gaza Stripand more wid
in Phase 3
BCP nt’l Airport Younis useirat mmercial Port
a City anoun ya-Idhna bron nk Int’l Airport cho Br. BCP
ayda BCP
Phase 4, thro
mited stops an
Railway infrasnin and Al Jalapart of the Pal
llowing for orbulkarm, wher
and more wid
populated ith the aim
ydaBCP.
more freight-p Corridor) despread
ough:
d covering
structure amehBCP, lestinian
bital re
despread
A
The racity raimedium When ccompriairportsCrossin
Already Operation
1. Ram2. BirZ
45.6.
7. Ea8. Qala
9. N1
1112
14.15.
16. Y. A17. 18.
19. New Ga20
21. 22. Ta
224. New W
226. Da
27. Tel
il infrastructurl line, conceivm/long-distan
completed, inse 33 stations (Y. Arafat Ang Points (fiv
IV.2 -12Road
nal from Precede
mallah-Al Bireh Zayt University 3. Salfit
4. Nablus BaniNa’im Bethlehem
ast Jerusalem andiya/ Al Ram
Nablus North 10. Tubas 1. Zababida 2. Qabatiya 13. Jenin Al Jalameh Rafah BCP
Arafat Int’l AirportKhan Younis Al Nouseirat
aza Commercial 0. Gaza City Bayt Hanoun
arqumiya-Idhna 23. Hebron est Bank Int’l Air
25. Jericho amyeh Br. BCP ll Al Bayda BCP
re implementved as an expnce travels.
n 2045, the ens, linking also
Airport in Gazae in West Ban
d and Transportatio
ent Phases
t
Port
rport
ed becomes press passeng
ntire rail transo the new Coma Strip and thnk and two in
on Master Plan | Pa
operative throger service w
sport network mmercial Por
he new West Bn Gaza Strip).
alestine – 30/09/201
Start Operating
28. Qalq29. Tulkarm/ Fa
30. Azz31. Bayt
32. Bal’a/ A33. Araba/ K
ough an extenwith limited sto
for West Banrt of Gaza StrBank Int’l Airp
16
in Phase 4
qiliya aroun BCP zun t Iba Anabta KafrRa’l
nsion of domeops and cover
nk and Gaza Srip, two internaport), and 7 B
estic Inter-ring
Strip will ational
Border
IV.2 -13Road
Figure
d and Transportatio
e 2. Railway Stat
on Master Plan | Pa
tions and Networ
alestine – 30/09/201
rk Scheme (2045
16
5)
3
The linimprovStrip rasector comple
3.2
In Wes
• Al Ja• Tell A
Al JalaHaifa (The coMediteimplemThe coAqaba Qatar, Tell Althe inte In Gaz
• Rafa
Rafah freight East-AIn this with its
3.2
In Wes
• Tulka
TulkarlogisticGaza SThe beabovec
• •
•
3.2 Internat
kages with neving multi modail network wias shown in t
etion of the fir
2.1 Interna
st Bank the fo
alameh BCP; Al Bayda BCP
ameh BCP linWest) and Irb
onnection to Herranean Sea,mentation of aonnection to J
in Jordan. FuBahrain, Kuw
l Bayda BCPernational rail
a Strip the fo
h BCP;
BCPconnectand passeng
Arab Gulf. context, the d
s international
2.2 Interna
st Bank the fo
arm/ Faroun B
rm/ Faroun Bcs centre is loStrip Corridorenefits resultincan be briefly
StrengtheniActing as a countries; Improving c
IV.2 -14Road
tional Rail K
eighboring codal transport ath bordering cthe freight trarst internation
ational Key L
ollowing two in
P.
nks West Banbid-Amman (EHaifa appears, to be consid
a new commeJordan is propurthermore, thwait, Oman anis another intl line running
llowing intern
ts Gaza Strip ger transport,
development l links, are un
ational Key L
ollowing intern
BCP.
