sapnote_0000494487 project system consulting notes

10
10.07.2013 Page 1 of 10 SAP Note 494487 - Project System: Consulting notes Note Language: English Version: 13 Validity: Valid Since 14.03.2003 Summary Symptom Consulting notes in PS Structure: 1. Master data a) General o Archiving PS_PROJECT o Authorization check o Validation / substitution o Customer-specific fields o Batch input o User status o Editing masks o Conversion b) Network o CO888 when network is called up o Material o Dates o Delivery address for third-party order c) WBS o ALE distribution o Create with template o Inconsistencies d) Project Builder e) Project planning board f) Milestones g) PS texts h) Documents and PS

Upload: mayura-mulla

Post on 09-Feb-2016

155 views

Category:

Documents


1 download

DESCRIPTION

OSS NOTES

TRANSCRIPT

Page 1: Sapnote_0000494487 PROJECT SYSTEM Consulting Notes

10.07.2013 Page 1 of 10

SAP Note 494487 - Project System: Consulting notes

Note Language: English Version: 13 Validity: Valid Since 14.03.2003

Summary

SymptomConsulting notes in PS

Structure:

1. Master data

a) General

o Archiving PS_PROJECT

o Authorization check

o Validation / substitution

o Customer-specific fields

o Batch input

o User status

o Editing masks

o Conversion

b) Network

o CO888 when network is called up

o Material

o Dates

o Delivery address for third-party order

c) WBS

o ALE distribution

o Create with template

o Inconsistencies

d) Project Builder

e) Project planning board

f) Milestones

g) PS texts

h) Documents and PS

Page 2: Sapnote_0000494487 PROJECT SYSTEM Consulting Notes

10.07.2013 Page 2 of 10

SAP Note 494487 - Project System: Consulting notes

i) Version / simulation

2. Controlling

a) General information

b) Sales order value update

c) Project cash management

d) Cost planning

e) Period closing general

f) Revenues+result

3. Progress analysis

4. Resource-related billing document/sales pricing/offer creation/results analysis project

5. Information system

a) Logical database PSJ

b) Logistics Information system

c) Business Information system

d) Summarization

6. Business Information Warehouse: PS content

7. Interface to external project systems (OpenPS)

8. Confirmation

Notes:

1. Master data

a) General

o Archiving PS_PROJECT

- 497986 Archiving: Projects/networks not deleted

o Authorization check

- 536428 Composite SAP note on authorization check

o Validation / substitution

- 536461 Composite SAP note on validation / substitution

o Customer-specific fields

Page 3: Sapnote_0000494487 PROJECT SYSTEM Consulting Notes

10.07.2013 Page 3 of 10

SAP Note 494487 - Project System: Consulting notes

- 522581 User-defined fields are not displayed

o Batch input

- 370958 Consulting note:Frequnt problems during batch input

- 535013 CJ20N: batch input in background mode

o User status

- 536464 Composite SAP note on user statuses in PS

o Editing masks

- 536471 Composite SAP note on editing masks

o Conversion

- 522246 PS consulting: Internal and external number project /WBS

b) Network

o CO888 when network is called up

- 536500 Composite SAP note on CO888 when calling network

- 391996 VA02: BOM explosion number is not copied

- 542887 Missing status objects and/or temporary activity numbers

o Material

- 526252 Project System, material: Consulting notes

o Dates

- 536487 Composite SAP note on dates in the network

o Delivery address for third-party order

- 536450 Composite SAP note on delivery address for third-partyorder

o Configuration

- 535189 Configured standard network: Possible object links

c) WBS

o ALE distribution

- 378888 Distribution of projects using ALE

o Create with template

- 536494 Composite SAP note on 'Create by copying'

Page 4: Sapnote_0000494487 PROJECT SYSTEM Consulting Notes

10.07.2013 Page 4 of 10

SAP Note 494487 - Project System: Consulting notes

o Inconsistencies

- 536501 Composite SAP note on inconsistencies in PS

d) Project Builder

- 536489 Composite SAP note on Project Builder

- 596263 CJ20N: consulting note: performance in the ProjectBuilder

- 535013 Batch input in background mode

e) Project planning board

- 500933 Proj. plng board: Recomm., additional information,advice

f) Milestones

- 328072 Positioning on milestone overview for WBS element

g) PS texts

- 493101 PS texts in the Project System

h) Documents and PS

- 536508 Composite SAP note on documents and PS

i) Version / simulation

- 505113 Consulting notes PS-SIM, PS-VER

2. Controlling

a) General information

- 397799 INFORMATION: CO-OM-OPA (Order & Project Accounting)

- 398983 Information: IM (Investment Management)

b) Sales order value update

- 512353 Composite SAP note on PS cash management

c) Project cash management

- 417511 (FI) Collective note for PS Cash Management

d) Cost planning

- 536521 Composite SAP note on cost planning in PS

e) Period closing general

- 536496 Composite SAP note on period-end closing (general)

