sapnote_0000494487 project system consulting notes
DESCRIPTION
OSS NOTESTRANSCRIPT
10.07.2013 Page 1 of 10
SAP Note 494487 - Project System: Consulting notes
Note Language: English Version: 13 Validity: Valid Since 14.03.2003
Summary
SymptomConsulting notes in PS
Structure:
1. Master data
a) General
o Archiving PS_PROJECT
o Authorization check
o Validation / substitution
o Customer-specific fields
o Batch input
o User status
o Editing masks
o Conversion
b) Network
o CO888 when network is called up
o Material
o Dates
o Delivery address for third-party order
c) WBS
o ALE distribution
o Create with template
o Inconsistencies
d) Project Builder
e) Project planning board
f) Milestones
g) PS texts
h) Documents and PS
10.07.2013 Page 2 of 10
SAP Note 494487 - Project System: Consulting notes
i) Version / simulation
2. Controlling
a) General information
b) Sales order value update
c) Project cash management
d) Cost planning
e) Period closing general
f) Revenues+result
3. Progress analysis
4. Resource-related billing document/sales pricing/offer creation/results analysis project
5. Information system
a) Logical database PSJ
b) Logistics Information system
c) Business Information system
d) Summarization
6. Business Information Warehouse: PS content
7. Interface to external project systems (OpenPS)
8. Confirmation
Notes:
1. Master data
a) General
o Archiving PS_PROJECT
- 497986 Archiving: Projects/networks not deleted
o Authorization check
- 536428 Composite SAP note on authorization check
o Validation / substitution
- 536461 Composite SAP note on validation / substitution
o Customer-specific fields
10.07.2013 Page 3 of 10
SAP Note 494487 - Project System: Consulting notes
- 522581 User-defined fields are not displayed
o Batch input
- 370958 Consulting note:Frequnt problems during batch input
- 535013 CJ20N: batch input in background mode
o User status
- 536464 Composite SAP note on user statuses in PS
o Editing masks
- 536471 Composite SAP note on editing masks
o Conversion
- 522246 PS consulting: Internal and external number project /WBS
b) Network
o CO888 when network is called up
- 536500 Composite SAP note on CO888 when calling network
- 391996 VA02: BOM explosion number is not copied
- 542887 Missing status objects and/or temporary activity numbers
o Material
- 526252 Project System, material: Consulting notes
o Dates
- 536487 Composite SAP note on dates in the network
o Delivery address for third-party order
- 536450 Composite SAP note on delivery address for third-partyorder
o Configuration
- 535189 Configured standard network: Possible object links
c) WBS
o ALE distribution
- 378888 Distribution of projects using ALE
o Create with template
- 536494 Composite SAP note on 'Create by copying'
10.07.2013 Page 4 of 10
SAP Note 494487 - Project System: Consulting notes
o Inconsistencies
- 536501 Composite SAP note on inconsistencies in PS
d) Project Builder
- 536489 Composite SAP note on Project Builder
- 596263 CJ20N: consulting note: performance in the ProjectBuilder
- 535013 Batch input in background mode
e) Project planning board
- 500933 Proj. plng board: Recomm., additional information,advice
f) Milestones
- 328072 Positioning on milestone overview for WBS element
g) PS texts
- 493101 PS texts in the Project System
h) Documents and PS
- 536508 Composite SAP note on documents and PS
i) Version / simulation
- 505113 Consulting notes PS-SIM, PS-VER
2. Controlling
a) General information
- 397799 INFORMATION: CO-OM-OPA (Order & Project Accounting)
- 398983 Information: IM (Investment Management)
b) Sales order value update
- 512353 Composite SAP note on PS cash management
c) Project cash management
- 417511 (FI) Collective note for PS Cash Management
d) Cost planning
- 536521 Composite SAP note on cost planning in PS
e) Period closing general
- 536496 Composite SAP note on period-end closing (general)
10.07.2013 Page 5 of 10
SAP Note 494487 - Project System: Consulting notes
f) Revenues+result
- 536526 Composite SAP note on revenues and result
3. Consulting note Progress analysis 516476
4. Resource-related billing/sales pricing/offer creation/ resultsanalysis project
- 528604 PS: SAP note on billing doc./costing/results analysis
5. Information system
a) Logical database PSJ
- 0528360 Composite SAP note for logical database PSJ
b) Logistics information system 516479
c) Business Information system
- 0526206 PSIS: Consulting notes on business information system
d) Summarization
- 0536524 Composite SAP note on summarization in PS
6. Business Information Warehouse: PS content
- 0526203 PSBW: Consulting notes on PS content in BW
7. Interface to external project systems (OpenPS)
- 0505734 Consulting notes OpenPS
8. Confirmation
- 594809 Collective consulting note for PS confirmation
Other terms
Reason and Prerequisites
SolutionTake the relevant notes (listed above) into account.
