sample housecheck maintenance action plan (map) · 2018-11-22 · housecheck johannesburg page 1 of...

94
Copyright 2018 © HouseCheck Sample HouseCheck Maintenance Action Plan (MAP) Cover Page Johannesburg Inspection prepared for: Sample Body Corporate MAP Report Date of Inspection: 24/8/2018 Time: 09:00 AM Age of Home: 30 - 40 Years Weather: Clear On-site inspector: Ettienne J van Rensburg - SAHITA Certified Inspector [email protected] / Cell: 082 927 7573 Inspector: Gerrie Van Niekerk

Upload: others

Post on 05-Aug-2020

0 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Sample HouseCheck Maintenance Action Plan (MAP) · 2018-11-22 · HouseCheck Johannesburg Page 1 of 93 HouseCheck Maintenance Action Plan (MAP) 2018/08/24 2018/09/21 01-Jul 30-Jun

Copyright 2018 ©

HouseCheckSample HouseCheck Maintenance Action Plan (MAP)

Cover Page

Johannesburg

Inspection prepared for: Sample Body Corporate MAP Report Date of Inspection: 24/8/2018 Time: 09:00 AM

Age of Home: 30 - 40 Years Weather: Clear

On-site inspector: Ettienne J van Rensburg - SAHITA Certified [email protected] / Cell: 082 927 7573

Inspector: Gerrie Van Niekerk

Page 2: Sample HouseCheck Maintenance Action Plan (MAP) · 2018-11-22 · HouseCheck Johannesburg Page 1 of 93 HouseCheck Maintenance Action Plan (MAP) 2018/08/24 2018/09/21 01-Jul 30-Jun

HouseCheck Johannesburg

Page 1 of 93

Ho

useC

heck M

ain

ten

an

ce A

cti

on

Pla

n (

MA

P)

20

18

/08

/24

20

18

/09

/21

01

-Ju

l3

0-J

un

R3

74

,69

8

R3

7,4

70

70

%

INC

OM

E &

EX

PE

ND

ITU

RE

R5

9,7

15

R7

3,0

00

AV

ER

AG

E M

ON

TH

LY

CO

NT

RIB

UT

ION

S B

Y M

EM

BE

RS

SE

E L

IST

R8

76

,00

0

R9

,13

4,6

98

R7

,16

5,7

69

R1

,96

8,9

29

YE

AR

LY

SU

RP

LU

S / S

HO

RT

FA

LL

IN

RE

SE

RV

E F

UN

D2

23

55

,09

75

29

,34

45

75

,89

91

,00

3,0

50

95

4,0

96

1,3

79

,92

72

,02

7,5

94

1,5

76

,53

11

,96

8,9

29

20

19

/20

RE

PA

IRS

3,5

00

65

6,0

00

18

,89

64

38

,17

99

6,9

76

57

,41

37

75

,76

4

77

,00

06

55

,21

41

0,0

78

3,4

01

61

7,2

21

61

,69

81

4,8

07

4,9

98

28

,50

01

7,7

80

5,4

42

13

9,5

86

28

,21

57

,99

62

05

,09

8

4,8

60

72

,31

72

,93

94

2,8

46

14

,43

7

36

,73

38

,81

62

5,7

07

23

,98

84

5,3

37

29

,50

05

0,0

00

58

,32

01

90

,21

72

01

,35

21

29

,30

11

23

,77

61

33

,67

81

44

,37

33

15

,84

31

68

,39

6

22

,00

02

,51

93

,17

42

7,4

21

3,9

98

59

,50

01

3,0

00

15

,16

39

8,2

58

78

,90

88

5,2

21

92

,03

91

33

,67

81

07

,35

41

15

,94

21

25

,21

8

23

,20

02

5,4

21

28

,56

33

2,0

93

36

,06

04

0,5

17

10

,87

91

1,5

32

12

,22

41

2,9

57

13

,73

41

4,5

59

15

,43

21

6,3

58

17

,33

91

8,3

80

-11

-2,7

55

-26

,46

7-2

8,7

95

-50

,15

2-4

7,7

05

-68

,99

6-1

01

,38

0-7

8,8

27

25

9,6

16

53

,42

47

8,9

38

1,0

72

96

,12

31

62

,57

5

22

0,0

00

1,0

30

,47

58

21

,12

64

01

,75

28

29

,44

54

48

,84

99

24

,95

44

50

,16

92

28

,33

31

,32

7,0

63

48

3,6

02

AS

SE

SS

ME

NT

/ IN

SP

EC

TIO

N D

ON

E B

Y IN

SP

EC

TO

RE

ttie

nn

e J

va

n R

en

sb

urg

20

18

BU

DG

ET

PR

OG

RA

M IM

PL

EM

EN

TA

TIO

N Y

EA

R

AS

SE

SS

ME

NT

CO

ST

- D

ISC

OU

NT

ED

AT

8%

, E

SC

UL

AT

ED

AT

6%

20

28

/29

3 -

OP

EN

ING

S

4 -

FL

OO

RS

& C

EIL

ING

S

20

21

/22

20

22

/23

20

20

/21

2 -

WA

LL

S &

FE

NC

ES

PR

OJE

CT

ED

% E

XP

EN

DIT

UR

E O

F R

EP

AIR

BU

DG

ET

FO

R U

NF

OR

ES

EE

N R

EP

AIR

S

TO

TA

L E

XP

EN

DIT

UR

E A

T T

HE

EN

D O

F T

HE

10

YE

AR

PE

RIO

D

SU

RP

LU

S / S

HO

RT

FA

LL

AT

EN

D O

F T

HE

10

YE

AR

PE

RIO

D

SU

MM

AR

Y2

02

3/2

42

02

4/2

52

02

5/2

62

02

6/2

7

1 -

RO

OF

S

INS

UR

AN

CE

PR

EM

IUM

ES

CU

LA

TE

D A

T 6

%

INT

ER

ES

T E

AR

NE

D O

N R

ES

ER

VE

FU

ND

BA

LA

NC

E A

T 5

%

GR

AN

D T

OT

AL

S

5 -

FIX

TU

RE

S

6 -

GR

OU

ND

S

7 -

GA

RD

EN

ST

RU

CT

UR

ES

8 -

SE

RV

ICE

S

PR

OV

ISIO

N F

OR

UN

FO

RS

EE

N R

EP

AIR

S A

T 1

0%

OF

BU

DG

ET

INS

PE

CT

OR

S E

MA

IL A

DD

RE

SS

20

27

/28

CO

ST

OF

PR

OG

RA

M M

AN

AG

EM

EN

T A

T 0

% O

F B

UD

GE

T

INS

TIT

UT

ION

S F

INA

NC

IAL

YE

AR

PE

RIO

D F

RO

M / T

O

AS

SE

SS

ME

NT

YE

AR

AS

SE

SS

ING

/ IN

SP

EC

TIO

N C

OM

PA

NY

Ho

use

Ch

eck

AS

SE

SS

ME

NT

/ IN

SP

EC

TIO

N A

ND

BU

DG

ET

CO

MP

ILIN

G D

AT

E

BO

DY

CO

RP

OR

AT

E (

SA

MP

LE

)

20

19

TO

TA

L R

ES

ER

VE

FU

ND

S A

VA

ILA

BL

E

10

% O

F R

ES

ER

VE

FU

ND

AL

LO

CA

TE

D F

OR

UN

FO

RS

EE

N R

EP

AIR

S

CA

LC

UL

AT

ED

TO

TA

L M

ON

TH

LY

CO

NT

RIB

UT

ION

BY

ME

MB

ER

S

AD

JU

ST

ED

/ A

CT

UA

L T

OT

AL

MO

NT

HL

Y C

ON

TR

IBU

TIO

N B

Y M

EM

BE

RS

YE

AR

LY

TO

TA

L C

ON

TR

IBU

TIO

NS

BY

ME

MB

ER

S

TO

TA

L IN

CO

ME

AT

TH

E E

ND

OF

TH

E 1

0 Y

EA

R P

ER

IOD

0

10

00

00

0

20

00

00

0

30

00

00

0

40

00

00

0

50

00

00

0

60

00

00

0

70

00

00

0

80

00

00

0

90

00

00

0

10

00

00

00

Re

serv

e F

un

d

Inco

me

& E

xp

en

dit

ure

Page 3: Sample HouseCheck Maintenance Action Plan (MAP) · 2018-11-22 · HouseCheck Johannesburg Page 1 of 93 HouseCheck Maintenance Action Plan (MAP) 2018/08/24 2018/09/21 01-Jul 30-Jun

HouseCheck Johannesburg

Page 2 of 93

20

19

/20

RE

PA

IRS

1-1

1R

oo

f c

ove

rin

g -

RO

OF

- M

AIN

ST

RU

CT

UR

ES

, G

AR

AG

ES

AN

D S

TA

FF

QU

AR

TE

RS

43

8,1

79

64

3,8

29

1-1

2R

oo

f c

ove

rin

g -

RO

OF

- C

AR

PO

RT

S3

,50

03

00

,00

01

7,1

38

1-1

3R

oo

f c

ove

rin

g -

MA

INS

TR

UC

TU

RE

- P

ER

GO

LA

18

,89

62

5,7

07

1-1

4R

oo

f c

ove

rin

g -

1-2

1E

ave

s -

1-2

2E

ave

s -

1-3

1F

as

cia

& B

arg

e B

oa

rds

-

1-3

2F

as

cia

& B

arg

e B

oa

rds

-

1-4

1R

ain

Wa

ter

Go

od

s -

RA

INW

AT

ER

GO

OD

S -

MA

IN S

TR

UC

TU

RE

S C

AR

PO

RT

S &

ST

AF

F Q

UA

RT

ER

S

29

0,0

00

14

,56

8

1-4

2R

ain

Wa

ter

Go

od

s -

1-5

1R

oo

f W

ate

rpro

ofi

ng

Sys

tem

s -

WA

TE

RP

RO

OF

ING

- M

AIN

ST

RU

CT

UR

ES

AN

D S

TA

FF

QU

AR

TE

RS

66

,00

09

6,9

76

13

1,9

34

1-5

2R

oo

f W

ate

rpro

ofi

ng

Sys

tem

s -

1-6

1S

kylig

hts

-

1-7

1C

him

ne

y S

tac

k / F

lue

& C

ow

ls -

-

3,5

00

65

6,0

00

18

,89

64

38

,17

99

6,9

76

57

,41

37

75

,76

4

20

19

/20

RE

PA

IRS

2-1

1E

xte

rio

r F

ou

nd

ati

on

& S

up

ers

tru

ctu

re W

alls

- M

AIN

ST

RU

CT

UR

ES

, G

AR

AG

ES

AN

D S

TA

FF

QU

AR

TE

RS

60

1,3

52

2-1

2E

xte

rio

r F

ou

nd

ati

on

& S

up

ers

tru

ctu

re W

alls

- M

AIN

ST

RU

CT

UR

ES

, G

AR

AG

ES

ST

AF

F Q

UA

RT

ER

S -

DA

MP

IS

SU

ES

77

,00

06

48

,21

65

1,4

15

2-1

3E

xte

rio

r F

ou

nd

ati

on

& S

up

ers

tru

ctu

re W

alls

-

2-2

1In

teri

or

Su

pe

rstr

uc

ture

Wa

lls

- B

UIL

DIN

G 1

6 -

OF

FIC

E &

ST

OR

E6

,99

81

0,2

83

2-2

2In

teri

or

Su

pe

rstr

uc

ture

Wa

lls

- B

UIL

DIN

G 3

4 -

ST

AF

F Q

UA

RT

ER

S

10

,07

81

4,8

07

2-3

1B

ou

nd

ary

& G

ard

en

Wa

lls

& F

en

ce

s -

GA

RD

EN

WA

LL

S1

5,8

69

2-3

2B

ou

nd

ary

& G

ard

en

Wa

lls

& F

en

ce

s -

2-3

3B

ou

nd

ary

& G

ard

en

Wa

lls

& F

en

ce

s -

2-3

4B

ou

nd

ary

& G

ard

en

Wa

lls

& F

en

ce

s -

2-4

1R

eta

inin

g W

alls

- R

ET

AIN

ING

WA

LL

S3

,40

14

,99

8

2-4

2R

eta

inin

g W

alls

-

-

-

-

-

77

,00

06

55

,21

41

0,0

78

3,4

01

61

7,2

21

61

,69

81

4,8

07

4,9

98

20

19

/20

RE

PA

IRS

3-1

1W

ind

ow

s &

Do

ors

- W

IND

OW

S M

AIN

ST

RU

CT

UR

E &

ST

AF

F Q

UA

RT

ER

S2

8,5

00

13

9,5

86

20

5,0

98

3-1

2W

ind

ow

s &

Do

ors

- D

OO

RS

MA

IN S

TR

UC

TU

RE

& S

TA

FF

QU

AR

TE

RS

17

,78

02

8,2

15

3-1

3W

ind

ow

s &

Do

ors

- G

AR

AG

E D

OO

RS

MA

IN S

TR

UC

TU

RE

4

,08

15

,99

7

20

22

/23

20

23

/24

20

26

/27

20

27

/28

20

28

/29

20

23

/24

20

26

/27

20

22

/23

2 -

WA

LL

S &

FE

NC

ES

TO

TA

LS

TO

TA

LS

20

24

/25

20

20

/21

20

24

/25

20

25

/26

20

20

/21

20

21

/22

20

22

/23

20

23

/24

20

24

/25

20

25

/26

20

27

/28

20

28

/29

20

26

/27

20

21

/22

20

20

/21

20

21

/22

1 -

RO

OF

S

3 -

OP

EN

ING

S

20

27

/28

20

25

/26

20

28

/29

Page 4: Sample HouseCheck Maintenance Action Plan (MAP) · 2018-11-22 · HouseCheck Johannesburg Page 1 of 93 HouseCheck Maintenance Action Plan (MAP) 2018/08/24 2018/09/21 01-Jul 30-Jun

HouseCheck Johannesburg

Page 3 of 93

3-1

4W

ind

ow

s &

Do

ors

-

3-1

5W

ind

ow

s &

Do

ors

-

3-2

1S

ec

uri

ty G

ate

s -

SE

CU

RIT

Y G

AT

E -

PO

OL

1

,36

01

,99

9

3-2

2S

ec

uri

ty G

ate

s -

3-3

1E

xte

rna

l B

urg

lar

Ba

rs -

3-3

2E

xte

rna

l B

urg

lar

Ba

rs -

3-4

1W

ind

ow

an

d D

oo

r C

an

op

ies

/ A

wn

ing

s / S

hu

tte

rs -

3-4

2W

ind

ow

an

d D

oo

r C

an

op

ies

/ A

wn

ing

s / S

hu

tte

rs -

-

-

-

-

28

,50

01

7,7

80

5,4

42

13

9,5

86

28

,21

57

,99

62

05

,09

8

20

19

/20

RE

PA

IRS

4-1

1F

loo

r C

ove

rin

g -

MA

IN S

TR

UC

TU

RE

S7

2,3

17

10

,73

5

4-1

2F

loo

r C

ove

rin

g -

ST

AF

F Q

UA

RT

ER

S

4,8

60

2,9

39

3,7

02

4-1

3F

loo

r C

ove

rin

g -

4-2

1F

loo

r S

lab

s -

MA

IN S

TR

UC

TU

RE

S A

ND

ST

AF

F Q

UA

RT

ER

S (

co

sti

ng

un

de

r e

xte

rio

r fo

un

da

tio

n &

su

pe

rstr

uc

ture

wa

ll)

