roadnet transportation system pp overview 1210
TRANSCRIPT
![Page 1: ROADNET TRANSPORTATION SYSTEM PP OVERVIEW 1210](https://reader036.vdocuments.net/reader036/viewer/2022092621/589c951d1a28ab1e5d8b6de9/html5/thumbnails/1.jpg)
ROADNET TRANSPORTATION SYSTEM(IMPLEMENTATION)
PRIOR POST0
10
20
30
40
50
60
70
80
90
100
COSTON TME DE-LIVERIES
• 7% TRANSPORTATION FLEET COST REDUCTION IN IMPLEMENTATION PROJECT .
• ON TIME DELIVERY IMPROVEMENTS FROM 64% TO 92%.
![Page 2: ROADNET TRANSPORTATION SYSTEM PP OVERVIEW 1210](https://reader036.vdocuments.net/reader036/viewer/2022092621/589c951d1a28ab1e5d8b6de9/html5/thumbnails/2.jpg)
ROADNET IMPLEMENTATION LETTER
![Page 3: ROADNET TRANSPORTATION SYSTEM PP OVERVIEW 1210](https://reader036.vdocuments.net/reader036/viewer/2022092621/589c951d1a28ab1e5d8b6de9/html5/thumbnails/3.jpg)
ROADNET TRANSPORTATION SYSTEM (3 YEAR PROGRAM)
PRIOR POST0
10
20
30
40
50
60
70
80
90
100
COST(OT)3PL COSTFLEET INS.
• LOWERED DRIVER OVERTIME BY 27%
•REDUCED 3RD PARTY DELIVERY EXPENSE BY 17%
• REDUCED FLEET TRUCK INSURANCE BY 31%
NEGOTIATED A YEARLY SAVINGS OF $78K WITH STARBUCKS 3RD PARTY DELIVERY SERVICE PROVIDER.
ELIMINATED A REDUNDANT TRANSPORTATION POSITION FOR A YEARLY SAVINGS OF $45K.