Page 1: Rockaway Parks Conceptual Plan Community Board MeetingMar 24, 2014  · Broad Channel - American Park & Sunset Cove Bayside Nature Trail B 9th-B126th Boardwalk-Adjacent Area B 9th

ROCKAWAY PARKS CONCEPTUAL PLAN

Rockaway ParksConceptual PlanCommunityBoard MeetingPresentation of Draft Concept Designs for Review and Comment

March 24, 2014

Page 2: Rockaway Parks Conceptual Plan Community Board MeetingMar 24, 2014  · Broad Channel - American Park & Sunset Cove Bayside Nature Trail B 9th-B126th Boardwalk-Adjacent Area B 9th

ROCKAWAY PARKS CONCEPTUAL PLAN

GOALS FORTHE CONCEPTUAL PLAN

1. Develop a plan for a comprehensive park system in the Rockaways

2. Complement the Rockaway Boardwalk Plan

3. Establish investment goals for parks and open space

4. Integrate resiliency into Parks’ plans

5. Develop specific ideas and designs for particular parks

Page 3: Rockaway Parks Conceptual Plan Community Board MeetingMar 24, 2014  · Broad Channel - American Park & Sunset Cove Bayside Nature Trail B 9th-B126th Boardwalk-Adjacent Area B 9th

ROCKAWAY PARKS CONCEPTUAL PLAN

PROJECTSCHEDULE

Page 4: Rockaway Parks Conceptual Plan Community Board MeetingMar 24, 2014  · Broad Channel - American Park & Sunset Cove Bayside Nature Trail B 9th-B126th Boardwalk-Adjacent Area B 9th

ROCKAWAY PARKS CONCEPTUAL PLAN

STUDY AREA

Page 5: Rockaway Parks Conceptual Plan Community Board MeetingMar 24, 2014  · Broad Channel - American Park & Sunset Cove Bayside Nature Trail B 9th-B126th Boardwalk-Adjacent Area B 9th

ROCKAWAY PARKS CONCEPTUAL PLAN

Sunset Cove Park & Broad Channel American ParkStudy Area

Page 6: Rockaway Parks Conceptual Plan Community Board MeetingMar 24, 2014  · Broad Channel - American Park & Sunset Cove Bayside Nature Trail B 9th-B126th Boardwalk-Adjacent Area B 9th

ROCKAWAY PARKS CONCEPTUAL PLAN

a

123456789

10

Shore Front Parkway (B 73rd-108th) *B 94th & 95th Street Corridor *Bayswater Park *Rockaway Community Park/ Edgemere *Thursby Basin Park *B 88th Street Park *B 108th Esplanade *Broad Channel - American Park & Sunset CoveBayside Nature TrailB 9th-B126th Boardwalk-Adjacent Area B 9th Seating & Play Area (Unbuilt PlaNYC) B 20th Overlook (Unbuilt PlaNYC) B 26th-27th Park Area (Unbuilt PlaNYC)

* Parks for which conceptual design cost estimates have been prepared

1

6

8

7

b

5

2

9

10

4

3

c

abc

OPPORTUNITY SITESOVERVIEW

Page 7: Rockaway Parks Conceptual Plan Community Board MeetingMar 24, 2014  · Broad Channel - American Park & Sunset Cove Bayside Nature Trail B 9th-B126th Boardwalk-Adjacent Area B 9th

ROCKAWAY PARKS CONCEPTUAL PLAN

Shore Front Parkway Beach 73 - 108 Street

N

106

9786

BEAC

H 7

3RD

BEAC

H 7

4TH

BEAC

H 7

7TH

BEAC

H 8

1ST

BEAC

H 8

4TH

BEAC

H 9

0TH

BEAC

H 9

1ST

BEAC

H 9

2ND

BEAC

H 9

3RD

BEAC

H 9

4TH

BEAC

H 9

5TH

BEAC

H 9

6TH

BEAC

H 9

7TH

BEAC

H 9

8TH

BEAC

H 9

9TH

BEAC

H 1

01ST

BEAC

H 1

02N

D

BEAC

H 1

05TH

BEAC

H 1

08TH

HOCKEY RINK

HANDBALLCOURTS

EXISTING BOARDWALK ISLAND

SHUFFLEBOARDCOURTS

SHADE STRUCTURE

94th & 95th STARRIVAL PLAZA

PLAYGROUND

DOG RUNPERFORMANCE SPACE

BASKETBALLCOURT

GAME TABLE AREAPLAYGROUND WITH SPRAY SHOWER

VEHICLE DROP-OFF

PICNIC AREACLIMBING PLAZA

SKATE PLAZAJR SKATE PLAZA

ADULT FITNESS

BEACH RAMP

PHASE 1 BOARDWALK

BOARDWALK

PLAYGROUNDHANDBALL COURTS

MULTI-PURPOSE SYNTHETIC TURF FIELD

BASKETBALL COURTS

SHADE STRUCTURE

SHADE STRUCTURE

SHADE STRUCTURE

SHADE STRUCTURE

IMPROVE CROSSING(DOT TO REVIEW)

