romanian wind energy developer private/data room... · 1 general presentation1. general...

16
+ ROMANIAN WIND ENERGY DEVELOPER BETA WIND PROJECT GENERAL INFORMATION

Upload: others

Post on 27-May-2020

5 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: ROMANIAN WIND ENERGY DEVELOPER private/Data Room... · 1 General Presentation1. General Presentation IMA Partners IMA Partners is a 100% Romanian Share Capital. The activities of

+

ROMANIAN WIND ENERGY DEVELOPER

BETA WIND PROJECT GENERAL INFORMATION

Page 2: ROMANIAN WIND ENERGY DEVELOPER private/Data Room... · 1 General Presentation1. General Presentation IMA Partners IMA Partners is a 100% Romanian Share Capital. The activities of

+I Wind Project PresentationI. Wind Project PresentationIndex

1. General Presentation – IMA Partners

2 B t Wi d P j t P j t T 2. Beta Wind Project – Project Teaser

3. Beta Wind Project – General Description

4. Beta Wind Project – Cluster Basic Information

5. Beta Wind Project – Wind Information

6. Beta Wind Project – Construction Key Elements

7. Beta Wind Project – Project Licensing Status

8. IMA Partners Contact List

Page 3: ROMANIAN WIND ENERGY DEVELOPER private/Data Room... · 1 General Presentation1. General Presentation IMA Partners IMA Partners is a 100% Romanian Share Capital. The activities of

+1 General Presentation1. General PresentationIMA Partners

IMA Partners is a 100% Romanian Share Capital.

The activities of Wind Energy Development has started in 2006 with the The activities of Wind Energy Development has started in 2006 with the Casimcea Project.

The Main role of IMA Partners is to carry out the Project Development until the Ready-to-build stage as Project ManagersReady-to-build stage, as Project Managers.

IMA Partners has developed a strong competence in dealing in a professional manner with the Authorities in the Wind Park development stages (Local Councils ANRE Transelectrica etc)Councils, ANRE, Transelectrica, etc).

IMA Partners has created “in house” the needed competences to manage the development of Wind Projects, such as Alpha Wind 150MW; CAS Regenerabile Project 50MW; Beta Wind 232MW; Moldova Project 224MW and an additional Project 50MW; Beta Wind 232MW; Moldova Project 224MW and an additional capacity in Dobrogea of 100MW.

IMA Partners was able to put together a strong group of suppliers and designers, to help the successful development of the Wind Parks. designers, to help the successful development of the Wind Parks.

Page 4: ROMANIAN WIND ENERGY DEVELOPER private/Data Room... · 1 General Presentation1. General Presentation IMA Partners IMA Partners is a 100% Romanian Share Capital. The activities of

+1 General Presentation 1. General Presentation Project Teaser- Dobrogea

Dobrogea is one of the most windy place in Romania…

…It can reach average wind speeds of 8 m/s  at 100m.

Under Development Projects

Project Region Installed Capacity

CAS Regenerabile Tulcea 50MW

Alpha Wind Tulcea 150MW

Beta Wind Tulcea 232MW

Moldavia Iasi 224MW

IMA Partner is developing wind power projects inRomania since 2005 and has already TCP for 600MW inDobrogea Area…

Moldavia Iasi 224MW……and recently got a new ATR for an additional

capacity of 100MW.

Page 5: ROMANIAN WIND ENERGY DEVELOPER private/Data Room... · 1 General Presentation1. General Presentation IMA Partners IMA Partners is a 100% Romanian Share Capital. The activities of

+2 BETA Wind Project 2. BETA Wind Project Project Teaser

BETA WIND PROJECT OVERVIEWThe Beta Wind Project has secured

The Beta Project has a total Capacity of 323MW and it’s is divided in several Clusters, located near two villages in the Dobrogea Region, Casimcea and Topolog;

enough plots for all turbines.

The Project

Project was divided in more than 6 Sub-Projects (Clusters);

Clusters from 7 to 32 Wind Turbines;

NO objections on the Environmental Approval Process;

Construction ready to start in 2010;

Operational Summary

jlocation is one of the Best in Dobrogea Region…

BETA WIND DEVELOPMENT PLAN

y ;

First Operation expected for 4thQ 2011.

Project life: 25 years

Average Winds > 7 2m/s @HH

All Main Development actions are ongoing:

• Wind Turbine and Main equipment under analysis; • 400kV Substation Tender to be finalized in November

Average Winds > 7,2m/s @HH

Capacity factor Around 30%

2010 • Electrical design (cables, 110 Substations) partially

finalized; • Preliminary design for 30kV Park Cabling and 110kV

Cable connection ready; Cable connection ready; • Balance of Plant Projects ongoing;• Connection Contract signed.

