Martins Gate Road Frog Hollow Road Safety Meeting Point (Unnamed): Intersection of Gwydir Hwy & Martins Gate Rd Grid Ref: 421 860 E 6727 500 N Heli Landing Area: clearing on Cradle Gully Rd 29d 34' 4.06'' Latitude 152d 12' 32.60'' Longitude 423423 Easting 6728847 Northing GLEN ELGIN 9338-4N CANGAI 9338-1N YELLOW JACKET 9338-4S MOUNT WELLINGTON 9338-1S ROCKADOOIE 9339-3S COOMBADJHA 9339-2S NEWTON BOYD 9338 TENTERFIELD 9339 Barool NP Gibraltar Range NP Nymboida NP Washpool NP Mann River NR Butterleaf SCA GWYDIR HIGHWAY Glen Elgin Road Camp Road MOOGEM MOUNT MITCHELL GIBRALTAR RANGE GLEN ELGIN BUTTERLEAF 415000 415000 420000 420000 425000 425000 430000 430000 6720000 6720000 6725000 6725000 6730000 6730000 6735000 6735000 0 1 2 3 4 0.5 Kilometers Map Sheets: 1:25,000 Glen Elgin 9338-4N 1:100,000 Newton Boyd 9338 Gibraltar Range State Forest Locality Map Glen Innes MA Compartment 24, 25 & 26 Created: 17/12/2018 Created By: Flavio Bugno Scale: 1:100,000 Map Sheets 25K Map Sheets 100K ROADS Sealed All Weather, Unsealed Dry Weather, Unsealed Four Wheel Drive Proposed Haulage SAFETY POINTS Helicopter Landing Area MAP FEATURES Harvest Area State Forest National Park & Nature Reserve Built Up Area Plantations Safety Meeting Point Drainage Feature Private Plantations

Upload: others

Post on 05-Nov-2021

3 views

Category:

Documents


0 download

TRANSCRIPT

Martins Gate Road

Frog Hollow Road

Safety Meeting Point (Unnamed):Intersection of Gwydir Hwy & Martins Gate RdGrid Ref: 421 860 E 6727 500 N

Heli Landing Area:clearing on Cradle Gully Rd29d 34' 4.06'' Latitude152d 12' 32.60'' Longitude423423 Easting6728847 Northing

GLEN ELGIN9338-4N

CANGAI9338-1N

YELLOW JACKET9338-4S

MOUNT WELLINGTON9338-1S

ROCKADOOIE9339-3S

COOMBADJHA9339-2S

NEWTON BOYD9338

TENTERFIELD9339

Barool NP

Gibraltar Range NP

Nymboida NP

Washpool NP

Mann River NR

Butterleaf SCA

GWYD

IR HIG

HWAY

Glen Elgin

Road

Camp Road

MOOGEM

MOUNT MITCHELL

GIBRALTAR RANGEGLEN ELGIN

BUTTERLEAF

415000

415000

420000

420000

425000

425000

430000

430000

6720

000

6720

000

6725

000

6725

000

6730

000

6730

000

6735

000

6735

000

0 1 2 3 40.5Kilometers

Map Sheets: 1:25,000 Glen Elgin 9338-4N1:100,000 Newton Boyd 9338

Gibraltar Range State Forest Locality Map

Glen Innes MACompartment 24, 25 & 26

Created: 17/12/2018Created By: Flavio BugnoScale: 1:100,000

Map Sheets 25KMap Sheets 100K

ROADSSealedAll Weather, UnsealedDry Weather, UnsealedFour Wheel DriveProposed Haulage

SAFETY POINTSHelicopter Landing Area

MAP FEATURESHarvest Area

State ForestNational Park & Nature ReserveBuilt Up Area

Plantations

Safety Meeting Point

Drainage Feature

Private Plantations

N o Truc k Exit

24/3 Roa d

FE

AC

D B

1

4

6

3

5

2

8

7

9

15

14

13

10

12

11

GIBRALTAR RANGE 352

GLEN ELGIN 331

MOOGEM 614

GWYDIR HIGHWAY

Martins Gate Ro a d

26/1 Ro a d

24/3 Roa d

24/1 Roa d

Glovers Roa d

Lo op Ro a d

Mc ilwa ins Ro a d

Ta llo wo o d Ro a d

Cra dle Gully Ro a d

Ogilivies Road

Gurrs Ro a d

26/2 Ro ad

Bo unda ry Brea k

Flat Ro ck Ro ad

Roc k Ro ad

24/4 Ro a d25/1 Roa d

Snig tra ck

Propo sed snig tra c k

24/2 Ro a d

Cra dle Gully Ro a d

24/1 Roa d

Lo o p Ro a d

Gib ra ltar Ra nge N P

Baro o l N PN ym b o ida N P

13

24

26

27

12

25

2314

1011

30

8

GWYDIR HIGHW AY

Jimm ys Ro ad

GWYDIR HIGHW AY

Gurrs Ro a d

Fla t Ro c k Ro a d

420000

420000

421000

421000

422000

422000

423000

423000

6725000

6726000

6726000

6727000

6727000

6728000

6728000

6729000

6729000

FORESTRY CORPORATION OF NSW, HARDWOOD FORESTS DIVISIONHARVEST PLAN OPERATIONAL MAP

1:15,000Co nto ur Interva l 10m

Pla n N a m e:GI_ 24_ 25_ 26

Prepared By Flavio Bugno Date: 19/12/2018

Date Printed: 19/12/2018

Pla n N o :59847

© Cro wn Co pyright 2013. The info rm atio n a nd data c o nta ined in this m ap is to the b est o f Fo restry Co rpo ra tio n’s b elief, true a nd c o rrec t at the tim e o f pub lic a tio n. Ho wever, c ha nges in c irc um sta nc es a fter the pub lic a tio n m a y im pa c t upo n the a c c ura c y o f the m ateria l. N o warra nty o r gua ra ntee is pro vided b y the State o f N ew So uth W a les, Fo restry Co rpo ra tio n a nd its em plo yees a nd a gents a nd no lia b ility is a c c epted fo r a ny lo ss o r da m a ge, c o sts o r expense resulting fro m the use o r relia nc e upo n the info rm a tio n a nd data c o nta ined in this m a p

0 0.5 1 1.5Kilo m etres

Helipa dEm ergenc y Meeting Po intN o n Ab o rigina l Herita gePro po sed Dra ina ge Fea ture Snig Cro ssingCro ssings