42

,84

6

4-2

2F

loo

r S

lab

s -

4-2

3F

loo

r S

lab

s -

4-3

1C

eilin

gs

-

4-3

2C

eilin

gs

-

4-3

4C

eilin

gs

-

-

-

-

-

-

-

4,8

60

72

,31

72

,93

94

2,8

46

14

,43

7

20

19

/20

RE

PA

IRS

5-1

1A

nte

nn

as

an

d S

ate

llit

e D

ish

es

-

5-1

2A

nte

nn

as

an

d S

ate

llit

e D

ish

es

-

5-2

1W

alk

Wa

y B

alu

str

ad

es

an

d H

an

d R

ailin

gs

- M

AIN

ST

RU

CT

UR

ES

AN

D S

TA

FF

QU

AR

TE

RS

8,8

16

12

,95

4

5-2

2W

alk

Wa

y B

alu

str

ad

es

an

d H

an

d R

ailin

gs

-

5-3

1S

ign

ag

e, In

form

ati

on

Dis

pla

ys

an

d R

oa

d S

ign

s -

SIG

NA

GE

& IN

FO

RM

AT

ION

BO

AR

DS

12

,24

41

7,9

91

5-3

2S

ign

ag

e, In

form

ati

on

Dis

pla

ys

an

d R

oa

d S

ign

s -

RO

AD

MA

RK

ING

S2

0,4

07

25

,70

73

2,3

84

5-3

3S

ign

ag

e, In

form

ati

on

Dis

pla

ys

an

d R

oa

d S

ign

s -

5-4

1P

os

t B

ox

es

- P

OS

T B

OX

ES

4,0

81

5,9

97

5-4

2P

os

t B

ox

es

-

5 -

FIX

TU

RE

S2

02

6/2

7

TO

TA

LS

TO

TA

LS

4 -

FL

OO

RS

& C

EIL

ING

S

20

21

/22

20

22

/23

20

23

/24

20

27

/28

20

28

/29

20

20

/21

20

21

/22

20

22

/23

20

23

/24

20

24

/25

20

27

/28

20

28

/29

20

20

/21

20

25

/26

20

24

/25

20

25

/26

20

26

/27

Page 5: Sample HouseCheck Maintenance Action Plan (MAP) · 2018-11-22 · HouseCheck Johannesburg Page 1 of 93 HouseCheck Maintenance Action Plan (MAP) 2018/08/24 2018/09/21 01-Jul 30-Jun

HouseCheck Johannesburg

Page 4 of 93

-

-

-

-

-

-

36

,73

38

,81

62

5,7

07

23

,98

84

5,3

37

20

19

/20

RE

PA

IRS

6-1

1G

ate

s &

Do

ors

-

61

2G

ate

s &

Do

ors

-

62

1G

ate

s &

Do

ors

-

62

2G

ate

s &

Do

ors

-

63

1G

rou

nd

Co

ve

rin

g -

RO

AD

, P

AR

KIN

G &

WA

LK

WA

YS

15

,00

06

1,2

22

89

,95

5

63

2G

rou

nd

Co

ve

rin

g -

63

3G

rou

nd

Co

ve

rin

g -

64

1G

rou

nd

& S

torm

Wa

ter

Dra

ina

ge

- G

RO

UN

DS

2

,50

01

4,6

93

19

,99

0

64

2G

rou

nd

& S

torm

Wa

ter

Dra

ina

ge

- G

RO

UN

DS

- S

TO

RM

WA

TE

R M

AN

AG

EM

EN

T/s

ee

wa

ll &

fe

nc

es

34

,01

24

9,9

75

65

1W

ate

r S

up

ply

, G

ard

en

Wa

ter

an

d Irr

iga

tio

n -

WA

TE

R S

UP

PL

Y1

2,0

00

25

,19

42

7,2

10

29

,38

73

1,7

37

34

,27

63

7,0

19

39

,98

04

3,1

78

65

2W

ate

r S

up

ply

, G

ard

en

Wa

ter

an

d Irr

iga

tio

n -

66

1G

ard

en

Ste

ps

-

67

1S

wim

min

g P

oo

ls &

Ja

cu

zzi's

- S

WIM

MIN

G P

OO

L1

02

,03

71

0,8

84

11

,75

51

2,6

95

13

,71

11

4,8

07

15

,99

21

7,2

71

67

2S

wim

min

g P

oo

ls &

Ja

cu

zzi's

-

68

1V

eg

eta

tio

n -

GA

RD

EN

50

,00

05

8,3

20

62

,98

66

8,0

24

73

,46

67

9,3

44

85

,69

19

2,5

47

99

,95

01

07

,94

6

29

,50

05

0,0

00

58

,32

01

90

,21

72

01

,35

21

29

,30

11

23

,77

61

33

,67

81

44

,37

33

15

,84

31

68

,39

6

20

19

/20

RE

PA

IRS

7-1

1B

raa

i S

tru

ctu

res

-

7-2

1E

xte

rna

l S

tair

ca

se

s -

7-2

2E

xte

rna

l S

tair

ca

se

s -

7-3

1P

erg

ola

s a

nd

La

pa

's S

tru

ctu

res

-

7-3

2P

erg

ola

s a

nd

La

pa

's S

tru

ctu

res

-

7-4

1D

ec

ks

-

7-4

2D

ec

ks

-

7-5

1F

ish

& K

oi P

on

ds

, W

ate

r F

ea

ture

s -

WA

TE

R F

EA

TU

RE

2,5

19

3,1

74

3,9

98

7-5

2F

ish

& K

oi P

on

ds

, W

ate

r F

ea

ture

s -

7-6

1J

un

gle

Gym

s, T

ram

po

lin

es

, G

aze

bo

-

7-6

2J

un

gle

Gym

s, T

ram

po

lin

es

, G

aze

bo

-

7-7

1C

arp

ort

s -

Str

uc

ture

- C

AR

PO

RT

ST

RU

CT

UR

ES

22

,00

02

7,4

21

7-7

2C

arp

ort

s -

Str

uc

ture

-

-

-

20

23

/24

20

24

/25

20

25

/26

20

20

/21

20

21

/22

20

22

/23

20

23

/24

TO

TA

LS

7 -

GA

RD

EN

ST

RU

CT

UR

ES

6 -

GR

OU

ND

S2

02

1/2

22

02

2/2

32

02

6/2

72

02

7/2

82

02

8/2

92

02

0/2

12

02

4/2

52

02

5/2

6

20

26

/27

20

27

/28

20

28

/29

TO

TA

LS

Page 6: Sample HouseCheck Maintenance Action Plan (MAP) · 2018-11-22 · HouseCheck Johannesburg Page 1 of 93 HouseCheck Maintenance Action Plan (MAP) 2018/08/24 2018/09/21 01-Jul 30-Jun

HouseCheck Johannesburg

Page 5 of 93

22

,00

02

,51

93

,17

42

7,4

21

3,9

98

20

19

/20

RE

PA

IRS

8-1

1F

ire

Fig

hti

ng

Eq

uip

me

nt

- H

OS

E &

RE

EL

FIR

E E

QU

IPM

EN

T6

,00

06

,99

87

,55

88

,16

38

,81

69

,52

11

0,2

83

11

,10

61

1,9

94

12

,95

4

8-1

2F

ire

Fig

hti

ng

Eq

uip

me

nt

- F

IRE

EX

TIN

GU

ISH

ER

S

6,0

00

6,9

98

7,5

58

8,1

63

8,8

16

9,5

21

10

,28

31

1,1

06

11

,99

41

2,9

54

8-1

3F

ire

Fig

hti

ng

Eq

uip

me

nt

- F

IRE

HY

DR

AN

TS

1,0

00

1,1

66

1,2

60

1,3

60

1,4

69

1,5

87

1,7

14

1,8

51

1,9

99

2,1

59

8-2

1E

lec

tric

al In

sta

lla

tio

ns

- L

IGH

T F

ITT

ING

S -

MA

IN S

TR

UC

TU

RE

S, G

AR

AG

ES

AN

D S

TA

FF

QU

AR

TE

RS

12

,50

02

5,1

94

34

,27

6

8-2

2E

lec

tric

al In

sta

lla

tio

ns

- M

AIN

ST

RU

CT

UR

ES

, G

AR

AG

ES

AN

D S

TA

FF

QU

AR

TE

RS

12

,00

03

1,4

93

34

,01

23

6,7

33

39

,67

24

2,8

46

46

,27

34

9,9

75

53

,97

3

8-2

3E

lec

tric

al In

sta

lla

tio

ns

-

8-3

1D

rain

s &

Se

we

r S

ys

tem

s -

MA

IN S

TR

UC

TU

RE

S, G

AR

AG

ES

AN

D S

TA

FF

QU

AR

TE

RS

35

,00

02

5,1

94

27

,21

02

9,3

87

31

,73

73

4,2

76

37

,01

93

9,9

80

43

,17

8

8-3

2D

rain

s &

Se

we

r S

ys

tem

s -

8-4

1G

as

in

sta

lla

tio

ns

-

8-5

1A

cc

es

s C

on

tro

l &

Se

cu

rity

Sys

tem

s -

8-5

2A

cc

es

s C

on

tro

l &

Se

cu

rity

Sys

tem

s -

8-6

1L

ifts

& H

ois

ts -

8-7

1E

lec

tro

nic

In

sta

lla

tio

ns

-

8-7

2E

lec

tro

nic

In

sta

lla

tio

ns

-

-

59

,50

01

3,0

00

15

,16

39

8,2

58

78

,90

88

5,2

21

92

,03

91

33

,67

81

07

,35

41

15

,94

21

25

,21

8

20

26

/27

TO

TA

LS

TO

TA

LS

20

27

/28

20

28

/29

20

20

/21

20

21

/22

20

22

/23

20

23

/24

8 -

SE

RV

ICE

S2

02

4/2

52

02

5/2

6

HC

MA

P B

UD

GE

T W

OR

KB

OO

K V

ER

S 1

1, 2

/20

18

, D

EV

EL

OP

ED

BY

D. F

AR

R, 0

83

44

81

39

3

Page 7: Sample HouseCheck Maintenance Action Plan (MAP) · 2018-11-22 · HouseCheck Johannesburg Page 1 of 93 HouseCheck Maintenance Action Plan (MAP) 2018/08/24 2018/09/21 01-Jul 30-Jun

HouseCheck Johannesburg

Page 6 of 93

HouseCheck Maintenance Action Plan (MAP)

MEMBERS MONTHLY CONTRIBUTIONS MEMBERS CONTRIBUTIONS

NAME OF COMPLEX / BUILDING

ADDRESS CALCULATED TOTAL MONTHLY CONTRIBUTION

ADJUSTED TOTAL MONTHLY CONTRIBUTION

UNIT AREA MONTHLY UNIT AREA MONTHLY UNIT AREA MONTHLY

NO MEMBER M² CONTRIBUTION NO MEMBER M² CONTRIBUTION NO MEMBER M² CONTRIBUTION

1 House 1 84 737.99 151 301

2 House 2 85 746.78 152 302

3 House 3 84 737.99 153 303

4 House 4 85 746.78 154 304

5 House 5 84 737.99 155 305

6 House 6 85 746.78 156 306

7 House 7 84 737.99 157 307

8 House 8 83 729.21 158 308

9 House 9 66 579.85 159 309

10 House 10 66 579.85 160 310

11 House 11 66 579.85 161 311

12 House 12 66 579.85 162 312

13 House 13 66 579.85 163 313

14 House 14 66 579.85 164 314

15 House 15 66 579.85 165 315

16 House 16 66 579.85 166 316

17 House 17 65 571.07 167 317

18 House 18 65 571.07 168 318

19 House 19 65 571.07 169 319

20 House 20 65 571.07 170 320

21 House 21 84 737.99 171 321

22 House 22 83 729.21 172 322

23 House 23 83 729.21 173 323

24 House 24 82 720.42 174 324

25 House 25 84 737.99 175 325

26 House 26 83 729.21 176 326

27 House 27 84 737.99 177 327

28 House 28 84 737.99 178 328

29 House 29 84 737.99 179 329

30 House 30 84 737.99 180 330

31 House 31 66 579.85 181 331

32 House 32 66 579.85 182 332

33 House 33 66 579.85 183 333

34 House 34 66 579.85 184 334

35 House 35 66 579.85 185 335

36 House 36 66 579.85 186 336

37 House 37 66 579.85 187 337

38 House 38 66 579.85 188 338

39 House 39 66 579.85 189 339

40 House 40 66 579.85 190 340

41 House 41 84 737.99 191 341

42 House 42 84 737.99 192 342

43 House 43 84 737.99 193 343

44 House 44 84 737.99 194 344

45 House 45 84 737.99 195 345

46 House 46 84 737.99 196 346

47 House 47 84 737.99 197 347

48 House 48 84 737.99 198 348

49 House 49 84 737.99 199 349

50 House 50 84 737.99 200 350

51 House 51 84 737.99 201 351

52 House 52 84 737.99 202 352

53 House 53 84 737.99 203 353

54 House 54 84 737.99 204 354

55 House 55 84 737.99 205 355

56 House 56 84 737.99 206 356

57 House 57 84 737.99 207 357

58 House 58 84 737.99 208 358

59 House 59 84 737.99 209 359

60 House 60 84 737.99 210 360

61 House 61 84 737.99 211 361

62 House 62 84 737.99 212 362

63 House 63 108 948.85 213 363

64 House 64 108 948.85 214 364

65 House 65 108 948.85 215 365

66 House 66 108 948.85 216 366

67 House 67 108 948.85 217 367

68 House 68 108 948.85 218 368

69 House 69 108 948.85 219 369

70 House 70 108 948.85 220 370

71 House 71 84 737.99 221 371

72 House 72 84 737.99 222 372

73 House 73 84 737.99 223 373

74 House 74 84 737.99 224 374

75 House 75 84 737.99 225 375

76 House 76 84 737.99 226 376

77 House 77 108 948.85 227 377

78 House 78 108 948.85 228 378

79 House 79 108 948.85 229 379

80 House 80 108 948.85 230 380

81 House 81 108 948.85 231 381

82 House 82 108 948.85 232 382

83 House 83 108 948.85 233 383

84 House 84 108 948.85 234 384

85 House 85 108 948.85 235 385

86 House 86 108 948.85 236 386

87 House 87 108 948.85 237 387

88 House 88 108 948.85 238 388

89 House 89 84 737.99 239 389

90 House 90 84 737.99 240 390

91 House 91 84 737.99 241 391

92 House 92 84 737.99 242 392

93 House 93 84 737.99 243 393

94 House 94 84 737.99 244 394

95 House 95 84 737.99 245 395

96 House 96 84 737.99 246 396

97 House 97 84 737.99 247 397

98 House 98 84 737.99 248 398

SUMMARYR59,715

R73,000

BODY CORPORATE (SAMPLE)