IMPROVE CROSSING(DOT TO REVIEW)

VEHICULAR RAMP

Detailed print outs of this concept design will be available at tables after presentation

B10

8

B10

5

B10

2

B94

/95

B90

B84

B81

B77

B73

Page 8: Rockaway Parks Conceptual Plan Community Board MeetingMar 24, 2014  · Broad Channel - American Park & Sunset Cove Bayside Nature Trail B 9th-B126th Boardwalk-Adjacent Area B 9th

ROCKAWAY PARKS CONCEPTUAL PLAN

106

BEAC

H 1

08TH

HOCKEY RINK

EXISTING BOARDWALK ISLANDEXISTING BOARDWALK ISLANDEXISTING BOARDWALK ISLANDEXISTING BOARDWALK ISLANDEXISTING BOARDWALK ISLANDEXISTING BOARDWALK ISLANDEXISTING BOARDWALK ISLANDEXISTING BOARDWALK ISLANDEXISTING BOARDWALK ISLANDEXISTING BOARDWALK ISLANDEXISTING BOARDWALK ISLANDEXISTING BOARDWALK ISLANDEXISTING BOARDWALK ISLAND

PLAYGROUND WITH SPRAY SHOWERPLAYGROUND WITH SPRAY SHOWERPLAYGROUND WITH SPRAY SHOWERPLAYGROUND WITH SPRAY SHOWERPLAYGROUND WITH SPRAY SHOWERPLAYGROUND WITH SPRAY SHOWERPLAYGROUND WITH SPRAY SHOWERPLAYGROUND WITH SPRAY SHOWERPLAYGROUND WITH SPRAY SHOWERPLAYGROUND WITH SPRAY SHOWERPLAYGROUND WITH SPRAY SHOWERPLAYGROUND WITH SPRAY SHOWERPLAYGROUND WITH SPRAY SHOWERPLAYGROUND WITH SPRAY SHOWERPLAYGROUND WITH SPRAY SHOWERPLAYGROUND WITH SPRAY SHOWERPLAYGROUND WITH SPRAY SHOWERPLAYGROUND WITH SPRAY SHOWERPLAYGROUND WITH SPRAY SHOWERPLAYGROUND WITH SPRAY SHOWERPLAYGROUND WITH SPRAY SHOWERPLAYGROUND WITH SPRAY SHOWERPLAYGROUND WITH SPRAY SHOWERPLAYGROUND WITH SPRAY SHOWERPLAYGROUND WITH SPRAY SHOWERPLAYGROUND WITH SPRAY SHOWERPLAYGROUND WITH SPRAY SHOWERPLAYGROUND WITH SPRAY SHOWERPLAYGROUND WITH SPRAY SHOWERPLAYGROUND WITH SPRAY SHOWERPLAYGROUND WITH SPRAY SHOWERPLAYGROUND WITH SPRAY SHOWERPLAYGROUND WITH SPRAY SHOWERPLAYGROUND WITH SPRAY SHOWERPLAYGROUND WITH SPRAY SHOWERPLAYGROUND WITH SPRAY SHOWERPLAYGROUND WITH SPRAY SHOWERPLAYGROUND WITH SPRAY SHOWERPLAYGROUND WITH SPRAY SHOWERPLAYGROUND WITH SPRAY SHOWERPLAYGROUND WITH SPRAY SHOWERPLAYGROUND WITH SPRAY SHOWERPLAYGROUND WITH SPRAY SHOWERPLAYGROUND WITH SPRAY SHOWERPLAYGROUND WITH SPRAY SHOWERPLAYGROUND WITH SPRAY SHOWERPLAYGROUND WITH SPRAY SHOWER