BCPis locatedcated. For mo
r. ng from the im
y summarized
ng the contribcatalyst for tr
cost-effectiven
d and Transportatio
Key Linkag
ountries are cat regional levcountries will
affic forecasts nal rail key link
Linkages in P
nt’l key linkag
nk rail networkEast). s fundamentaldered beside trcial port. For
posed to connhis connectionnd UAE. ternational raibetween Haif
national key lin
rail network wconsists of th
and usability ndoubtedly es
Linkages in P
national key li
d in the North ore details, re
mplementationas follows:
bution of Wesrade facilitatio
ness of region
on Master Plan | Pa
es
rucial for boovel. In particueventually crand proven b
kages is prop
Phase 3
es are propos
k to the intern
l for providingthe one propor more detailsnect West Bann would allow
il key linkage fa (West) and
nkage is prop
with Egypt. Inhe completion
of the rail netsential.
Phase 4
nkage is prop
Eastern areaefer to:¶VI – L
n of the intern
st Bank to regon activities w
nal railway ne
alestine – 30/09/201
osting economular,connectinreate importaby the traffic m
posed in Phas
sed for Phase
national rail lin
g West Bank wosed in Gaza s, refer to:¶IVnk to the majo
w other links w
connecting Wd Irbid-Amman
posed for Pha
this case, then of the linkag
twork in West
posed for Pha
a of West BanLogistics, BCP
national rail ke
gional trade awith West Ban
etwork;
16
mic developmeg West Banknt benefits fomodelling parse 3.
e 3:
ne running be
with an accesStrip, throug
V.4 – Maritimeor cities and twith Syria, Iraq
West Bank rain (East).
ase 3:
e main benefge North Africa
t Bank and G
ase 4:
nk, where a diPs and West
ey linkages d
nd economic nk's neighbori
ent and and Gaza r logistics rt.The
etween
ss to h the
e Transport. the Port of q, KSA,
l network to
fit, for both a-Middle
aza Strip,
strict Bank –
escribed
integration; ing
•
•
3.2
After thrailway
• •
•
3
Traffic based traffic fFeatur The tabby NTMtravelli
The graphases¶IV.2.3almost
Supporting increasing iPromoting G
2.3 Additio
he completiony network can
Railway in SRailway N-Ethe border wRailway Stawith Gaza SFor more de
3.3 Rail Tra
forecasts for on PTM (Paleforecasts, referes and Calibr
ble below illusMP. The valueng by train du
aph above shs (for more de3 – Rail Transt 2,000 passe
0
2,000
4,000
6,000
8,000
10,000
12,000
14,000
16,000
18,000
20,000
IV.2 -15Road
competitivenenvestments rGaza Strip ro
onal Rail Con
n of the rail nen occur throug
S West Bank,E West Bank,with Jordan, aation along WStrip (Bayt Haetails, refer to
affic Foreca
the proposedestinian Transer to:¶VII – Pration.
strates the traes reported auring peak 4-h
Figure 3.
hows clearly hetails, refer tosport Proposangers travel a
1,
Phase 1
d and Transportatio
ess and devereturnwith porle as a key ga
nnections Af
etwork envisagh the implem
from BaniNa between Da
and; WB-GS Corridoanoun BCP).o:¶VI – Logisti
asts
d railway netwsport Model);TM Transpor
affic expectedare organized hour interval (1
Rail Transport T
how the expao:¶III – Road aal) entails alsoalong the railw
857
Phase
on Master Plan | Pa
elopment of Crt improvemenateway for Gu
fter 2045
aged by NTMPmentation of:
a’im to Freijat myeh Br. BC
or, connecting
ics, BCPs an
work herein de for a more c
rt Model Outp
d along Palesby Phase an
15:15-19:15)
Traffic Forecast b
nsion of the rand Transporo an increaseway linking R
5,650
e 2 P
alestine – 30/09/201
Commercial Pnt projects; ulf countries t
P, a further ex
(Al Dahriya) P and Nation
g West Bank
d West Bank
escribed, folloomprehensivuts, and¶AX.
