route 50 widening design/build project · route 50 widening design/build project pd o d tm tipardon...

12
Route 50 Widening Route 50 Widening Design/Build Project Design/Build Project P d O D tM ti Pardon Our Dust Meeting J ne 28 2012 J ne 28 2012 June 28, 2012 June 28, 2012 6:00 PM 6:00 PM

Upload: tranhanh

Post on 02-Jan-2019

227 views

Category:

Documents


0 download

TRANSCRIPT

Route 50 WideningRoute 50 WideningDesign/Build ProjectDesign/Build Project

P d O D t M tiPardon Our Dust Meeting

J ne 28 2012J ne 28 2012June 28, 2012June 28, 20126:00 PM6:00 PM

The Project TeamThe Project TeamThe Project TeamThe Project Team

Virginia Department of Transportation Shirley Contracting Company Dewberry Fairfax and Loudoun Counties

2

Tonight’s ObjectivesTonight’s ObjectivesTonight s ObjectivesTonight s Objectives

P id O i f th P j tP id O i f th P j t Provide an Overview of the ProjectProvide an Overview of the Project Discuss the Project ScheduleDiscuss the Project Schedule Describe 2012 Construction ActivitiesDescribe 2012 Construction Activities Answer Your QuestionsAnswer Your Questions Answer Your QuestionsAnswer Your Questions

3

Major Design FeaturesMajor Design FeaturesMajor Design FeaturesMajor Design Features

Ultimate Six Lane RoadwayUltimate Six Lane Roadway

Signals at Poland Rd, Tall Cedars Pkwy, Signals at Poland Rd, Tall Cedars Pkwy, Both Pleasant Valley Both Pleasant Valley RdsRds, Stonecroft Blvd, , Stonecroft Blvd, A i Pk d L RdA i Pk d L RdAvion Pkwy and Lee RdAvion Pkwy and Lee Rd

Paved 10’ Wide Shared Use Path on North Paved 10’ Wide Shared Use Path on North and South Sidesand South Sidesand South Sidesand South Sides

New Bridges Over Cub RunNew Bridges Over Cub Run

Complete Reconstruction of All PavementComplete Reconstruction of All Pavement

4

Project ScheduleProject Schedule

M 2011 Ki k Off D i /B ild

Project ScheduleProject Schedule

May 2011 Kick-Off to Design/Build

Fall 2011 Complete Design, Obtain PermitsPermits

September 2011 Begin Construction – Stage 1

Dec 2011- Fall 2012 Right-of-way Acquisitions

Summer 2012 - Fall 2013 Utility Relocations

December 2014 Construction Complete

5

Construction SequenceConstruction SequenceStages 1, 2 & 3Stages 1, 2 & 3

6

Construction SequenceConstruction SequenceStages 4 & 5Stages 4 & 5

7

2012 Construction Season2012 Construction SeasonRightRight--ofof--way way

AcquisitionsAcquisitionsAcquisitionsAcquisitions

Utility Relocations Utility Relocations along WB Lanesalong WB Lanesalong WB Lanesalong WB Lanes

8

2012 Construction Season2012 Construction Season

Temporary Bridge Temporary Bridge

Permanent Permanent Permanent Permanent Construction of EB Construction of EB Lanes between Lanes between Poland Road and Poland Road and Poland Road and Poland Road and Stonecroft BlvdStonecroft Blvd

Permanent EB BridgePermanent EB Bridge

9

Upcoming Traffic Changesp g g

Early JulyEarly July–– Shift WB Route 50 Between Shift WB Route 50 Between y yy yStonecroft and Pleasant Valley (Fairfax)Stonecroft and Pleasant Valley (Fairfax)

Mid July Mid July –– Shift EB Route 50 Between Shift EB Route 50 Between S f d Pl V ll (F i f )S f d Pl V ll (F i f )Stonecroft and Pleasant Valley (Fairfax)Stonecroft and Pleasant Valley (Fairfax)

Fall 2012 Fall 2012 -- Shift EB and WB Traffic to new Shift EB and WB Traffic to new EB lanes between Poland Rd and Pleasant EB lanes between Poland Rd and Pleasant EB lanes between Poland Rd and Pleasant EB lanes between Poland Rd and Pleasant Valley (Fairfax)Valley (Fairfax)

By Early 2013 By Early 2013 –– Shift EB and WB from Shift EB and WB from By Early 2013 By Early 2013 –– Shift EB and WB from Shift EB and WB from Pleasant Valley (Fairfax) to StonecroftPleasant Valley (Fairfax) to Stonecroft

10

Public Communication of U i T ffi ChUpcoming Traffic Changes

VDOT to Send Press Release for Major VDOT to Send Press Release for Major VDOT to Send Press Release for Major VDOT to Send Press Release for Major ShiftsShifts

Notices will be provided to Supervisors / Notices will be provided to Supervisors / Notices will be provided to Supervisors / Notices will be provided to Supervisors / DelegatesDelegates

Notices will be distributed to Email Notices will be distributed to Email Notices will be distributed to Email Notices will be distributed to Email distribution listdistribution list

Fire, Rescue, and schools notifiedFire, Rescue, and schools notified, ,, ,

Variable Message Boards will be placed Variable Message Boards will be placed one week in advanceone week in advance

11

For More Information About Route For More Information About Route 50 Widening Project:50 Widening Project:

http://www.virginiadot.org/projects/northernvirginia/route_50_widening.asp

(this webpage will be updated throughout the project development)( p g p g p j p )

O G l “R t 50 Wid i ”Or Google: “Route 50 Widening”

Questions and AnswersQuestions and Answers12