VEHICLE DROP-OFFVEHICLE DROP-OFFVEHICLE DROP-OFF

BEACH RAMP

BOARDWALK

SHADE SHADE SHADE SHADE SHADE SHADE SHADE SHADE SHADE SHADE SHADE SHADE SHADE SHADE SHADE SHADE SHADE SHADE SHADE SHADE STRUCTURESTRUCTURESTRUCTURESTRUCTURESTRUCTUREEXISTING BOARDWALK ISLANDSTRUCTUREEXISTING BOARDWALK ISLAND

VEHICULAR RAMPVEHICULAR RAMPVEHICULAR RAMPVEHICULAR RAMPVEHICULAR RAMPVEHICULAR RAMPVEHICULAR RAMPVEHICULAR RAMPVEHICULAR RAMP

Shore Front Parkway Beach 106 - 108 StreetSample Section

Page 9: Rockaway Parks Conceptual Plan Community Board MeetingMar 24, 2014  · Broad Channel - American Park & Sunset Cove Bayside Nature Trail B 9th-B126th Boardwalk-Adjacent Area B 9th

ROCKAWAY PARKS CONCEPTUAL PLAN

Shore Front Parkway Beach 93 - 98 StreetSample Section

97

BEAC

H 9

3RD

BEAC

H 9

4TH

BEAC

H 9

4TH

BEAC

H 9

4TH

BEAC

H 9

4TH

BEAC

H 9

4TH

BEAC

H 9

4TH

BEAC

H 9

4TH

BEAC

H 9

4TH

BEAC

H 9

4TH

BEAC

H 9

4TH

BEAC

H 9

4TH

BEAC

H 9

4TH

BEAC

H 9

4TH

BEAC

H 9

4TH

BEAC

H 9

4TH

BEACH 94TH

ST BEAC

H 9

4TH

BEACH 94TH

ST BEAC

H 9

4TH

BEAC

H 9

5TH

BEAC

H 9

5TH

BEAC

H 9

5TH

BEAC

H 9

5TH

BEAC

H 9

5TH

BEAC

H 9

5TH

BEAC

H 9

5TH

BEAC

H 9

5TH

BEAC

H 9

5TH

BEAC

H 9

5TH

BEAC

H 9

5TH

BEACH 95TH

ST

BEAC

H 9

5TH

BEACH 95TH

STBEACH

95TH ST

BEAC

H 9

5TH

BEACH 95TH

STBEACH

95TH ST

BEAC

H 9

5TH

BEACH 95TH

ST

BEAC

H 9

5TH

BEAC

H 9

6TH

BEAC

H 9

7TH

BEAC

H 9

8TH

94th & 95th STARRIVAL PLAZA

PERFORMANCE SPACEPERFORMANCE SPACEPERFORMANCE SPACEPERFORMANCE SPACEPERFORMANCE SPACEPERFORMANCE SPACEPERFORMANCE SPACEPICNIC AREAPICNIC AREAPICNIC AREAPICNIC AREAPICNIC AREAPICNIC AREAPICNIC AREAPICNIC AREAPICNIC AREAPICNIC AREA

CLIMBING PLAZACLIMBING PLAZACLIMBING PLAZACLIMBING PLAZACLIMBING PLAZACLIMBING PLAZA

PHASE 1 BOARDWALKPHASE 1 BOARDWALKPHASE 1 BOARDWALKPHASE 1 BOARDWALKPHASE 1 BOARDWALKPHASE 1 BOARDWALKPHASE 1 BOARDWALKPHASE 1 BOARDWALKPHASE 1 BOARDWALKPHASE 1 BOARDWALKPHASE 1 BOARDWALKPHASE 1 BOARDWALKPHASE 1 BOARDWALKPHASE 1 BOARDWALKPHASE 1 BOARDWALKPHASE 1 BOARDWALKPHASE 1 BOARDWALKPHASE 1 BOARDWALKPHASE 1 BOARDWALKPHASE 1 BOARDWALKPHASE 1 BOARDWALKPHASE 1 BOARDWALK

STRUCTURESTRUCTURESTRUCTURESTRUCTURESTRUCTURESTRUCTURESTRUCTURESTRUCTURESTRUCTURESTRUCTURESTRUCTURESTRUCTURE

Page 10: Rockaway Parks Conceptual Plan Community Board MeetingMar 24, 2014  · Broad Channel - American Park & Sunset Cove Bayside Nature Trail B 9th-B126th Boardwalk-Adjacent Area B 9th