DumpsW etDry

Fauna TSLSc a rlet Ro b inPhilo ria pughiGrey Fa lc o n

So o ty OwlFla m e Ro b inV a ried SittellaBa rking OwlPo werful OwlMa sked OwlGlo ssy Bla c k-Co c ka to oRufo us Sc rub -b irdRegent Ho neyea terSpo tted-ta iled Quo llGo lden-tipped Ba tSc rub -wren nest

MGA Grid 100mCo m partm ents (Line)

DrainageDra ina ge LineUnm a pped Dra ina ge Line

RoadsSea led Ro a dsHaula ge Ro a ds-Dry W ea therN o n Haula ge Ro a dsOther Ro a dsRo a ds no t to b e usedState Fo rest

N a tio na l Park EstateManagement ZonesHarvest Area

Genera l Ma na gem ent (FMZ 4 a nd 8)4 Bar Exclusions

Ra info restW a rm Tem pera te Ra info rest EZ

3 Bar Limited FallingMapped Lim ited Fa lling EZRo c k a nd EZ (20m ) Ridge a nd Hea dwa ter Ha b ita t EZ

Drainage featuresStrea m PZ 1st Order (10m )Strea m PZ 2nd Order (20m )Strea m PZ 3rd Order (30m )Strea m PZ 4th Order (50m )

OtherN o n V ia b leRufo us Sc rub Bird Pro tec tio nPhilo ria Pro tec tio n 50mGo lden-tipped Ba t Pro tec tio n 30m

Ma psheet:GLEN ELGIN (9338-4N )

GIBRALTAR RAN GE Fo restN O. 352Ma na gem ent Area :GLEN IN N ESCpt N o :24,25,26

V ERSION : 1

GDA 1994 MGA Zo ne 56

MAP FEATURES

3

150

168153

152

168

152168

163a

163a

168

3

3

168

33

153

47b

163a

163a

152

3

163a

168

163a

220

163b

46b

3

3

168

234

53

3

163a

163b11

163a

163b

163b

163a

152

163b

47a

152

62b

163a163b

168

163b13

24

26

27

12

25

2314

1011

30

8

GIBRALTAR RANGE 352GLEN ELGIN 331

MOOGEM 614

GWY DIR HIGHWAY

Martins Gate Road

26/1 Road

24/3 Road

24/1 Road

Glovers Road

Loop Road

Mc ilwains Road

Tallowood Road

Crad le Gully Road

Ogilivies Road

Gurrs Road

26/2 Road

Bound ary Bre ak

Flat Rock Road

Roc k Road

24/4 Road

Snig track

Propose d snig trac k

24/2 Road

Crad le Gully Road

24/1 Road

Loop Road

Gib raltar Range NP

Barool NP Nym b oid a NP

420000

420000

421000

421000

422000

422000

423000

423000

6725000

6726000

6726000

6727000

6727000

6728000

6728000

6729000

6729000

FORESTRY CORPORATION OF NSW, HARDWOOD FORESTS DIVISIONFOREST TYPE MAP

1:15,000Contour Inte rval 10m

Plan Nam e :GI_24_25_26

Pre pare d By Flavio Bugno Date : 19/12/2018

Date Printe d : 19/12/2018

Plan No:59847

© Crown Copyright 2013. The inform ation and d ata c ontaine d in this m ap is to the b e st of Fore stry Corporation’s b e lie f, true and corre ct at the tim e of pub lication. Howe ve r, c hange s in c ircum stanc e s afte r the pub lication m ay im pact upon the ac curac y of the m ate rial. No warranty or guarante e is provid e d b y the State of Ne w South Wale s, Fore stry Corporation and its e m ploye e s and age nts and no liab ility is ac c e pte d for any loss or d am age , c osts or e xpe nse re sulting from the use or re lianc e upon the inform ation and d ata c ontaine d in this m ap

0 0.5 1 1.5Kilom e tre s

RoadsSe ale d Road sHaulage Road s-Private Prope rtyHaulage Road s-Shire O wne dHaulage Road s-ExistingO the r Road s

Drainage (Ordered)Unm appe d Drainage1

234 PLUS

LiDAR Contours10m Inte rval100m Inte rvalMGA Grid 100mCom partm e nts (Line )State Fore st Bound ary (Line )National Park Estate

State Fore stForest Types

Type 3 Corkwood - Sassafras - Crab apple - Silve r Sycam oreType 11 Coac hwood - Crab appleType 46 Syd ne y Blue GumType 47 Tallowwood - Syd ne y Blue GumType 53 Brush BoxType 62 Gre y Gum - Gre y Ironb ark - White MahoganyType 150 Me ssm ateType 152 Me ssm ate - Gum

Type 153 Me ssm ate - Silve rtop Stringyb arkType 163 Ne w England Blac kb uttType 168 Silve rtop Stringyb ark - GumType 220 Cle are d / Partially Cle are dType 234 Roc k

Mapshe e t:GLEN ELGIN(9338-4N)

GIBRALTAR RANGE Fore stNO . 352Manage m e nt Are a:GLEN INNESCpt No:24,25,26

VERSIO N: 1

GDA 1994 MGA Z one 56

Document title: GI_24_25_26 Harvest Plan Version No.: 1 Page 1 of 11 Harvest Plan No.: 59847 Approval Date: 19/12/2018 Expiry Date: 16/11/2020

Warning: a printed copy of this document may be uncontrolled. Please verify this is the latest version prior to use.

Hardwood Forests Division

Harvest and Haul Plan

State Forest Gibraltar Range Compartments 24, 25 & 26

Management Area Glen Innes IFOA Region Upper North East

Harvest Plan No. 59847 Price Zone Glen Innes

Legal Conditions Native Forest Harvesting under the UNE IFOA; expires 16/11/2020

Survey expiry date for this plan is 3/02/2026

Certification Timber products removed from the plan area are within the Defined Forest Area covered by Australian Forestry Standard and ISO14001 Certificate 13761

Prepared by Senior Planner Flavio Bugno

SIGNATURE ON FILE Date: 17/12/2018

Reviewed by Senior Planner Andrew Kemsley

SIGNATURE ON FILE Date: 14/12/2018

Approved by Planning Supervisor Matt Kinny

SIGNATURE ON FILE Date: 19/12/2018

Abbreviations FT = Forest Technician, HC = Harvesting Coordinator, PtS= Protection Supervisor, HS = Harvesting Supervisor, RC = Roading Coordinator, Crew = Harvest Contractor/Forest Operators, IFOA = Integrated Forestry Operations Approval, TSL = Threatened Species Licence, EPL = Environment Protection Licence, FL = Fisheries Licence, CH = Cultural Heritage, SOP = Standard Operating Procedure, HPOM = Harvest Plan Operational Map, HCVOG = High Conservation Value Old Growth

1. Harvest Area Details (all Slope info is LiDAR derived) Cpt 24 Cpt 25 Cpt 26 Total

PlanCpt ID 129342 129343 129344

Gross Area (ha) 219 64 183 466

Harvest Area 107 26 141 274 Estimated Yield 2044 497 2693 5234 Yield/ha 19.1 19.1 19.1 19.1 (av)

Slope (% 0-15 degrees) 93 62 93 90

Slope (% 15-30 degrees) 7 38 7 10

Slope (% 0-20 degrees) 99 91 98 98 Slope (% 20-25 degrees) 1 7 2 2

Slope (% 25-30 degrees) 0 2 0 0

Document title: GI_24_25_26 Harvest Plan Version No.: 1 Page 2 of 11 Harvest Plan No.: 59847 Approval Date: 19/12/2018 Expiry Date: 16/11/2020

Warning: a printed copy of this document may be uncontrolled. Please verify this is the latest version prior to use.