Page 6: ROMANIAN WIND ENERGY DEVELOPER private/Data Room... · 1 General Presentation1. General Presentation IMA Partners IMA Partners is a 100% Romanian Share Capital. The activities of

+3 BETA Wind Project3. BETA Wind ProjectBeta Project – General Description

General Description Location Description:

• Altitude: 170m - 250mAltitude: 170m 250m• Surface area: 700 ha (Total Beta Project)• Orography: Small hills and high flats with a North-South orientation• Land Use: Agriculture Lands• Accessibility: National Road and other accesses• Surrounding Landscape: Pasture and low height crops.g p g p

Key Topics:

• Beta Wind has superficies rights with private companies (no Public Lands);• The site is a composed by high level terraces, with moderate slopes;p y g p• Most of the lands are used for continuous agriculture;• Houses and Villages are more than 500m from the Clusters.

North East South

Page 7: ROMANIAN WIND ENERGY DEVELOPER private/Data Room... · 1 General Presentation1. General Presentation IMA Partners IMA Partners is a 100% Romanian Share Capital. The activities of

+4 BETA Wind Project4. BETA Wind ProjectBeta North 1 Cluster

Project Basic InfoAll the licensing procedures are advancing at a good pace...

Permitting Procedure

Ongoing

N. of WEC’s 21

Wind Speeds 7 2 @80mWind Speeds ~ 7,2 @80m

Capacity Factor ~30%

RTB Expected 2nd Q 2011

…we expect to reach the Ready-to-Build stage for the entire Beta Wind P j t d i 2011

MILESTONES

Development Construction Operation

Project during 2011.

ProjectWF Construction

LicenseInterconnection Lines Construction License

Start of Civil Works

Start ofErection

FirstOperation

Beta North 1 1st Q 2011 (E) 1st Q 2011 (E) 2011 (E) 3rd Q 2011 (E) 1st Q 2012 (E)Beta North 1 1st Q 2011 (E) 1st Q 2011 (E) 2011 (E) 3 d Q – 2011 (E) 1st Q – 2012 (E)

Page 8: ROMANIAN WIND ENERGY DEVELOPER private/Data Room... · 1 General Presentation1. General Presentation IMA Partners IMA Partners is a 100% Romanian Share Capital. The activities of

+4 BETA Wind Project4. BETA Wind ProjectBeta North 2 Cluster

Project Basic InfoAll the licensing procedures are advancing at a good pace...

Permitting Procedure

Ongoing

N. of WEC’s 34

Wind Speeds 7 2 @80mWind Speeds ~7,2 @80m

Capacity Factor ~30%

RTB Expected 2nd Q 2011

…we expect to reach the Ready-to-Build stage for the entire Beta Wind P j t d i 2011

MILESTONES

Development Construction Operation

Project during 2011.

ProjectWF Construction

LicenseInterconnection Lines Construction License

Start of Civil Works

Start ofErection

FirstOperation

Beta North 2 1st Q 2011 (E) 1st Q 2011 (E) 2011 (E) 3rd Q 2011 (E) 1st Q 2012 (E)Beta North 2 1st Q 2011 (E) 1st Q 2011 (E) 2011 (E) 3 d Q – 2011 (E) 1st Q – 2012 (E)

Page 9: ROMANIAN WIND ENERGY DEVELOPER private/Data Room... · 1 General Presentation1. General Presentation IMA Partners IMA Partners is a 100% Romanian Share Capital. The activities of

+4 BETA Wind Project4. BETA Wind ProjectBeta North 3 Cluster

Project Basic InfoAll the licensing procedures are advancing at a good pace...

Permitting Procedure

Ongoing

N. of WEC’s 7

Wind Speeds 7 2 @80mWind Speeds ~7,2 @80m

Capacity Factor ~30%

RTB Expected 2nd Q 2011

…we expect to reach the Ready-to-Build stage for the entire Beta Wind P j t d i 2011

MILESTONES

Development Construction Operation

Project during 2011.