TOTAL CONTRIBUTING MEMBERS IF ALL CONTRIBUTIONS ARE THE SAME

SEE LISTTOTAL CONTIBUTION BY MEMBER

Page 8: Sample HouseCheck Maintenance Action Plan (MAP) · 2018-11-22 · HouseCheck Johannesburg Page 1 of 93 HouseCheck Maintenance Action Plan (MAP) 2018/08/24 2018/09/21 01-Jul 30-Jun

HouseCheck Johannesburg

Page 7 of 93

Contents

Contents

1 RoofsPage 11 111 Roof Covering • ROOF - MAIN STRUCTURES, GARAGES AND STAFF

QUARTERSPage 19 112 Roof Covering • ROOF - CARPORTSPage 27 113 Roof Covering • MAINSTRUCTURE - PERGOLAPage 28 141 Rainwater

Goods• RAINWATER GOODS - MAIN STRUCTURES CARPORTS& STAFF QUARTERS

Page 31 151 RoofWaterproofingSystems

• WATERPROOFING - MAIN STRUCTURES AND STAFFQUARTERS

2 Walls & FencesPage 32 211 Exterior

Foundation &SuperstructureWalls

• MAIN STRUCTURES, GARAGES AND STAFF QUARTERS

Page 40 212 ExteriorFoundation &SuperstructureWalls

• MAIN STRUCTURES, GARAGES STAFF QUARTERS -DAMP ISSUES

Page 49 221 InteriorSuperstructureWalls

• BUILDING 16 - OFFICE & STORE

Page 50 222 InteriorSuperstructureWalls

• BUILDING 34 - STAFF QUARTERS

Page 52 231 Boundary &Garden Walls &Fences

• GARDEN WALLS

Page 54 241 RetainingWalls

• RETAINING WALLS

3 OpeningsPage 55 311 Windows &

Doors• WINDOWS MAIN STRUCTURE & STAFF QUARTERS

Page 58 312 Windows &Doors

• DOORS MAIN STRUCTURE & STAFF QUARTERS

Page 60 313 Windows &Doors

• GARAGE DOORS MAIN STRUCTURE

Page 60 321 Security Gates • SECURITY GATE - POOL4 FloorsPage 61 411 Floor Covering • MAIN STRUCTURESPage 63 412 Floor Covering • STAFF QUARTERSPage 64 421 Floor Slab • MAIN STRUCTURES AND STAFF QUARTERS5 Fixtures

Page 9: Sample HouseCheck Maintenance Action Plan (MAP) · 2018-11-22 · HouseCheck Johannesburg Page 1 of 93 HouseCheck Maintenance Action Plan (MAP) 2018/08/24 2018/09/21 01-Jul 30-Jun

HouseCheck Johannesburg

Page 8 of 93

Page 66 521 Walk WayBalustrades andHand Railings

• MAIN STRUCTURES AND STAFF QUARTERS

Page 67 531 Signage,InformationDisplays and RoadSigns

• SIGNAGE & INFORMATION BOARDS

Page 68 532 Signage,InformationDisplays and RoadSigns

• ROAD MARKINGS

Page 69 541 Post Boxes • POST BOXES6 GroundsPage 70 621 Ground

Covering• ROAD, PARKING & WALKWAYS

Page 71 631 Ground &Storm WaterDrainage

• GROUNDS

Page 72 632 Ground &Storm WaterDrainage

• GROUNDS - STORM WATER MANAGEMENT

Page 75 641 Water Supply,Garden Water &Irrigation

• WATER SUPPLY

Page 75 661 SwimmingPools & Jacuzzi's

• SWIMMING POOL

Page 76 671 Vegetation • GARDEN7 Garden StructuresPage 78 751 Fish & Koi

Ponds, WaterFeatures

• WATER FEATURE

Page 78 771 Carports • CARPORT STRUCTURES8 ServicesPage 85 811 Fire Fighting

& PreventionEquipment

• HOSE & REEL FIRE EQUIPMENT

Page 86 812 Fire Fighting &PreventionEquipment

• FIRE EXTINGUISHERS

Page 87 813 Fire Fighting &PreventionEquipment

FIRE HYDRANTS

Page 88 821 ElectricalInstallations

• LIGHT FITTINGS -MAIN STRUCTURES, GARAGES ANDSTAFF QUARTERS

Page 89 822 ElectricalInstallations

• MAIN STRUCTURES, GARAGES AND STAFF QUARTERS

Page 91 831 Drains &Sewer Systems

• MAIN STRUCTURES, GARAGES AND STAFF QUARTERS

Page 10: Sample HouseCheck Maintenance Action Plan (MAP) · 2018-11-22 · HouseCheck Johannesburg Page 1 of 93 HouseCheck Maintenance Action Plan (MAP) 2018/08/24 2018/09/21 01-Jul 30-Jun

HouseCheck Johannesburg

Page 9 of 93

Introduction

In terms of the Sectional Title Schemes management (Act 8 of 2011) regulations as set out by the minister in theGovernment Gazette on 7 October 2016 Body Corporates have to:1. Establish a reserve fund for future costs including maintenance.2. Prepare a written maintenance, repair and replacement plan for capital items over the next ten years.3. Prepare a report on the current condition or state of repair for those items and and the times when those items willneed to be maintained, repaired to replaced.4. Estimate the maintenance, repair and replacement costs over the next ten years.5. Determine the annual contribution to the reserve fund [(estimated cost minus past contribution) divided by estimatedlife].The maintenance, repair and replacement plan takes effect on it’s approval by the members in general meeting.Each year the trustees must report the extent to which the approved maintenance, repair and replacement plan has beenimplemented to each annual general meeting. The HouseCheck SolutionHouseCheck has developed a unique product that provides all these requirements. A HouseCheck SAHITA trainedinspector will provide an independent report on the current condition of the property, estimate the maintenance and repaircosts over the next ten years and determine the annual contribution necessary to the reserve fund to cover the cost ofmaintenance as envisioned in the ministers regulations. A full report detailing this estimate will be provided to the body corporate trustees / managing agent to allow for tabling atthe Body Corporates annual general Meeting. What is the process?In terms of the regulations an annual condition assessment inspection report needs to be prepared. The initial reporttakes quite a bit of work as estimates of the size of the property need to be concluded. Individual components havedifferent lifespans and this data has to be collated for each property. This represents a "take on” phase. This phase doesnot have to be repeated in future years unless further improvements or units are added to the complex. The next component is the actual inspection which needs to be undertaken annually. This requires an inspector to makean assessment of the current condition of components and to revise his or her view on the likely maintenance, repair orreplacement date. This report’s information needs to be added into the specially developed HouseChecks managementtool to provide for an updated maintenance, repair and replacement plan cost over the next ten years. There are various factors that can influence the maintenance, repair and replacement plan, most notably severe weatherconditions. What if your body corporate decides not to do a maintenance plan?Under section 26(f) of the regulations, an independent auditor needs to review the annual statements, express a view onthe annual maintenance plan and the body corporate must make this available to any member, registered bondholder ormanaging agent. It is therefore unlikely that units can be sold or be transferred without this being in place.

Page 11: Sample HouseCheck Maintenance Action Plan (MAP) · 2018-11-22 · HouseCheck Johannesburg Page 1 of 93 HouseCheck Maintenance Action Plan (MAP) 2018/08/24 2018/09/21 01-Jul 30-Jun

HouseCheck Johannesburg

Page 10 of 93

Inspectors CommentsThis sectional title complex consists of thirteen double storey buildings comprising of ninety-eightdwelling units, each with a balcony; one staff quarter comprising of seven bedrooms, one commonarea, one bathroom and balcony; four garage buildings; one office and store room at pool area;eighteen carports; and a pool area.

This complex was in a fair condition. As with most buildings maintenance and repairs is required insome areas.

It would be suggested that the following projects be prioritised to commence at earliest possibledate:• Appoint professional expert advice, review & design for upgrade and/or additional drainagesystem to drain water away from all main structures. (Section Walls & Fences - 212 ExteriorFoundation & Superstructure Walls / Section Floors – 421 Floor Slag / Grounds – 632 Ground &Storm Water Drainage) Note: Investigation and monitoring should possibly include a wet and dryseason and remedial work would commence in a dry season;

• Carport roof covering sheets or components showing defects as described in report should bereplaced and/or a repair procedure should be undertaken. (Section Roofs - 112 Roof Covering);and

• Roof waterproofing systems on all slabs/canopies above entrances to units on first floor. (Roofs –151 Roof Waterproofing Systems) If viable, replace all rainwater goods to all structures includingcarports at same time. (Roofs - 141 Rainwater Goods)

Property InformationORIENTATION:For the purpose of this report the street front is taken to be south facingESTIMATED AGE:The age of the property is estimated to be 30 - 40 years oldERF GRADING:The grounds slopes slightly down to the west

Property DescriptionROOF AND COVERING:Galvanised metal sheetingEAVES:No eaves or roof overhangRAINWATER GOODS:PVCEXTERIOR WALLS:Plastered and painted wallWINDOW FRAMES:SteelEXTERNAL DOORS:TimberSteelGARAGE DOORS:Metal and Aluminium

Contact DetailsObservations: Contact Persons Name:Position held on the Body Corporate:Contact Numbers:

Page 12: Sample HouseCheck Maintenance Action Plan (MAP) · 2018-11-22 · HouseCheck Johannesburg Page 1 of 93 HouseCheck Maintenance Action Plan (MAP) 2018/08/24 2018/09/21 01-Jul 30-Jun

HouseCheck Johannesburg

Page 11 of 93

1 Roofs

Contributing MembersObservations: Total Contributing Members: 98Pro rata contribution list avaliable:Yes

Reserve FundEstablished Reserve Fund: Yes

Property InsuranceProperty insured: Yes

Roof Inspection & RestrictionsViewed via drone photographic and/or video imagesWalked on roof

WeatherObservations: WEATHER DURING INSPECTION:Clear

111 Roof Covering• COMPONENT DISCRIPTION:• All roof coverings of the main structures, secondary structures, lapa's, pergolas, car ports, shadeports, braai structures, etc. Tile, slates, sheets, thatch, slabs, etc. Ridges, valleys, verges, etc areincluded in this component.• COMPONENT INFORMATION AND CONDITION ASSESSMENT:• ROOF - MAIN STRUCTURES, GARAGES AND STAFFQUARTERS• Roof cover type:Metal roof sheets - 116• Current condition:Good• Finishing:Painted - 2• REPAIRS / ATTENTION REQUIRED:• Repairs required: No• RECOMMENDATIONS FOR MAINTENANCE:• Maintenance performed during approximately:Year 2017• Maintenance / attention required during: See attached Maintenance Action Plan• Maintenance recommended:Clean & paint - 2• COMPONENT REPLACEMENT:• Component earmarked for replacement:No• ROOF - MAIN STRUCTURES, GARAGES AND STAFFQUARTERS

Page 13: Sample HouseCheck Maintenance Action Plan (MAP) · 2018-11-22 · HouseCheck Johannesburg Page 1 of 93 HouseCheck Maintenance Action Plan (MAP) 2018/08/24 2018/09/21 01-Jul 30-Jun

HouseCheck Johannesburg

Page 12 of 93

Building 21 -Finishing:Painted - 2 Building 21 -Current condition:Good

Building 20 - Current condition:Good Building 20 -Current condition:Good

Building 20 -Current condition:Good Building 19 - Current condition:Good

Page 14: Sample HouseCheck Maintenance Action Plan (MAP) · 2018-11-22 · HouseCheck Johannesburg Page 1 of 93 HouseCheck Maintenance Action Plan (MAP) 2018/08/24 2018/09/21 01-Jul 30-Jun

HouseCheck Johannesburg

Page 13 of 93

Building 19 - Current condition:Good Building 17 - Current condition:Good

Building 17 - Current condition:Good Building 17 - Current condition:Good

Building 10 - Current condition:Good Building 10 - Current condition:Good

Page 15: Sample HouseCheck Maintenance Action Plan (MAP) · 2018-11-22 · HouseCheck Johannesburg Page 1 of 93 HouseCheck Maintenance Action Plan (MAP) 2018/08/24 2018/09/21 01-Jul 30-Jun

HouseCheck Johannesburg

Page 14 of 93

Building 9 -Current condition:Good Building 9 - Current condition:Good

Building 9 - Current condition:Good Building 8 - Current condition:Good

Building 18 - Current condition:Good Building 18 -Current condition:Good

Page 16: Sample HouseCheck Maintenance Action Plan (MAP) · 2018-11-22 · HouseCheck Johannesburg Page 1 of 93 HouseCheck Maintenance Action Plan (MAP) 2018/08/24 2018/09/21 01-Jul 30-Jun

HouseCheck Johannesburg

Page 15 of 93

Building 18 - Current condition:Good Building 11 - Current condition:Good

Building 11 - Current condition:Good Building 4 - Current condition:Good

Building 4 - Current condition:Good Building 4 - Current condition:Good

Page 17: Sample HouseCheck Maintenance Action Plan (MAP) · 2018-11-22 · HouseCheck Johannesburg Page 1 of 93 HouseCheck Maintenance Action Plan (MAP) 2018/08/24 2018/09/21 01-Jul 30-Jun

HouseCheck Johannesburg

Page 16 of 93

Building 3 - Current condition:Good Building 3 - Current condition:Good

Building 3 - Current condition:Good Building 3 - Current condition:Good

Building 2 - Current condition:Good Building 2 - Current condition:Good

Page 18: Sample HouseCheck Maintenance Action Plan (MAP) · 2018-11-22 · HouseCheck Johannesburg Page 1 of 93 HouseCheck Maintenance Action Plan (MAP) 2018/08/24 2018/09/21 01-Jul 30-Jun

HouseCheck Johannesburg

Page 17 of 93

Building 2 - Current condition:Good Building 1 - Current condition:Good

Building 1 - Current condition:Good Building 34 - Current condition:Reasonable

Building 34 - Current condition:Reasonable Building 34 - Current condition:Reasonable

Page 19: Sample HouseCheck Maintenance Action Plan (MAP) · 2018-11-22 · HouseCheck Johannesburg Page 1 of 93 HouseCheck Maintenance Action Plan (MAP) 2018/08/24 2018/09/21 01-Jul 30-Jun

HouseCheck Johannesburg

Page 18 of 93

Building 19/garage - Current condition:Good Building 33 - Current condition:Good

Building 33 - Current condition:Good Building 16 - Current condition:Reasonable

Page 20: Sample HouseCheck Maintenance Action Plan (MAP) · 2018-11-22 · HouseCheck Johannesburg Page 1 of 93 HouseCheck Maintenance Action Plan (MAP) 2018/08/24 2018/09/21 01-Jul 30-Jun

HouseCheck Johannesburg

Page 19 of 93

112 Roof Covering• COMPONENT DISCRIPTION:• All roof coverings of the main structures, secondary structures, lapa's, pergolas, car ports, shadeports, braai structures, etc. Tile, slates, sheets, thatch, slabs, etc. Ridges, valleys, verges, etc areincluded in this component.• COMPONENT INFORMATION AND CONDITION ASSESSMENT:• ROOF - CARPORTS• Roof cover type:Metal roof sheets - 116• Current condition:Reasonable• Finishing:Epoxy coated - 4• REPAIRS / ATTENTION REQUIRED:• Repairs required: Yes• The following was observed at time of inspection of the carport roof coverings: light & heavywhite rust and/or red rust & superficial rust staining.