Contractor must ensure timber removed is allocated to the correct compartment when entered into Electronic Delivery Docket.

2. Management Conditions on Boundaries Boundary Conditions

SMZ / FMZ FMZ 2 and 3 a – occur and are mapped on HPOM as exclusion zones consisting of High Conservation Old Growth Forest. Additional areas are embedded within mapped areas of Rainforest and Rocky Outcrop.

FMZ 4 – Available for harvesting under the conditions of this plan and displayed on the HPOM as net harvest area.

Aboriginal Cultural Heritage

Aboriginal Cultural Heritage Survey report is pending. No operations to take place until report and consultation has been completed. If any potential heritage sites are identified an interim 100m exclusion buffer must be applied and Planning Supervisor notified as soon as possible.

European Cultural Heritage

Lettered Tree: Located below dump 8 there was a tree with a broad arrow and lettering carved into the truck. The tree could not be located during planning. FT’s to continue search and mark tree for protection if located.

Lonsdale’s Sawmill Site, Glovers House and Ogilvy’s Hut: no evidence was found other than old clearings. Protect any artefacts found in these sites.

Neighbours A 40m wide road reserve for the Gwydir Highway occurs along the western boundary of the compartments. The Boundary of the reserve is delineated by fence line. No trees are to be harvested within the road reserve. Harvesting machinery is prohibited from the reserve except for the non-haulage section of 26/1 Road.

Gibraltar Range National Park is adjacent to the East of the compartments but is separated from the harvest area by Rainforest and HCVOG, except for a section along Cpt 25. This boundary must be conservatively marked by the FT after consultation with the NPWS Ranger.

3. Expected Yields

Product Estimates Volume (m3) Species Species Mix (Sawlog)

HQ Large Sawlog (Quota) 2,137 Messmate 40%

HQ Small Sawlog 521 New England Blackbutt 25%

Poles, Piles and Girders 0 Silver Top Stringybark 25%

LQ Sawlog (Salvage) 2,576 Other (Gum) 10

Total 5,234

4. Haulage Route and Contractor Travel Route Haul Route Internal compartments trails to Martins Gate Road, 24/1 Road and Tallowwood

Road – then out of forest via Gwydir Highway onto various sawmill sites.

BEWARE – Moderate traffic flow exists along Gwydir Highway. Extreme care should be taken turning onto highway from Martins Gate Road and Tallowood

Document title: GI_24_25_26 Harvest Plan Version No.: 1 Page 3 of 11 Harvest Plan No.: 59847 Approval Date: 19/12/2018 Expiry Date: 16/11/2020

Warning: a printed copy of this document may be uncontrolled. Please verify this is the latest version prior to use.

Road. Haulage Contractor must complete a risk assessment before commencing haulage operations.

Traffic Control Plan A Traffic Control Plan (TCP) must be developed, by an accredited company, and implemented when harvesting within 2 tree lengths of the Gwydir Highway. The HC must review WHS Procedure 4.11 - Traffic Management for more information.

Mud- Gwydir Highway HC and Crew must monitor exits onto the Gwydir Highway to ensure mud is not dragged onto the highway during haulage.

5. Community Issue Detail Conditions

Forest Permits (Bees) Apiary permits exists over the western half of the net harvest area.

The Apiary Permit holders have been notified regarding the harvest event. No hives were detected during planning however if hives are constraining harvesting operations then the apiarist must be contacted by the HC at least two weeks prior to commencement of harvesting to allow hives to be moved and again on completion of harvesting in the area.

Gibraltar Range National Park

Controls for recreation use

This area adjoins Gibraltar Range National Park. The National Parks office in Glen Innes has been notified of the harvesting and roading operations. Roading and Harvesting Supervisors must notify the Ranger prior to operations beginning. The area and Martins Gate Road may be used by members of the public during visits to the National Park.. It is the crew’s responsibility to ensure that their work site is safe during the course of operations and a Traffic Management Plan (TMP) has been developed and implemented for state forest roads (refer to WHS 4.11 Traffic Management).

HC and Crew must develop management procedures for dealing with unexpected visitors/recreational users and include these in the SSP.

6. Infrastructure

Infrastructure Conditions

All Mapped Fire Trails Mapped roads must be reinstated to similar or better condition than prior to harvesting/snigging and comply with the EPL. The roads running parallel to the Highway are used as fire breaks. Please ensure that drainage structures installed will allow movement of vehicles.

Document title: GI_24_25_26 Harvest Plan Version No.: 1 Page 4 of 11 Harvest Plan No.: 59847 Approval Date: 19/12/2018 Expiry Date: 16/11/2020

Warning: a printed copy of this document may be uncontrolled. Please verify this is the latest version prior to use.

7. Harvesting Conditions

Silviculture Type Harvesting Objectives and Condition for each stand condition

STS Light to Medium

In these stands dominated by New England species, the objective is to remove mature trees and suppressed trees to promote regeneration. A high proportion of defective and damage stems are present.

HC to instruct crew to retain patches of quality advanced regeneration where they occur.

Monitoring Due to high proportion of defective and fire damaged stems there is a low likelihood of basal area limit being exceeded, therefore no basal area monitoring is required.

IFOA Limits STS Light/Medium

STS Tract 274ha

Pre-harvest BA 27ha

Post-harvest BA 23ha

Planned Removal 14%

8. Tree Retention - refer to TSL booklet for full conditions

Prescription Condition/Responsibility

Mark-Up – the FT is responsible for marking up the forest ahead of harvesting operations consistent with SOP 2 Exclusion Zone Boundary Mark Up - and SOP 3 - Forest Mark Up

Compartment Mark-Up Survey

(5.1, 5.2, 5.13)

Compartment mark-up surveys must be conducted at least 300m in advance of operations. The survey must search for threatened and protected species features listed in conditions 5.1 and 5.2 of the TSL.