ROCKAWAY PARKS CONCEPTUAL PLAN

Shore Front Parkway Beach 94 - 95 Street Plaza

Page 11: Rockaway Parks Conceptual Plan Community Board MeetingMar 24, 2014  · Broad Channel - American Park & Sunset Cove Bayside Nature Trail B 9th-B126th Boardwalk-Adjacent Area B 9th

ROCKAWAY PARKS CONCEPTUAL PLAN

Shore Front Parkway Beach 86 - 93 StreetSample Section

86

BEAC

H 9

0TH

BEAC

H 9

1ST

BEAC

H 9

2ND

BEAC

H 9

3RD

CLIMBING PLAZACLIMBING PLAZACLIMBING PLAZACLIMBING PLAZACLIMBING PLAZACLIMBING PLAZACLIMBING PLAZACLIMBING PLAZASKATE PLAZA

JR SKATE PLAZAJR SKATE PLAZAJR SKATE PLAZAJR SKATE PLAZAJR SKATE PLAZAJR SKATE PLAZAJR SKATE PLAZAJR SKATE PLAZAADULT FITNESS

PHASE 1 BOARDWALKPHASE 1 BOARDWALKPHASE 1 BOARDWALKPHASE 1 BOARDWALKPHASE 1 BOARDWALKPHASE 1 BOARDWALKPHASE 1 BOARDWALKPHASE 1 BOARDWALKPHASE 1 BOARDWALKPHASE 1 BOARDWALKPHASE 1 BOARDWALKPHASE 1 BOARDWALKPHASE 1 BOARDWALKPHASE 1 BOARDWALKPHASE 1 BOARDWALKPHASE 1 BOARDWALKPHASE 1 BOARDWALKPHASE 1 BOARDWALKPHASE 1 BOARDWALKPHASE 1 BOARDWALKPHASE 1 BOARDWALKPHASE 1 BOARDWALK

SHADE SHADE SHADE SHADE STRUCTURESTRUCTURESTRUCTURESTRUCTURE

Page 12: Rockaway Parks Conceptual Plan Community Board MeetingMar 24, 2014  · Broad Channel - American Park & Sunset Cove Bayside Nature Trail B 9th-B126th Boardwalk-Adjacent Area B 9th

ROCKAWAY PARKS CONCEPTUAL PLAN

Shore Front Parkway Skate Plaza

Page 13: Rockaway Parks Conceptual Plan Community Board MeetingMar 24, 2014  · Broad Channel - American Park & Sunset Cove Bayside Nature Trail B 9th-B126th Boardwalk-Adjacent Area B 9th

ROCKAWAY PARKS CONCEPTUAL PLAN

Beach 94th & 95th Street CorridorTotal Park Cost: $12 - 15 M

Page 14: Rockaway Parks Conceptual Plan Community Board MeetingMar 24, 2014  · Broad Channel - American Park & Sunset Cove Bayside Nature Trail B 9th-B126th Boardwalk-Adjacent Area B 9th

ROCKAWAY PARKS CONCEPTUAL PLAN

Market Scenario:

Beach 94th & 95th Street Corridor

Markets

Outdoor cafe with seating

Events

SHOREFRONT PARKWAY

HOLLAND AVE

JOSEPH ALCAMO BLVD

JOSEPH ALCAMO BLVD

ROCKAWAY FWY

ROCKAWAY FWY

BEACH CHANNEL DR

BEACH

94TH ST

CROSS BAY PKW

Y

BEACH

93RD ST

BEACH

92ND

ST

BEACH

92ND

ST

BEACH

95TH ST

BEACH

96TH ST

BEACH

96TH ST

SHOREFRONT PARKWAY

HOLLAND AVE

JOSEPH ALCAMO BLVD

JOSEPH ALCAMO BLVD

ROCKAWAY FWY

ROCKAWAY FWY

BEACH CHANNEL DR

BEACH

94TH ST

CROSS BAY PKW

Y

BEACH

93RD ST

BEACH

92ND

ST

BEACH

92ND

ST

BEACH

95TH ST

BEACH

96TH ST

BEACH

96TH ST

106

97

86

BEAC

H 7

3RD

BEAC

H 7

4TH

BEAC

H 7

7TH

BEAC

H 8

1ST

BEAC

H 8

4TH

BEAC

H 9

0TH

BEA

CH 9

1ST

BEA

CH 9

2ND

BEA

CH 9

3RDBE

ACH

94T

H

BEA

CH 9

5TH

BEA

CH 9

6TH

BEA

CH 9

7TH

BEA

CH 9

8TH

BEA

CH 9

9TH

BEA

CH 1

01ST

BEA

CH 1

02N

D

BEA

CH 1

05THBE

ACH

108

TH

HOCKEY RINK108th ST ARRIVAL PLAZA

SPRAYGROUNDPLAYGROUND

VEHICLE DROP-OFF

PHASE 2 BEACH RAMP

RAMP, BLEACHER-STAIRS, & SHADE STRUCTURE

VEHICULAR BOARDWALK ACCESS RAMP

SHOREFRONT PARKWAY

HOLLAND AVE

JOSEPH ALCAMO BLVD

JOSEPH ALCAMO BLVD

ROCKAWAY FWY

ROCKAWAY FWY

BEACH CHANNEL DR

BEACH 94TH

ST

CROSS BAY PKW

Y

BEACH 93RD

ST

BEACH 92N

D ST

BEACH 92N

D ST

BEACH 95TH

ST

BEACH 96TH

STBEACH

96TH ST

1

2

3

1

2

3

Page 15: Rockaway Parks Conceptual Plan Community Board MeetingMar 24, 2014  · Broad Channel - American Park & Sunset Cove Bayside Nature Trail B 9th-B126th Boardwalk-Adjacent Area B 9th

ROCKAWAY PARKS CONCEPTUAL PLAN

Beach 94th & 95th Street Corridor

Photomontage viewing north at the intersection of Shore Front Parkway and Beach 94th Street

Page 16: Rockaway Parks Conceptual Plan Community Board MeetingMar 24, 2014  · Broad Channel - American Park & Sunset Cove Bayside Nature Trail B 9th-B126th Boardwalk-Adjacent Area B 9th

ROCKAWAY PARKS CONCEPTUAL PLAN

STOP

STOP

STOP

STOP

STOP

STOP

STOP

STOPSTOP

STOP

BEAC

H 3

8TH

BEAC

H 3

7TH

BEAC

H 3

6TH

BEAC

H 3

5TH

ROCKAWAY FWY

FAR ROCKAWAY BLVD

OCEAN CREST BLVD

FALCON AVE

BESSEMUND AVE

BAY 31ST STBAY

32N

D S

T

BAY 32ND

ST

BAY 30TH ST

HA

RTMA

N LN

ROCKAWAY FWY

BEAC

H 3

4TH

BEAC

H 3

3RD

BEAC

H 3

2ND

BEAC

H 1

ST

SEAGIRT BLVD

BEACH CHANNEL DRIVE

NORTON BASINNATURAL RESOURCE AREA

DWIGHT AVE

N

New Facilities:

Bayswater Park

Public Art PlazaBoat Shed $1.25-1.75MKayak LaunchRunning TrackBBQ and Picnic AreaSkate Area $200-300KPermanent Event StageBaseball Field (1)Cricket Field (1)Soccer Field (1) $1-1.25MTennis Courts (3)Junior Tennis Courts (2)Basketball Courts (3)Handball Courts (6)Playground $560-875KToddler Playground $300-500KWater JetsImproved Crossing (DOT to review)Refurbished Comfort Station$.75-1.25MAll costs are draft estimates for specific amenities only and do not account for other necessary infrastructure

1413121110

7654321

89

151617

1

23

4

5

6

7

89

10

1112

13

14

15

1617

18

18

1819

19

Total Park Cost: $26-29 M

Page 17: Rockaway Parks Conceptual Plan Community Board MeetingMar 24, 2014  · Broad Channel - American Park & Sunset Cove Bayside Nature Trail B 9th-B126th Boardwalk-Adjacent Area B 9th

ROCKAWAY PARKS CONCEPTUAL PLAN

Bayswater Park

Existing

Proposed

Page 18: Rockaway Parks Conceptual Plan Community Board MeetingMar 24, 2014  · Broad Channel - American Park & Sunset Cove Bayside Nature Trail B 9th-B126th Boardwalk-Adjacent Area B 9th

ROCKAWAY PARKS CONCEPTUAL PLAN

STOP

STOP

STOPSTOP

STOP

ALMEDA AVE

BEACH CHANNEL DR

HANTZ RD

BEACH CHANNEL DR

NORTON AVE

BEAC

H 5

8TH

ST

BEAC

H 5

7TH

ST

BEAC

H 5

6 TH

ST

BEAC

H 5

3RD

ST

BEAC

H 5

0TH

ST

BEAC

H 5

4TH

ST

CON

CH P

L

BEAC

H 4

9TH

ST

BEAC

H 4

8TH

ST

BEAC

H 4

7TH

ST

BEAC

H 4

6TH

ST

BEAC

H 4

5TH

ST

BEAC

H 4

4TH

ST

BEAC

H 4

3RD

ST

N

New Facilities:

Rockaway Community Park/Edgemere

2

1 Future Park (to be reviewed with DSNY)Rockaway Community Park

1

2

Page 19: Rockaway Parks Conceptual Plan Community Board MeetingMar 24, 2014  · Broad Channel - American Park & Sunset Cove Bayside Nature Trail B 9th-B126th Boardwalk-Adjacent Area B 9th

ROCKAWAY PARKS CONCEPTUAL PLAN

STOP

STOP

STOPSTOP

STOP

ALMEDA AVE

BEACH CHANNEL DR

HANTZ RD

BEACH CHANNEL DR

NORTON AVE

BEAC

H 5

8TH

ST

BEAC

H 5

7TH

ST

BEAC

H 5

6 TH

ST

BEAC

H 5

3RD

ST

BEAC

H 5

0TH

ST

BEAC

H 5

4TH

ST

CON

CH P

L

BEAC

H 4

9TH

ST

BEAC

H 4

8TH

ST

BEAC

H 4

7TH

ST

BEAC

H 4

6TH

ST

BEAC

H 4

5TH

ST

BEAC

H 4

4TH

ST

BEAC

H 4

3RD

ST

N

New Facilities:

Rockaway Community Park

14

13121110

7654321

89

15

PlaygroundTurf FieldComfort Station and Park Kiosk $.75-1.25MSkate Plaza $.75-1.25MKayak Landing PointBBQ and Picnic AreasPierCricket Field (1)Soccer Field (1)Tennis Courts (4)Basketball Courts (3)Handball Courts (2)Gaming Area: Ping Pong, Shuffleboard (1)Restored WetlandsRestored Upland ForestPaved PathCommunity GardenWetland Boardwalk $400-600KRefurbished Comfort Station $400-600KAll costs are draft estimates for specific amenities only and do not account for other necessary infrastructure

1

2

3

4

5

6

7

8

9

11 1213

14

15

16

16

6

7

17

17

6

12 10

New Facilities:

1819

18

19

Total Park Cost: $25-28 M

Page 20: Rockaway Parks Conceptual Plan Community Board MeetingMar 24, 2014  · Broad Channel - American Park & Sunset Cove Bayside Nature Trail B 9th-B126th Boardwalk-Adjacent Area B 9th

ROCKAWAY PARKS CONCEPTUAL PLAN

Rockaway Community Park

Photomontage looking northwest at proposed new section of Rockaway CommunityPark. View taken from intersection of Beach 49th Street and Norton Drive.

Page 21: Rockaway Parks Conceptual Plan Community Board MeetingMar 24, 2014  · Broad Channel - American Park & Sunset Cove Bayside Nature Trail B 9th-B126th Boardwalk-Adjacent Area B 9th

ROCKAWAY PARKS CONCEPTUAL PLAN

N

New Facilities:

Rockaway Community Park

Mosquito Magnets New Facilities:

Page 22: Rockaway Parks Conceptual Plan Community Board MeetingMar 24, 2014  · Broad Channel - American Park & Sunset Cove Bayside Nature Trail B 9th-B126th Boardwalk-Adjacent Area B 9th

ROCKAWAY PARKS CONCEPTUAL PLAN

THURSBY AVE

ELIZABETH RD

BEAC

H 6

3RD

STR

EET

BEAC

H 6

2ND

STR

EET

New Facilities:

Thursby Basin Park

4321 Comfort Station

Shade StructuresAdult Fitness AreaPlaygroundBBQ AreaWaterfront Seating

Open LawnRain GardenRiparian Planting/RiprapLawnBermed Lawn

7

65

8

1

2

3

4 5 67

8

2

N

9

9

10

10

11

11

Park Cost: $8-10M

Page 23: Rockaway Parks Conceptual Plan Community Board MeetingMar 24, 2014  · Broad Channel - American Park & Sunset Cove Bayside Nature Trail B 9th-B126th Boardwalk-Adjacent Area B 9th

ROCKAWAY PARKS CONCEPTUAL PLAN

Thursby Basin Park

Photomontage looking east from proposed from proposed picnic area towards the Thursby Basin Waterfront with Rockaway Community Park across the water in the distance.