tinian new rad express theof a working
y Phase (passen
rail network, artation Master in rail-basedamallah to Na
11,895
hase 3
16
ort in Gaza S
to Mediterrane
xtension of P
BCP; al Logistics C
(Tarqumiya-Id
– Gaza Strip
ow. Traffic fore understand16– Transpor
ilway networke quantity of pday.
ngers)
as proposed br Plan Overvie traffic. In Phaablus via BirZ
5
17,
Phase 4
Strip,
ean Sea.
alestinian
Center and
dhna BCP)
Corridor.
recasts are ding of rt Model
k proposed passengers
by NTMP ew and to ase 1
Zayt
565
Univers(450kmThe incbased
33.4
In Phasabout 3is furthThe fol
• • • •
• • • • • •
In Phasnetworfollowin
• • • •
• • • • • •
In PhascompleTubas
• • • •
• •
sity (30km), wm) in the wholcrease of rail-traffic, hence
3.4 Functio4.1 Techn
se 1, the line 30 km with tw
her extended tllowing chara
Standard gaDouble tracVehicle loadElectrificatioTrans-EuroDesign speeDesign speeMaximum aMaximum vMinimum cuMinimum pl
se 3, the interk offers for thng characteris
Standard gaDouble tracVehicle loadElectrificatioTrans-EuroDesign speeDesign speeMaximum aMaximum vMinimum cuMinimum pl
se 4, the folloete the rail ne– DamyehBr
Standard gaDouble tracVehicle loadElectrificatioTrans-EuroDesign speeMaximum a
IV.2 -16Road
while in Phasele West Bank-based traffic
e leveraging P
onal and Teical Specific
Ramallah-Nawo intermediatto BaniNa’im cteristics are
auge rail netwck with minimuding gauge: Eon, Signalizatpean Railwayed for freight ed for passen
axle load: 22.5vertical gradieurve radius: 2atform length
rnational line he first time bostics are prop
auge rail netwck with minimuding gauge: Eon, Signalizatpean Railwayed for freight ed for passen
axle load: 22.5vertical gradieurve radius: 2atform length
owing lines in etwork: Qalqili. BCP. For th
auge rail netwck with minimuding gauge: Eon, Signalizatpean Railwayed for passen
axle load: 20to
d and Transportatio
e 4 around 17k and Gaza St, as forecaste
Palestinian roa
chnical Specations for Ra
ablus is implete stations: B(south) and Aproposed for
work: 1.435mum distance bEN 15273 GCtion and Telecy Network spetrains: 120km
nger trains: 165tons.
ent: 3.5% 250m h: 350m
Rafah BCP -oth domestic posed:
work: 1.435mum distance bEN 15273 GCtion and Telecy Network spetrains: 120km
nger trains: 255tons.
ent: 3.5% 250m h: 500m
the northern iya – Tulkarmese four lines
work: 1.435mum distance bEN 15273 GCtion and Telecy Network spenger trains: 16ons.
on Master Plan | Pa
7,500 passentrip. ed by the PTMad network.
ecificationsail Network
emented: it is irZayt and Sa
Al Jalameh BCr lines implem
m between cent
C communicatioecification m/h 60km/h
-Tell al Baydaand internatio
m between cent
C communicatioecification m/h 50km/h
part of West m – Jenin; Nabs, the followin
m between cent
C communicatioecification 60km/h
alestine – 30/09/201
gers travel on
M, will produc
s
a typical regioalfit. In PhaseCP (north).
mented both in
ters: 4 m
on systems ac
aBCPis implemonal services
ters: 4m
on systems ac
Bank are intrblus – Qalqiliyng characteris
ters: 4m
on systems ac
16
n the entire ra
e a decrease
onal line with e 2, Ramallah-
n Phase 1 and
ccording with
mented; rail ts. For this mix
ccording with
roduced, with ya; Nablus – Astics are propo
ccording with
ail network
e of road-
length of -Nablus line
d Phase 2:
UIC and
ransport xed line, the
UIC and
the aim to Anabta; osed:
UIC and
• • •
The credesignMoreovTherefoevacuanetwor
3.4.2 T
TakingEMU (Ewith caare procomforThe ma
Maximum vMinimum cuMinimum pl
eation of stan of each envisver, safety staore, installatioation, etc., nerk.