No Koala star search triggers were identified during pre-harvest surveys.

Hollow-bearing and Recruitment tree retention (H and R)

Non-Regrowth Zone - 5.6 b), c) and f) and 6.9 d) conditions apply.

Additional H trees for Greater Glider condition applies

FT must select and mark 8 H trees/ha where available and five R trees/ha

Significant Food Resources

(5.6 g)

FT must mark for retention - 10 Eucalypt feed trees/2 ha where they occur (see Swift Parrot and Regent Honeyeater prescription), glider sap feed trees, stands of forest oak and forest oak feed trees.

Mountain Gum and Manna Gum are suitable E tree species present in these compartments.

Document title: GI_24_25_26 Harvest Plan Version No.: 1 Page 5 of 11 Harvest Plan No.: 59847 Approval Date: 19/12/2018 Expiry Date: 16/11/2020

Warning: a printed copy of this document may be uncontrolled. Please verify this is the latest version prior to use.

Harvesting - Crew and HC responsibilities

Protection of Retained Trees (5.6h)

Trees marked or selected for retention must not be felled.

The crew must minimise damage to H, R and E trees by using directional felling.

Harvesting debris should not accumulate within 5 m of retained trees. Where debris does accumulate the crew must remove or flatten to < 1m high.

The HC must be notified of any badly damaged retained trees and they must assess and record if a replacement retained tree is required.

Stag Retention (Dead standing trees 5.6f)

The crew should retain stags where safe to do so.

The crew must record the date, DBH, risk and location of unsafe stags removed

Impenetrable Understory Areas identified as Impenetrable Understory by the FT must be managed as per the requirements of SOP 3.

9. Site-Specific Flora and Fauna (see SOP 1, 2 and 3)

Present in compartment

Condition Boundary Type

Prescription

Riparian Habitat Protection (5.7)

(The HPOM indicates LIC drainage order corrected by LiDAR)

2 bars Implement filter strip (hard) and protection zone (soft) around drainage features as shown on the HPOM. Refer to SOP 1.

FT must mark unmapped drainage lines and 1st order protection zone boundary with 2 bars.

The crew will locate and protect all 2nd order and above streams with GPS.

Ground Habitat (5.17)

N/A Commercial firewood collection in these compartments is not permitted.

HCVOG (5.3) Limited Embedded in Mapped Limited Falling Exclusion Zone. Boundary to be located by GPS in harvester.

Rainforest (5.4) Accidental Mapped Exclusion zone to be located by GPS in harvester. FT to continue to search for unmapped rainforest and mark for exclusion if identified.

Philoria sp. (6.04) Machinery Mapped Exclusion zone (50m on record) to be located by GPS in harvester.

Rufous Scrub-bird

(6.10)

Machinery Mapped Exclusion zone to be located by GPS in harvester.

25/1 Road south of dump 1, through Rufous Scrub-bird exclusion, must not be used during the operation.

Document title: GI_24_25_26 Harvest Plan Version No.: 1 Page 6 of 11 Harvest Plan No.: 59847 Approval Date: 19/12/2018 Expiry Date: 16/11/2020

Warning: a printed copy of this document may be uncontrolled. Please verify this is the latest version prior to use.

Golden – tipped Bat

(6.20)

Machinery Mapped Exclusion zone to be located by GPS in harvester.

Ridge & Headwater Habitat (5.8)

Limited Mapped Exclusion zone to be located by GPS in harvester.

Rocky Outcrop

(5.11)

Limited Rocky Outcrop area with 20m buffer identified in HPOM between dumps 8 and 9. A minimum of the mapped area must be marked due to underlying FMZ. This, and others located during mark-up, to be assessed and marked by FT.

20m buffer on outcrops >0.1 ha.

Swift Parrot and Regent Honeyeater 7b)viii

Modified FT must mark for retention - 10 Eucalypt feed trees/2 ha where they occur.

Not mapped as occurring in compartments, however markup searches should target these potential prescriptions.

Condition Boundary Type

Prescription

Yellow-bellied Glider

(7b)xii)

Limited Tree retention requirements to be implemented by FT. Mark and retain all observed feed trees & 15 trees within 100m of sap feed trees, mark and retain 15 trees within 100m of record, mark and retain 15 trees within 200m of record.

10. Soil & Water – Refer to EPL Booklet for full conditions

Issue Assessment Conditions

EPL Scheduled Activity No

EPL Licenced Yes Harvesting Supervisor and Roading Supervisor must update IFOA Report for commencement, suspension and completion of operations.

Unmapped drainage Line harvesting

Not Permitted

Inherent hazard level 1

Refer SOP 1

Harvesting Slope Limits 30 degrees EPL – Sch 4 Condition 3.

Dispersible Soils No

Document title: GI_24_25_26 Harvest Plan Version No.: 1 Page 7 of 11 Harvest Plan No.: 59847 Approval Date: 19/12/2018 Expiry Date: 16/11/2020

Warning: a printed copy of this document may be uncontrolled. Please verify this is the latest version prior to use.

Mass Movement / Instability No Nil

Acid Sulphate Soils No Nil

Seasonality Conditions No Nil

Historical or existing erosion No Nil

Ground cover >70% Nil

Burning conditions No Nil

Log Dumps

Log dumps must not encroach on the Gwydir Highway road reserve.

HC and Crew must mark and inspect boundary of Rufous Scrub Bird exclusion near dump 1 to ensure that dump operations do not impact the exclusion.

Refer to SOP 5

HC is responsible for authorising moving the location of a log dump.

Roading management during harvesting

Refer to SOP 6.

HC is responsible for monitoring road and crossing drainage during haulage.

Wet Weather and Rutting

Refer to SOP 6.

Crew is responsible for implementing automatic closures and following notified closures.

HC is responsible for ensuring crew notified when notified closure is lifted.

Snigging

Two snig track routes identified during planning are shown on the HPOM:

Existing old track located NE of dump 6.

Proposed snig track west of dump 1. Closed section of 25/1 Road and old snig tracks running through Rufous Scrub Bird exclusion must not be used.

The two identified tracks are to be assessed and marked by the HC prior to use.

Refer to SOP 8

Crew is responsible for progressive drainage of snig tracks

Snig Track Crossings

Snig track crossings of depressions shown on HPOM must be assessed by the HC before and after use to ensure the stability of the crossing. The crossing pavement and approaches must be

Document title: GI_24_25_26 Harvest Plan Version No.: 1 Page 8 of 11 Harvest Plan No.: 59847 Approval Date: 19/12/2018 Expiry Date: 16/11/2020

Warning: a printed copy of this document may be uncontrolled. Please verify this is the latest version prior to use.

repaired and seeded on completion of operations.

