russia’s reliable gas supplies to europe: challenges & … · 2008. 11. 12. · belarus...
TRANSCRIPT
Dr. Andrei Konoplyanik,Deputy Secretary General, Energy Charter Secretariat
Presentation at the UNECE Round Table on “Securing reliable natural gas supply in the context of sustainable development in the UNECE region”,
23 January, 2007, UNECE, Geneva
RUSSIA’S RELIABLE GAS SUPPLIES TO EUROPE: CHALLENGES & RISKS AND THE ENERGY
CHARTER’S ROLE
1. Historical structure of Soviet/Russian gas supplies to EU
2. New challenges and risks3. New risks 1: EU related4. New risks 2: CIS related
4.1. Gas export pricing & prices5. Energy Charter role
TABLE OF CONTENTS
www.encharter.org
• Long-term contracts• On-border (EU-15) sales/delivery points• Pricing: replacement value + net-back• Destination clauses• Transit
Soviet/Russian contractual gas export structure is based on Groningen LTC concept for Continental Europe
www.encharter.orgDr. A. Konoplianik, UNECE Round Table on Gas, 23.01.2007 - Figure 1
SOVIET / RUSSIAN GAS TO EUROPE:DEVELOPMENT OF CONTRACTUAL STRUCTURE
Barents Sea
North Sea
Yamal
Northern Lights
Wes
t Sib
e ria
- Bl
ue S
tream
Co n
nect
o r
Bratstvo(Brotherhood) Soyuz
FINLANDSWEDEN
NORWAY
GERMANY
FRANCE AUSTRIASWITZERLAND ROMANIA
KAZAKHSTANMOLDOVA
BELARUS
LITHUANIA
LATVIA
ESTONIA
POLAND
CZECH REP.SLOVAK REP.
HUNGARY
DENMARK
BELGIUM
UKNETHERLANDS
RUSSIA
RUSSIA
Moscow
HelsinkiStockholm
Minsk
Kiev
Warsaw
Murmansk
St. Petersburg
Arkhangelsk
Yelets
Ukhta
GreifswaldRostock
Lubeck
Ob
Gulf
Taz Gulf
Kara Sea
BalticSea
Yamal Peninsula
TorzhokVolga
Ob
Ur
al
s
M
ou
nt
ai
ns
UKRAINE
Yamal-1
Link
Existing Large-Diameter Pipeline
Planned Large-Diameter Pipeline
Producing Gas Field
Undeveloped Gas Field
Shtokmanovskoye field: to be developed as of 2007; may require
1-3 large-diameter pipelines
Yamal peninsula fields: to be developed after 2015; may requireup to 6-7 large-diameter pipelines
Zapolyarnoye field:Exploitation beganlate October 2001to supply gas for
“Blue Stream”
North Tran
sgas
Yamal-2 Orenburg
Karachaganak
Kharampur
Urengoy
Zapolyarnoye
Yamburg
Medvezh’ye
Shtokmanovskoye
NorwegianSea
АC B
Map source -IEA
RUSSIAN GAS EXPORT TO EUROPE: ON-BORDER SALES AND TRANSIT LEGS
Russian LTC to EU:A, B, C – points of change of ownership for gas and/or pipeline;C – delivery points to EU
www.encharter.orgDr. A. Konoplianik, UNECE Round Table on Gas, 23.01.2007 - Figure 2
1. Historical structure of Soviet/Russian gas supplies to EU
2. New challenges and risks3. New risks 1: EU related4. New risks 2: CIS related
4.1. Gas export pricing & prices5. Energy Charter role
TABLE OF CONTENTS
www.encharter.org
• Since 1991 – upstream to delivery points, within CIS/NIS = result of USSR dissolution => new transit risks
• Since 2002/03 – at delivery points (not at the market?); solution on destination clauses = package deal => but: e.g. TAG Dec’05 capacity allocation
• Since 2004/07 – upstream to delivery points, within enlarged EU-25/27 = combined result of EU expansion + EU gas market liberalization => new prospective transit/transportation risks
NEW RISKS FOR RUSSIA’S GAS SUPPLY TO EUROPE: WHICH, WHEN & WHERE
www.encharter.orgDr. A. Konoplianik, UNECE Round Table on Gas, 23.01.2007 - Figure 3
RussiaBelarusUkraineMoldova
PolandSlovakia
