s5.21
DESCRIPTION
S5.21TRANSCRIPT
-
bD
A
A
#5 EF CONTUNO
MAX SPACING =d/6 OR 12"WHICHEVERIS LESS
D
E
P
T
H
S
L
A
B
d
B
E
A
M
D
E
P
T
H
d
B
E
A
M
D
E
P
T
H
d
B
E
A
M
D
E
P
T
H
b
BEAM WIDTH
b
BEAM WIDTH
b
BEAM WIDTH
USE ONLY AT MULTIPLE SPANCONDITIONS, USE SEISMIC
DEVELOPMENT LENGTH IF BEAMTERMINATES AT SHEAR WALL
STANDARD LAP PER"TYPICAL REINFORCING GR 60SPLICE LENGTH SCHEDULE" 2"
SPLICE CENTEREDAT MIDSPAN USE ONLY
AT MULTIPLE SPANCONDITIONS IF REQUIRED
STANDARD LAP PER"TYPICAL REINFORCING GR 60SPLICE LENGTH SCHEDULE"
UNLESS NOTED OTHERWISE
TYPE S1 STIRRUPS = 2.5d
UNLESS NOTED OTHERWISE
TYPE S3 STIRRUPS = 2.5d
UNLESS NOTED OTHERWISEUSE SEISMIC DEVELOPMENT LENGTHIF BEAM TERMINATES AT SHEAR WALLPER "TYPICAL STRAIGHT AND HOOKED
DEVELOPMENT LENGTH SCHEDULE"
GREATER OF L1/3 & L3/3
SEE PLAN
CANTILEVER L2 = CLEAR SPAN
SEE PLAN
L1 = CLEAR SPAN
SEE PLAN
L3 = CLEAR SPAN
CLR
2"
CLR
2"
CLR
2"
CLR
2"
d
B
E
A
M
D
E
P
T
H
M
A
I
N
R
E
I
N
F
3
/
4
"
C
L
R
T
O
TO STIRRUP
1 1/2"(MIN) CLR
T
O
S
T
I
R
R
U
P
1
1
/
2
"
(
M
I
N
)
C
L
R
TO STIRRUP
1 1/2"(MIN) CLR
WHICHEVER ISGREATER
BAR DIA OR 1" MIN
(1 1/2" MIN) TYPICAL
MIN SPACING = BAR DIA
M
A
X
6
"
2" CLEAR
0.125L1 0.125L1
BALANCE TYPE S2 STIRRUPS TYPE S1 OR S3 STIRRUPS
36" MIN
E
Q
E
Q
GREATER OF L1/3, L3/3 OR Ld GREATER OF L1/3, L2 OR Ld
TYP
1'-0"
T
Y
P
1
"
C
L
R
WIDTH
1 1/2"3" 3"3"
1 1/2"
D
/
3
D
/
3
D
/
3
D
E
P
T
H
TYPICALALL STIRRUP HOOKS TO BEPLACED ON THE INTERIORSIDE OF THE BEAM
EDGE OF SLABWHERE OCCURS
STIRRUP PERSCHEDULE
BARS IN SAME PLANESEE NOTE #3 ONSECTION
BARS IN SAME PLANESEE NOTE #3 ONSECTION
BARS IN SAME PLANESEE NOTE #3 ONSECTION
CL SOUTH OREASTSUPPORT
ADD #6@12"DOWELS, UNO
PROVIDE STD HOOK PER"TYPICAL STRAIGHT ANDHOOKED DEVELOPMENTLENGTH SCHEDULE"
STIRRUP PERSCHEDULE
WHERE SLABEXISTS
STIRRUP PERSCHEDULE
TYPICALALL STIRRUP HOOKS TO BEPLACED ON THE INTERIORSIDE OF THE BEAM
EDGE OF SLABWHERE OCCURS
STIRRUP PERSCHEDULE
A BARSB BARSA BARS
TYPICAL HOOK TOP AND BOT BARS ATDISCONTINUOUS END PER "TYPICAL REINFSTRAIGHT AND HOOKED DEVELOPMENTLENGTH SCHEDULE"
TYPICALEND OF BEAM WHERE OCCURS
C BARS
BARS IN SAME PLANESEE NOTE #3 ONSECTION
E BARS D BARS
TYPICALEXTEND TOP BARS INTO ADJACENT SLAB WHERE POSSIBLE.
NOTES:1. CONFIGURATION 1, 2 AND 3 MAY BE USED WHERE SLAB OCCURS ON EACH SIDE AT TOP OF BEAM.2. CONFIGURATION 1, 2 AND 3 MAY BE USED WHERE SLAB OCCURS ON ONE SIDE AT TOP OF BEAM.
THE 90 HOOK SHALL BE PLACED ON THE SLAB SIDE.
