Page 1: San Jose Diridon Station Integrated Concept Planand+Minutes/JPB/CAC/Other/2014/...Feb 20, 2019  · Management KEY OBJECTIVES 3 . Concept Plan Scope 12-18 Month Process ... STATION

1

SAN JOSÉ DIRIDON STATION

JPB CAC

February 20, 2019

Agenda Item 9

Page 2: San Jose Diridon Station Integrated Concept Planand+Minutes/JPB/CAC/Other/2014/...Feb 20, 2019  · Management KEY OBJECTIVES 3 . Concept Plan Scope 12-18 Month Process ... STATION

- Work as a cohesive group

- Shared vision for a fresh, bold look

- Co-create an integrated project (i.e., tracks, station, development)

- Partner resources & commitments (funding, grants, etc.)

- “You won’t get everything you want, but you will get more than you expected!”

Cooperative Agreement

COOPERATIVE AGREEMENT

2

Page 3: San Jose Diridon Station Integrated Concept Planand+Minutes/JPB/CAC/Other/2014/...Feb 20, 2019  · Management KEY OBJECTIVES 3 . Concept Plan Scope 12-18 Month Process ... STATION

Key Objectives

A Multi-modal, Integrated, and Human-centered Station

The Station as Catalyst for the Urban Environment

The Station as a Destination

A Compelling Vision for the Future of the Diridon Station

A Futureproof, Flexible, Adaptive, and Innovative Station

Partnership Organization

Internal & External Stakeholder

Funding Objectives and Risk Management

KEY OBJECTIVES

3

Page 4: San Jose Diridon Station Integrated Concept Planand+Minutes/JPB/CAC/Other/2014/...Feb 20, 2019  · Management KEY OBJECTIVES 3 . Concept Plan Scope 12-18 Month Process ... STATION

Concept Plan Scope

12-18 Month Process

Phase I: Spatial Configuration

• Scenario Development

• Scenario Evaluation

• Single Preferred Option Selection

Phase II: Advance the Preferred Option

• Prepare 10% engineering and design plans

• Roadmap to Delivery (potential phasing program)

• Preliminary cost estimate

Organizational framework developed in tandem with design and engineering

CONCEPT PLAN SCOPE

18 Month Process

PHASE I: Spatial Configuration

- Scenario Development

- Scenario Evaluation

- Single Preferred Option Selection

PHASE II: Advance the Preferred Option

- Prepare 10% engineering and design plans

- Roadmap to Delivery (potential phasing program)

- Preliminary cost estimate

Organizational framework developed in tandem with design and engineering

4

Page 5: San Jose Diridon Station Integrated Concept Planand+Minutes/JPB/CAC/Other/2014/...Feb 20, 2019  · Management KEY OBJECTIVES 3 . Concept Plan Scope 12-18 Month Process ... STATION

STATION AND

SURROUNDINGS

5

Page 6: San Jose Diridon Station Integrated Concept Planand+Minutes/JPB/CAC/Other/2014/...Feb 20, 2019  · Management KEY OBJECTIVES 3 . Concept Plan Scope 12-18 Month Process ... STATION

Track configuration

Spatial configuration of the Multimodal Hub

Urban integration

Position of Bus Stops, Light Rail, Taxis, TNCs, Vehicles, etc…

Intermodal transfer

Station Access

Basis for evaluation

NOT: Architectural Vision

NOT: Detailed Engineering

NOT: Atmosphere, Colors, Materials, Look & Feel

WHAT IS A SCENARIO?

