rubbish free lunch day project

16
BBISH FREE LUNCH DAY PROJE BBISH FREE LUNCH DAY PROJE BBISH FREE LUNCH DAY PROJE

Upload: ronat

Post on 23-Feb-2016

43 views

Category:

Documents


0 download

DESCRIPTION

Rubbish free lunch day project. RUBBISH FREE LUNCH DAY PROJECT. RUBBISH FREE LUNCH DAY PROJECT. BEFORE RUBBISH. THIS PIE GRAPH SHOWS THAT GRADE PREP AND GRADE 1 HAD THE LEAST AMOUNT OF RUBBISH. IT ALSO SHOWS THAT GRADE 2 HAD THE MOST AMOUNT OF RUBBISH. - PowerPoint PPT Presentation

TRANSCRIPT

Page 1: Rubbish free lunch day project

RUBBISH FREE LUNCH DAY PROJECTRUBBISH FREE LUNCH DAY PROJECTRUBBISH FREE LUNCH DAY PROJECT

Page 2: Rubbish free lunch day project

BEFORE RUBBISH

Page 3: Rubbish free lunch day project

THIS PIE GRAPH SHOWS THAT GRADE PREP AND GRADE 1 HAD THE LEAST AMOUNT OF RUBBISH.IT ALSO SHOWS THAT GRADE 2 HAD THE MOST AMOUNT OF RUBBISH.THIS PIE GRAPH SHOWS THAT THE SENIOR KIDS JOINED TOGETHER HAD MORE RUBBISH THEN THE JUNIOR KIDS JOINED TOGETHER. I THINK THAT THE SENIOR KIDS JOINED TOGETHER HAD MORE RUBBISH THEN THE JUNIOR KIDS JOINED TOGETHER BECAUSE WE GET A CHOICE OF WHAT WE BRING TO SCHOOL AND THE JUNIOR KIDS DONT HAVE A CHOICE

Page 4: Rubbish free lunch day project

BEFORE RECYCLING

Page 5: Rubbish free lunch day project

THIS PIE GRAPH SHOWS THAT GRADE 3 AND GRADE 5/6 HAD THE LEAST AMOUNT OF RECYCLING AND THE GRADE PREP HAD THE MOST AMOUNT OF RECYCLING.THIS PIE GRAPH SHOWS THAT THE JUNIOR KIDS HAD MORE RECYCLING THEN THE SENIOR KIDS.I THINK THAT IS BECAUSE THE JUNIOR KIDS MUM’S AND DAD’S HAVE MORE CONTROLE OVER THEM AND THE SENIOR KIDS HAVE MORE FREEDEM.

Page 6: Rubbish free lunch day project

Grade Prep Grade 1 Grade 2 Grade 3 Grade 4/5 Grade 5/60

50

100

150

200

250

300

Total Recycle (grams)Total Rubbish (grams)

THIS GRAPH SHOWS THAT THE GRADE 2 HAD THE MOST AMOUNT OF RUBBISH AND THE GRADE PREP AND THE GRADE 1 HAD THE LEAST AMOUNT OF RUBBISH.THIS GRAPH ALSO SHOWS THAT GRADE’S 3 AND 5/6 HAD THE LEAST AMOUNT OF RECYCLIG AND THE GRADE PREP HAD THE MOST AMOUNT OF RECYCLING.

Page 7: Rubbish free lunch day project

AFTER RUBBISH

Page 8: Rubbish free lunch day project

THIS PIE GRAPH SHOWS THAT THE GRADE 4/5 HAD THE M OST AMOUNT OF RUBBISH AND THAT THE GRADE 3 AND THE GRADE 5/6 HAD THE LEAST AMOUNT OF RUBBISH.I THINK THAT IS BECAUSE THE GRADE 3 AND THE GRADE 5/6 TEACHES HAVE TOLD US WHEN IT WAS GOING TO HAPPEN.

Page 9: Rubbish free lunch day project

AFTER RECYCLING

Page 10: Rubbish free lunch day project

THIS PIE GRAPH SHOWS THAT THE GRADE 2 HAD THE MOST AMOUNT OF RECYCLING AND THE GRADE 1 HAD THE LEAST AMOUNT OF RECYCLING. I THINK THAT IS BECAUSE THE GRADE 2 DID NOT REALLY NO WHAT WAS GOING ON.

Page 11: Rubbish free lunch day project

Grade Prep Grade 1 Grade 2 Grade 3 Grade 4/5 Grade 5/60

20

40

60

80

100

120

140

160

180

Total Recycle (grams)Total Rubbish (grams)

THIS GRAPH SHOWS THAT THE GRADE 4/5 HAD THE MOST AMOUNT OF RUBBISH AND THE GRADE 3 HAD THE LEAST AMOUNT OF RUBBISH.THIS GRAPH ALSO SHOWS THAT THE GRADE 1 HAD THE LEAST AMOUNT OF RECYCLING AND THE GRADE 2 HAD THE MOST AMOUNT OF RECYCLING.

Page 12: Rubbish free lunch day project

CONCLUTION

Page 13: Rubbish free lunch day project

I THINK THAT THE RUBBISH FREE LUNCH DAY TASK WAS REALLY GOOD BECAUSE THE GRADE 5/6 CAME SECOND SO WAS A REALLY GOOD EFERT. OUR % WAS 12.94% AND WE FINNISHED OFF WITH 5% SO WE WHERE VERY PROUD OF OUR SELFS

Page 14: Rubbish free lunch day project

REFLECTION

Page 15: Rubbish free lunch day project

I THINK THIS WAS A SUCSESS BECAUSE WE MANEGED TO GET PEOPLE TO BRING LESS RUBBISH AND RECYCLING.BUT IT WAS AMAZING TO SEE HOW MUCH RUBBISH AND RECYCLING PEOPLE DID BRING.MR COLBERT’S GRADE NEEDS TO IMPROVE BECAUSE THEY HAD THE MOST ANOUNT OF RUBBISH AND REDUSED IT BY THE LEAST.IT WAS REALLY HARD TO DO IT MYSELF BUT I MANEGED WITHOUT MY PARTNER BEING HERE.I THINK MISS B’S CLASS WON BECAUSE SHE ORGANISED THE HOLE THING AND SHE WOULD OF STUCK IT IN THERE HEADS NOT TO BRING ANY RUBBISH. BUT OTHER THEN THAT IT WAS A FUN EXPIRENCE

Page 16: Rubbish free lunch day project

THE END