3. CONFIGURATION 1 AND 2 MAY BE USED WHERE NO SLAB OCCURS AT TOP OF BEAM INCLUDINGUPTURNED BEAM UNLESS NOTED OTHERWISE.
4. FOR STANDARD HOOK AND BEND DETAILS, SEE "TYPICAL STRAIGHT AND HOOKED DEVELOPMENTLENGTH SCHEDULE"
CONFIGURATION 3CONFIGURATION 2CONFIGURATION 1
CL NORTH ORWESTSUPPORT
1ST LAYER 2ND LAYER
b > 40
24 < b 40"
8 < b 24"
b 8"
FIRST CONC POURSECOND CONC POUR
BEAM STIRRUPS
ADD 2 CLOSED STIRRUPSTO MATCH BEAM STIRRUPSEA SIDE OF JOINT
2-#6 JOINT REINFORCING PER SET,SEE SCHEDULE FOR NUMBER OFSETS AND PLACEMENT
LONGITUDINAL BEAM REINFORCINGSHALL BE CONTINUOUS THROUGHCONTRUCTION JOINT
JOINT SHALL BE WITHINMIDDLE 1/3 OF BEAM SPAN
2-#6 JOINTREINF PER SET,SEE SCHEDULE
TYPICALCLEAN AND ROUGHENSURFACE TO MIN 1/4"AMPLITUDE
1 SET @12"ACROSS BEAM WIDTH
2 SETS EA SIDE OF BEAM(PLACE SETS @3" AT EA SIDE)
1 SETPLACE IN THE MIDDLE OF BEAM
BEAM WIDTHb
SCHEDULE
JOINT REINFORCING
1 SET EA SIDE OF BEAM
4. PROVIDE MIN #5 CONT AT CORNER OF ALL STIRRUPS.
3. ALL BARS SHALL BE PLACED IN 1ST LAYER WHERE CLEARANCES / SPACING ALLOW. ADDITIONAL REINF TO BE PLACED IN 2ND LAYER:
2. SKIN REINF (WHERE REQD) NOT SHOWN FOR CLARITY.1. BALANCE OF SLAB REINF NOT SHOWN FOR CLARITY.NOTES:
SCALE:REF:
1S5.21 NONE
-
TYPICAL CONCRETE BEAM DETAILS
TYPICAL BEAM ELEVATION CANTILEVER BEAM CONDITION
TYPICAL BEAM SECTION TYPICAL BEAM (GIRDER)SUPPORTING SECTION
TYPICAL ADDED SKIN REINFORCEMENTWITH BEAM DEPTH GREATER THAN 36"
TYPICAL ADDED DOWELS AT PERIMETERBEAM CONNECTED TO SHEAR WALL
ACCEPTABLE STIRRUPS CONFIGURATION:
D C BA
AA
AA
E
BEAM ELEVATIONSECTION A-A
SCALE:REF:
2S5.22 NONE
TYPICAL CONCRETE BEAM CONSTRUCTION JOINT DETAIL
S a n t a M o n i c a , C a l i f o r n i a U S A 9 0 4 0 5
1 9 1 8 M a i n S t r e e t
H a m m e l , G r e e n a n d A b r a h a m s o n , I n c .
A r c h i t e c t u r e | E n g i n e e r i n g | P l a n n i n g
T e l e p h o n e 3 1 0 . 5 5 3 . 6 8 8 8 F a c s i m i l e 3 1 0 . 5 5 3 . 1 6 6 8
I D E N T I F I C A T I O N S T A M P
D I V I S I O N O F
T H E S T A T E A R C H I T E C T
SSS DATE
FILE #
AC FLS
APPL # 03-113564
1255 South Lewis Street Anaheim, CA 92805 714.490.4000
LACCD PROJECT NAME
LACCD PROJECT NUMBER
CLIENT
BUILDER
DESIGN CONSULTANT
REGISTRATION STAMP
AGENCY APPROVAL
ISSUE
MARK DATE DESCRIPTION
DESIGNER PROJ. NO.
DRAWN BY:
CHECKED BY:
SCALE:
KEY PLAN
SHEET TITLE
SHEET NUMBER
c 2009 LA
CCD Rev. 3
c 2009 LA
CCD Rev. 3
c 2009 LA
CCD Rev. 3
c 2009 LA
CCD Rev. 3
1 2 3 4 5 6
E
D
C
B
A
1 2 3 4 5 6
East Los Angeles College1301 Avenida Cesar ChavezMonterey Park, CA 91754
3050-003-003050-003-003050-003-003050-003-00
Los AngelesCommunity CollegeDistrict
StructuralSaiful Bouquet 626.304.2616
Mechanical/PlumbingFundament & Associates, Inc. 949.251.1131
Electrical/ITFBA Engineering 949.352.9995
CivilJMC2 310.241.6550
LandscapeKatherine Spitz Associates, Inc. 310.574.4460
Acoustical and AVVeneklasen 310.450.1733
SecuritySafirRosetti 510.268.8373
SignageDavies Associates, Inc. 310.247.9572
CodeRolf Jensen & Associates, Inc. 714.257.3555
NONENONENONENONE
05.04.1105.04.1105.04.1105.04.11 100% CONSTRUCTION DOCUMENTS100% CONSTRUCTION DOCUMENTS100% CONSTRUCTION DOCUMENTS100% CONSTRUCTION DOCUMENTS
5
/
3
/
2
0
1
1
1
0
:
3
3
:
1
9
A
M
C
:
\
U
s
e
r
s
\
H
i
e
p
h
\
D
o
c
u
m
e
n
t
s
\
E
L
A
C
S
S
R
C
-
S
1
1
_
C
E
N
T
R
A
L
_
H
i
e
p
h
.
r
v
t
S5.21
CONCRETE BEAM DETAILSCONCRETE BEAM DETAILSCONCRETE BEAM DETAILSCONCRETE BEAM DETAILS
EAST LOS ANGELESEAST LOS ANGELESEAST LOS ANGELESEAST LOS ANGELESCOLLEGECOLLEGECOLLEGECOLLEGE
STUDENT SUCCESS ANDSTUDENT SUCCESS ANDSTUDENT SUCCESS ANDSTUDENT SUCCESS ANDRETENTION CENTERRETENTION CENTERRETENTION CENTERRETENTION CENTER
32E.5234.0232E.5234.0232E.5234.0232E.5234.02
AuthorAuthorAuthorAuthor
CheckerCheckerCheckerChecker