In general, sheets or components showing these defects should not be used and rather replacedand/or a repair procedure could be undertaken. However, it would be recommended thatexpert/specialist advice and review be sought first re: cause/nature of rust, financial feasibility ofrepairing and/or replacing of the roof covering.• Cost for expert/specialist advice and review would be a once off cost. Estimated cost of R 3 500for budget purpose is reflected under repairs; and• An estimated cost for replacing roof covering has been included.

White rust is a white powdery deposit formed from a natural corrosion process that can occur onany new zinc coated steel product. It is damaging to the appearance of the steel and importantly tothe anti-corrosion layer of zinc that protects the body of the steel. White rust is acidic, and it wouldbe recommended to replace the effected sheeting. If the sheeting is not replaced, remedialtreatment to reinstate the coating of the existing sheeting should be undertaken: affected areasshould be brushed off and an approved epoxy/inorganic zinc-rich paint applied to achieve arequired dry film thickness of 100 microns minimum.

• RECOMMENDATIONS FOR MAINTENANCE:• Maintenance / attention required during: See attached Maintenance Action Plan• Maintenance recommended:Clean - 1• Maintenance work as per expert/specialist advice and review.• COMPONENT REPLACEMENT:• Component earmarked for replacement:Yes• Replacement required in the next 10 years:Yes• Replacement required in: See attached Maintenance Action Plan• ROOF - CARPORTS

Page 21: Sample HouseCheck Maintenance Action Plan (MAP) · 2018-11-22 · HouseCheck Johannesburg Page 1 of 93 HouseCheck Maintenance Action Plan (MAP) 2018/08/24 2018/09/21 01-Jul 30-Jun

HouseCheck Johannesburg

Page 20 of 93

Bld 32 - Visible rust Bld 26 - Current condition:Reasonable

Bld 27 - Repairs required: Yes Bld 30 - Current condition:Reasonable

Bld 31 - Repairs required: Yes Bld 12 - Repairs required: Yes

Page 22: Sample HouseCheck Maintenance Action Plan (MAP) · 2018-11-22 · HouseCheck Johannesburg Page 1 of 93 HouseCheck Maintenance Action Plan (MAP) 2018/08/24 2018/09/21 01-Jul 30-Jun

HouseCheck Johannesburg

Page 21 of 93

Bld 13 - Current condition:Reasonable Bld 24 - Current condition:Reasonable

Bld 25 - Current condition:Reasonable Bld 22 - Current condition:Reasonable

Bld 22 - Current condition:Reasonable Bld 22 - Current condition:Reasonable

Page 23: Sample HouseCheck Maintenance Action Plan (MAP) · 2018-11-22 · HouseCheck Johannesburg Page 1 of 93 HouseCheck Maintenance Action Plan (MAP) 2018/08/24 2018/09/21 01-Jul 30-Jun

HouseCheck Johannesburg

Page 22 of 93

Bld 23 - Current condition:Reasonable Bld 14 - Gutters blocked with debris

Bld 14 - Current condition:Reasonable Bld 14 - Gutters blocked with debris

Bld 14 - Current condition:Reasonable Bld 14 - Current condition:Reasonable

Page 24: Sample HouseCheck Maintenance Action Plan (MAP) · 2018-11-22 · HouseCheck Johannesburg Page 1 of 93 HouseCheck Maintenance Action Plan (MAP) 2018/08/24 2018/09/21 01-Jul 30-Jun

HouseCheck Johannesburg

Page 23 of 93

Bld 7 - Current condition:Reasonable Bld 5 - Current condition:Reasonable

Bld 5 - Current condition:Reasonable Bld 5 CP - Rusted areas observed

Bld 14 CP - Light white rust Bld 14 CP - Heavy white rust observed

Page 25: Sample HouseCheck Maintenance Action Plan (MAP) · 2018-11-22 · HouseCheck Johannesburg Page 1 of 93 HouseCheck Maintenance Action Plan (MAP) 2018/08/24 2018/09/21 01-Jul 30-Jun

HouseCheck Johannesburg

Page 24 of 93

Bld 14 CP - Heavy white rust Bld 15 CP - Rust debris observed

Bld 15 CP - Heavy white rust Bld 15 CP - Decaying leaves possibly creatingrust

Bld 22 CP - Heavy white rust observed Bld 22 CP - Heavy white rust observed

Page 26: Sample HouseCheck Maintenance Action Plan (MAP) · 2018-11-22 · HouseCheck Johannesburg Page 1 of 93 HouseCheck Maintenance Action Plan (MAP) 2018/08/24 2018/09/21 01-Jul 30-Jun

HouseCheck Johannesburg

Page 25 of 93

Bld 22 CP - Heavy white rust observed Bld 23 CP - Heavy white rust observed

Bld 23 CP - Heavy white rust observed Bld 24 CP - Light white rust observed

Bld 25 CP - Heavy white rust observed Bld 27 CP - Rust observed

Page 27: Sample HouseCheck Maintenance Action Plan (MAP) · 2018-11-22 · HouseCheck Johannesburg Page 1 of 93 HouseCheck Maintenance Action Plan (MAP) 2018/08/24 2018/09/21 01-Jul 30-Jun

HouseCheck Johannesburg

Page 26 of 93

Bld 28 CP - Heavy white rust observed Bld 29 CP - Heavy white rust observed

Bld 30 CP - Heavy white rust observed Bld 31 CP - Rust observed

Bld 31 CP - Heavy white rust observed Bld 32 CP - Heavy white rust observed

Page 28: Sample HouseCheck Maintenance Action Plan (MAP) · 2018-11-22 · HouseCheck Johannesburg Page 1 of 93 HouseCheck Maintenance Action Plan (MAP) 2018/08/24 2018/09/21 01-Jul 30-Jun

HouseCheck Johannesburg

Page 27 of 93

113 Roof Covering• COMPONENT DISCRIPTION:• All roof coverings of the main structures, secondary structures, lapa's, pergolas, car ports, shadeports, braai structures, etc. Tile, slates, sheets, thatch, slabs, etc. Ridges, valleys, verges, etc areincluded in this component.• COMPONENT INFORMATION AND CONDITION ASSESSMENT:• MAINSTRUCTURE - PERGOLA• Roof cover type:Timber board - 1111• Current condition:Fair• Finishing:Varnished - 3• REPAIRS / ATTENTION REQUIRED:• Repairs required: No• RECOMMENDATIONS FOR MAINTENANCE:• Maintenance / attention required during: See attached Maintenance Action Plan• Maintenance recommended:Remove flaking varnish & re-varnish - 5• COMPONENT REPLACEMENT:• Component earmarked for replacement:No• MAINSTRUCTURE - PERGOLA

Bld 1 - Pergola Bld 8 - Current condition: Fair

Bld 8 - Current condition: Fair

Page 29: Sample HouseCheck Maintenance Action Plan (MAP) · 2018-11-22 · HouseCheck Johannesburg Page 1 of 93 HouseCheck Maintenance Action Plan (MAP) 2018/08/24 2018/09/21 01-Jul 30-Jun

HouseCheck Johannesburg

Page 28 of 93

141 Rainwater Goods• COMPONENT DISCRIPTION:• All rainwater goods, gutters, box gutters, down pipes of the main structure and secondarystructure are included in this component• COMPONENT INFORMATION AND CONDITION ASSESSMENT:• RAINWATER GOODS - MAIN STRUCTURES CARPORTS & STAFF QUARTERS• Rain water goods type:PVC - 141• Current condition:Poor• Finishing:Natural - 6• REPAIRS / ATTENTION REQUIRED:• Repairs required: Yes• Type of repairs / attention required: Replace damaged gutters / down pipes; remove debris andunblock gutters / down pipes. It would however be recommended to replace all rainwater goods toall structures including carports. Possibly with a seamless gutter system which is not susceptible toweathering and a product that carries a warranty of at least 30-years.• RECOMMENDATIONS FOR MAINTENANCE:• Maintenance / attention required during: See attached Maintenance Action Plan• Maintenance recommended:Remove debris - 8• Maintenance work as per expert/specialist advice and review.• COMPONENT REPLACEMENT:• Component earmarked for replacement:Yes

• Replacement required in the next 10 years:Yes• Replacement required in: See attached Maintenance Action Plan• RAINWATER GOODS - MAIN STRUCTURES CARPORTS & STAFF QUARTERS

Building 20 - Gutter full of debris Building 10 - Debris in gutter

Page 30: Sample HouseCheck Maintenance Action Plan (MAP) · 2018-11-22 · HouseCheck Johannesburg Page 1 of 93 HouseCheck Maintenance Action Plan (MAP) 2018/08/24 2018/09/21 01-Jul 30-Jun

HouseCheck Johannesburg

Page 29 of 93

Building 8 - Gutters with debris Bld 23 - Gutters block with debris

Bld 1 - down pipes installed Bld 1 - No down pipes installed

Bld 2 - Down pipe cracked at joint Bld 3 - Gutter cracked

Page 31: Sample HouseCheck Maintenance Action Plan (MAP) · 2018-11-22 · HouseCheck Johannesburg Page 1 of 93 HouseCheck Maintenance Action Plan (MAP) 2018/08/24 2018/09/21 01-Jul 30-Jun

HouseCheck Johannesburg

Page 30 of 93

Bld 3 - Gutter leaking at joint Bld 4 - Gutter cracked at joint

Bld 17 - Gutter damaged Bld 17 - Gutter damaged

Bld 17 -Down pipe damaged Bld 30 CP - Gutter damaged

Page 32: Sample HouseCheck Maintenance Action Plan (MAP) · 2018-11-22 · HouseCheck Johannesburg Page 1 of 93 HouseCheck Maintenance Action Plan (MAP) 2018/08/24 2018/09/21 01-Jul 30-Jun

HouseCheck Johannesburg

Page 31 of 93

2 Walls & Fences

151 Roof Waterproofing Systems• COMPONENT DISCRIPTION:• All waterproofing and flashing systems of all roofs of the main and secondary structures areincluded in this component• COMPONENT INFORMATION AND CONDITION ASSESSMENT:• WATERPROOFING - MAIN STRUCTURES AND STAFF QUARTERS• Waterproofing System type:Torch-on system - 152• Current condition:Poor• REPAIRS / ATTENTION REQUIRED:• Repairs required: Yes• Type of repairs / attention required: Evidence of water ponding on majority of the slabs• Remove torch-on waterproofing;• Correct slope/gradient for directional water flow to outlet;• Apply new torch-on waterproofing; and• Connect outlet to downpipe to ground level; directing water away from main structure.

• RECOMMENDATIONS FOR MAINTENANCE:• Maintenance / attention required during: See attached Maintenance Action Plan• Maintenance recommended:Clean & apply waterproofing coating - 3• COMPONENT REPLACEMENT:• Component earmarked for replacement:Yes• Replacement required in: See attached Maintenance Action Plan• WATERPROOFING - MAIN STRUCTURES AND STAFF QUARTERS

Building 19 - Evidence of water ponding Building 11 - Evidence of water ponding

Page 33: Sample HouseCheck Maintenance Action Plan (MAP) · 2018-11-22 · HouseCheck Johannesburg Page 1 of 93 HouseCheck Maintenance Action Plan (MAP) 2018/08/24 2018/09/21 01-Jul 30-Jun

HouseCheck Johannesburg

Page 32 of 93

211 Exterior Foundation & Superstructure Walls• COMPONENT DISCRIPTION:• Foundations, exterior of common superstructure areas , beams, columns, balconies, porches,verandas, terraces, courtyards, balustrade and balcony walls are included in this component.• COMPONENT INFORMATION AND CONDITION ASSESSMENT:• MAIN STRUCTURES, GARAGES AND STAFF QUARTERS• Wall type:Plaster - 211• Current condition:Fair• Finishing:Painted - 2• REPAIRS / ATTENTION REQUIRED:• Repairs required: No• RECOMMENDATIONS FOR MAINTENANCE:• Maintenance / attention required during: See attached Maintenance Action Plan• Maintenance recommended:Clean & paint - 2• COMPONENT REPLACEMENT:• Component earmarked for replacement:No• MAIN STRUCTURES, GARAGES AND STAFF QUARTERS

Building 1 Building 2

Bld 2 - Current condition: Fair Building 3

Page 34: Sample HouseCheck Maintenance Action Plan (MAP) · 2018-11-22 · HouseCheck Johannesburg Page 1 of 93 HouseCheck Maintenance Action Plan (MAP) 2018/08/24 2018/09/21 01-Jul 30-Jun

HouseCheck Johannesburg

Page 33 of 93

Bld 3 - Current condition:Fair Bld 3 - Current condition: Fair

Building 4 Bld 4 - Current condition: Fair

Bld 4 - Current condition: Fair Building 8

Page 35: Sample HouseCheck Maintenance Action Plan (MAP) · 2018-11-22 · HouseCheck Johannesburg Page 1 of 93 HouseCheck Maintenance Action Plan (MAP) 2018/08/24 2018/09/21 01-Jul 30-Jun

HouseCheck Johannesburg

Page 34 of 93

Bld 8 - Birds nest Building 9

Building 10 Bld 10 - Current condition: Fair

Building 11 Bld 11 - Current condition: Fair

Page 36: Sample HouseCheck Maintenance Action Plan (MAP) · 2018-11-22 · HouseCheck Johannesburg Page 1 of 93 HouseCheck Maintenance Action Plan (MAP) 2018/08/24 2018/09/21 01-Jul 30-Jun

