san bernardino county transportation funding update

30
cta cog san bernardino county transportation authority san bernardino council of governments The California Asphalt Pavement Association CalAPA Spring Asphalt Pavement Conference & Equipment Expo April 12, 2017 Paula Beauchamp, PE Director of Project Delivery

Upload: california-asphalt-pavement-association

Post on 15-Apr-2017

19 views

Category:

Engineering


2 download

TRANSCRIPT

Page 1: San Bernardino County Transportation Funding Update

cta cogsan bernardino countytransportation authority

san bernardinocouncil of governments

The California Asphalt Pavement Association

CalAPASpring Asphalt Pavement Conference & Equipment Expo

April 12, 2017

Paula Beauchamp, PEDirector of Project Delivery

Page 2: San Bernardino County Transportation Funding Update

Agenda• SBCTA Background• Project Delivery

• Freeways• Interchanges• Grade Separations

• Transit & Rail• Doing Business with SBCTA

2

Page 3: San Bernardino County Transportation Funding Update

3

CouncilOf

Governments

CountyTransportation

Commission

TransportationAuthority

SubregionalPlanningAgency

CongestionManagement

Agency

Page 4: San Bernardino County Transportation Funding Update

2

Page 5: San Bernardino County Transportation Funding Update

Project Delivery

Development & construction of highway projects:

Freeways/Highways

Interchanges

Railroad Grade Separations

5

Page 6: San Bernardino County Transportation Funding Update

Project Delivery

• Environmental Phase • Environmental/Engineering Studies

• Design and Right of Way Phases• Land Surveys• Geometrics• Acquisition• Utility Coordination

• Construction• Post Construction

• Project Close out• Landscape

What we are doing…

6

Page 7: San Bernardino County Transportation Funding Update

Agenda

• SBCTA Background• Project Delivery

• Freeways• Interchanges• Grade Separations

• Transit & Rail• Doing Business with SBCTA

7

Page 8: San Bernardino County Transportation Funding Update

Freeway Mainline

8

Page 9: San Bernardino County Transportation Funding Update

9

Freeway Mainline

Page 10: San Bernardino County Transportation Funding Update

Freeway Mainline

10

Mixed Flow Lane Addition

PA&EDJanuary 2017

Final Design CompleteSummer 2018

Begin ConstructionSpring 2019

Page 11: San Bernardino County Transportation Funding Update

Freeway Mainline

Project Name CurrentPhase

TotalAmount

Opento

Public1 I-10 EB Truck Climbing Lane Planning $25.0M 20212 I-15 Corridor Express Lanes Environmental $371.0M 20243 I-10 Corridor Express Lanes Environmental $1.85B 20244 SR-210 Lane Addition Design / ROW $133.3M 20205 US 395 Widening Design / ROW $57.6M 2020