Header Data
Release Status: Released for CustomerReleased on: 14.03.2003 14:54:45Master Language: GermanPriority: Correction with high priorityCategory: Consulting
10.07.2013 Page 6 of 10
SAP Note 494487 - Project System: Consulting notes
Primary Component: PS Project System
Secondary Components:PS-ST Structures
PS-ST-PLN Structure Planning
PS-ST-INT Interface to External ProjectSoftware
PS-COS-PER-ABC Process Costs
PS-REV Revenues and Eamings
PS-REV-PLN-PLN Planning
PS-CAF-PLN-PLN Planning
PS-REV-PLN-CAL Costings
PS-CAF-PLN-CAL Costings
PS-CAF Payments
PS-CRP-WFP Workforce Planning
PS-CRP-SRV External Services Management
PS-MAT-INT Bill of Material Transfer
PS-MAT-DLV Delivery
PS-CON-CAT Time Sheet
PS-SIM Simulation
PS-VER Versions
PS-PRG Progress
PS-PRG-EVA Progress Analysis
PS-IS-TRA Trend Analyses
PS-IS-CON Responsibility Accounting
PS-IS-ACC-SUM Project Summarization
PS-IS-INT Interfaces and Enhancements
CS-BS-BI Billing
BW-BCT-PS Project System
PS-REV-IO Project-Related Incoming Orders
PS-COS-BUD Budget
PS-ST-TMP Templates
PS-ST-DEF-TMP Standard Project Definition
PS-DOC Documents
PS-DOC-TXT Project Text
PS-DOC-DMS Document Processing
PS-ST-MIL-TMP Standard Milestone
PS-ST-NET-TMP Standard Network
PS-CRP-PRT Production Resources/Tools
PS-ST-WBS-TMP Standard Work Breakdown Structure
PS-COS-PER Automatic and Periodic Allocations
PS-COS-PER-PT Periodic Transfer
PS-COS-PER-OC Overhead
PS-COS-PER-IC Interest
PS-REV-RA Results Analysis
PS-COS-PER-SE Settlement
PS-CON Confirmation
10.07.2013 Page 7 of 10
SAP Note 494487 - Project System: Consulting notes
PS-CON-NET Confirmation of Network Activities
PS-CON-EXT Decentralized Confirmation (PDC)
PS-COS-ACT Actual Costs and Forecast
PS-CRP-CMP Capacity Leveling
PS-CAF-ACT Actual Payments and Forecast
PS-MAT-PRC Procurement
PS-REV-ACT Actual Revenues and Forecast
PS-WFL SAP Business Workflow Connection
PS-IS Information System
PS-IS-ACC Accounting
PS-IS-LOG-CAP Capacities
PS-IS-LOG Logistics
PS-IS-REP Project Reports
PS-IS-GRF Graphics
PS-IS-INT-EXT Interfaces With External Systems
PS-IS-LOG-MAT Material
PS-ST-OPR Operative Structures
PS-ST-DEF Project Definition
PS-ST-MIL Milestone
PS-ST-NET Network and activities
PS-CRP-PLN Capacity Planning
PS-ST-NET-SUB Subnetworks
PS-ST-WBS Work Breakdown Structure
PS-REV-TRF Subprojects
PS-COS Costs
PS-COS-PLN Costs
PS-COS-PLN-PLN Planned Costs
PS-COS-PLN-CAL Costing
PS-ST-ORD Orders for Projects
PS-PRG-IND Statistical Key Figures
PS-CRP Resources
PS-DAT Dates
PS-DAT-WBS Time Scheduling
PS-DAT-NET Network Scheduling
PS-CAF-PLN Planned Payments
PS-MAT Material
PS-ST-PPB Project Planning Board
PS-REV-PLN Planned Revenues
PS-CLM Claim Management
PS-ST-PB Project Builder
CA-TS-PS Integration Project System
PS-ST-INT-EXT PS-interface to external systems
PS-ST-INT-BAPI BAPI-interface to PS
The Note is release-independent
10.07.2013 Page 8 of 10
SAP Note 494487 - Project System: Consulting notes
Related Notes
Number Short Text
596263 CJ20N: consulting note: performance in the Project Builder
594809 Collective consulting note for PS confirmation
573133 FAQ 2: Call of network
554415 FAQ 2: Authorization check
554139 FAQ 2: Batch input
553832 FAQ 2: Conversion
553661 FAQ 2: Coding masks
542887 Missing status objects and/or temporary activity numbers
535013 CJ20N: batch input in background mode
533434 CN25: Goods Movement via PS Confirmation (Consulting Note)
528604 PS: SAP note on billing doc./costing/results analysis
528360 Composite SAP note for logical database PSJ
526252 Project System, material: Consulting notes
526206 PSIS: Consulting notes on business information system
526203 PSBW: Consulting notes on PS content in BW
522426 Consulting: Authorizations in the Project System
522285 Project creation with template vs. Inclusion