6

Page 7: San Jose Diridon Station Integrated Concept Planand+Minutes/JPB/CAC/Other/2014/...Feb 20, 2019  · Management KEY OBJECTIVES 3 . Concept Plan Scope 12-18 Month Process ... STATION

7

Page 8: San Jose Diridon Station Integrated Concept Planand+Minutes/JPB/CAC/Other/2014/...Feb 20, 2019  · Management KEY OBJECTIVES 3 . Concept Plan Scope 12-18 Month Process ... STATION

8

Page 9: San Jose Diridon Station Integrated Concept Planand+Minutes/JPB/CAC/Other/2014/...Feb 20, 2019  · Management KEY OBJECTIVES 3 . Concept Plan Scope 12-18 Month Process ... STATION

9

STATION AREA PROPERTY OWNERSHIP

Page 10: San Jose Diridon Station Integrated Concept Planand+Minutes/JPB/CAC/Other/2014/...Feb 20, 2019  · Management KEY OBJECTIVES 3 . Concept Plan Scope 12-18 Month Process ... STATION

CURRENT SITUATION

10

Page 11: San Jose Diridon Station Integrated Concept Planand+Minutes/JPB/CAC/Other/2014/...Feb 20, 2019  · Management KEY OBJECTIVES 3 . Concept Plan Scope 12-18 Month Process ... STATION

Community Engagement Strategy

- Support future capacity for multiple rail operators

(passenger platforms, number of tracks, etc. )

- Coordinate with Caltrain Business Plan

TRACK CONFIGURATION

11

Page 12: San Jose Diridon Station Integrated Concept Planand+Minutes/JPB/CAC/Other/2014/...Feb 20, 2019  · Management KEY OBJECTIVES 3 . Concept Plan Scope 12-18 Month Process ... STATION

AT GRADE

12

Page 13: San Jose Diridon Station Integrated Concept Planand+Minutes/JPB/CAC/Other/2014/...Feb 20, 2019  · Management KEY OBJECTIVES 3 . Concept Plan Scope 12-18 Month Process ... STATION

ELEVATED

13

Page 14: San Jose Diridon Station Integrated Concept Planand+Minutes/JPB/CAC/Other/2014/...Feb 20, 2019  · Management KEY OBJECTIVES 3 . Concept Plan Scope 12-18 Month Process ... STATION

Elements: Track Configuration Trade-Off/Benefits Considerations

- Relationship to the Urban fabric

- Points North and South:

- Interface with UPRR

- Interface with Roadway crossings

TRACK CONFIGURATION

TRADE-OFF / BENEFITS CONSIDERATIONS

14

Page 15: San Jose Diridon Station Integrated Concept Planand+Minutes/JPB/CAC/Other/2014/...Feb 20, 2019  · Management KEY OBJECTIVES 3 . Concept Plan Scope 12-18 Month Process ... STATION

CURRENT SITUATION

16

Page 16: San Jose Diridon Station Integrated Concept Planand+Minutes/JPB/CAC/Other/2014/...Feb 20, 2019  · Management KEY OBJECTIVES 3 . Concept Plan Scope 12-18 Month Process ... STATION

Need the image for the middle station location

ST FERNANDO POSITION

17

Page 17: San Jose Diridon Station Integrated Concept Planand+Minutes/JPB/CAC/Other/2014/...Feb 20, 2019  · Management KEY OBJECTIVES 3 . Concept Plan Scope 12-18 Month Process ... STATION

SANTA CLARA POSITION

18

Page 18: San Jose Diridon Station Integrated Concept Planand+Minutes/JPB/CAC/Other/2014/...Feb 20, 2019  · Management KEY OBJECTIVES 3 . Concept Plan Scope 12-18 Month Process ... STATION

Urban Integration

- How the intermodal station relates physically to the surroundings

- Resolve or address any barriers that the current situation creates

- Connections and pathways through and to the intermodal station

- Easy, seamless connections for all abilities and ages

URBAN INTEGRATION

ACCESS PLANNING

19

Page 19: San Jose Diridon Station Integrated Concept Planand+Minutes/JPB/CAC/Other/2014/...Feb 20, 2019  · Management KEY OBJECTIVES 3 . Concept Plan Scope 12-18 Month Process ... STATION

Key Milestones and Tentative Timeline: Phase 1

Fall 2018 Winter 2019 Spring 2019 Summer 2019

Kick-off Scenarios

Direction from City Council/ Partner Agency Boards

Single Preferred Option

KEY MILESTONES AND TENTATIVE TIMELINE:

PHASE I