Page 5: Sapnote_0000494487 PROJECT SYSTEM Consulting Notes

10.07.2013 Page 5 of 10

SAP Note 494487 - Project System: Consulting notes

f) Revenues+result

- 536526 Composite SAP note on revenues and result

3. Consulting note Progress analysis 516476

4. Resource-related billing/sales pricing/offer creation/ resultsanalysis project

- 528604 PS: SAP note on billing doc./costing/results analysis

5. Information system

a) Logical database PSJ

- 0528360 Composite SAP note for logical database PSJ

b) Logistics information system 516479

c) Business Information system

- 0526206 PSIS: Consulting notes on business information system

d) Summarization

- 0536524 Composite SAP note on summarization in PS

6. Business Information Warehouse: PS content

- 0526203 PSBW: Consulting notes on PS content in BW

7. Interface to external project systems (OpenPS)

- 0505734 Consulting notes OpenPS

8. Confirmation

- 594809 Collective consulting note for PS confirmation

Other terms

Reason and Prerequisites

SolutionTake the relevant notes (listed above) into account.

Header Data

Release Status: Released for CustomerReleased on: 14.03.2003 14:54:45Master Language: GermanPriority: Correction with high priorityCategory: Consulting

Page 6: Sapnote_0000494487 PROJECT SYSTEM Consulting Notes

10.07.2013 Page 6 of 10

SAP Note 494487 - Project System: Consulting notes

Primary Component: PS Project System

Secondary Components:PS-ST Structures

PS-ST-PLN Structure Planning

PS-ST-INT Interface to External ProjectSoftware

PS-COS-PER-ABC Process Costs

PS-REV Revenues and Eamings

PS-REV-PLN-PLN Planning

PS-CAF-PLN-PLN Planning

PS-REV-PLN-CAL Costings

PS-CAF-PLN-CAL Costings

PS-CAF Payments

PS-CRP-WFP Workforce Planning

PS-CRP-SRV External Services Management

PS-MAT-INT Bill of Material Transfer

PS-MAT-DLV Delivery

PS-CON-CAT Time Sheet

PS-SIM Simulation

PS-VER Versions

PS-PRG Progress

PS-PRG-EVA Progress Analysis

PS-IS-TRA Trend Analyses

PS-IS-CON Responsibility Accounting

PS-IS-ACC-SUM Project Summarization

PS-IS-INT Interfaces and Enhancements

CS-BS-BI Billing

BW-BCT-PS Project System

PS-REV-IO Project-Related Incoming Orders

PS-COS-BUD Budget

PS-ST-TMP Templates

PS-ST-DEF-TMP Standard Project Definition

PS-DOC Documents

PS-DOC-TXT Project Text

PS-DOC-DMS Document Processing

PS-ST-MIL-TMP Standard Milestone

PS-ST-NET-TMP Standard Network

PS-CRP-PRT Production Resources/Tools

PS-ST-WBS-TMP Standard Work Breakdown Structure

PS-COS-PER Automatic and Periodic Allocations

PS-COS-PER-PT Periodic Transfer

PS-COS-PER-OC Overhead

PS-COS-PER-IC Interest

PS-REV-RA Results Analysis

PS-COS-PER-SE Settlement

PS-CON Confirmation

Page 7: Sapnote_0000494487 PROJECT SYSTEM Consulting Notes

10.07.2013 Page 7 of 10

SAP Note 494487 - Project System: Consulting notes

PS-CON-NET Confirmation of Network Activities

PS-CON-EXT Decentralized Confirmation (PDC)