Refer to SOP 8

HC is responsible to ensure snig track crossings are approved prior to use and rehabilitated upon completion.

11. Crossing Approvals No IFOA crossings are approved. Any other feature crossings must be assessed, recorded below and approved by the Planning Supervisor before use.

Document title: GI_24_25_26 Harvest Plan Version No.: 1 Page 9 of 11 Harvest Plan No.: 59847 Approval Date: 19/12/2018 Expiry Date: 16/11/2020

Warning: a printed copy of this document may be uncontrolled. Please verify this is the latest version prior to use.

12. Operational Plan Briefing: A briefing of this operational plan was conducted by Person Role Nature of Briefing Date

Induction Questionnaire 1. Where is the Emergency meeting point and Helicopter Landing Area? 2. How are the compartment boundaries delineated? 3. What is the proposed silviculture? 4. What are the requirements for operations near the Gwydir Highway? 5. List the exclusion zones present and the level of protection for each?

13. Acknowledgement of Briefing: I acknowledge that I have received a copy of the plan documents and that I have been briefed on the conditions of the Plan. I understand the operational control requirements as outlined in the plan and take responsibility for the implementation of plan conditions relevant to my responsibilities

Name Role Signature Date

Document title: GI_24_25_26 Harvest Plan Version No.: 1 Page 10 of 11 Harvest Plan No.: 59847 Approval Date: 19/12/2018 Expiry Date: 16/11/2020

Warning: a printed copy of this document may be uncontrolled. Please verify this is the latest version prior to use.

14. Standard Operating Procedures: The following SOP’s apply to this plan. FCNSW staff and the crew must hold a copy on site whilst operating and comply with the conditions set out in each SOP.

Procedure Number

Title

1 Drainage Feature Protection

2 Exclusion Zone Boundary Management

3 Forest Mark-Up

4 Operating in Inherent Hazard Level 3 Areas

5 Log Dump Operation and Use

6 Road and Crossing Management and Wet Weather Controls

7 Safety Requirements

8 Snig Tracks and Extraction Tracks

9 Tree Felling and Servicing Logs

10 Fire Precautions and miscellaneous requirements

Document title: GI_24_25_26 Harvest Plan Version No.: 1 Page 11 of 11 Harvest Plan No.: 59847 Approval Date: 19/12/2018 Expiry Date: 16/11/2020

Warning: a printed copy of this document may be uncontrolled. Please verify this is the latest version prior to use.

Operational Diary:

Date Issue Action Required

Action Completed Initials

Record: Daily activities (eg tree marking, dump 2); Condition 5.2 of TSL items - EEC locations, rocky outcrops, koala scats, feed tree identification etc), discussions with stakeholders/neighbours/ site visitors; areas of impenetrable understorey; unviable areas not marked, non-conformances; harvesting issues identified, twice weekly road and crossing drainage checks

ROADING PLAN – Gibraltar Range State Forest, Compartments 24, 25 & 26

1

FORESTRY CORPORATION OF NSW

ROADWORKS PLAN

Gibraltar Range State Forest; Compartments 24, 25 & 26

ASSOCIATED HARVEST PLAN NO. 59847

Certification

Prepared by:

Senior Planner SIGNATURE ON FILE Date: 17/12/2018

Flavio Bugno

Reviewed by:

Harvest Planner SIGNATURE ON FILE

Date: 14/12/2018 Andrew Kemsley

Approved by:

Planning Supervisor SIGNATURE ON FILE Date: 19/12/2018

Mathew Kinny

Road Works and Operational Expenditure Approved by:

Roading Supervisor SIGNATURE ON FILE Date: 19/12/2018

Holly James

Duration of Approval:

The above approval is valid until 12 months from date of signature. Contents

1. Cover Page

2. Operational Map

3. Costings

4. Roadworks Plan Text/Prescriptions/Road and crossings work sheets

5. Locality Map

6. Safety Plan / MEEP

7. Harvesting Plan

8. Harvesting Notification List (Operations Team Leader and Roading Supervisor Only)

ROADING PLAN – Gibraltar Range State Forest, Compartments 24, 25 & 26

2

ROADING PLAN – Gibraltar Range State Forest, Compartments 24, 25 & 26

3

1. Objectives

1. Roadworks are required for a Native Forest Harvesting operation scheduled to commence in early to mid 2019.

1. The operational map shows the location of the proposed works. 2. Attachments: Financial Analysis Spreadsheet gives full details of costs, benefits, material &

plant requirements.

2. Specifications and Legal Conditions

This operation must comply with: • Standard Operating Procedures issued by FCNSW. • State Forests of NSW Forest Practices Code - Part 4 Forest Roads and Fire Trails (February

1999). • Integrated Forestry Operations Approval issued under part 5B of the Forestry Act 2012 (IFOA)

including the associated licences: - Threatened Species Licence issued under the Threatened Species Conservation Act (1995). - Fisheries Licence issued under section 220ZW of the Fisheries Management Act 1994. - Environment Protection Licence No. 4017 (UNE) issued under section 55 of the Protection of

the Environment Operations Act 1997. Licenced operation. • Technical Guidance Notes for Roadworks.

3. Special Conditions

Feature Conditions

Cultural Heritage Aboriginal Cultural Heritage Survey report is pending. No operations to take place until report and consultation has been completed.

Threatened Species See Harvesting Plan and Harvesting Plan Operational Map for exclusion zones. Only road maintenance is permitted within the rocky outcrop and Rufous Scrub Bird exclusions (no tree removal >20cm dbhob). Roading Coordinator must mark these exclusion boundaries before commencing roadworks on Boundary Break and Martins Gate Road.

Gwydir Highway Gwydir Highway is a Shire and Roads and Maritime Services (RMS) road. A short section of 26/2 Road is contained within the road reserve (adjacent Rocky Outcrop). No roadworks to be undertaken within the Highway road reserve until approval is obtained from these organisations and the Planner provides written advice to the Roading Coordinator and Roading Supervisor.

Environmental impacts i.e. Dust, Noise, Water, Visual

During Roadworks the Roading Coordinator must monitor exits onto the Gwydir Highway to ensure mud is not dragged onto the highway. No gravelling is to be undertaken within the Highway road reserve without written approval from Shire and RMS.