ProjectWF Construction

LicenseInterconnection Lines Construction License

Start of Civil Works

Start ofErection

FirstOperation

Beta North 3 2nd Q 2011 (E) 1st Q 2011 (E) 2011 (E) 3rd Q 2011 (E) 1st Q 2012 (E)Beta North 3 2 d Q 2011 (E) 1st Q 2011 (E) 2011 (E) 3 d Q – 2011 (E) 1st Q – 2012 (E)

Page 10: ROMANIAN WIND ENERGY DEVELOPER private/Data Room... · 1 General Presentation1. General Presentation IMA Partners IMA Partners is a 100% Romanian Share Capital. The activities of

+4 BETA Wind Project4. BETA Wind ProjectBeta South 1Cluster

Project Basic InfoAll the licensing procedures are advancing at a good pace...

Permitting Procedure

Ongoing

N. of WEC’s 12

Wind Speeds 7 2 @80mWind Speeds ~7,2 @80m

Capacity Factor ~30%

RTB Expected 2nd Q 2011

…we expect to reach the Ready-to-Build stage for the entire Beta Wind P j t d i 2011

MILESTONES

Development Construction Operation

Project during 2011.

ProjectWF Construction

LicenseInterconnection Lines Construction License

Start of Civil Works

Start ofErection

FirstOperation

Beta South 1 2nd Q 2011 (E) 1st Q 2011 (E) 2011 (E) 3rd Q 2011 (E) 1st Q 2012 (E)Beta South 1 2 d Q 2011 (E) 1st Q 2011 (E) 2011 (E) 3 d Q – 2011 (E) 1st Q – 2012 (E)

Page 11: ROMANIAN WIND ENERGY DEVELOPER private/Data Room... · 1 General Presentation1. General Presentation IMA Partners IMA Partners is a 100% Romanian Share Capital. The activities of

+4 BETA Wind Project4. BETA Wind ProjectBeta South 2 Cluster

Project Basic InfoAll the licensing procedures are advancing at a good pace...

Permitting Procedure

Ongoing

N. of WEC’s 12

Wind Speeds 7 2 @80mWind Speeds ~7,2 @80m

Capacity Factor ~30%

RTB Expected 2nd Q 2011

…we expect to reach the Ready-to-Build stage for the entire Beta Wind P j t d i 2011

MILESTONES

Development Construction Operation

Project during 2011.

ProjectWF Construction

LicenseInterconnection Lines Construction License

Start of Civil Works

Start ofErection

FirstOperation

Beta South 2 1st Q 2011 (E) 1st Q 2011 (E) 2011 (E) 3rd Q 2011 (E) 1st Q 2012 (E)Beta South 2 1st Q 2011 (E) 1st Q 2011 (E) 2011 (E) 3 d Q – 2011 (E) 1st Q – 2012 (E)

Page 12: ROMANIAN WIND ENERGY DEVELOPER private/Data Room... · 1 General Presentation1. General Presentation IMA Partners IMA Partners is a 100% Romanian Share Capital. The activities of

+4 BETA Wind Project4. BETA Wind ProjectBeta South 3 Cluster

Project Basic InfoAll the licensing procedures are advancing at a good pace...

Permitting Procedure

Ongoing

N. of WEC’s 11

Wind Speeds 7 2 @80mWind Speeds ~7,2 @80m

Capacity Factor ~30%

RTB Expected 1st Q 2011…The Beta South 3 Cluster has already

bt i d th B ildi

MILESTONES

Development Construction Operation

obtained the Building Permit.

ProjectWF Construction

LicenseInterconnection Lines Construction License

Start of Civil Works

Start ofErection

FirstOperation

Beta South 3 Done 1st Q 2011 (E) 2011 (E) 3rd Q 2011 (E) 1st Q 2012 (E)Beta South 3 Done 1st Q 2011 (E) 2011 (E) 3 d Q – 2011 (E) 1st Q – 2012 (E)

Page 13: ROMANIAN WIND ENERGY DEVELOPER private/Data Room... · 1 General Presentation1. General Presentation IMA Partners IMA Partners is a 100% Romanian Share Capital. The activities of

+5 BETA Wind Project 5. BETA Wind Project Wind Information

WIND STUDIESThe Wind Measurement has been conducted by

In cooperation with its partners, IMA Partners has conducted wind measurements for the Beta Project since 2008:

a highly experienced international company …..