Czech Rep.HungaryRomaniaBulgaria
FRGAustriaGreece
FranceSwitzerland
ItalyTurkey
RF
USSR
COMECON
А
В
С
EC – 25/27
EC – 15
Italic – non-EU countries; New EU accession states: underlined –since 01.05.2004, underlined + italic – since 1.01.2007A, B, C – points of change of ownership for Russian gas and/or pipeline on its way to Europe
RUSSIAN GAS SUPPLIES TO EUROPE: ZONES OF NEW RISKS
New Risks 1 zone
New risks 2 zone
Direction of Russian gas flow to Europe
www.encharter.orgDr. A. Konoplianik, UNECE Round Table on Gas, 23.01.2007 - Figure 4
1. Historical structure of Soviet/Russian gas supplies to EU
2. New challenges and risks3. New risks 1: EU related4. New risks 2: CIS related
4.1. Gas export pricing & prices5. Energy Charter role
TABLE OF CONTENTS
www.encharter.org
• No transit of Russian gas inside EU up to May’2004 (EU-15)• Transit of Russian gas inside EU since May’2004 (EU-25) and
even more since Jan’2007 (EU-27)• Transit risks for imported Russian & other non-EU gas inside
EU:– Major elements of liberalization:
unbundling + TPA,– No clear transit rules for internal EU
gas market (domestic transportation = free flow of goods inside EU),
– Problem of contractual mismatch (long-term access to infrastructure for transit flows to match existing supply LTC)
New risks = combined result of unclear EU rules on gas transit through single member states plus + EU expansion => transitional risk of EU liberalization
Energy Charter role: draft TP + other gas/transit related activities …
NEW RISKS 1: EU RELATED (SINCE 2004)
www.encharter.orgDr. A. Konoplianik, UNECE Round Table on Gas, 23.01.2007 - Figure 5
CONTRACTUAL MISMATCH PROBLEM (CORRELATION IN DURATION (D) & VOLUME (V) OF LONG-TERM SUPPLY CONTRACT VS.
TRANSIT/TRANSPORTATION ARRANGEMENT)
www.encharter.org
Supply contract: D + V
Transportation contract: D + V
Transit contract: D + Vor Contractual
mismatch
Time
Mismatch between expiration dates & volumes of long term supply (delivery) contract and transit/transportation contract as integral part to fulfill the delivery contract creates a risk of non-renewal of transit/ transportation contract.Core issue: guarantee of access to adequate transportation capacity within the duration of existing (in force) delivery (supply) contract.
Dr. A. Konoplianik, UNECE Round Table on Gas, 23.01.2007 - Figure 6
1. Historical structure of Soviet/Russian gas supplies to EU
2. New challenges and risks3. New risks 1: EU related4. New risks 2: CIS related
4.1. Gas export pricing & prices5. Energy Charter role
TABLE OF CONTENTS
www.encharter.org
• Earlier structure : – Barter deals – Political & friendly pricing– Transportation system – not transit system– No transit within USSR– Supply & transit are not separated within COMECON
• Long & painful transition to :– Contractual separation of transit & export supplies – Domestic transportation vs. transit legislation – From barter to cash payments– From political to market-based pricing:
• Transit tariffs methodology• Market-oriented gas export pricing & prices
New risks = Result & long-term consequences of dissolution of USSR/COMECON system (transition risks)
Energy Charter role:draft TP + gas/transit-
related activities (e.g. Transit tariffs
study (Jan’06),
Pricing study (March’07),
etc.