Safety Issues (includes hazards, public use of roads)

All operators to remain vigilant when entering and exiting Martins Gate Road and Tallowood Road to / from the Gwydir Highway. Roading Coordinator and Contractors must complete a risk assessment before commencing haulage operations. See Hazard Assessment in the Site Safety Pack

ROADING PLAN – Gibraltar Range State Forest, Compartments 24, 25 & 26

4

3.1 EPL Licencing (if applicable) • This operation is licensed under the EPL. • The Roading Supervisor/Harvesting Supervisor is responsible for licensing the activity • The Roading Coordinator/Harvesting Coordinator must notify the Roading

Supervisor/Harvesting Supervisor when operations have commenced and ceased.

4. General Conditions

• Tree removal should be undertaken mechanically where possible. Refer to Safety Procedures 4.25 “Manual Tree Felling” and 4.26 “Management of Hazardous Trees & Overhead Hazards”.

• Remove vegetation within 3m of the road prism only where required to maintain safe sight distance and passage of trucks.

• Note: Clearing is generally permitted within 3m of the road prism for all roads. Ground disturbance and tree debris may impact outside this 3m either side of the road prism as is required to effect clearing within 3m of the road prism. Conditions 5, 6 and 47 Schedule 5 of the EPL must apply.

5. Works Schedule Refer to attached Road Works sheets.

Road Maintainence/Upgrade

Road Name 24/1 Road

Length (m) Location Martins Gate Road to 24/2 Road

Upgrade Length (m)

Formation Width (m)Location

Curve Widening

Upgrade Spoil

Reopen entry onto Martins Gate Rd for turn west to HWY.

All road

NA

Gravel Length (m)NA

Remove vegetation only in accordance to general condition #

Works >30 Slopes

Mass Movement

Dispersible

Widening

Grade Lowering

RealignmentReopening

WORKS YES INSTRUCTIONS/SITE SPECIFIC CONDITIONS

Clear veg/debris

Repair surface

Crown/Crossfall

Gravel

Remove trees >20 cm

Remove trees <20 cmBatter Repair/Upgrade

CulvertsMitres

ROD/Spoon

Belts/Channels

Drop Downs

Silt Trapping

Start Date: Finish Date: Soil Stabilisation Date (must be within 5 days): Date Event Initial

Site

Info

Pa

vem

ent

Drain

age

Road

side/

Batte

rs

Category

NA

Upgr

ade

Main

tena

nce Maintenance Length (m)

See general condition 4

Size: Sets:

Sets:

Sets:

Sets:

Max Clearing width (m) 3

Comments: NA

DETAILS

Permanent

Page 1 of 9

Road Name 24/2 Road

Length (m) Location 24/1 Road to dump 12

Upgrade Length (m)

Formation Width (m) NALocation NA

Curve Widening NA

Upgrade Spoil NA

NA

NA

NA

All road

NA

NA

Gravel Length (m)NA

Remove vegetation only in accordance to general condition #

NA

Works >30 Slopes

Mass Movement

Dispersible

Widening

Grade Lowering

RealignmentReopening

WORKS YES INSTRUCTIONS/SITE SPECIFIC CONDITIONS

Clear veg/debris

Repair surface

Crown/Crossfall

Gravel

Remove trees >20 cm

Remove trees <20 cmBatter Repair/Upgrade

CulvertsMitres

ROD/Spoon

Belts/Channels

Drop Downs

Silt Trapping

Start Date: Finish Date: Soil Stabilisation Date (must be within 5 days): Date Event Initial

Site

Info

Pa

vem

ent

Drain

age

Road

side/

Batte

rs

Category

NA

Upgr

ade

Main

tena

nce Maintenance Length (m)

See general condition 4

Size: Sets:

Sets:

Sets:

Sets:

Max Clearing width (m) 3

Comments: NA

DETAILS

Temporary

Page 2 of 9

Road Name 24/3 Road

Length (m) Location Tallowood Road to 24/4 Road

Upgrade Length (m)

Formation Width (m) NALocation NA

Curve Widening NA

Upgrade Spoil NA

NA

NA

NA

All road

NA

NA

Gravel Length (m)NA

Remove vegetation only in accordance to general condition #

NA

Works >30 Slopes

Mass Movement

Dispersible

Widening

Grade Lowering

RealignmentReopening

WORKS YES INSTRUCTIONS/SITE SPECIFIC CONDITIONS

Clear veg/debris

Repair surface

Crown/Crossfall

Gravel

Remove trees >20 cm

Remove trees <20 cmBatter Repair/Upgrade

CulvertsMitres

ROD/Spoon

Belts/Channels

Drop Downs

Silt Trapping

Start Date: Finish Date: Soil Stabilisation Date (must be within 5 days): Date Event Initial

Site

Info

Pa

vem

ent

Drain

age

Road

side/

Batte

rs

Category

NA

Upgr

ade

Main

tena

nce Maintenance Length (m)

See general condition 4

Size: Sets:

Sets:

Sets:

Sets:

Max Clearing width (m) 3

Comments: NA

DETAILS

Temporary

Page 3 of 9

Road Name 24/4 Road

Length (m) Location 24/3 Road to dump 15

Upgrade Length (m)

Formation Width (m) NALocation NA

Curve Widening NA

Upgrade Spoil NA

NA

NA

NA

All road

NA

NA

Gravel Length (m)NA

Remove vegetation only in accordance to general condition #

NA

Works >30 Slopes

Mass Movement

Dispersible

Widening

Grade Lowering

RealignmentReopening

WORKS YES INSTRUCTIONS/SITE SPECIFIC CONDITIONS

Clear veg/debris

Repair surface

Crown/Crossfall

Gravel

Remove trees >20 cm

Remove trees <20 cmBatter Repair/Upgrade

CulvertsMitres

ROD/Spoon

Belts/Channels

Drop Downs

Silt Trapping

Start Date: Finish Date: Soil Stabilisation Date (must be within 5 days): Date Event Initial

Site

Info

Pa

vem

ent

Drain

age

Road

side/

Batte

rs

Category

NA

Upgr

ade

Main

tena

nce Maintenance Length (m)

See general condition 4

Size: Sets:

Sets:

Sets:

Sets:

Max Clearing width (m) 3

Comments: NA

DETAILS

Temporary

Page 4 of 9

Road Name 25/1 Road

Length (m) Location Martins Gate Road to dump 1

Upgrade Length (m)

Formation Width (m) NALocation NA

Curve Widening NA

Upgrade Spoil NA

NA

NA

NA

All road

NA

NA

Gravel Length (m)NA

Remove vegetation only in accordance to general condition #

NA

Works >30 Slopes

Mass Movement

Dispersible

Widening

Grade Lowering

RealignmentReopening

WORKS YES INSTRUCTIONS/SITE SPECIFIC CONDITIONS

Clear veg/debris

Repair surface

Crown/Crossfall

Gravel

Remove trees >20 cm

Remove trees <20 cmBatter Repair/Upgrade

CulvertsMitres

ROD/Spoon

Belts/Channels

Drop Downs

Silt Trapping

Start Date: Finish Date: Soil Stabilisation Date (must be within 5 days): Date Event Initial

Site

Info

Pa

vem

ent

Drain

age

Road

side/

Batte

rs

Category

NA

Upgr

ade

Main

tena

nce Maintenance Length (m)

See general condition 4

Size: Sets:

Sets:

Sets:

Sets:

Max Clearing width (m) 3

Comments: Covered with shrub and debris. Road Supervisor must mark location of the road and Rufous Scrub Bird exclusion boundary. No tree removal > 20cm dbhob permited within Rufous Scrub Bird exclusion zone. Minimise disturbance as far is practicable within this zone.