HouseCheck Johannesburg

Page 35 of 93

Building 17 Building 18

Current condition: Fair Building 19

Bld 19 - Current condition:Fair Building 20

Page 37: Sample HouseCheck Maintenance Action Plan (MAP) · 2018-11-22 · HouseCheck Johannesburg Page 1 of 93 HouseCheck Maintenance Action Plan (MAP) 2018/08/24 2018/09/21 01-Jul 30-Jun

HouseCheck Johannesburg

Page 36 of 93

Building 21 Bld 21 - Current condition: Fair

Bld 21 - Current condition: Fair Bld 16 - Current condition: Fair

Building 26 - Garage Bld 26 Garage - Current condition: Fair

Page 38: Sample HouseCheck Maintenance Action Plan (MAP) · 2018-11-22 · HouseCheck Johannesburg Page 1 of 93 HouseCheck Maintenance Action Plan (MAP) 2018/08/24 2018/09/21 01-Jul 30-Jun

HouseCheck Johannesburg

Page 37 of 93

Bld 26 Garage - Current condition: Fair Building 33 - Garage

Building 19 - Garage Building 33 - Current condition: Fair

Building 19 - Current condition: Fair Building 34 - Garages & Staff Quarters

Page 39: Sample HouseCheck Maintenance Action Plan (MAP) · 2018-11-22 · HouseCheck Johannesburg Page 1 of 93 HouseCheck Maintenance Action Plan (MAP) 2018/08/24 2018/09/21 01-Jul 30-Jun

HouseCheck Johannesburg

Page 38 of 93

Bld 34 - Current condition: Fair Bld 34 - Current condition: Fair

Bld 34 - Exterior walls

Page 40: Sample HouseCheck Maintenance Action Plan (MAP) · 2018-11-22 · HouseCheck Johannesburg Page 1 of 93 HouseCheck Maintenance Action Plan (MAP) 2018/08/24 2018/09/21 01-Jul 30-Jun

HouseCheck Johannesburg

Page 39 of 93

212 Exterior Foundation & Superstructure Walls• COMPONENT DISCRIPTION:• Foundations, exterior of common superstructure areas , beams, columns, balconies, porches,verandas, terraces, courtyards, balustrade and balcony walls are included in this component.• COMPONENT INFORMATION AND CONDITION ASSESSMENT:• MAIN STRUCTURES, GARAGES STAFF QUARTERS - DAMP ISSUES• Wall type:Plaster - 211• Current condition:Fair• Finishing:Painted - 2• REPAIRS / ATTENTION REQUIRED:• Repairs required: Yes• The following was observed at time of inspection of the exterior foundation & superstructure wall:• Active rising damp;• Penetrating damp;• No visible joint between concrete slab & brick work observed - resulting in structural cracks andpossibly causing penetrating damp and spalling of concrete;• Deteriorated paint on exterior window sills – building 11 (unit 1) and• Holes and/or service ducts in exterior wall – building 20 (unit 67).

It would be recommended to get the following professional expert advice and review:• ECSA registered structural engineer; o The structural engineer could advise on the structural integrity of buildings and possiblesolutions to stop cracking between concrete slab and brickwork and spalling of the concrete (seesection 4-21 Floors Slab); o Advise on the effectiveness of the current storm water management system which possibly hasa major impact on rising damp in exterior foundation & superstructure wall as observed; o Propose an upgrade and/or additional drainage system to drain water away from mainstructures; and o Investigate and advise on the possible effect of dewatering schemes on uplift pressure andgroundwater variation under buildings i.e. possible structural cracking, structural stability ofbuildings and foundation systems etc.• A damp proofing specialist who is affiliated with the “Damp proofing and WaterproofingAssociation of South Africa”; o The damp proofing specialists would use equipment like thermo-imagining cameras etc. to donon-invasive testing to be able to advise on remedial costs and the most effective solutions.• Leak detection specialist; o To detect possible leaking pipes in the wall structure as well as possible leaking pipes in theground.

Estimated costs:• Professional fees for both the expert/specialist advice and review would be a once off cost.Estimated cost of R 65 000 for budget purpose is reflected under repairs.• The estimated costs of R 12 000 for the deteriorated paint on exterior window sills – building 11(unit 1) and holes and/or service ducts in exterior wall – building 20 (unit 67) is reflected underrepairs.• An estimated cost for proposed upgrade and/or additional drainage system has been included inbudget.

Note: Investigation and monitoring should include a wet and dry weather season and remedial workwould be done in a dry season.

Rising damp brings with it destructive nitrate and chloride salts from the ground. These salts areoften hygroscopic in nature. At times of high humidity, the salts absorb moisture from the air addingto the overall damp problem. Another main cause of damp is penetrative damp. This is wheredampness enters a building laterally through the walls.

Page 41: Sample HouseCheck Maintenance Action Plan (MAP) · 2018-11-22 · HouseCheck Johannesburg Page 1 of 93 HouseCheck Maintenance Action Plan (MAP) 2018/08/24 2018/09/21 01-Jul 30-Jun

HouseCheck Johannesburg

Page 40 of 93

Left unchecked damp can lead to structural damage and very costly repairs. It’s is thereforenecessary to act pro-actively.

• RECOMMENDATIONS FOR MAINTENANCE:• Maintenance / attention required during: See attached Maintenance Action Plan• Remedial work as per expert/specialist advice and review.• COMPONENT REPLACEMENT:• Component earmarked for replacement:No• MAIN STRUCTURES, GARAGES STAFF QUARTERS - DAMP ISSUES

Bld 1 -Damp measured in walls Bld 1 - No visible joint between slab & brick work -resulting in penetrating damp

Bld 2 - Damp measured Bld 2 - Acrylic waterproofing weathered

Page 42: Sample HouseCheck Maintenance Action Plan (MAP) · 2018-11-22 · HouseCheck Johannesburg Page 1 of 93 HouseCheck Maintenance Action Plan (MAP) 2018/08/24 2018/09/21 01-Jul 30-Jun

HouseCheck Johannesburg

Page 41 of 93

Bld 2 - Damp measured in walls Bld 2 - Penetrating damp - possibly from roof slab

Bld 2 - No visible joint between slab & brick work -resulting structural cracking & penetrating damp

Bld 2 - No visible joint between slab & brick work -resulting structural cracking & penetrating damp

Bld 3 - Active damp measured Bld 3 - Active damp measured

Page 43: Sample HouseCheck Maintenance Action Plan (MAP) · 2018-11-22 · HouseCheck Johannesburg Page 1 of 93 HouseCheck Maintenance Action Plan (MAP) 2018/08/24 2018/09/21 01-Jul 30-Jun

HouseCheck Johannesburg

Page 42 of 93

Bld 3 - Active damp measured Bld 3 - Active damp measured

Bld 3 - Penetrating damp from above Bld 3 - Penetrating damp from above

Bld 3 - Penetrating damp from above Bld 3 - Active rising damp

Page 44: Sample HouseCheck Maintenance Action Plan (MAP) · 2018-11-22 · HouseCheck Johannesburg Page 1 of 93 HouseCheck Maintenance Action Plan (MAP) 2018/08/24 2018/09/21 01-Jul 30-Jun

HouseCheck Johannesburg

Page 43 of 93

Bld 3 - Penetrating damp from above Bld 8 - Penetrating damp from above

Bld 9 - Active damp measured Bld 9 - Active damp measured

Bld 9 - Active damp measured Bld 9 - Active damp measured

Page 45: Sample HouseCheck Maintenance Action Plan (MAP) · 2018-11-22 · HouseCheck Johannesburg Page 1 of 93 HouseCheck Maintenance Action Plan (MAP) 2018/08/24 2018/09/21 01-Jul 30-Jun

HouseCheck Johannesburg

Page 44 of 93

Bld 11 - Active damp measured Bld 11 - Active damp measured

Bld 11 - Paint weathered Bld 11 - Active damp measured

Bld 11 - Paint weathered Bld 17 - Active damp measured

Page 46: Sample HouseCheck Maintenance Action Plan (MAP) · 2018-11-22 · HouseCheck Johannesburg Page 1 of 93 HouseCheck Maintenance Action Plan (MAP) 2018/08/24 2018/09/21 01-Jul 30-Jun

HouseCheck Johannesburg

Page 45 of 93

Bld 17 - Active damp measured Bld 17 - No visible joint between slab & brick work- resulting in structural cracks and/or penetrating

damp

Bld 17 - Active damp measured Bld 17 - Active damp measured

Page 47: Sample HouseCheck Maintenance Action Plan (MAP) · 2018-11-22 · HouseCheck Johannesburg Page 1 of 93 HouseCheck Maintenance Action Plan (MAP) 2018/08/24 2018/09/21 01-Jul 30-Jun

HouseCheck Johannesburg

Page 46 of 93

Bld 17 - Acrylic waterproofing on wall weathered Bld 17 - No visible joint between slab & brick work- resulting in structural cracks and/or penetrating

damp

Bld 17 - Penetrating damp from above Bld 17 - Acrylic waterproofing on wall weathered

Bld 17 - Active damp measured Bld 18 - Penetrating damp from above

Page 48: Sample HouseCheck Maintenance Action Plan (MAP) · 2018-11-22 · HouseCheck Johannesburg Page 1 of 93 HouseCheck Maintenance Action Plan (MAP) 2018/08/24 2018/09/21 01-Jul 30-Jun

HouseCheck Johannesburg

Page 47 of 93

Bld 18 - Penetrating damp from above Bld 20 - Active damp measured

Bld 20 - Active damp measured Bld 20 - Active damp measured

Bld 20 - Active damp measured Bld 20 - Structure requires repairs

Page 49: Sample HouseCheck Maintenance Action Plan (MAP) · 2018-11-22 · HouseCheck Johannesburg Page 1 of 93 HouseCheck Maintenance Action Plan (MAP) 2018/08/24 2018/09/21 01-Jul 30-Jun

HouseCheck Johannesburg

Page 48 of 93

Bld 20 - Active damp measured Bld 20 - Active damp measured

Bld 20 - Penetrating damp Bld 20 - Active damp measured

Unit 91 - Paint bilstering on beam

Page 50: Sample HouseCheck Maintenance Action Plan (MAP) · 2018-11-22 · HouseCheck Johannesburg Page 1 of 93 HouseCheck Maintenance Action Plan (MAP) 2018/08/24 2018/09/21 01-Jul 30-Jun

HouseCheck Johannesburg

Page 49 of 93

221 Interior Superstructure Walls• COMPONENT DISCRIPTION:• Interior walls of common superstructure areas including beams, columns etc. are included in thiscomponent.• COMPONENT INFORMATION AND CONDITION ASSESSMENT:• BUILDING 16 - OFFICE & STORE• Interior Wall type: Plaster - 221• Current condition:Poor• Finishing:Painted - 2• REPAIRS / ATTENTION REQUIRED:• Repairs required: Yes• Type of repairs / attention require: Clean, dam proof & paint• RECOMMENDATIONS FOR MAINTENANCE:• Maintenance / attention required during: See attached Maintenance Action Plan• Maintenance recommended:Clean & paint - 2• COMPONENT REPLACEMENT:• Component earmarked for replacement:No• BUILDING 16 - OFFICE & STORE

Building 16 - Office Building 16 - Store room

Bld 16- Slab with water damage Bld 16 -Penetrating damp in walls

Page 51: Sample HouseCheck Maintenance Action Plan (MAP) · 2018-11-22 · HouseCheck Johannesburg Page 1 of 93 HouseCheck Maintenance Action Plan (MAP) 2018/08/24 2018/09/21 01-Jul 30-Jun

HouseCheck Johannesburg

Page 50 of 93

Bld 16 - Toilet & wash hand basin Bld 16 - Ceilings

222 Interior Superstructure Walls• COMPONENT DISCRIPTION:• Interior walls of common superstructure areas including beams, columns etc. are included in thiscomponent.• COMPONENT INFORMATION AND CONDITION ASSESSMENT:• BUILDING 34 - STAFF QUARTERS• Interior Wall type: Plaster - 221• Current condition:Poor• Finishing:Painted - 2• REPAIRS / ATTENTION REQUIRED:• Repairs required: Yes• Type of repairs / attention required: Clean, repair ceilings, kitchen units & paint• RECOMMENDATIONS FOR MAINTENANCE:• Maintenance / attention required during: See attached Maintenance Action Plan• Maintenance recommended:Clean & paint - 2• COMPONENT REPLACEMENT:• Component earmarked for replacement:No• BUILDING 34 - STAFF QUARTERS

Bld 34 - Kitchen area Bld 34 - Kitchen units require maintenance

Page 52: Sample HouseCheck Maintenance Action Plan (MAP) · 2018-11-22 · HouseCheck Johannesburg Page 1 of 93 HouseCheck Maintenance Action Plan (MAP) 2018/08/24 2018/09/21 01-Jul 30-Jun

HouseCheck Johannesburg

Page 51 of 93

Bld 34 - Ceilings Bld 34 - Walls dirty

Bld 34 - Living area Bld 3 - Bathroom

Bld 34 - Bathroom shower Bld 3 - Paint peeling

Page 53: Sample HouseCheck Maintenance Action Plan (MAP) · 2018-11-22 · HouseCheck Johannesburg Page 1 of 93 HouseCheck Maintenance Action Plan (MAP) 2018/08/24 2018/09/21 01-Jul 30-Jun

HouseCheck Johannesburg

Page 52 of 93

Bld 3 - Paint peeling Bld 34 - Ceilings

Bld 34 - Ceilings

231 Boundary & Garden Walls & Fences• COMPONENT DISCRIPTION:• All boundary and garden walls / fences are included in this component are included in thiscomponent.• COMPONENT INFORMATION AND CONDITION ASSESSMENT:• GARDEN WALLS• Wall type:Plaster - 231• Current condition:Good• Finishing:Painted - 2• REPAIRS / ATTENTION REQUIRED:• Repairs required: No• RECOMMENDATIONS FOR MAINTENANCE:• Maintenance / attention required during: See attached Maintenance Action Plan• Maintenance recommended:Clean & paint - 2• COMPONENT REPLACEMENT:• Component earmarked for replacement:No• GARDEN WALLS

Page 54: Sample HouseCheck Maintenance Action Plan (MAP) · 2018-11-22 · HouseCheck Johannesburg Page 1 of 93 HouseCheck Maintenance Action Plan (MAP) 2018/08/24 2018/09/21 01-Jul 30-Jun

HouseCheck Johannesburg

Page 53 of 93

Boundary wall pool area Boundary wall pool area

Boundary wall pool area Washing/hanging area

Washing/hanging area Garden wall

Page 55: Sample HouseCheck Maintenance Action Plan (MAP) · 2018-11-22 · HouseCheck Johannesburg Page 1 of 93 HouseCheck Maintenance Action Plan (MAP) 2018/08/24 2018/09/21 01-Jul 30-Jun