Technical Sp
into accountElectrical Mul
abin and interovided consisrtable serviceain technical
Vehicl
Main destin
Maximum d
Operationa
Carb
Car end c
HV
Ch
Toil
Electronic syste
Passenger info
Security sys
Data transmissio
Bra
Pow
Maximu
Maximu
Maximu
IV.2 -17Road
vertical gradieurve radius: 2atform length
ndardized statsaged stationandards shallons and infrased to be stan
pecifications
t the types of ltiple Unit) tramediate traileting of 3, 4, 5, also in casefeatures for th
Tab 6. Ra
le type
nation of use
esign speed
al kilometer
body
connection
VAC
hair
lette
em driving (TCN)
ormation system
stem driving
on to the outside
ake
wer
m speed
m length
m height
d and Transportatio
ent: 3. % 250m h: 300m
tions is foresen, and equippl be taken intostructure para
ndardized, to e
s for Rolling
line, servicesain is proposeer car. To ens5 cars. Trains e of overcrowdhis type of tra
ail Rolling Stock
Gener
Main Tech
e
Moto
on Master Plan | Pa
een. Railway ed for commeo account for ameters like fensure comm
Stock
s and distanced, in variable
sure maximummay addition
ding at peak tain are summ
Technical Specs
ral Features
First clas
Medium a
hnical Features
Steel
AutoSemi-per
Double air-co
Fixed type in
On
UIC pne
r Car (MC)
alestine – 30/09/201
Stations shalercial and serboth freight a
fire extinguishmon safety lev
es between stcomposition
m service flexnally travel cotimes. arized in the
s: Single-Deck EM
Single deck ss, second class
and short distanc
160 km/
About 300,000
car body with we
omatic coupler onrmanent coupler
onditioning syste
second class. WTable on the
e each car. Vacu
Yes
Yes
Yes
Yes
eumatic brake. TwComply with TS
1.5MW
160km/h
25,400m
4,050mm
16
ll be modular,rvice activitiesand passengehing systems,vels for the en
tations for Phconsisting of
xibility three coupled, to ens
following tabl
MU
EMU. s and driver coac
ces. Intercity train
/h
km/year.
elded structure.
n drive coach. on other coache
em. Redundant c
With slider in first back.
uum system.
wo disks for axleSI norms.
W
h
mm
m
,to ease the s. er transport. passenger
ntire
hase 1, f motor car ompositions ure
e.
ch
ns.
es.
control
class.
e.