DETAILS

Temporary

Page 5 of 9

Road Name 26/1 Road

Length (m) Location Martins Gate Road to dump 7

Upgrade Length (m)

Formation Width (m) NALocation NA

Curve Widening NA

Upgrade Spoil NA

NA

NA

NA

All road

NA

NA

Gravel Length (m)NA

Remove vegetation only in accordance to general condition #

NA

Works >30 Slopes

Mass Movement

Dispersible

Widening

Grade Lowering

RealignmentReopening

WORKS YES INSTRUCTIONS/SITE SPECIFIC CONDITIONS

Clear veg/debris

Repair surface

Crown/Crossfall

Gravel

Remove trees >20 cm

Remove trees <20 cmBatter Repair/Upgrade

CulvertsMitres

ROD/Spoon

Belts/Channels

Drop Downs

Silt Trapping

Start Date: Finish Date: Soil Stabilisation Date (must be within 5 days): Date Event Initial

Site

Info

Pa

vem

ent

Drain

age

Road

side/

Batte

rs

Category

NA

Upgr

ade

Main

tena

nce Maintenance Length (m)

See general condition 4

Size: Sets:

Sets:

Sets:

Sets:

Max Clearing width (m) 3

Comments: No tree removal >20cm dbhob within rocky outcrop exclusion. Roading Supervisor to mark boundary of exclusion near road. No roadworks to be undertaken within the Highway road reserve until approval is obtained from Glen Innes Severn Shire and the Roads and Maritime Services.

DETAILS

Permanent

Page 6 of 9

Road Name 26/2 Road

Length (m) Location Martins Gate Road to dump 6

Upgrade Length (m)

Formation Width (m) NALocation NA

Curve Widening NA

Upgrade Spoil NA

NA

NA

NA

All road

NA

NA

Gravel Length (m)NA

Remove vegetation only in accordance to general condition #

NA

Works >30 Slopes

Mass Movement

Dispersible

Widening

Grade Lowering

RealignmentReopening

WORKS YES INSTRUCTIONS/SITE SPECIFIC CONDITIONS

Clear veg/debris

Repair surface

Crown/Crossfall

Gravel

Remove trees >20 cm

Remove trees <20 cmBatter Repair/Upgrade

CulvertsMitres

ROD/Spoon

Belts/Channels

Drop Downs

Silt Trapping

Start Date: Finish Date: Soil Stabilisation Date (must be within 5 days): Date Event Initial

Site

Info

Pa

vem

ent

Drain

age

Road

side/

Batte

rs

Category

NA

Upgr

ade

Main

tena

nce Maintenance Length (m)

See general condition 4

Size: Sets:

Sets:

Sets:

Sets:

Max Clearing width (m) 3

Comments: Minor fern and debris cover.

DETAILS

Temporary

Page 7 of 9

Road Name Martins Gate Road

Length (m) Location Gwydir Highway to 25/1 Road

Upgrade Length (m)

Formation Width (m) NALocation NA

Curve Widening NA

Upgrade Spoil NA

NA

NA

NA

All road

Repair minor ruts

NA

Gravel Length (m)NA

Remove vegetation only in accordance to general condition #

NA

Works >30 Slopes

Mass Movement

Dispersible

Widening

Grade Lowering

RealignmentReopening

WORKS YES INSTRUCTIONS/SITE SPECIFIC CONDITIONS

Clear veg/debris

Repair surface

Crown/Crossfall

Gravel

Remove trees >20 cm

Remove trees <20 cmBatter Repair/Upgrade

CulvertsMitres

ROD/Spoon

Belts/Channels

Drop Downs

Silt Trapping

Start Date: Finish Date: Soil Stabilisation Date (must be within 5 days): Date Event Initial

Site

Info

Pa

vem

ent

Drain

age

Road

side/

Batte

rs

Category

NA

Upgr

ade

Main

tena

nce Maintenance Length (m)

See general condition 4

Size: Sets:

Sets:

Sets:

Sets:

Max Clearing width (m) 3

Comments: Last 400m is covered in shrubs and debris. Road Supervisor must mark location of the road and Rufous Scrub Bird exclusion boundary. No tree removal > 20cm dbhob permited within Rufous Scrub Bird exclusion zone. Minimise disturbance as far is practicable within this zone.

DETAILS

Permanent

Page 8 of 9

Road Name Tallowood Road

Length (m) Location Gwydir Highway to dump 13

Upgrade Length (m)

Formation Width (m) NALocation NA

Curve Widening NA

Upgrade Spoil NA

NA

NA

NA

All road

NA

NA

Gravel Length (m)NA

Remove vegetation only in accordance to general condition #

NA

Works >30 Slopes

Mass Movement

Dispersible

Widening

Grade Lowering

RealignmentReopening

WORKS YES INSTRUCTIONS/SITE SPECIFIC CONDITIONS

Clear veg/debris

Repair surface

Crown/Crossfall

Gravel

Remove trees >20 cm

Remove trees <20 cmBatter Repair/Upgrade

CulvertsMitres

ROD/Spoon

Belts/Channels

Drop Downs

Silt Trapping

Start Date: Finish Date: Soil Stabilisation Date (must be within 5 days): Date Event Initial

Site

Info

Pa

vem

ent

Drain

age

Road

side/

Batte

rs

Category

NA

Upgr

ade

Main

tena

nce Maintenance Length (m)

See general condition 4

Size: Sets:

Sets:

Sets:

Sets:

Max Clearing width (m) 3

Comments: Minimise disturbance within exclusion zone. Road Supervisor must mark boundary of exclusion zone near road.