522246 PS consulting: Internal and external number for project/WBS
521625 Apparent inconsistencies during the creation of projects
521483 Input help displayed incorrectly
520944 Problems when/after creating/transporting editing masks
512353 Consulting composite SAP note planned revenues from SD docs
505734 Consulting notes OpenPS
505113 Consulting notes PS-SIM, PS-VER
502459 Copy project via menu entries
502407 F4 for dely address third-party requisitn:Address group PS02
500933 Proj.plng board: Recomm., additional information, consulting
500556 CJB1/CJB2: Information for settlement rule generation
499389 VA01/VF01: Check/derivation of the assigned WBS element
497986 Archiving: Projects/networks not deleted
496963 32-bit source release in upgrades to 620
495269 Poor performance for substitution /mass change/ ...
493101 PS texts in the Project System
491308 Project Builder: Switching from display to change
490916 Project creation with template: Data from project profile
489473 CJ9F/CJ9FS: Automatic determin. of interval for fiscal year
458871 Message 26073 when creating documents
455255 CJ2B: Font in the date bar cannot be changed
454013 CJZ1: Charges of current year not with interest calculation
10.07.2013 Page 9 of 10
SAP Note 494487 - Project System: Consulting notes
Number Short Text
453280 Conflicting coding mask and project/WBS element
441749 Infrastructure for wildcard search of WBS element
434155 Call PS display transactions from CV02N/CV03N
433328 Error messages in SAP enhancement CNEX0002
422558 Message when executing customer exit CNEX0002
418141 Copying customer number proposed (after Note 396340)
417511 (FI) Collective note for PS Cash Management
415367 CN21: Transfer of standard network w/ parameter effectivity
399312 Display transaction for PS objects in CV02N
398983 Information: IM (Investment Management)
398627 INFO: CO-PC-OBJ (Results analysis/WIP calculation)
397799 INFORMATION: CO-OM-OPA (Order & Project Accounting)
397243 Information: CO-OM (period-end closing)
396340 Address for third-party requistn in network despite 'Cancel'
393782 Performance: Results analysis
391996 VA02: BOM explosion number is not copied
390224 CO888 in CN22, CN23 when network is called up
378888 Distribution of projects using ALE
378813 Special development: Partially confirmed activity element
370958 Consulting note:Frequnt problems during batch input
355904 Always read planning board profile from project profile
353130 PS/PM integration: Different scheduling results
350868 KKRC: Conversion report RCJCLMIG and standard WBS
338469 Print control in the Project Builder
329038 KKRP: initial NUMC fields for transfer in PS
328072 Positioning on milestone overview for WBS element
313899 Summarization via master data characteristics
311938 Problems w. PS confirmation due to status HCNF
303348 User exits CNEX0025: Example
182244 AM010: F4 help address no. third-party requisition
178110 Short dump when calling Project Builder
171244 Valuation area for networks
170948 Status inconsistency in work breakdown structure
158714 Project coding mask can be transported w/o warning
151551 Consulting: Scheduling of network
150788 Classification inconsistency in project
149698 Hierarchy inconsistency in the project
134752 Error in project interest calculation
123211 CO888 in CN22, CN23 when calling network
88699 Termination message CO888: 'Internal error when creating ITA
61886 SAP enhancement CNEX0002: No authorization
60522 Author.check B_USERSTAT during business transaction
49293 Wildcards during data selection
10.07.2013 Page 10 of 10
SAP Note 494487 - Project System: Consulting notes
Attributes
Attribute Value
Transaction codes BAPI
Transaction codes CN21
Transaction codes CN22
Transaction codes CN23
Transaction codes CN33
Transaction codes CN70
Transaction codes KKRP
Transaction codes VA02