S
S
Maximu
Wheel d
Bogie cent
Floor height at
Total mas
Total
Standing passeng
Maximum l
Maximum l
Maximu
Maximu
Wheel d
Bogie cent
Floor height at
Total mas
Total
Standing passeng
MC+T
MC+TC+
MC+TC+T
IV.2 -18Road
um width
distance
tre distance
t entrance level
ss (empty)
seats
gers (4 pass./m2
Tra
length (TC)
length (SP)
m height
um width
distance
tre distance
t entrance level
ss (empty)
seats
gers (4 pass./m2
TC+SP
+TC+MC
TC+TC+MC
d and Transportatio
2)
ailer Car (TC) – t
2)
Com
on Master Plan | Pa
railer car with ca
mpositions
alestine – 30/09/201
2,850mm
2,500mm
18,300m
650mm from To
58.0t
70
80
abin (SP)
24,800m
25,400m
4,050mm
2,850mm
2,500mm
18,300m
650mm from To
42.0t
80
90
230 seat + 250
310 seat + 340
390 seat + 430
16
m
m
mm
op of Rail
mm
mm
m
m
m
mm
op of Rail
standing
standing
standing
For subpredictsimilar In this be feasThe fol
D
5Source:
bsequent devtable increaseto the previocase, the transible.This willllowing table s
Vehicle
Main destina
Maximum de
Operationa
Carb
Car end co
HVA
Cha
Toile
Electronic system
Passenger infor
Security sys
Data transmissio
Bra
: www.masstrans
IV.2 -19Road
Figure 4. Si
velopments ree of passengeus one but wnsportation of ensure adeqsummarizes t
Tab 7. Ra
e type
ation of use
esign speed
l kilometer
body
onnection
AC
air
ette
m driving (TCN)
rmation system
stem driving
on to the outside
ake
sitmag.com
d and Transportatio
ingle-deck EMU:
elated both toers, a double ith a higher cf over 1000 pquate mobilitythe main tech
il Rolling Stock T
Gener
Main Tech
on Master Plan | Pa
: Alstom Coradia
o the extensiodeck type of apacity, is proassengers pe
y between Wehnical features
Technical Specs:
ral Features
First clas
Medium a
hnical Features
Steel carbody w
AutomUIC
Double air-co
FWith slide
One
UIC pneu
alestine – 30/09/201
a Meridian for Tre
n of the lines train, with cooposed as aner train in five est Bank citiess for the doub
: Double-Deck E
Double deck Ess, second class
and short distanc
160km/h
About 300,000k
with welded struc
matic coupler onC coupler on othe
onditioning system
ixed type in secoer in first class. T
e each car. Vacu
Yes
Yes
Yes
Yes
umatic brake. Thr
16
enitalia5
in Phase 2 anfigurations s
n alternative. cars configus even at peable-deck EMU
EMU
EMU. and driver coach
ces. Intercity train
h
km/year
cture. Floor in ino
n drive coach. er coaches.
m. Redundant co
ond class. Table on the back
uum system.
ree disks for axle
and the substantially
ration will ak times. U:
h
ns
ox steel.
ontrol
k.
e.
S
S
Pow
Maximum
Maximum
Maximum
Maximum
Wheel d
Bogie centr
Floor height at
Total mass
Total s
tanding passeng
Maximum le
Maximum le
Maximum
Maximum
Wheel d
Bogie centr
Floor height at
Total mass
Total s
tanding passeng
MC+TC
MC+TC+
MC+TC+TC
IV.2 -20Road
wer
m speed
m length
m height
m width
distance
re distance
entrance level
s (empty)
seats
gers (4 pass./m2
Trai
ength (TC)
ength (SP)
m height
m width
distance
re distance
entrance level
s (empty)
seats
gers (4 pass./m2
C+SP
+TC+MC
C+TC+MC
d and Transportatio
Moto
)
iler Car (TC) – T
)
Com
on Master Plan | Pa
r Car (MC)
railer Car with Ca
mpositions
alestine – 30/09/201
Comply with TS
1.6MW
160km/h
27,110mm
4,300mm
2,774mm
2,500mm
20,000mm
650mm from To
65.1t
90
100
abin (SP)
26,480mm
27,110mm
4,300mm
2,774mm
2,500mm
20,000mm
650mm from To
49.2t
126
100
306 seat + 300 s
432 seat + 400 s
558 seat + 500 s
16
I norms.
h
m
m
m
m
m
p of Rail
m
m
m
m
m
m
p of Rail
standing
standing
standing
In Phasplanne
• longe• ampl• intern• inter-
High-sstock:7
6Source:7 High-spspeed tra
se 3, the consed taking into
er length of ther distances national conn-hub domestic
peed trains w7
T
Vehicl
Main destin
Maximum de
Operationa
Carb
Car end c
HV
Ch
Toil
: www.scalatt.it peed train (250kain with restraine
IV.2 -21Road
Fig
struction of thaccount the f
he line between statiections cs express se
with the follow
Tab 8. Rail Rollin
e type
ation of use
esign speed
al kilometer
body
connection
VAC
hair
ette
m/h) use is stricted costs.
