Page 1: SA Health Car Park Reform. Project Implementation Guiding Principles >Minimise impact to staff, patients and families >Ensure proactive engagement with

SA Health

Car Park Reform

Page 2: SA Health Car Park Reform. Project Implementation Guiding Principles >Minimise impact to staff, patients and families >Ensure proactive engagement with

Project Implementation Guiding Principles

> Minimise impact to staff, patients and families

> Ensure proactive engagement with key stakeholders at affected sites

> Maximise usage of boom gates to ensure that patients and visitors are not adversely impacted

> Ensure that emergency access and facility support features are maintained

> Maintain the flow of traffic around the sites

> Ensure that charged staff have access to parking spaces

> Review staff security arrangements

> Develop a fully integrated system to support flexibility around staff movements across sites

Page 3: SA Health Car Park Reform. Project Implementation Guiding Principles >Minimise impact to staff, patients and families >Ensure proactive engagement with

> The proposed car parking reforms announced as part of the 2010-11 Budget included the implementation of charged parking at The Queen Elizabeth Hospital, Modbury Hospital, Repatriation General Hospital, Hampstead Rehabilitation Centre, Glenside Hospital and St Margaret’s Hospital.

> All sites were initially assessed in terms of their respective complexity regarding implementation of revised arrangements.

> Specific focus is on those sites where implementation in 2010 - 2011 present the least logistical challenges excluding: Glenside Hospital which is undergoing

considerable change with major infrastructure works occurring.

The Repatriation General Hospital, due to its dispersed car parks and multiple access points presents unique challenges.

Page 4: SA Health Car Park Reform. Project Implementation Guiding Principles >Minimise impact to staff, patients and families >Ensure proactive engagement with

> Priority sites have been established as follows: The Queen Elizabeth Hospital Modbury Hospital Hampstead Rehabilitation Centre

Page 5: SA Health Car Park Reform. Project Implementation Guiding Principles >Minimise impact to staff, patients and families >Ensure proactive engagement with

Current Project Status

> Draft implementation strategies have been developed for the priority sites

> These will be further refined once a preferred infrastructure supplier has been selected through the procurement tender process

> Tender close – end February 2011

> Initial focus of the tender process is on the three lead sites

> Refinement of implementation strategies will be completed in consultation with the respective facility management and Regional representatives

> Consultation with the relevant councils will commence shortly

Page 6: SA Health Car Park Reform. Project Implementation Guiding Principles >Minimise impact to staff, patients and families >Ensure proactive engagement with

Current Project Status (cont.)

> Any associated civil works e.g. the creation or widening of entrances and exits to provide lanes of appropriate width will be undertaken as part of implementation

> The project team is establishing a new administration group to implement and operate the car park charging arrangements

Page 7: SA Health Car Park Reform. Project Implementation Guiding Principles >Minimise impact to staff, patients and families >Ensure proactive engagement with

Current Project Status (cont.)

> The administration team will draw upon the experience and knowledge of existing staff who successfully manage the WCH and RAH car parks

> Staff will be issued with a permit, with the intention that payment will be via payroll deductions with sacrifice arrangements available

Page 8: SA Health Car Park Reform. Project Implementation Guiding Principles >Minimise impact to staff, patients and families >Ensure proactive engagement with

Current Project Status (cont.)

> A minimum standard of car park specification will be adopted wherever possible e.g.

• Car parks will be surfaced

• Car parking on unsealed areas will no longer be permitted

• Staff and public parking areas will be segregated (possible shared disabled parking) with designated staff parking areas wherever possible

• A review has commenced of any measures necessary to improve safety and security e.g. lighting and a standard approach to directional signage and line markings

• Australian Standards will be applied wherever possible

Page 9: SA Health Car Park Reform. Project Implementation Guiding Principles >Minimise impact to staff, patients and families >Ensure proactive engagement with
Page 10: SA Health Car Park Reform. Project Implementation Guiding Principles >Minimise impact to staff, patients and families >Ensure proactive engagement with

Hampstead Rehabilitation Centre

Current Proposed

Staff 207* 281

Reserved 70 70

Public 219** 145

Disabled 45 45

Total 541 541

Current and Proposed Car Parking Provision

*Note – does not include unsealed parks**Note - staff also utilising public parks

Note – Final implementation may result in variation in space allocations

Page 11: SA Health Car Park Reform. Project Implementation Guiding Principles >Minimise impact to staff, patients and families >Ensure proactive engagement with

Recommended Parking Plans Hampstead Rehabilitation Centre

> Segregated staff and public parking (possible shared disabled)

> Designated staff parking areas to the north east south and centre of the site

> Implementing parking controls will not adversely impact on vehicle flows within the facility

> Review of lighting and security has commenced

> All main area either boom gated or marked (and monitored) for permit parking only.