Page 24: Rockaway Parks Conceptual Plan Community Board MeetingMar 24, 2014  · Broad Channel - American Park & Sunset Cove Bayside Nature Trail B 9th-B126th Boardwalk-Adjacent Area B 9th

ROCKAWAY PARKS CONCEPTUAL PLAN

BEACH CHANNEL DR

BEAC

H 8

9TH

ST

BEAC

H 8

8TH

ST

OLD B

EACH

88T

H ST

BEAC

H 87T

H ST

New Facilities:

Beach 88th Street Park

Comfort Station Kayak StorageBeach with Kayak LaunchShade StructuresPier

Picnic and BBQOpen LawnPlaygroundOyster ReefRestored WetlandsUpland Riparian Zone

Improved Crossing (DOT to review)

321

4

76

5

8

12

34

5

6

78 4

N

910

9 10

11

11

12

12 1212

Park Cost: $7-8M

Page 25: Rockaway Parks Conceptual Plan Community Board MeetingMar 24, 2014  · Broad Channel - American Park & Sunset Cove Bayside Nature Trail B 9th-B126th Boardwalk-Adjacent Area B 9th

ROCKAWAY PARKS CONCEPTUAL PLAN

Beach 88th Street Park

Photomontage looking northwest from proposed kayak launch towards new fishing pier.(Rendering will be updated to refelct existing DEP infrastructure)

Page 26: Rockaway Parks Conceptual Plan Community Board MeetingMar 24, 2014  · Broad Channel - American Park & Sunset Cove Bayside Nature Trail B 9th-B126th Boardwalk-Adjacent Area B 9th

ROCKAWAY PARKS CONCEPTUAL PLAN

BEACH CHANNEL DRIVE

BEACH 108TH

STREET

WA

INW

RIGH

T CT.

BENCH16’-0” ESPLANADE

PLANTING AREA

POSSIBLEFERRY PIER

ARRIVALPLAZA

NATIONAL GRID PROPERTY

FEBRUARY 6th, 2014

BEACH 108TH STREET ESPLANADEN

0 80’40’

New Facilities:Park Cost: to be Funded by National Grid

Beach 108th Esplanade

EsplanadeLandscape BufferPossible Ferry Pier

1

12

2

N

3

3

Page 27: Rockaway Parks Conceptual Plan Community Board MeetingMar 24, 2014  · Broad Channel - American Park & Sunset Cove Bayside Nature Trail B 9th-B126th Boardwalk-Adjacent Area B 9th

ROCKAWAY PARKS CONCEPTUAL PLAN

Beach 108th Esplanade

Potential Ferry Landing Jamaica Bay

Seating

Railing

New Bulkhead by EDC

Beach Channel Dr

Sidewalk LandscapeBuffer

Esplanade

Page 28: Rockaway Parks Conceptual Plan Community Board MeetingMar 24, 2014  · Broad Channel - American Park & Sunset Cove Bayside Nature Trail B 9th-B126th Boardwalk-Adjacent Area B 9th

ROCKAWAY PARKS CONCEPTUAL PLAN

Broad Channel - American Park & Sunset CoveKey Features:

1

2

34

7

5

6

8

9

101112131415161718

19

Oyster Revetment Installation (NY Rising)Salt Marsh Habitat Restoration

Location of Possible Community CenterPark Entrance from Cross Bay Blvd

Elevated Comfort Station & Field HousePrimary Walking/Jogging Path

Access for Canoes & Kayaks

For future discussion with the Broad Channel Civic Association, next meeting on March 27th

Scrub-Shrub Forest TrailStormwater Bio-swales

Upgraded Parking Lot

Tot LotMulti-purpose FieldNature Path on NPS LandSkate FeaturesShade StructureBaseball Field (Upgraded)Baseball Field (Existing)Beach NourishmentDesignated Fishing Zone

Page 29: Rockaway Parks Conceptual Plan Community Board MeetingMar 24, 2014  · Broad Channel - American Park & Sunset Cove Bayside Nature Trail B 9th-B126th Boardwalk-Adjacent Area B 9th

ROCKAWAY PARKS CONCEPTUAL PLAN

REGIONAL OPPORTUNITIES

8. Bayside Nature Trail

9. Boardwalk-Adjacent Area

a. Eastern B 9th Seating and Play Area (Unbuilt PlaNYC Park)

b. B 20th Overlook (Unbuilt PlaNYC Park)

c. B 26th-27th Park Area (Unbuilt PlaNYC Park)