• Wind Studies and data processing, done by a experience Austrian company – Energiewerkstatt;

• The P50 Capacity Factor is expected to raise above 30%;

• The expected equivalent hours will be around the 2750h NETT with the existing turbines

• The measurements were conducted for more than 2 complete years;

The Project location is considered to have the best

WIND MEASUREMENTS

p y ;

• A new 100m Measurement Antenna will be erected in November 2010;

• Cooperation with others Developers for Wind Data acquisition.

have the best wind speeds in Dobrogea Region…

All Equipments used, comes from known Manufactures:

• 40m Tower will NRG Equipments;F ll C lib i f h A d Wi d • Full Calibration of the Anemometers and Wind Vanes;

• New 100m Tower with Thies Clima Equipment ;• Highly experience company for Wind analysis.

Page 14: ROMANIAN WIND ENERGY DEVELOPER private/Data Room... · 1 General Presentation1. General Presentation IMA Partners IMA Partners is a 100% Romanian Share Capital. The activities of

+6 BETA Wind Project 6. BETA Wind Project Construction Key Elements

SITE CONSTRUCTIONIMA Partners, has worked in close relation with experienced

Using experienced designers on the Romanian Market, the Beta Project has already all preliminary designs:

consultants and designers for the Beta Project…..

….. the BoP stage

• Roads will be built using the agriculture servitude roads and private lands;

• Big size Turbines used on road design and Building Permit approvals;

• Wind Farm Cabling using private lands and agriculture servitude roads;

• Several large storage areas (100x150m) to simplify the building, assembly and commissioning ghas already attracted several international companies for the electrical and civil

BOP MAIN ELEMENTS

g g ( ) p y g, y gstage;

• 400kV Substation Tender to be finalized in Nov. 2010

electrical and civil works. Several General Contractors have showed their

interest:

• Geotechnical Studies carried out in several areas;;

• Roads design for Cluster Beta South 3 complete;• 30kV Wind Farm Cabling, Intermediary

Substations and 110kV Cable design by ISPE.

Page 15: ROMANIAN WIND ENERGY DEVELOPER private/Data Room... · 1 General Presentation1. General Presentation IMA Partners IMA Partners is a 100% Romanian Share Capital. The activities of

+7 BETA Wind Project 7. BETA Wind Project Project Licensing Status

Stage DescriptionBeta North 1 Beta North II Beta North 1II

Beta South1 Beta South I1 Beta South II1 New Clusters

City Planning Certificate Concluded Concluded Concluded Concluded Concluded ConcludedOngoing / Concluded

Environmental Approval for Zoning (PUZ)

4thQ - 2010 4thQ – 2010 1stQ – 2011 1stQ – 2011 Concluded Concluded Ongoing

Zoning Approval (PUZ) 1stQ – 2011 1stQ – 2011 1stQ – 2011 1stQ – 2011 Q4-2010 Concluded4th Q 2010 to 3rdQ – 2011

Environmental Approval for Construction

1stQ – 2011 1stQ – 2011 1stQ - 2011 1stQ – 2011 1stQ - 2011 Concluded4th Q 2010 to 3rdQ – 2011

Building Permit 1stQ - 2011 1stQ – 2011 2ndQ – 2011 2ndQ – 2011 1stQ – 2011 Concluded4th Q 2010 to 3rdQ – 2011

Technical Permit of Connection

Concluded Concluded Concluded Concluded Concluded Concluded Concluded

Connection Contract Concluded Concluded Concluded Concluded Concluded Concluded End 2010

Investor Investor Investor Investor Investor Investor InvestorSet-up Authorization

InvestorResponsibility

InvestorResponsibility

InvestorResponsibility

InvestorResponsibility

InvestorResponsibility

InvestorResponsibility

InvestorResponsibility

NOTE: (1)Several Positions for the new 100MW capacity can be used from buffer positions on other Clusters therefore their licensing status are very advanced. (2) The above deadlines assume the selection of the turbines is final. Any changes of turbines determine up to 2 months delay.turbines determine up to 2 months delay.

Page 16: ROMANIAN WIND ENERGY DEVELOPER private/Data Room... · 1 General Presentation1. General Presentation IMA Partners IMA Partners is a 100% Romanian Share Capital. The activities of

+8 IMA Partners Contact List8. IMA Partners Contact List

MARIUS ILIEV

Managing DirectorTel : : +4 031 425 1935

Nuno Costa AlemãoSenior Technical AdviserTel: +4 031 425 1935Tel.: : +4 031 425 1935

Mob.: +4 072 230 7400Email: [email protected]

Tel: +4 031 425 1935Mob.: +4 073 532 2222Email: [email protected]

A d i RAndrei RapeanuProject ManagerTel: +4 031 425 1935Mob.: +4 073 502 2222Email: andrei rapeanu@imapartners roEmail: [email protected]