HouseCheck Johannesburg

Page 54 of 93

Garden wall Washing/hanging area

Garden wall

241 Retaining Walls• COMPONENT DISCRIPTION:• All retaining walls are included in this component.• COMPONENT INFORMATION AND CONDITION ASSESSMENT:• RETAINING WALLS• Retaining wall type: Brick and Mortar - 241• Current condition:Good• Finishing:Painted - 2• REPAIRS / ATTENTION REQUIRED:• Repairs required: No• RECOMMENDATIONS FOR MAINTENANCE:• Maintenance / attention required during: See attached Maintenance Action Plan• Maintenance recommended:Clean & paint - 2• COMPONENT REPLACEMENT:• Component earmarked for replacement:No• RETAINING WALLS

Page 56: Sample HouseCheck Maintenance Action Plan (MAP) · 2018-11-22 · HouseCheck Johannesburg Page 1 of 93 HouseCheck Maintenance Action Plan (MAP) 2018/08/24 2018/09/21 01-Jul 30-Jun

HouseCheck Johannesburg

Page 55 of 93

3 Openings

Retaining wall Retaining wall

311 Windows & Doors• COMPONENT DISCRIPTION:• All windows and doors of the main structure and secondary structures are included in thiscomponent• COMPONENT INFORMATION AND CONDITION ASSESSMENT:• WINDOWS MAIN STRUCTURE & STAFF QUARTERS• Window / Door type:Metal - 311• Current condition:Poor• Finishing:Painted - 2• REPAIRS / ATTENTION REQUIRED:• Repairs required: Yes• Type of repairs / attention required: Remove and replace cracked glazing, putty and paint• RECOMMENDATIONS FOR MAINTENANCE:• Maintenance / attention required during: See attached Maintenance Action Plan• Maintenance recommended:Clean & paint - 2• COMPONENT REPLACEMENT:• Component earmarked for replacement:No• WINDOWS MAIN STRUCTURE & STAFF QUARTERS

Page 57: Sample HouseCheck Maintenance Action Plan (MAP) · 2018-11-22 · HouseCheck Johannesburg Page 1 of 93 HouseCheck Maintenance Action Plan (MAP) 2018/08/24 2018/09/21 01-Jul 30-Jun

HouseCheck Johannesburg

Page 56 of 93

Bld 2 - Window frames require maintenance Bld 3 - Window frames require maintenance

Bld 3 - Windows require maintenance Bld 3 - Window frames require maintenance

Bld 4 - Frame rusted Bld 9 - Window frames require maintenance

Page 58: Sample HouseCheck Maintenance Action Plan (MAP) · 2018-11-22 · HouseCheck Johannesburg Page 1 of 93 HouseCheck Maintenance Action Plan (MAP) 2018/08/24 2018/09/21 01-Jul 30-Jun

HouseCheck Johannesburg

Page 57 of 93

Bld 9 - Window frames require maintenance Bld 11 - Windows frames require maintenance

Bld 17 - Window frames require maintenance Bld 20 - Window frames require maintenance

Bld 16 - Window frames requires maintenance Bld 16 - Window frames requires maintenance

Page 59: Sample HouseCheck Maintenance Action Plan (MAP) · 2018-11-22 · HouseCheck Johannesburg Page 1 of 93 HouseCheck Maintenance Action Plan (MAP) 2018/08/24 2018/09/21 01-Jul 30-Jun

HouseCheck Johannesburg

Page 58 of 93

Bld 34 - Steel door rusted

312 Windows & Doors• COMPONENT DISCRIPTION:• All windows and doors of the main structure and secondary structures are included in thiscomponent• COMPONENT INFORMATION AND CONDITION ASSESSMENT:• DOORS MAIN STRUCTURE & STAFF QUARTERS

• Window / Door type:Timber - 313• Current condition:Fair• Finishing:Painted - 2• REPAIRS / ATTENTION REQUIRED:• Repairs required: No• RECOMMENDATIONS FOR MAINTENANCE:• Maintenance / attention required during: See attached Maintenance Action Plan• Maintenance recommended:Clean & paint - 2• COMPONENT REPLACEMENT:• Component earmarked for replacement:No• DOORS MAIN STRUCTURE & STAFF QUARTERS

Bld 1 - Front doors weathered Bld 2 - Front doors weathered

Page 60: Sample HouseCheck Maintenance Action Plan (MAP) · 2018-11-22 · HouseCheck Johannesburg Page 1 of 93 HouseCheck Maintenance Action Plan (MAP) 2018/08/24 2018/09/21 01-Jul 30-Jun

HouseCheck Johannesburg

Page 59 of 93

Bld 9 - Front doors weathered Bld 11 - Front doors weathered

Bld 17 - Storeroom doors damaged Bld 17 - Front doors weathered

Bld 18 - Front doors weathered

Page 61: Sample HouseCheck Maintenance Action Plan (MAP) · 2018-11-22 · HouseCheck Johannesburg Page 1 of 93 HouseCheck Maintenance Action Plan (MAP) 2018/08/24 2018/09/21 01-Jul 30-Jun

HouseCheck Johannesburg

Page 60 of 93

313 Windows & Doors• COMPONENT DISCRIPTION:• All windows and doors of the main structure and secondary structures are included in thiscomponent• COMPONENT INFORMATION AND CONDITION ASSESSMENT:• GARAGE DOORS MAIN STRUCTURE• Window / Door type:Glavanized metal - 312• Current condition:Fair• Finishing:Epoxy coated - 4• REPAIRS / ATTENTION REQUIRED:• RECOMMENDATIONS FOR MAINTENANCE:• Maintenance / attention required during: See attached Maintenance Action Plan• Maintenance recommended:Service / Maintenance - 10• COMPONENT REPLACEMENT:• Component earmarked for replacement:Select• GARAGE DOORS MAIN STRUCTURE

Bld 26 Garage - Doors appeared in good condition

321 Security Gates• COMPONENT DISCRIPTION:• All security gates in the common areas of the main and secondary structures are included in thiscomponent• COMPONENT INFORMATION AND CONDITION ASSESSMENT:• SECURITY GATE - POOL• Security gate type:• Current condition:Good• Finishing:Painted - 2• REPAIRS / ATTENTION REQUIRED:• Repairs required: No• RECOMMENDATIONS FOR MAINTENANCE:• Maintenance / attention required during: See attached Maintenance Action Plan• Maintenance recommended:Clean - 1• COMPONENT REPLACEMENT:• Component earmarked for replacement:No• SECURITY GATE - POOL

Page 62: Sample HouseCheck Maintenance Action Plan (MAP) · 2018-11-22 · HouseCheck Johannesburg Page 1 of 93 HouseCheck Maintenance Action Plan (MAP) 2018/08/24 2018/09/21 01-Jul 30-Jun

HouseCheck Johannesburg

Page 61 of 93

4 Floors

Security gate at pool area

411 Floor Covering• COMPONENT DISCRIPTION:• All floor covering of balconies, terraces, porches, verandas etc of the main structure andsecondary structures are included in this component• COMPONENT INFORMATION AND CONDITION ASSESSMENT:• MAIN STRUCTURES• Floor Covering type:Floor Tiles - 411• Current condition:Fair• Finishing:No finishing - 0• REPAIRS / ATTENTION REQUIRED:• Repairs required: Yes• Type of repairs / attention required: Specific sealing of tiles on stairways to prevent penetratingdamp into store rooms• RECOMMENDATIONS FOR MAINTENANCE:• Maintenance / attention required during: See attached Maintenance Action Plan• Maintenance recommended:Clean & apply waterproofing coating - 3• COMPONENT REPLACEMENT:• Component earmarked for replacement:No• MAIN STRUCTURES

Page 63: Sample HouseCheck Maintenance Action Plan (MAP) · 2018-11-22 · HouseCheck Johannesburg Page 1 of 93 HouseCheck Maintenance Action Plan (MAP) 2018/08/24 2018/09/21 01-Jul 30-Jun

HouseCheck Johannesburg

Page 62 of 93

Appear not to be sealed - penetrating damp instore rooms below

Tile floor covering

Tile floor covering Tile floor covering - mould

Appear not to be sealed - penetrating damp instore rooms below

Tile covering

Page 64: Sample HouseCheck Maintenance Action Plan (MAP) · 2018-11-22 · HouseCheck Johannesburg Page 1 of 93 HouseCheck Maintenance Action Plan (MAP) 2018/08/24 2018/09/21 01-Jul 30-Jun

HouseCheck Johannesburg

Page 63 of 93

412 Floor Covering• COMPONENT DISCRIPTION:• All floor covering of balconies, terraces, porches, verandas etc of the main structure andsecondary structures are included in this component• COMPONENT INFORMATION AND CONDITION ASSESSMENT:• STAFF QUARTERS• Floor Covering type:Floor Tiles - 411• Current condition:Poor• Finishing:No finishing - 0• REPAIRS / ATTENTION REQUIRED:• Repairs required: Yes• RECOMMENDATIONS FOR MAINTENANCE:• Maintenance / attention required during: See attached Maintenance Action Plan• Maintenance recommended: Clean and replace broken tiles• COMPONENT REPLACEMENT:• Component earmarked for replacement:No• STAFF QUARTERS

Bld 34 - Novilon floor covering damaged Bld 34 - Novilon floor covering damaged

Page 65: Sample HouseCheck Maintenance Action Plan (MAP) · 2018-11-22 · HouseCheck Johannesburg Page 1 of 93 HouseCheck Maintenance Action Plan (MAP) 2018/08/24 2018/09/21 01-Jul 30-Jun

HouseCheck Johannesburg

Page 64 of 93

421 Floor Slab• COMPONENT DISCRIPTION:• All floor slabs of balconies, terraces, porches, verandas etc of the main structure and secondarystructures are included in this component• COMPONENT INFORMATION AND CONDITION ASSESSMENT:• MAIN STRUCTURES AND STAFF QUARTERS• Floor slab type: Pre-cast Structure - 423• Current condition:Fair• Finishing:Painted - 2• REPAIRS / ATTENTION REQUIRED:• Repairs required: Yes• Type of repairs / attention required : Repair and seal cracks• See section 2-12 Exterior Foundations & Superstructure Walls

• RECOMMENDATIONS FOR MAINTENANCE:• Maintenance / attention required during: See attached Maintenance Action Plan• Maintenance recommended: As per specialist advise• COMPONENT REPLACEMENT:• Component earmarked for replacement:No• MAIN STRUCTURES AND STAFF QUARTERS

Bld 3 - Penetrating damp from above Bld 4 - Penetrating damp

Page 66: Sample HouseCheck Maintenance Action Plan (MAP) · 2018-11-22 · HouseCheck Johannesburg Page 1 of 93 HouseCheck Maintenance Action Plan (MAP) 2018/08/24 2018/09/21 01-Jul 30-Jun

HouseCheck Johannesburg

Page 65 of 93

Bld 8 - Penetrating damp from above Bld 8 - Penetrating damp from above

Bld 8 - Penetrating damp from above Bld 10 - No visible joint between slab & brick work- resulting in structural cracks and/or penetrating

damp

Bld 17 - Penetrating damp from above Unit 91 - Concrete spalling/paint flackig

Page 67: Sample HouseCheck Maintenance Action Plan (MAP) · 2018-11-22 · HouseCheck Johannesburg Page 1 of 93 HouseCheck Maintenance Action Plan (MAP) 2018/08/24 2018/09/21 01-Jul 30-Jun

HouseCheck Johannesburg

Page 66 of 93

5 Fixtures

521 Walk Way Balustrades and Hand Railings• COMPONENT DISCRIPTION:• All walkway, balcony, decks, terrace etc - balustrades and hand railings of the main andsecondary structures are included in this component• COMPONENT INFORMATION AND CONDITION ASSESSMENT:• MAIN STRUCTURES AND STAFF QUARTERS• Balustrade / railing type:Metal - 523• Current condition:Good• Finishing:Natural - 6• REPAIRS / ATTENTION REQUIRED:• Repairs required: No• RECOMMENDATIONS FOR MAINTENANCE:• Maintenance / attention required during: See attached Maintenance Action Plan• Maintenance recommended:Service / Maintenance - 10• COMPONENT REPLACEMENT:• Component earmarked for replacement:No• MAIN STRUCTURES AND STAFF QUARTERS

Generally in good condition Balustrades and hand railings

Page 68: Sample HouseCheck Maintenance Action Plan (MAP) · 2018-11-22 · HouseCheck Johannesburg Page 1 of 93 HouseCheck Maintenance Action Plan (MAP) 2018/08/24 2018/09/21 01-Jul 30-Jun

HouseCheck Johannesburg

Page 67 of 93

531 Signage, Information Displays and Road Signs• COMPONENT DISCRIPTION:• All signage, information and road signs affixed to or on walls, on road / tar, etc are included in thiscomponent• COMPONENT INFORMATION AND CONDITION ASSESSMENT:• SIGNAGE & INFORMATION BOARDS• Signage type: Board - 532• Current condition:Good• Finishing:Painted - 2• REPAIRS / ATTENTION REQUIRED:• Repairs required: No• RECOMMENDATIONS FOR MAINTENANCE:• Maintenance / attention required during: See attached Maintenance Action Plan• Maintenance recommended:Clean & paint - 2• COMPONENT REPLACEMENT:• Component earmarked for replacement:No• SIGNAGE & INFORMATION BOARDS

Bld 16 - Current condition:Good Current condition:Good

Current condition:Good Current condition:Good

Page 69: Sample HouseCheck Maintenance Action Plan (MAP) · 2018-11-22 · HouseCheck Johannesburg Page 1 of 93 HouseCheck Maintenance Action Plan (MAP) 2018/08/24 2018/09/21 01-Jul 30-Jun

HouseCheck Johannesburg

Page 68 of 93

Current condition:Good Current condition:Good

532 Signage, Information Displays and Road Signs• COMPONENT DISCRIPTION:• All signage, information and road signs affixed to or on walls, on road / tar, etc are included in thiscomponent• COMPONENT INFORMATION AND CONDITION ASSESSMENT:• ROAD MARKINGS• Signage type :Roadway - 531• Current condition:Good• Finishing: Painted - 2• REPAIRS / ATTENTION REQUIRED:• Repairs required: Yes• Type of repairs / attention required: Repaint stop road marking at main entrance• RECOMMENDATIONS FOR MAINTENANCE:• Maintenance / attention required during: See attached Maintenance Action Plan• Maintenance recommended:Clean & paint - 2• COMPONENT REPLACEMENT:• Component earmarked for replacement:No• ROAD MARKINGS

Stop road markings weathered Road markings current condition:Good

Page 70: Sample HouseCheck Maintenance Action Plan (MAP) · 2018-11-22 · HouseCheck Johannesburg Page 1 of 93 HouseCheck Maintenance Action Plan (MAP) 2018/08/24 2018/09/21 01-Jul 30-Jun