6I-215 Bi-County HOV Gap Closure Close Out $207.6M 2015

7 I-215 Widening Close Out / Landscape $326.3M 20148 SR-210 Freeway  Landscape $223.4M 2007

$3.19B  

11

Page 12: San Bernardino County Transportation Funding Update

Agenda

• SBCTA Background• Project Delivery

• Freeways• Interchanges• Grade Separations

• Transit & Rail• Doing Business with SBCTA

12

Page 13: San Bernardino County Transportation Funding Update

Interchanges

13

Page 14: San Bernardino County Transportation Funding Update

14

Interstate 215Barton Road InterchangeCM/GC

Construction Starts

Fall 2017

Interchanges

Page 15: San Bernardino County Transportation Funding Update

15

InterchangesInterstate 215

University Parkway Interchange

California’s first Divergent Diamond Interchange

Page 16: San Bernardino County Transportation Funding Update

I-10 Tippecanoe II

Interchanges

16

Page 17: San Bernardino County Transportation Funding Update

I-15 / I-215 / Devore

Interchanges

17

Page 18: San Bernardino County Transportation Funding Update

InterchangesProject Name Current Phase Total

AmountOpen to Public

1 I-10 / Mountain View Planning $3M 20202 I-10 / Mount Vernon Planning $37.6M 20223 I-10 / Monte Vista Environmental $31.3M 20214 I-215 / University Environmental $5.6M 20205 SR 60 / Archibald Environmental $14.6M 20216 SR 60 / Central Environmental $20M 20207 I-10 / Alabama Environmental $10.0M 20208 I-10 / Cedar Design / ROW $72M 20219 SR-210 / Baseline Design / ROW $19M 202010 I-215 / Barton Construction $43.7M 201911 SR-210 / Pepper Construction $24.5M 201812 I-10 / University Construction $5.9M 201813 I-10 / Pepper Construction $10.5M 201714 I-15 / Baseline Construction $50.5M 201615 I-15 / I-215 / Devore ROW / Close Out $325M 201616 I-15 / Ranchero Close Out $58.3M 201517 I-10 / Cherry Close Out $80.7M 201518 I-10 / Citrus Close Out / Landscape $57.7M 201419a I-10 / Tippecanoe I Landscape $24.9M 201419b I-10 / Tippecanoe II Close Out / Landscape $54.2M 201620 I-10 / Riverside Landscape $40M 201121 I-10 / Wildwood Canyon Conceptual TBD TBD

$989M   18

Page 19: San Bernardino County Transportation Funding Update

Agenda

• SBCTA Background• Project Delivery

• Freeways• Interchanges• Grade Separations

• Transit & Rail• Doing Business with SBCTA

19

Page 20: San Bernardino County Transportation Funding Update

Grade Separations

20

Page 21: San Bernardino County Transportation Funding Update

Laurel Street / BNSF

Grade Separations

21

Page 22: San Bernardino County Transportation Funding Update

Grade Separations

Project Name Current Phase Total Amount

Open to Public

1 Mount Vernon Avenue Viaduct Environmental / Design $124M 2024

2 Monte Vista Avenue / UPRR Construction $26.7M 2018

3 North Vineyard / UPRR Construction $56.4M 2016

4 Palm Avenue / BNSF Close Out $24.2M 2015

5 South Milliken / UPRR Close Out $72.1M 2017

6 Lenwood Road / BNSF Close Out $30.9M 2015

7 Laurel Street / BNSF Close Out $59.9M 2016

8 Hunts Lane / UPRR Close Out $34.0M 2014

9 Glen Helen Pkwy / BNSF Close Out $32.5M 2015. $460.7M  

22

Page 23: San Bernardino County Transportation Funding Update

Agenda

• SBCTA Background• Project Delivery

• Freeways• Interchanges• Grade Separations

• Transit & Rail• Doing Business with SBCTA

23

Page 24: San Bernardino County Transportation Funding Update

Transit & Rail Programs

24

Downtown San BernardinoPassenger Rail Project

Construction = 70% complete

Revenue service begins in spring 2017

Page 25: San Bernardino County Transportation Funding Update

Transit & Rail Programs

25

Final Design 2015-2017

Vehicle Procurement2016-2020

Construction 2017-2019

Begin Service2020

Page 26: San Bernardino County Transportation Funding Update

Transit & Rail Programs

West Valley Connector

26

West Valley Connector - BRT

Page 27: San Bernardino County Transportation Funding Update

Project Name CurrentPhase

TotalAmount

Opento Public

Metrolink Eastern Maintenance Facility Operational $13.1M 2014 San Bernardino Transit Center Operational $23M 2015 San Bernardino Transit Center Landscaping & Emergency Generator Pre-Construction $0.8M 2017 Downtown San Bernardino Passenger Rail Construction $110M 2017 Redlands Passenger Rail Design/Early Utilities $285.5M 2020

Gold Line to Montclair*Advanced Conceptual

Engineering $70M 2025

Metrolink Double Track – Lilac to Rancho

Environmental/ Preliminary Engineering $74M TBD

Shortway Quiet Zone Right of Way $4M 2017 Sierra & Juniper Grade Crossings Pre-Construction $3.7M 2017 West Valley Connector Environmental $170M+ TBD Zanja Bridge Removal Environmental $0.06M N/A Mountain Transit Facility Upgrade Study Study $0.3M N/A

$754M+  

Transit & Rail Programs

27

Page 28: San Bernardino County Transportation Funding Update

28

• SBCTA Background• Project Delivery

• Freeways• Interchanges• Grade Separations

• Transit & Rail• Doing Business with SBCTA

Agenda

Page 29: San Bernardino County Transportation Funding Update

Doing Business

2929

Page 30: San Bernardino County Transportation Funding Update

cta cogsan bernardino countytransportation authority

san bernardinocouncil of governments

Thank You

Questions/Comments

Paula BeauchampDirector of Project Delivery

[email protected]