7
Item Report Page 1 of 2
CLIENT ENSCO International Offshore Company
FACILITY ENSCO 8504 Semi-Sub rig, Drilling for SHELL offshore Sarawak, Malaysia
LOCATION AIR COMPRESSOR ROOM
EQUIPMENT AIR COMPRESSOR 3
COMPONENT CONTACT BREAKER,
SURVEYOR Anthony R Clouder, [email protected] +60138330093
FIXED
DURING
SURVEY
REMARKS: SEVERITY: SERIOUS FAULT TEMP. 75C. / Overheated by 27C approx. This was fixed and re-checked during the survey, and is now OK.
ARC. 10th March 2014
8
Item Report Page 2 of 2
CLIENT ENSCO PTY in Miri, Sarawak, East MALAYSIA.
FACILITY ENSCO 105 Jack-up rig, Drilling for SHELL offshore Miri, Sarawak.
LOCATION SCR ROOM
EQUIPMENT DEEP WELL, PORT-LEG, OVER LOAD UNIT
COMPONENT CONTACT BREAKER, TOP LEFT TERMINATION.
SURVEYOR Anthony R Clouder, [email protected] +60138330093
FIXED
DURING
SURVEY
REMARKS: 29th December 2013 SEVERITY: VERY SERIOUS FAULT TEMP. 75C. / Overheated by 50C approx. This was fixed and re-checked during the survey, and is now OK.
ARC.
6
CLIENT MAERSK DRILLING
FACILITY MAERSK COMPLETER drilling offshore BRUNEI Darussalam for SHELL
LOCATION VFD Room.
EQUIPMENT LIGHTING PANEL # 875 EL 002.
COMPONENT CONTACT BREAKER, 001
SURVEYOR Anthony R Clouder, [email protected] +60138330093
REMARKS: SEVERITY: VERY SERIOUS FAULT TEMP. 82C. / Overheated by 45C approx. Needed wire cutting-back a bit, and re-terminating.
ARC. 16th Sep. 2015
FIXED
DURING SURVEY
7
Item Report Page 2 of 2
CLIENT ENSCO International Offshore Company
FACILITY ENSCO 8504 Semi-Sub rig, Drilling for SHELL offshore Sarawak, Malaysia
LOCATION AIR COMPRESSOR ROOM
EQUIPMENT AIR COMPRESSOR 3
COMPONENT CONTACT BREAKER.
SURVEYOR Anthony R Clouder, [email protected] +60138330093
FIXED
DURING
SURVEY
REMARKS: SEVERITY: INTERMIDIATE FAULT TEMP. 65C. / Overheated by 16C approx. This was fixed and re-checked during the survey, and is now OK.
ARC. 10th March 2014.
7
Item Report Page 1 of 2
CLIENT ENSCO PTY in Miri, Sarawak, East MALAYSIA.
FACILITY ENSCO 105 Jack-up rig, Drilling for SHELL offshore Miri, Sarawak.
LOCATION SCR ROOM
EQUIPMENT MUD PUMP 1 BLOWER STARTER. OVERLOAD UNIT
COMPONENT CONTACT BREAKER, BOTTOM RIGHT TERMINATION.
SURVEYOR Anthony R Clouder, [email protected] +60138330093
FIXED
DURING
SURVEY
REMARKS: 29th DECEMBER 2013 SEVERITY: SERIOUS FAULT TEMP. 53C. / Overheated by 27C approx. This was fixed and re-checked during the survey, and is now OK.
ARC.
Item Report Page 1 of 2 CLIENT MAERSK DRILLING FACILITY MAERSK CONVINCER drilling offshore west MALAYSIA LOCATION SCR ROOM EQUIPMENT MUD AGITATOR # 8 COMPONENT TERMINAL BLOCK CONNECTOR B6FF. Centre right connection. SURVEYOR Anthony R Clouder, [email protected] +60138330093
REMARKS: 26th June 2013 SEVERITY: SERIOUS FAULT TEMP. 70C. / Overheated by 40c approx. This was fixed and re-checked during the survey, and is now OK.
ARC.
FIXED
DURING
SURVEY
Item Report Page 2 of 2
CLIENT MAERSK DRILLING FACILITY MAERSK CONVINCER drilling offshore west MALAYSIA LOCATION DRILL-FLOOR MCC ROOM EQUIPMENT EMERGENCY LIGHTING PANEL 876EL009 COMPONENT CONTACT BREAKER Bottom Left Termination. SURVEYOR Anthony R Clouder, [email protected] +60138330093
FIXED
DURING
SURVEY
REMARKS: 27th June 2013 SEVERITY: SERIOUS FAULT TEMP. 50C. / Overheated by 25c approx. This was fixed and re-checked during the survey, and is now OK.
ARC.
WASTE HEAT BOILER & TRANSFERLINE BOTH SIDES, & TOP.
Three anomalies were found on this system, as arrowed.
REFORMER CONVECTION MODULE WALL
NORTH-SIDE
Possibly a problem, but there could also be a Thermo-reflection from the heat-source above the light unit, As per the photograph, there appears to be a problem with panel above the light.
REFORMER CONVECTION MODULE WALL
NORTH-SIDE
STEAM REFORMER F-1201
NORTH‐WALL(WESTERN‐END)
The more serious anomalies are arrowed. Some of the others may warrant closer inspection.