HouseCheck Johannesburg

Page 69 of 93

Current condition:Good Road markings current condition:Good

541 Post Boxes• COMPONENT DISCRIPTION:• All post boxes affixed to walls or part of wall structure are included in this component• COMPONENT INFORMATION AND CONDITION ASSESSMENT:• POST BOXES• Type of post boxes:Metal - 543• Current condition:Good• Finishing:Painted - 2• REPAIRS / ATTENTION REQUIRED:• Repairs required: No• Type of repairs / attention required:Select repairs• RECOMMENDATIONS FOR MAINTENANCE:• Maintenance / attention required during: See attached Maintenance Action Plan• Maintenance recommended:Service / Maintenance - 10• COMPONENT REPLACEMENT:• Component earmarked for replacement:No• POST BOXES

Bld 16 - Current condition:Good Bld 16 - Current condition:Good

Page 71: Sample HouseCheck Maintenance Action Plan (MAP) · 2018-11-22 · HouseCheck Johannesburg Page 1 of 93 HouseCheck Maintenance Action Plan (MAP) 2018/08/24 2018/09/21 01-Jul 30-Jun

HouseCheck Johannesburg

Page 70 of 93

6 Grounds

621 Ground Covering• COMPONENT DISCRIPTION:• All ground coverings - driveways, foot paths, outside areas, tennis courts, braai area, ect. areincluded in this component• COMPONENT INFORMATION AND CONDITION ASSESSMENT:• ROAD, PARKING & WALKWAYS• Ground covering type: Brick paving - 621• Current condition:Fair• Finishing:Natural - 6• REPAIRS / ATTENTION REQUIRED:• Repairs required: Yes• Type of repairs / attention required: Remove loose bricks and relay• RECOMMENDATIONS FOR MAINTENANCE:• Maintenance / attention required during: See attached Maintenance Action Plan• Maintenance recommended:Service / Maintenance - 10• COMPONENT REPLACEMENT:• Component earmarked for replacement:No• ROAD, PARKING & WALKWAYS

Walkways generally require attention in places Walkways generally require attention in places

Paved roadway - Current condition:Fair Pave parking areas generally in a fair condition

Page 72: Sample HouseCheck Maintenance Action Plan (MAP) · 2018-11-22 · HouseCheck Johannesburg Page 1 of 93 HouseCheck Maintenance Action Plan (MAP) 2018/08/24 2018/09/21 01-Jul 30-Jun

HouseCheck Johannesburg

Page 71 of 93

Paved parking requires general maintenance Paved walkways generally in a fair condition

631 Ground & Storm Water Drainage• COMPONENT DISCRIPTION:• All ground and storm water drainage systems are included in this component• COMPONENT INFORMATION AND CONDITION ASSESSMENT:• GROUNDS• Ground & Storm Water System type: Under ground pipes - 633• Current condition:Fair• REPAIRS / ATTENTION REQUIRED:• Repairs required: Yes• Type of repairs / attention required: Repair and replace damaged catch pit grids• RECOMMENDATIONS FOR MAINTENANCE:• Maintenance / attention required during: See attached Maintenance Action Plan• Maintenance recommended:Service / Maintenance - 10• COMPONENT REPLACEMENT:• Component earmarked for replacement:No• GROUNDS

Current condition:Good Current condition:Good

Page 73: Sample HouseCheck Maintenance Action Plan (MAP) · 2018-11-22 · HouseCheck Johannesburg Page 1 of 93 HouseCheck Maintenance Action Plan (MAP) 2018/08/24 2018/09/21 01-Jul 30-Jun

HouseCheck Johannesburg

Page 72 of 93

Current condition:Good Storm water inlet grid cover missing

632 Ground & Storm Water Drainage• COMPONENT DISCRIPTION:• All ground and storm water drainage systems are included in this component• COMPONENT INFORMATION AND CONDITION ASSESSMENT:• GROUNDS - STORM WATER MANAGEMENT• Ground & Storm Water System type: Concrete and/or paving apron around main structure wallsdirecting water flow away from structures• Current condition:Very poor• REPAIRS / ATTENTION REQUIRED:• Repairs required: Yes• The following was observed at time of inspection of the grounds in close proximity to thestructures: • Paved areas around structures covered in moss and algae; • Evidence of water ponding in areas; • Garden beds up against wall structures; and • Water run off not channelled away from structures.

This observation together with a possible high-water table goes hand in hand with the active risingdamp observed as noted and discussed in the section 2-12 Exterior Foundation & SuperstructureWall if left can lead to structural damage and very costly repairs.

See section 2-12 Exterior Foundation & Superstructure Wall for possible remedial work.• RECOMMENDATIONS FOR MAINTENANCE:• Maintenance recommended: Remedial work as per expert/specialist advice and review.• COMPONENT REPLACEMENT:• Component earmarked for replacement:No• GROUNDS - STORM WATER MANAGEMENT

Page 74: Sample HouseCheck Maintenance Action Plan (MAP) · 2018-11-22 · HouseCheck Johannesburg Page 1 of 93 HouseCheck Maintenance Action Plan (MAP) 2018/08/24 2018/09/21 01-Jul 30-Jun

HouseCheck Johannesburg

Page 73 of 93

Bld 2 - Garden beds against structure - possibledamp in walls

Bld 2 - Garden beds against structure - possibledamp in walls

Bld 3 - Garden beds against structure - possibledamp in walls

Bld 4 - Garden beds against structure - possibledamp in walls

Bld 4 - Apron not sloping away from mainstructure

Bld 8 - Garden beds against structure - possibledamp in walls

Page 75: Sample HouseCheck Maintenance Action Plan (MAP) · 2018-11-22 · HouseCheck Johannesburg Page 1 of 93 HouseCheck Maintenance Action Plan (MAP) 2018/08/24 2018/09/21 01-Jul 30-Jun

HouseCheck Johannesburg

Page 74 of 93

Bld 8 - Rain water not flowing away from mainstructure

Bld 9 - Garden beds against structure - possibledamp in walls

Bld 20 - Garden beds against structure - possibledamp in walls

Bld 20 - Garden beds against structure - possibledamp in walls

Page 76: Sample HouseCheck Maintenance Action Plan (MAP) · 2018-11-22 · HouseCheck Johannesburg Page 1 of 93 HouseCheck Maintenance Action Plan (MAP) 2018/08/24 2018/09/21 01-Jul 30-Jun

HouseCheck Johannesburg

Page 75 of 93

641 Water Supply, Garden Water & Irrigation• COMPONENT DISCRIPTION:• All water supply systems, garden water and irrigation systems are included in this component• COMPONENT INFORMATION AND CONDITION ASSESSMENT:• WATER SUPPLY• Water Supply, Garden Water & Irrigation System type:Water taps - 641• Current condition:Reasonable• REPAIRS / ATTENTION REQUIRED:• Repairs required: No• RECOMMENDATIONS FOR MAINTENANCE:• Maintenance / attention required during: See attached Maintenance Action Plan• Maintenance recommended:Service / Maintenance - 10

The water reticulation system of this complex is approximately 30 years old. Galvanised pipes weremostly used. There could possibly be water pressure problems etc. due to calcium buildup and/orother buildup in the galvanised pipes. It should be considered to get specialist advise and reviewand possible solutions.

The remedial work for the water supply could be argued as a repair cost. However, the exact extentand possible high cost is unknown and therefore rather budgeted for as a maintenance item overmultiple financial years. This budget can then also be adjusted annually as required.

• Professional fees for both the expert/specialist advice and review would be a once off cost.Estimated cost of R 12 000 for budget purpose is reflected under repairs.

• COMPONENT REPLACEMENT:• Component earmarked for replacement:No• WATER SUPPLY

661 Swimming Pools & Jacuzzi's• COMPONENT DISCRIPTION:• All swimming pool and jacuzzis' are included in this component• COMPONENT INFORMATION AND CONDITION ASSESSMENT:• SWIMMING POOL• REPAIRS / ATTENTION REQUIRED:• Repairs required: No• RECOMMENDATIONS FOR MAINTENANCE:• Maintenance / attention required during: See attached Maintenance Action Plan• Maintenance recommended:Service / Maintenance - 10• COMPONENT REPLACEMENT:• Component earmarked for replacement:YesFiberglass Lining• Replacement required in: See attached Maintenance Action Plan• SWIMMING POOL

Page 77: Sample HouseCheck Maintenance Action Plan (MAP) · 2018-11-22 · HouseCheck Johannesburg Page 1 of 93 HouseCheck Maintenance Action Plan (MAP) 2018/08/24 2018/09/21 01-Jul 30-Jun

HouseCheck Johannesburg

Page 76 of 93

Swimming pool - Current condition:Good

671 Vegetation• COMPONENT DISCRIPTION:• All trees, plants and shrubs which can cause potential damage are included in this component• COMPONENT INFORMATION AND CONDITION ASSESSMENT:• GARDEN• Tree, shrubs and plant growth type: Trees - 671• Current condition:Poor• Finishing:No finishing - 0• REPAIRS / ATTENTION REQUIRED:• Repairs required: Yes• Type of repairs / attention required: Trim tree branches & shrubs back and away from all.• RECOMMENDATIONS FOR MAINTENANCE:• Maintenance / attention required during: See attached Maintenance Action Plan• Maintenance recommended:Remove vegetation - 9• COMPONENT REPLACEMENT:• Component earmarked for replacement:No• GARDEN

Building 8 - Overhanging branches Bld 15 CP - Tree branches overhangingroof/leaves block gutters

Page 78: Sample HouseCheck Maintenance Action Plan (MAP) · 2018-11-22 · HouseCheck Johannesburg Page 1 of 93 HouseCheck Maintenance Action Plan (MAP) 2018/08/24 2018/09/21 01-Jul 30-Jun

HouseCheck Johannesburg

Page 77 of 93

Bld 23 CP - Tree branches overhangingroof/leaves block gutters

Bld 24 CP - Tree branches overhangingroof/leaves block gutters

Bld 25 CP - Tree branches overhangingroof/leaves block gutters

Bld 27 CP - Tree branches overhangingroof/leaves block gutters

Bld 29 CP - Tree branches overhangingroof/leaves block gutters

Bld 30 CP - Tree branches overhangingroof/leaves block gutters

Page 79: Sample HouseCheck Maintenance Action Plan (MAP) · 2018-11-22 · HouseCheck Johannesburg Page 1 of 93 HouseCheck Maintenance Action Plan (MAP) 2018/08/24 2018/09/21 01-Jul 30-Jun

HouseCheck Johannesburg

Page 78 of 93

7 Garden Structures

751 Fish & Koi Ponds, Water Features• COMPONENT DISCRIPTION:• All Fish & Koi ponds, Water features are included in this component• COMPONENT INFORMATION AND CONDITION ASSESSMENT:• WATER FEATURE• Fish & Koi ponds and water features type: Water feature• Current condition:Good• REPAIRS / ATTENTION REQUIRED:• RECOMMENDATIONS FOR MAINTENANCE:• Maintenance recommended:• COMPONENT REPLACEMENT:• Component earmarked for replacement:No• WATER FEATURE

Current condition:Good Current condition: Good

771 Carports• COMPONENT DISCRIPTION:• All carports structures are included in this component• COMPONENT INFORMATION AND CONDITION ASSESSMENT:• CARPORT STRUCTURES• Carport Structure type: Metal - 771• Current condition:Good• Finishing:Painted - 2• REPAIRS / ATTENTION REQUIRED:• Repairs required: Yes• Type of repairs / attention required: Remove and replace rusted sections• RECOMMENDATIONS FOR MAINTENANCE:• Maintenance recommended:Service / Maintenance - 10• COMPONENT REPLACEMENT:• Component earmarked for replacement:No• CARPORT STRUCTURES

Page 80: Sample HouseCheck Maintenance Action Plan (MAP) · 2018-11-22 · HouseCheck Johannesburg Page 1 of 93 HouseCheck Maintenance Action Plan (MAP) 2018/08/24 2018/09/21 01-Jul 30-Jun

HouseCheck Johannesburg

Page 79 of 93

Building 5 - Carport Bld 5 CP - Structure in good condition

Bld 5 CP - Acrylic waterproofing membranedebonding & rust

Building 6 - Carport

Bld 6 CP Bld 6 CP

Page 81: Sample HouseCheck Maintenance Action Plan (MAP) · 2018-11-22 · HouseCheck Johannesburg Page 1 of 93 HouseCheck Maintenance Action Plan (MAP) 2018/08/24 2018/09/21 01-Jul 30-Jun

HouseCheck Johannesburg

Page 80 of 93

Building 7 - Carport Bld 7 CP - Structure in good condition

Building 12 - Carport Building 13 - Carport

Building 14 - Carport Bld 14 CP - Structure in good condition

Page 82: Sample HouseCheck Maintenance Action Plan (MAP) · 2018-11-22 · HouseCheck Johannesburg Page 1 of 93 HouseCheck Maintenance Action Plan (MAP) 2018/08/24 2018/09/21 01-Jul 30-Jun

HouseCheck Johannesburg

Page 81 of 93

Building 15 - Carport Bld 15 CP - Decaying leaves possibly creatingrust

Building 22 CP - Carport Bld 22 CP - Structure in good condition

Building 23 - Carport Building 24 - Carport

Page 83: Sample HouseCheck Maintenance Action Plan (MAP) · 2018-11-22 · HouseCheck Johannesburg Page 1 of 93 HouseCheck Maintenance Action Plan (MAP) 2018/08/24 2018/09/21 01-Jul 30-Jun

HouseCheck Johannesburg

Page 82 of 93

Building 25 - Carport Bld 25 CP - Structure with rusted areas

Building 26 - Carport Bld 26 - Bird nest

Building 27 - Carport Bld 27 CP - Severe rust observed/internal gutterspossibly blocked

Page 84: Sample HouseCheck Maintenance Action Plan (MAP) · 2018-11-22 · HouseCheck Johannesburg Page 1 of 93 HouseCheck Maintenance Action Plan (MAP) 2018/08/24 2018/09/21 01-Jul 30-Jun

HouseCheck Johannesburg

Page 83 of 93

Bld 27 CP - Rust previously repaired Building 28 - Carport

Bld 28 CP - Structure badly rusted Bld 28 CP - Internal gutters possibly blocked

Building 29 - Carport Bld 29 CP - Structure badly rusted/possiblyblocked gutters

Page 85: Sample HouseCheck Maintenance Action Plan (MAP) · 2018-11-22 · HouseCheck Johannesburg Page 1 of 93 HouseCheck Maintenance Action Plan (MAP) 2018/08/24 2018/09/21 01-Jul 30-Jun