DETAILS

Temporary

Page 9 of 9

Crossing Works

Diagram

Start Date: Finish Date: Soil Stabilisation Date (must be within 5 days): Date Event Initial

Crossing Name A Road Name Martins Gate Road Drainage Feature Depression Stream Permanency Intermittent

Location 750m from Highway

Existing CrossingCauseway

SizeNA

Stability StatusUnstable (upgrade)

Crossing RequiredExisting

Size (mm/m)NA

FuturePermanent

Reshape Bed/banks NilDisposal of Spoil NA

Inlet Existing vegetation

Outlet Existing vegetation

Stabilisation Nil

ErosionControl Natural vegetation

Approaches Nil

Temporary Drainage Nil

5-30m Upstream Left Reshape existing Rollover

5-30m Upstream Right Reshape existing Rollover

Practices where no 5-30 NA

OutletControl Natural vegetation

TableDrain Natural vegetation

Crossing Works Approaches and Road Drainage

Armour with rockPavement/Structure

Comments Nil

Wednesday, 19 December 2018 Page 1 of 6

Diagram

Start Date: Finish Date: Soil Stabilisation Date (must be within 5 days): Date Event Initial

Crossing Name B Road Name 26/2 Road Drainage Feature Depression Stream Permanency Intermittent

Location 250m from Martins Gate Road

Existing CrossingCauseway

SizeNA

Stability StatusStable (no works)

Crossing RequiredExisting

Size (mm/m)NA

FuturePermanent

Reshape Bed/banks NilDisposal of Spoil NA

Inlet Nil

Outlet Nil

Stabilisation Nil

ErosionControl Nil

Approaches Nil

Temporary Drainage Nil

5-30m Upstream Left Existing crest

5-30m Upstream Right Existing crest

Practices where no 5-30 NA

OutletControl Natural vegetation

TableDrain Natural vegetation

Crossing Works Approaches and Road Drainage

Armour with rock/gravel if deformation occurs

Pavement/Structure

Comments Nil

Wednesday, 19 December 2018 Page 2 of 6

Diagram

Start Date: Finish Date: Soil Stabilisation Date (must be within 5 days): Date Event Initial

Crossing Name C Road Name Martins Gate Road Drainage Feature Depression Stream Permanency Intermittent

Location 500m from Highway

Existing CrossingCauseway

SizeNA

Stability StatusUnstable (upgrade)

Crossing RequiredExisting

Size (mm/m)NA

FuturePermanent

Reshape Bed/banks Reshape causewayDisposal of Spoil NA

Inlet Nil

Outlet Nil

Stabilisation Nil

ErosionControl Nil

Approaches Nil

Temporary Drainage Nil

5-30m Upstream Left Existing crest

5-30m Upstream Right Reshape existing Rollover

Practices where no 5-30 NA

OutletControl Natural vegetation

TableDrain Natural vegetation

Crossing Works Approaches and Road Drainage

Armour with rockPavement/Structure

Comments Nil

Wednesday, 19 December 2018 Page 3 of 6

Diagram

Start Date: Finish Date: Soil Stabilisation Date (must be within 5 days): Date Event Initial

Crossing Name D Road Name Martins Gate Road Drainage Feature Depression Stream Permanency Intermittent

Location 200m from Highway

Existing CrossingGully stuffer

SizeNA

Stability StatusStable (maintenance)

Crossing RequiredExisting

Size (mm/m)NA

FuturePermanent

Reshape Bed/banks NilDisposal of Spoil NA

Inlet Existing sill log

Outlet Existing rock

Stabilisation Nil

ErosionControl Nil

Approaches Nil

Temporary Drainage Nil

5-30m Upstream Left Existing crest

5-30m Upstream Right Existing crest

Practices where no 5-30 NA

OutletControl Natural vegetation

TableDrain Natural vegetation

Crossing Works Approaches and Road Drainage

Armour with additional rockPavement/Structure

Comments Nil

Wednesday, 19 December 2018 Page 4 of 6

Diagram

Start Date: Finish Date: Soil Stabilisation Date (must be within 5 days): Date Event Initial

Crossing Name E Road Name 24/1 RoadDrainage Feature Depression Stream Permanency Intermittent

Location 150m from Martins Gate Road

Existing CrossingCauseway

SizeNA

Stability StatusUnstable (upgrade)

Crossing RequiredExisting

Size (mm/m)NA

FuturePermanent

Reshape Bed/banks NilDisposal of Spoil NA

Inlet Existing armoured/vegetated

Outlet Existing armoured/vegetated

Stabilisation NA

ErosionControl NA

Approaches Nil

Temporary Drainage NA

5-30m Upstream Left Existing crest

5-30m Upstream Right Reshape existing rollover

Practices where no 5-30 NA

OutletControl Natural vegetation

TableDrain Natural vegetation

Crossing Works Approaches and Road Drainage

Armour with rockPavement/Structure

Comments Nil

Wednesday, 19 December 2018 Page 5 of 6

Diagram

Start Date: Finish Date: Soil Stabilisation Date (must be within 5 days): Date Event Initial

Crossing Name F Road Name 24/1 RoadDrainage Feature Depression Stream Permanency Intermittent

Location 250m from Martins Gate Road

Existing CrossingCauseway

SizeNA

Stability StatusUnstable (upgrade)

Crossing RequiredExisting

Size (mm/m)NA

FuturePermanent

Reshape Bed/banks NilDisposal of Spoil NA

Inlet Existing armoured/vegetated

Outlet Existing armoured/vegetated

Stabilisation NA

ErosionControl NA

Approaches Nil

Temporary Drainage NA

5-30m Upstream Left Reshape existing rollover

5-30m Upstream Right Reshape existing rollover

Practices where no 5-30 NA

OutletControl Natural vegetation

TableDrain Natural vegetation

Crossing Works Approaches and Road Drainage

Armour with rockPavement/Structure

Comments Nil

Wednesday, 19 December 2018 Page 6 of 6

ROADING PLAN – Gibraltar Range State Forest, Compartments 24, 25 & 26

5

6. Operational Control

Roading Supervisor to sign here

I acknowledge that I have received a copy of the plan documents and that I have been briefed on the conditions of the Plan. I understand the operational control requirements as outlined in the plan and take responsibility for the implementation of plan conditions as the principle controller of the operation.

I will brief any other operators not present at this briefing prior to them starting any work on site and ensure that risk assessment for the Safety Management Plan is completed for this area prior to operations commencing

Name: Signature:

Position: Date: From

Company: To

Name: Signature:

Position: Date: From

Company: To

Name: Signature:

Position: Date: From

Company: To

Name: Signature:

Position: Date: From

Company: To

Name: Signature:

Position: Date: From

Company: To

ROADING PLAN – Gibraltar Range State Forest, Compartments 24, 25 & 26

6

7. Handover Briefing

I acknowledge that I have received a copy of the plan documents and that I have been briefed on the conditions of the Plan. I understand the operational control requirements as outlined in the plan.

Position - Company Name Signature Date