safety in special environments - solutions developed by swiss it-factory
DESCRIPTION
Intervenant : Alois BACHMANN, Managing Partner, Human Resources & Building, swiss IT-Factory 2ème Atelier Microtechniques & Innovation de Minnovarc les 27-28 octobre 2011 à La Neuveville, Suisse.TRANSCRIPT
Minnovarc, 28.10.2011
Safety in special environments
Agenda
• swiss IT-Factory• Project “Trenino” • Tunnel Transco Sedrun• Project “Rocon”• Project “Equipment Monitoring”
2
A combined evolution…
• 2009 MBO swiss IT-Factory
• 2007 / 2008 Implementation in Russia• 2006 Result of merger of two largest Swiss construction companies
goes live with solution within 9 months• 2005 Time Reporting + Calculation module• 2004 Equipment planning and disposal module• 2003 Tender functionality, GC + installation Tunnel Neat• 2002 Start of development
• > 10 years experience in services and industry 3
With a solution created by practicing experts for expert practice
… A proven ALL-IN-ONE solution
ResearchInvestment
Project concept/ Design
General planner / Engineering
Production OperationFacility Mgmt. Deconstruction
GCDevelopment Acquisition Development Financing / Investment Sales
GCGeneral Contractor Acquisition Project calculation Project realisation Project completion
C&EAcquisition /Production
Acquisition Tenderpreparation
Jobplanning Production Completion
C&ESupport Maintenance Centre Procurement
Building Management Preparation /Maintenance
CommercialBuilding
Management
Technical Building Management Services (IBM + IFM)
Finance and Controlling, Corporate Services & Support, Human Resources, Mobile
General contractorTotal contractor
Total solution provider (design & build)
… swiss IT-Factory‘s CIT market solution portfolio raises thetransparency and efficiency bar to a unique new level. ...
4
Our advantageous approach
target-performance analysis
rough concept detail concept
customizing customer-specific
enhancements customer-specific
additional development
documentation
Our innovation cycle supports you in facing your challenge
pilot migration roll out training go live
2nd level support additional training maintenance customer-specific
further development
quality assurance
5
Project “Trenino”
Customer Objectives
6
Improve Security Providing real time location
of the workers inside the tunnel
Provide a global overview the driver of the current situation: beyond human eyes sight
Centralize control
Increase Efficiency Reduce unnecessary
slowdown when the connecting galleries are free
Optimize the use of the resources
Project “Trenino”
Implemented Solutions
7
Improve Security Providing real time location
of the workers inside the tunnel
Provide a global overview the driver of the current situation: beyond human eyes sight
Centralize control
Increase Efficiency Reduce unnecessary
slowdown when the connecting galleries are free
Optimize the use of the resources
Installed in tunnel Transco Sedrun …
Highspeedlines crossing the Alps
8
… on a special environment …
Flat rail link through the Alps
9
… in the middle of the Alps.
SEDRUN – Heart piece of the NEW TRANSALPINE LINE
10
1. PERSON (Mine workers) identification and localisation (section)
2. TRAIN identification and localisation
3. EQUIPMENT identification and localisation (Drilling, Dredge, Dumper, etc.)
4. TRACK SWITCHER status and remote control
Mandatory informations on Trenino-Dashboard & Control Center
Objectives
11
Objectives - Scheme
12
3020
10
Km/h
Km13,000
Km12,675
Km12,350
Km12,025
Speed instruction (Person or equipment ahead)
Actual speed
Actual position
30
Km 11,985Section x1
No speed limit
Section x2 Section x3Section x1 Section x4 Section xn
Speed reduction Speed limit / Look out No speed limitNo speed limit
Section xn
Scenario No.1Tracking based on sectors
Actual speed Speed instruction (Person or equipment ahead)
Objectives - Scheme
13
3020
10
Km/h
Km13,000
Km12,675
Km12,350
Km12,025
Actual position
30
Km 11,985Section x1
No speed limit
Section x2 Section x3Section x1 Section x4 Section xn
Speed reduction Speed limit / Look out No speed limitNo speed limit
Section xn
Scenario No.1Tracking based on sectors
Sedrun – 2’500 meters under ground
Drill and blast
14
Sedrun - Tunnelwork
Concrete train and pump
15
Overview of the components
swiss IT-Factory 16
The Solution – RFID ...
Antenna
Active TAG 2.45 GHz / 13 MHz
RFID installed
swiss IT-Factory 17
... implemented
Antenna
Active TAG 2.45 GHz / 13 MHz
Project “Rocon”
Increasing efficiency and avoid additional investment
18
• To transport concret for final construction the questions was:Buy new wagons or optimize concret transportation with existing ones
• New investment for wagons (around 1’400’000 CHF ) was not necesary because…
• …existing security system can be used for traking positions of «Rocon» train and optimize the process
Analyzing transportation time …
Overview of one day and one Rocon train
19
… allows to optimize transport and …
Detailled analysis
20
… production
Rocon Shuttle and Concret processing
21
Project “Equipment Monitoring”
Equipment monitoring system
22
• Where are the main equipments in use?
• Trigger event while equipment passes observed sectors
• Preventive stealing
Project “Equipment Monitoring”
Equipment monitoring system
23
Equipment
Registering Tags
24
Equipment
Monitoring notifications, registered tags + video
25
SMSVideoEmail
Conclusion
One Business case 3 realised Projects
26
• Project “Trenino”
• Project “Rocon”
• Project “Equipment Monitoring”
Next steps…
Energy and more
27
28
Questions ?
Contact
We are looking forward to providingyou with additional information.