PS-COS-ACT Actual Costs and Forecast

PS-CRP-CMP Capacity Leveling

PS-CAF-ACT Actual Payments and Forecast

PS-MAT-PRC Procurement

PS-REV-ACT Actual Revenues and Forecast

PS-WFL SAP Business Workflow Connection

PS-IS Information System

PS-IS-ACC Accounting

PS-IS-LOG-CAP Capacities

PS-IS-LOG Logistics

PS-IS-REP Project Reports

PS-IS-GRF Graphics

PS-IS-INT-EXT Interfaces With External Systems

PS-IS-LOG-MAT Material

PS-ST-OPR Operative Structures

PS-ST-DEF Project Definition

PS-ST-MIL Milestone

PS-ST-NET Network and activities

PS-CRP-PLN Capacity Planning

PS-ST-NET-SUB Subnetworks

PS-ST-WBS Work Breakdown Structure

PS-REV-TRF Subprojects

PS-COS Costs

PS-COS-PLN Costs

PS-COS-PLN-PLN Planned Costs

PS-COS-PLN-CAL Costing

PS-ST-ORD Orders for Projects

PS-PRG-IND Statistical Key Figures

PS-CRP Resources

PS-DAT Dates

PS-DAT-WBS Time Scheduling

PS-DAT-NET Network Scheduling

PS-CAF-PLN Planned Payments

PS-MAT Material

PS-ST-PPB Project Planning Board

PS-REV-PLN Planned Revenues

PS-CLM Claim Management

PS-ST-PB Project Builder

CA-TS-PS Integration Project System

PS-ST-INT-EXT PS-interface to external systems

PS-ST-INT-BAPI BAPI-interface to PS

The Note is release-independent

Page 8: Sapnote_0000494487 PROJECT SYSTEM Consulting Notes

10.07.2013 Page 8 of 10

SAP Note 494487 - Project System: Consulting notes

Related Notes

Number Short Text

596263 CJ20N: consulting note: performance in the Project Builder

594809 Collective consulting note for PS confirmation

573133 FAQ 2: Call of network

554415 FAQ 2: Authorization check

554139 FAQ 2: Batch input

553832 FAQ 2: Conversion

553661 FAQ 2: Coding masks

542887 Missing status objects and/or temporary activity numbers

535013 CJ20N: batch input in background mode

533434 CN25: Goods Movement via PS Confirmation (Consulting Note)

528604 PS: SAP note on billing doc./costing/results analysis

528360 Composite SAP note for logical database PSJ

526252 Project System, material: Consulting notes

526206 PSIS: Consulting notes on business information system

526203 PSBW: Consulting notes on PS content in BW

522426 Consulting: Authorizations in the Project System

522285 Project creation with template vs. Inclusion

522246 PS consulting: Internal and external number for project/WBS

521625 Apparent inconsistencies during the creation of projects

521483 Input help displayed incorrectly

520944 Problems when/after creating/transporting editing masks

512353 Consulting composite SAP note planned revenues from SD docs

505734 Consulting notes OpenPS

505113 Consulting notes PS-SIM, PS-VER

502459 Copy project via menu entries

502407 F4 for dely address third-party requisitn:Address group PS02

500933 Proj.plng board: Recomm., additional information, consulting

500556 CJB1/CJB2: Information for settlement rule generation

499389 VA01/VF01: Check/derivation of the assigned WBS element

497986 Archiving: Projects/networks not deleted

496963 32-bit source release in upgrades to 620

495269 Poor performance for substitution /mass change/ ...

493101 PS texts in the Project System

491308 Project Builder: Switching from display to change

490916 Project creation with template: Data from project profile

489473 CJ9F/CJ9FS: Automatic determin. of interval for fiscal year

458871 Message 26073 when creating documents

455255 CJ2B: Font in the date bar cannot be changed

454013 CJZ1: Charges of current year not with interest calculation

Page 9: Sapnote_0000494487 PROJECT SYSTEM Consulting Notes

10.07.2013 Page 9 of 10

SAP Note 494487 - Project System: Consulting notes

Number Short Text

453280 Conflicting coding mask and project/WBS element

441749 Infrastructure for wildcard search of WBS element

434155 Call PS display transactions from CV02N/CV03N

433328 Error messages in SAP enhancement CNEX0002

422558 Message when executing customer exit CNEX0002

418141 Copying customer number proposed (after Note 396340)

417511 (FI) Collective note for PS Cash Management

415367 CN21: Transfer of standard network w/ parameter effectivity

399312 Display transaction for PS objects in CV02N

398983 Information: IM (Investment Management)

398627 INFO: CO-PC-OBJ (Results analysis/WIP calculation)

397799 INFORMATION: CO-OM-OPA (Order & Project Accounting)

397243 Information: CO-OM (period-end closing)

396340 Address for third-party requistn in network despite 'Cancel'

393782 Performance: Results analysis

391996 VA02: BOM explosion number is not copied

390224 CO888 in CN22, CN23 when network is called up

378888 Distribution of projects using ALE

378813 Special development: Partially confirmed activity element

370958 Consulting note:Frequnt problems during batch input

355904 Always read planning board profile from project profile

353130 PS/PM integration: Different scheduling results

350868 KKRC: Conversion report RCJCLMIG and standard WBS

338469 Print control in the Project Builder

329038 KKRP: initial NUMC fields for transfer in PS

328072 Positioning on milestone overview for WBS element

313899 Summarization via master data characteristics

311938 Problems w. PS confirmation due to status HCNF

303348 User exits CNEX0025: Example

182244 AM010: F4 help address no. third-party requisition

178110 Short dump when calling Project Builder

171244 Valuation area for networks

170948 Status inconsistency in work breakdown structure

158714 Project coding mask can be transported w/o warning

151551 Consulting: Scheduling of network

150788 Classification inconsistency in project

149698 Hierarchy inconsistency in the project

134752 Error in project interest calculation

123211 CO888 in CN22, CN23 when calling network

88699 Termination message CO888: 'Internal error when creating ITA

61886 SAP enhancement CNEX0002: No authorization

60522 Author.check B_USERSTAT during business transaction

49293 Wildcards during data selection

Page 10: Sapnote_0000494487 PROJECT SYSTEM Consulting Notes

10.07.2013 Page 10 of 10

SAP Note 494487 - Project System: Consulting notes

Attributes

Attribute Value

Transaction codes BAPI

Transaction codes CN21

Transaction codes CN22

Transaction codes CN23

Transaction codes CN33

Transaction codes CN70

Transaction codes KKRP

Transaction codes VA02