> Car parking on unsealed areas will no longer be permitted but the overall provision of staff spaces will be maintained

Page 12: SA Health Car Park Reform. Project Implementation Guiding Principles >Minimise impact to staff, patients and families >Ensure proactive engagement with

Example – Main Entrance

Page 13: SA Health Car Park Reform. Project Implementation Guiding Principles >Minimise impact to staff, patients and families >Ensure proactive engagement with
Page 14: SA Health Car Park Reform. Project Implementation Guiding Principles >Minimise impact to staff, patients and families >Ensure proactive engagement with

Modbury Hospital

Current Proposed

Staff 418 408Reserved 50 50

Public 261 236Disabled 14 14

Total 743 708

Current and Proposed Car Parking Provision

Note – Final implementation may result in variation in space allocations.

Page 15: SA Health Car Park Reform. Project Implementation Guiding Principles >Minimise impact to staff, patients and families >Ensure proactive engagement with

Recommended Parking PlansModbury Hospital

> Segregated staff and public parking (possible shared disabled parking)

> Designated staff parking areas to the south of the site

> Implementing parking controls within the Modbury Hospital facility will not adversely impact on vehicle flows within the facility

> Review of lighting and security has commenced

> All main areas either boom gated or marked (and monitored) for permit parking only

Page 16: SA Health Car Park Reform. Project Implementation Guiding Principles >Minimise impact to staff, patients and families >Ensure proactive engagement with

Example – staff car park

Page 17: SA Health Car Park Reform. Project Implementation Guiding Principles >Minimise impact to staff, patients and families >Ensure proactive engagement with
Page 18: SA Health Car Park Reform. Project Implementation Guiding Principles >Minimise impact to staff, patients and families >Ensure proactive engagement with

Current and Proposed Car Parking Provision

The Queen Elizabeth Hospital

Current Proposed

Staff 698 700Reserved 43 43

Public 341 364*Disabled 59 19

Total 1141 1126

Note – Final implementation may result in variation in space allocations.*including some public disabled parking.

Page 19: SA Health Car Park Reform. Project Implementation Guiding Principles >Minimise impact to staff, patients and families >Ensure proactive engagement with

Recommended Parking PlansThe Queen Elizabeth Hospital

> Segregated staff and public parking (possible shared disabled)

> The multi-deck will remain a designated staff parking area and will be secured with boom gates (to prevent public parking)

> The main open space on the hospital side of Woodville road will be the designated public parking area

> Implementing parking controls within the TQEH facility will not adversely impact on vehicle flows within the facility

Page 20: SA Health Car Park Reform. Project Implementation Guiding Principles >Minimise impact to staff, patients and families >Ensure proactive engagement with

Recommended Parking PlansThe Queen Elizabeth Hospital

> Review of lighting and security has commenced> All main areas either boom gated or marked

(and monitored) for permit parking only

Page 21: SA Health Car Park Reform. Project Implementation Guiding Principles >Minimise impact to staff, patients and families >Ensure proactive engagement with

Example – Main Public Park

Page 22: SA Health Car Park Reform. Project Implementation Guiding Principles >Minimise impact to staff, patients and families >Ensure proactive engagement with

Three priority sites

Hospital Tentative Date for Staff

Charging

Tentative Date for Public Charging

The Queen Elizabeth Hospital

Mid April 2011 (revised rates)

Late April 2011

Modbury Hospital

April 2011 Late May 2011

Hampstead Rehabilitation

Centre

May 2011 Late June 2011

Note - effective dates subject to consultation and related infrastructure implementation Note – revised rates across all sites currently charging are proposed to be revised to align with implementation of charging at TQEH