NEW RISKS 2: COMECON / CIS RELATED (SINCE 1991)
www.encharter.orgDr. A. Konoplianik, UNECE Round Table on Gas, 23.01.2007 - Figure 7
1. Historical structure of Soviet/Russian gas supplies to EU
2. New challenges and risks3. New risks 1: EU related4. New risks 2: CIS related
4.1. Gas export pricing & prices5. Energy Charter role
TABLE OF CONTENTS
www.encharter.org
Source: International pricing mechanisms on Oil & Gas, ECS, to be released March 2007
RUSSIAN GAS PRICES TO EU & COUNTRIES ALONG THE PIPE
www.encharter.orgDr. A. Konoplianik, UNECE Round Table on Gas, 23.01.2007 - Figure 8
UKRAINE BELARUSCZECH & SLOVAK REPUBLICS
199019901990 2000 20002000 2010 20112010
Average gas price
Russian gas price
20072006
Netted back EU market price
Russian gas price
Russian gas price
20072007
Netted back EU market priceNetted back EU
market price
Notional price for Russian gas
Notional price for Russian gas
Notional price for Russian gas
1. Historical structure of Soviet/Russian gas supplies to EU
2. New challenges and risks3. New risks 1: EU related4. New risks 2: CIS related
4.1. Gas export pricing & prices5. Energy Charter role
TABLE OF CONTENTS
www.encharter.org
• Risks for reliable Russian gas supplies to Europe = long-term objective economic results of political changes within the gas cross-border value chain:– Dissolution of USSR/COMECON,– EU expansion + gas market liberalization & formation
of the single EU internal gas market • ECT + draft TP = multilateral legally-binding instruments
to mitigate these risks• E.g. Russia-Ukraine gas (2006) & Russia-Belarus gas
(2006) & oil (2007) disputes (Energy Charter principles addressed by parties in dispute + conciliatory procedure proposed by ECS)
SECURING RELIABLE GAS SUPPLY IN EURASIA: ENERGY CHARTER’S ROLE
www.encharter.orgDr. A. Konoplianik, UNECE Round Table on Gas, 23.01.2007 - Figure 9
Thank you for your attention!
www.encharter.org
www.encharter.org
Reserve slides
www.encharter.org
• Fair (non-discriminatory)• Balanced (mutually beneficial, long-term)• Economically proven (understandable)• Market-based• Transparent (predictable)• No new risks & diminish existing ones• Etc.
www.encharter.orgDr. A. Konoplianik, UNECE Round Table on Gas, 23.01.2007 - Figure 10
WHAT “SUSTAINABLE” MEANS?
DESTINATION CLAUSES = ECONOMICALLY MOTIVATED INTEGRAL PART OF HISTORICALLY EXISTING RUSSIAN EXPORT SCHEMES TO EUROPE
From Russia
EU e
xter
nal b
orde
r
(EU
-15)
AE
BC
D
A - LTC (Groningen
concept)- On-(EU-15)-border
sale- Replacement value+ net-back
- Destination clause
PB ≈ PC ≈ PD ≈ PE
AE < AB < AD < AC
PA►C < PA►D < PA►B < PA►E
“Destination clauses” allowed gas supplier to sell gas to different buyers at different prices and conditions at one and the same delivery point.
www.encharter.orgDr. A. Konoplianik, UNECE Round Table on Gas, 23.01.2007 - Figure 11
• Ricardian vs. Hotelling rent• Cost-plus vs. replacement value• Soviet/Rusian gas export contracts to the EU
(historically), former COMECON (since after USSR dissolution) and FSU (since recently) are based (to be based) on modified original concept of Groningen export LTC
Nothing is better than the good theory… (a Classic…)
www.encharter.orgDr. A. Konoplianik, UNECE Round Table on Gas, 23.01.2007 - Figure 12
GAS EXPORT PRICING & PRICES
Source: International pricing mechanisms on Oil & Gas, ECS, to be released March 2007
www.encharter.orgDr. A. Konoplianik, UNECE Round Table on Gas, 23.01.2007 - Figure 13
RICARDIAN VS. HOTELLING RENT
Cost of Supply
Volume (bbl/day)
Capacity Constraint
30>
70 - 80
Hotelling Rent
Ricardo Rent
~85
Price ($/bbl)
Cost of Supply
Volume (bbl/day)
Capacity Constraint
30>
70 - 80
Hotelling Rent
Ricardo Rent
~85
Price ($/bbl)