1

SAN JOSÉDIRIDON STATION

Joint Powers Board

February 7, 2019

Page 3: San Jose Diridon Station

A Multi-modal, Integrated, and Human-centered Station

The Station as Catalyst for the Urban Environment

The Station as a Destination

A Compelling Vision for the Future of the Diridon Station

A Futureproof, Flexible, Adaptive, and Innovative Station

Partnership Organization

Internal & External Stakeholder

Funding Objectives and Risk Management

KEY OBJECTIVES

3

Page 4: San Jose Diridon Station

CONCEPT PLAN SCOPE

18 Month Process

PHASE I: Spatial Configuration

- Scenario Development

- Scenario Evaluation

- Single Preferred Option Selection

PHASE II: Advance the Preferred Option

- Prepare 10% engineering and design plans

- Roadmap to Delivery (potential phasing program)

- Preliminary cost estimate

Organizational framework developed in tandem with design and engineering

4

Page 5: San Jose Diridon Station

5

Page 6: San Jose Diridon Station

Track configuration

Spatial configuration of the Multimodal Hub

Urban integration

Position of Bus Stops, Light Rail, Taxis, TNCs, Vehicles, etc…

Intermodal transfer

Station Access

Basis for evaluation

NOT: Architectural Vision

NOT: Detailed Engineering

NOT: Atmosphere, Colors, Materials, Look & Feel

WHAT IS A SCENARIO?

6

Page 7: San Jose Diridon Station

7

Page 8: San Jose Diridon Station

8

Page 9: San Jose Diridon Station

9

STATION AREA PROPERTY OWNERSHIP

Page 10: San Jose Diridon Station

CURRENT SITUATION

10

Page 11: San Jose Diridon Station

- Support future capacity for multiple rail operators

(passenger platforms, number of tracks, etc. )

- Balanced with integration with surroundings

- Coordinate with Caltrain Business Plan

TRACK CONFIGURATION

11

Page 12: San Jose Diridon Station

CONCEPT 1 –AT GRADE, SAN FERNANDO

12

Page 13: San Jose Diridon Station

CONCEPT 2 –ELEVATED, SAN FERNANDO

13

Page 14: San Jose Diridon Station

CONCEPT 3 –AT GRADE, SANTA CLARA

14

Page 15: San Jose Diridon Station

- Relationship to the Urban fabric

- Points North and South:

- Interface with UPRR

- Interface with Roadway crossings

- Guadalupe Creek

TRACK CONFIGURATION

TRADE-OFF / BENEFITS CONSIDERATIONS

15

Page 16: San Jose Diridon Station

CURRENT SITUATION

17

Page 17: San Jose Diridon Station

ST FERNANDO POSITION

18

Page 18: San Jose Diridon Station

SANTA CLARA POSITION

19

Page 19: San Jose Diridon Station

- How the intermodal station relates physically to the surroundings

- Resolve or address any barriers that the current situation creates

- Connections and pathways through and to the intermodal station

- Easy, seamless connections

URBAN INTEGRATION

ACCESS PLANNING

20

Page 20: San Jose Diridon Station

Fall 2018 Winter 2019 Spring 2019 Summer 2019

Kick-off Scenarios

Direction from City Council/ Partner Agency Boards

Single Preferred Option

KEY MILESTONES AND TENTATIVE TIMELINE:

PHASE I

21