d and Transportatio
gure 5. Double-d
he mixed – dofollowing para
ions
ervices
wing character
ng Stock Technic
Gene
Main Tec
tly dependent on
on Master Plan | Pa
deck EMU: Vivalto
omestic and inameters:
ristics can be
cal Specs: Single
ral Features
Single de
Abou
chnical Features
Steel
AutoFix
Double air-c
SWith recli
On
topography whic
alestine – 30/09/201
o for Trenitalia6
nternational N
considered a
e-Deck EMU 1st/
eck EMU. First cl
Intercity tra
200km/
ut 280,000km/yea
carbody with we
omatic coupler oed coupler on ot
onditioning syste
Slider type in secine in first class.
ne each car. Vacu
ch conditions ma
16
North-South li
as part of the
/ 2nd Class
lass, second clas
ains.
h
ar each coach.
elded structure.
n drive coach. ther coaches.
em. Redundant c
cond class. Table on the bac
uum system.
ay, or may not, a
ne is
rolling
ss.
control
ck.
allow for high-
S
S
Finallywith theBank, bThe typConsidthe pos
Electronic syste
Passenger info
Security sys
Data transmissio
Bra
Pow
Maximu
Maximum
Maximu
Wheel d
Bogie cent
Floor height at
Total mas
Total
Standing passeng
Pow
Maximumle
Maximum
Maximu
Wheel d
Bogie cent
Floor height at
Total mas
Total
Standing passeng
Note: it’s possib
SMC+IC+IC
SMC+IC+IC+
SMC+IC+IC+IC
, in Phase 4, e completion between Nabpe of train to dering demogssible inclusio
IV.2 -22Road
m driving (TCN)
rmation system
stem driving
on to the outside
ake
wer
mlength
m height
m width
distance
re distance
entrance level
ss (empty)
seats
gers (4 pass./m2
wer
ength (TC)
m height
m width
distance
re distance
entrance level
ss (empty)
seats
gers (4 pass./m2
ble add in the co
C+IC+SMC
+IC+IC+SMC
C+IC+IC+SMC
the railway nof planned ra
blus/Jenin, Qaimplement at raphic develo
on of closely s
d and Transportatio
Drive
2)
Interme
2)
Com
mposition a dinin
etwork will beailway, allowinalqiliya/Tulkar
this stage wiopments in thspaced small
on Master Plan | Pa
UIC pne
e Car (SMC)
6
ediate Car (IC)
8
mpositions
ng car. There is n
382 se
464 se
546 se
e extended fong orbital movrm and betwell be the same area, the instations on t
alestine – 30/09/201
Yes
Yes
Yes
Yes
eumatic brake. TComply with TS
0.5MW
26,880m
4,050mm
2,825mm
2,500mm
19,000m
1250mm from T
59.0t
68 (2 class) or 5
about 7
0.5MW
26,400m
4,050mm
2,825mm
2,500mm
19,000m
1,250mm from T
56.0t
82 (2 class) or 62
about 8
no limit to the the
eat + 372 standin
eat + 454 standin
eat + 536 standin
or an essentiavements in th
een Tubas ande as that sug
ncrease in demhe territory, a
16
Two disks for axleSI norms.
W
mm
m
m
m
mm
Top of Rail
1 (1 class)
5
W
mm
m
m
m
mm
Top of Rail
2 (1 class)
0
eoretical compos
ng (only 2 class)
ng (only 2 class)
ng (only 2 class)
ally domestic she northern pad Damyeh. gested for Phmand for rail sand the use of
e.
sition.
)
)
service, art of West
hase 1. service and f a type of
vehicleconsidethe act
e called LVR (ered. The tectual service re
IV.2 -23Road
(Light Rail Vechnical characequired.
d and Transportatio
ehicle) with lescteristics of th
on Master Plan | Pa
ss costs, for dhis type of veh
alestine – 30/09/201
domestic servhicle can then
16
vice in stage in be defined a
is according to