Page 30: Rockaway Parks Conceptual Plan Community Board MeetingMar 24, 2014  · Broad Channel - American Park & Sunset Cove Bayside Nature Trail B 9th-B126th Boardwalk-Adjacent Area B 9th

ROCKAWAY PARKS CONCEPTUAL PLAN

Hiking/Nature Trail

Bird Blind

Fishing Access

Street-End Park

Kayak/Canoe Launch

Existing PathProposed Path on DPR PropertyProposed Mountain Bike PathPotential Path in other Publicly Owned LandPotential Connections through StreetsSubway Station

NYC DPROWNER TYPE

Other Publicly Owned

Existing PathProposed Path on DPR PropertyProposed Mountain Bike PathPotential Path in other Publicly Owned LandPotential Connections through StreetsSubway Station

NYC DPROWNER TYPE

Other Publicly Owned

3.61mi2.44mi

Existing Path: Proposed Path:

ROCKAWAY PARKS CONCEPTUAL PLAN Bayside Nature Trail

N

STREETEND

Park Cost: $5-6MBayside Nature Trail

Page 31: Rockaway Parks Conceptual Plan Community Board MeetingMar 24, 2014  · Broad Channel - American Park & Sunset Cove Bayside Nature Trail B 9th-B126th Boardwalk-Adjacent Area B 9th

ROCKAWAY PARKS CONCEPTUAL PLAN

Kayak/Canoe Launch

Bayside Nature Trail

Trail Bayswater Park

Kayak Launch

Page 32: Rockaway Parks Conceptual Plan Community Board MeetingMar 24, 2014  · Broad Channel - American Park & Sunset Cove Bayside Nature Trail B 9th-B126th Boardwalk-Adjacent Area B 9th

ROCKAWAY PARKS CONCEPTUAL PLAN

Hiking/Nature Trail Street-End Park

Sidewalk Sidewalk Ocean Bay Apartments

StreetTrail

Raised Berm

Bayside Nature Trail

Page 33: Rockaway Parks Conceptual Plan Community Board MeetingMar 24, 2014  · Broad Channel - American Park & Sunset Cove Bayside Nature Trail B 9th-B126th Boardwalk-Adjacent Area B 9th

ROCKAWAY PARKS CONCEPTUAL PLAN

Bayside Nature Trail

Photomontage looking south to the proposed Bayside Nature Trail in Rockaway Community Park along Beach 58th Street and Thursby Basin.

Page 34: Rockaway Parks Conceptual Plan Community Board MeetingMar 24, 2014  · Broad Channel - American Park & Sunset Cove Bayside Nature Trail B 9th-B126th Boardwalk-Adjacent Area B 9th

ROCKAWAY PARKS CONCEPTUAL PLAN

B 9th St.

B 17th S

t.

B 19th S

t.

B 26th St.

B 27th St.

Pedestrian Way

Seagirt Blvd

B 20th Overlook B 9th Seating/Play AreaB 26th-27thCost: $2.7MCost: $1.3M Cost: $2.6M

Eastern Boardwalk Adjacent Park Opportunities

Page 35: Rockaway Parks Conceptual Plan Community Board MeetingMar 24, 2014  · Broad Channel - American Park & Sunset Cove Bayside Nature Trail B 9th-B126th Boardwalk-Adjacent Area B 9th

ROCKAWAY PARKS CONCEPTUAL PLAN

NEXT STEPSCLOSINGREMARKS

• Complete the Conceptual Plan• Revise Plan based on community feedback• Brief stakeholders• Release Final Report in Spring 2014

• Secure Funding for Implementation• The Conceptual Plan will be implemented in phases as funds are secured• Final Plan will identify funding needs for various components of the Plan• We look forward to your participation in making this project a reality

• Design and Construct Projects

Page 36: Rockaway Parks Conceptual Plan Community Board MeetingMar 24, 2014  · Broad Channel - American Park & Sunset Cove Bayside Nature Trail B 9th-B126th Boardwalk-Adjacent Area B 9th

ROCKAWAY PARKS CONCEPTUAL PLAN

NEXT STEPS

• Blow-up concept designs for each site will be available for viewing at tables

• We would like to hear your feedback on designs and priority of sites

• In addition, you can email your comments to: [email protected]

• Please submit all comments by Friday, March 28th