HouseCheck Johannesburg

Page 84 of 93

Bld 29 CP - Structure badly rusted/possiblyblocked gutters

Building 30 - Carport

Building 31 - Carport Bld 31 CP - Structure appears to be in goodcondition

Building 32 - Carport

Page 86: Sample HouseCheck Maintenance Action Plan (MAP) · 2018-11-22 · HouseCheck Johannesburg Page 1 of 93 HouseCheck Maintenance Action Plan (MAP) 2018/08/24 2018/09/21 01-Jul 30-Jun

HouseCheck Johannesburg

Page 85 of 93

8 Services

811 Fire Fighting & Prevention Equipment• COMPONENT DISCRIPTION:• All fire fighting, safety and prevention systems and equipment. Extinguishers, Smoke detectors,Sprinkler systems, ect are included in this component• COMPONENT INFORMATION AND CONDITION ASSESSMENT:• HOSE & REEL FIRE EQUIPMENT• Fire Fighting Equipment type: Hose & Reel - 811• Current condition:Good• REPAIRS / ATTENTION REQUIRED:• Repairs required: No• RECOMMENDATIONS FOR MAINTENANCE:• Maintenance recommended:Service / Maintenance - 10• COMPONENT REPLACEMENT:• Component earmarked for replacement:No• HOSE & REEL FIRE EQUIPMENT

Bld 1 - Appeared to be in order at time ofinspection

Bld 2 - Appeared to be in order at the time of theinspection

Bld 2 - Appeared in order at time of inspection Bld 8 - Appeared to be in order at time ofinspection

Page 87: Sample HouseCheck Maintenance Action Plan (MAP) · 2018-11-22 · HouseCheck Johannesburg Page 1 of 93 HouseCheck Maintenance Action Plan (MAP) 2018/08/24 2018/09/21 01-Jul 30-Jun

HouseCheck Johannesburg

Page 86 of 93

Bld - 9 appeared to be in order at time ofinspection

Bld 10 - Appeared to be in order at time ofinspection

812 Fire Fighting & Prevention Equipment• COMPONENT DISCRIPTION:• All fire fighting, safety and prevention systems and equipment. Extinguishers, Smoke detectors,Sprinkler systems, ect are included in this component• COMPONENT INFORMATION AND CONDITION ASSESSMENT:• FIRE EXTINGUISHERS• Fire Fighting Equipment type: Wall mounted extinguishers - 812• Current condition:Good• REPAIRS / ATTENTION REQUIRED:• Repairs required: No• RECOMMENDATIONS FOR MAINTENANCE:• Maintenance recommended:Service / Maintenance - 10• COMPONENT REPLACEMENT:• FIRE EXTINGUISHERS

Bld 3 - Appeared to be order at the time ofinspection

Bld 17 - Appeared to be in order at time ofinspection

Page 88: Sample HouseCheck Maintenance Action Plan (MAP) · 2018-11-22 · HouseCheck Johannesburg Page 1 of 93 HouseCheck Maintenance Action Plan (MAP) 2018/08/24 2018/09/21 01-Jul 30-Jun

HouseCheck Johannesburg

Page 87 of 93

Bld 20 - Appeared to be in order at time of inspection

813 Fire Fighting & Prevention EquipmentObservations: COMPONENT DISCRIPTION:All fire fighting, safety and prevention systems and equipment. Extinguishers, Smoke detectors,Sprinkler systems, ect are included in this componentCOMPONENT INFORMATION AND CONDITION ASSESSMENT:FIRE HYDRANTSFire Fighting Equipment type: Fire Hydrant - 814Current condition:GoodREPAIRS / ATTENTION REQUIRED:Repairs required: NoRECOMMENDATIONS FOR MAINTENANCE:Maintenance / attention required during:Year 2019Maintenance recommended:Service / Maintenance - 10COMPONENT REPLACEMENT:Component earmarked for replacement:NoFIRE HYDRANTS

Current condition:Good

Page 89: Sample HouseCheck Maintenance Action Plan (MAP) · 2018-11-22 · HouseCheck Johannesburg Page 1 of 93 HouseCheck Maintenance Action Plan (MAP) 2018/08/24 2018/09/21 01-Jul 30-Jun

HouseCheck Johannesburg

Page 88 of 93

821 Electrical Installations• COMPONENT DISCRIPTION:• All electrical installations, equipment, motors, lights, light fittings, are included in this component• COMPONENT INFORMATION AND CONDITION ASSESSMENT:• LIGHT FITTINGS -MAIN STRUCTURES, GARAGES AND STAFF QUARTERS• Current condition:Reasonable• Electrical Equipment type: Lights fittings - 823• REPAIRS / ATTENTION REQUIRED:• Repairs required: Yes• Type of repairs / attention required:Remove and replace damaged componenets• RECOMMENDATIONS FOR MAINTENANCE:• Maintenance / attention required during: See attached Maintenance Action Plan• Maintenance recommended:Service / Maintenance - 10

• COMPONENT REPLACEMENT:• Component earmarked for replacement:No• LIGHT FITTINGS -MAIN STRUCTURES, GARAGES AND STAFF QUARTERS

Bld 3 - Light shades missing Bld 3 - Light shades missing

Page 90: Sample HouseCheck Maintenance Action Plan (MAP) · 2018-11-22 · HouseCheck Johannesburg Page 1 of 93 HouseCheck Maintenance Action Plan (MAP) 2018/08/24 2018/09/21 01-Jul 30-Jun

HouseCheck Johannesburg

Page 89 of 93

822 Electrical Installations• COMPONENT DISCRIPTION:• All electrical installations, equipment, motors, lights, light fittings, are included in this component• COMPONENT INFORMATION AND CONDITION ASSESSMENT:• MAIN STRUCTURES, GARAGES AND STAFF QUARTERS• Electrical Equipment type: Electrical Distribution Box - 824• Current condition:Fair• REPAIRS / ATTENTION REQUIRED:• Repairs required: No• RECOMMENDATIONS FOR MAINTENANCE:• Maintenance / attention required during: See attached Maintenance Action Plan• Maintenance recommended:Service / Maintenance - 10

To compile an accurate maintenance plan for the electrical installations, it would be recommendedto get the services of a registered electrical engineer and/or electrician to establish the currentstatus-quo / compliance of the electrical installation for the whole complex.

• Professional fees for both the expert/specialist advice and review would be a once off cost.Estimated cost of R 12 000 for budget purpose is reflected under repairs.

• COMPONENT REPLACEMENT:• Component earmarked for replacement:No• MAIN STRUCTURES, GARAGES AND STAFF QUARTERS

Distribution cabinets Bld 16 - DB board

Page 91: Sample HouseCheck Maintenance Action Plan (MAP) · 2018-11-22 · HouseCheck Johannesburg Page 1 of 93 HouseCheck Maintenance Action Plan (MAP) 2018/08/24 2018/09/21 01-Jul 30-Jun

HouseCheck Johannesburg

Page 90 of 93

Bld 34 - DB Board Distribution cabinets

Distribution cabinets

Page 92: Sample HouseCheck Maintenance Action Plan (MAP) · 2018-11-22 · HouseCheck Johannesburg Page 1 of 93 HouseCheck Maintenance Action Plan (MAP) 2018/08/24 2018/09/21 01-Jul 30-Jun

HouseCheck Johannesburg

Page 91 of 93

Terms of Business and Scope of this HouseCheck Report

831 Drains & Sewer Systems• COMPONENT DISCRIPTION:• All gulleys, piping, rodding eyes, manholes, ect are included in this component• COMPONENT INFORMATION AND CONDITION ASSESSMENT:• MAIN STRUCTURES, GARAGES AND STAFF QUARTERS• Drains & Sewer System type: Drains & Gulleys - 831• Current condition:Reasonable• REPAIRS / ATTENTION REQUIRED:• Repairs required: No• RECOMMENDATIONS FOR MAINTENANCE:• Maintenance / attention required during: See attached Maintenance Action Plan• Maintenance recommended:Service / Maintenance - 10

The drains & sewer system of this complex is approximately 30 years old. To compile an effectiveappropriate maintenance plan for the drains & sewer system, it should be considered to have asewer camera inspection done of the sewer network in the complex.

• Professional fees for both the expert/specialist advice and review would be a once off cost.Estimated cost of R 35 000 for budget purpose is reflected under repairs.

• COMPONENT REPLACEMENT:• Component earmarked for replacement:No• MAIN STRUCTURES, GARAGES AND STAFF QUARTERS

Terms of Business &Scope of the HouseCheck Maintenance report This HouseCheck report documents only significant defects observed by the HouseCheck inspector at the time of theinspection regarding the estimated maintenance requirements of the external capital elements of a property, a structure,or a group property scheme. In the case of a group property scheme, the maintenance requirements of commonproperty may also be inspected and documented.“Maintenance requirement” is defined as an assessment by the HouseCheck inspector of the need to replace, repair orrefurbish any structure, or component of such structure within a time frame as stated in the HouseCheck report.Note: Other property specialists may disagree with the HouseCheck assessment of a defect, maintenance requirement,or time frame in which maintenance is estimated to be required. If uncertain, the client is urgent to get a “second opinion”. Training of HouseCheck inspectors:All HouseCheck reports are prepared by SAHITA certified inspectors using specialised inspection instruments andsoftware systems, which have been customised to suit the South African built environment. All HouseCheck reports arealso checked before release by an experienced Master Inspector to ensure and maintain the consistent high quality ofevery HouseCheck report. Limitations of this HouseCheck Report:Minor damage and defects, which in the opinion of HouseCheck, do not require prompt attention to preserve thefunctional and safety integrity of a structure or installation may not be documented in this HouseCheck Report. Typicallysuch damage or defects are “minor” or cosmetic in nature.  Need more detail? Get a HouseCheck Comprehensive Report:It is strongly recommended that anyone requiring comprehensive information regarding the condition of any propertyshould commission a HouseCheck Comprehensive Report on that property. This Comprehensive report, documents andevaluates all observed defects and also provides cost estimates for repair. Limitations and terms of any HouseCheck report:The goal of HouseCheck is to provide a professional, objective and unbiased inspection service to our clients based onobservable facts.

Page 93: Sample HouseCheck Maintenance Action Plan (MAP) · 2018-11-22 · HouseCheck Johannesburg Page 1 of 93 HouseCheck Maintenance Action Plan (MAP) 2018/08/24 2018/09/21 01-Jul 30-Jun

HouseCheck Johannesburg

Page 92 of 93

HouseCheck and Contractors

HouseCheck reports are based on the various standards set by the National Building Regulations (NBR), the NationalHome Builders' Registration Council (NHBRC) Manual and are guided by the specifications of the suppliers of manydifferent building materials used in the construction of South African homes. All of these sources provide HouseCheck inspectors with important information on the relevant accepted constructionquality standards. References to these authorities may be found in this report.  No guarantee or warranty:Caution: The HouseCheck report should never be construed as a guarantee or implied warranty of any type. Homeownership brings with it the certainty that failures and repairs will occur at some point and preventative maintenance andrepairs will be required. A HouseCheck report will not be able to predict all such occurrences, but the report shouldprovide the client(s) and other interested parties with a useful tool. All observations made and reported on in theHouseCheck report apply only to the time and date of the inspection. There is no guarantee or implied warranty of anyfuture condition, or change from the condition observed at the time of the inspection.  The scope and limitations of a HouseCheck inspection and report:HouseCheck will conduct a visual inspection only of the observable areas of the relevant sections of the property beinginspected and HouseCheck will then issue the client with a written report on the relevant inspected areas of the property.HouseCheck hereby absolves itself from any responsibility for any verbal feedback or comment provided to a client by aHouseCheck inspector or staff member. Only official, written, HouseCheck reports are valid. HouseCheck reports mayinclude photographs of some, or all, of the defects documented in the report. Where appropriate a technical assessmentof the defect, cost estimates and sometimes maintenance advice may also be included. The HouseCheck report is a reasonable effort to assess the present condition of the different components of theinspected property. The HouseCheck inspector will not move furniture or other goods, to obtain access to systems or components. The HouseCheck inspector will only walk on the roof, or enter the roof cavity, or a crawl space if, in the opinion of theinspector given the conditions at the time of the inspection, it is safe and practical for the inspector to do so. If theHouseCheck inspector is unable to access the roof or any other area for any reason, the inspector will inspect that areato the best of his/her ability without entering (for instance, scoping an inaccessible roof through binoculars). Who we are:HouseCheck is a national property inspection group of companies operating in Southern Africa. HouseCheck is a registered trademark (Trademark Reg. No. 2010113561) belonging to the HouseCheck Group ofCompanies. The HouseCheck Group consists of Fengshui Property Solutions CC Reg. No. 2008/234444/23;HouseCheck Inspectors (Pty) Ltd (Reg. No. 2012/189998/07); HouseCheck Inspectors (Cape) (Pty) Ltd Reg. No.2014/094671/07; HouseCheck Inspectors (Inland) (Pty) Ltd Reg. No. 2014/094666/07; HouseCheck Inspectors (East&Central) (Pty) Ltd Reg. No. 2014/094668/07; HouseCheck Franchising (Pty) Ltd Reg. No. 2012/189989/07 –all of:(Postal) Suite 258 Postnet, Private Bag X1005, Claremont, 7735 and with its Head Office at 80 St Michaels Road,Claremont 7707, Cape Town, South Africa.See also www.housecheck.co.za 

 HouseCheck does not recommend any contractors for repair work, because we see this as a potential conflict of interest and because wewould not have any control over workmanship, performance etc. HouseCheck recommends that the applicable governing body forwhichever trades are required should be contacted to obtain a list of local members. These members should be asked to quote on neededrepairs. Below are the regional website addresses of the Master Builders of South Africa. Master Builders South Africa: www.mbsa.org.za Regional Members:•Western Cape: www.mbawc.org.za

Page 94: Sample HouseCheck Maintenance Action Plan (MAP) · 2018-11-22 · HouseCheck Johannesburg Page 1 of 93 HouseCheck Maintenance Action Plan (MAP) 2018/08/24 2018/09/21 01-Jul 30-Jun

HouseCheck Johannesburg

Page 93 of 93

•Boland: www.mbaboland.org.za•Greater Boland: www.mbanorthboland.org.za•Northern Cape: www.mbanc.org.za •Eastern Cape: www.ecmba.org.za•North: www.mbanorth.co.za / www.gmba.org.za (Gauteng, North West, Mpumalanga and Limpopo provinces)•Kwa-Zulu Natal: www.masterbuilders.co.za •Free State: www.mbafs.co.za Below are the governing bodies of certain trades:•Electrical Contractors Association of SA: www.ecasa.co.za•Institute of Plumbing South Africa: www.iopsa.org.za/•Waterproofing Federation of South Africa: www.waterproofingfederation.co.za•Dampproofing and Waterproofing Association of South Africa: www.dwasa.net•Institute for Timber Construction South Africa: www.itc-sa.org•Thatchers Association of South Africa: www.sa-thatchers.co.za