scn _ all content - sap erp 6

24
8/24/2015 SCN : All Content SAP ERP 6.0 Upgrade http://upgrade137.rssing.com/chan19291971/all_p11.html#item201 1/24 Are you the publisher? Claim or contact us about this channel Embed this content in your HTML Search Report adult content: click to rate Account: (login ) More Channels Showcase RSS Channel Showcase 8310894 RSS Channel Showcase 5939232 RSS Channel Showcase 5639207 RSS Channel Showcase 5256184 Channel Catalog Subsection Catalog Articles on this Page (showing articles 201 to 220 of 870) 11/23/1220:50: _A practical approac... 12/16/1305:15: _EHP5 to EHP7 Upgrad... 01/06/1422:15: _SAP ERP 6.0 EHP 6 01/07/1400:29: _Stuck at preproces... 01/09/1410:27: _Upgrade tool to be ... 01/17/1302:31: _PSAPSR3702 not empt... 05/23/1014:21: _MAIN_INIT/CHECKCDMO... 03/15/1302:57: _Error at MAIN_UPTRA... 01/13/1417:52: _issue after upgrade... 01/13/1423:33: _Posting Goods issue... 01/14/1411:22: _4.6C Upgrade to ECC... 01/14/1413:49: _SP stack implementa... 01/15/1400:56: _Severe error(s) occ... 12/25/0923:07: _Is R3load used in U... 01/15/1423:48: _ERP Upgrade 2syste... 01/16/1402:36: _How to upgrade SAP ... 01/16/1421:39: _Can anyone tell if ... 01/16/1422:49: _Is ther anythings ... 02/14/1018:25: _R/3 4.6 C to ECC 6.... 01/18/1421:15: _Checks after phase ... (showing articles 201 to 220 of 870) Browse the Latest Snapshot Browsing All Articles (870 Articles) Live Browser Channel Description: All Content in SAP ERP 6.0 Upgrade older | 1 | .... | 8 | 9 | 10 | (Page 11) | 12 | 13 | 14 | .... | 44 | newer 0 0 11/23/1220:50: A practical approach to perform Technical assessment for SAP Upgrade project A practical approach to perform Technical assessment for SAP Upgrade project Technical assessment is the first step for any SAP Upgrade project. Initially I struggled a bit to gather all the required information in structured format as I did not get any suitable template on internet and SDN site. Finally I have decided to prepare a generic template for any upgrade project so that I can use for any client / company. Being a SAP Basis upgrade consultant / architect, what is the most important information I need for my upgrade project, so that it will help me to smoothly execute and deliver the project on time and can cover most of the unknown(s). From my personal experience, a technical upgrade assessment is a combined effort of SAP Basis, DBA, infrastructure and functional team, primarily driven by Basis upgrade consultant or designated project manager. Since this is a technical assessment, I will not cover any functional specifications or information about affected customized programs and changes. The main focus of technical assessment is to collect information about source landscape , interfaces and target landscape what is going to be changed and what are interdependencies. Finally, what tool you will use and how you will translate or implement these changes and resolve all interdependencies. A lot of upgrade projects need to perform both upgrade and Unicode migration; formally we called CU&UC (combine upgrade and Unicode conversion). So I will cover some of the critical assessment points of Unicode migration too. A assessment report varies from company to company – it may be a simple page , twopagedocument or a comprehensive report with detail technical specifications. I have prepared the following checklist as the starting point for any SAP upgrade project as a template for technical assessment. Once again this is not for functional upgrade or functional assessment – hence this will help SAP Basis folks only. Please share your experience if I missed something. Technical Assessment Checklist Sl No Topic Collected Information 1 Project Project is for : Release Upgrade Combine upgrade and Unicode migration Example : SAP BW 7.0 upgrade to BW 7.3 CU&UC from SAP Enterprise 4.7 to SAP ECC 6.0 with EHP6 HOME | SEARCH | REGISTER RSS | MY ACCOUNT | EMBED RSS | SUPER RSS | Contact Us | http://scn.sap.com/community/feeds/allcontent?community=2095 S CN : All Content SAP ERP 6.0 Upgrade

Upload: donna-schmidt

Post on 14-Dec-2015

384 views

Category:

Documents


4 download

DESCRIPTION

Scn _ All Content - Sap Erp 6

TRANSCRIPT

Page 1: Scn _ All Content - Sap Erp 6

8/24/2015 SCN : All Content SAP ERP 6.0 Upgrade

http://upgrade137.rssing.com/chan19291971/all_p11.html#item201 1/24

Are you the publisher? Claim or contact usabout this channel

Embed this content in your HTML

Search

Report adult content:

click to rate

Account: (login)

More Channels

Showcase

RSS Channel Showcase 8310894

RSS Channel Showcase 5939232

RSS Channel Showcase 5639207

RSS Channel Showcase 5256184

Channel Catalog

Subsection Catalog

Articles on this Page

(showing articles 201 to 220 of 870)

11/23/1220:50: _A practical approac...

12/16/1305:15: _EHP5 to EHP7 Upgrad...

01/06/1422:15: _SAP ERP 6.0 EHP 6

01/07/1400:29: _Stuck at preproces...

01/09/1410:27: _Upgrade tool to be ...

01/17/1302:31: _PSAPSR3702 not empt...

05/23/1014:21: _MAIN_INIT/CHECKCDMO...

03/15/1302:57: _Error at MAIN_UPTRA...

01/13/1417:52: _issue after upgrade...

01/13/1423:33: _Posting Goods issue...

01/14/1411:22: _4.6C Upgrade to ECC...

01/14/1413:49: _SP stack implementa...

01/15/1400:56: _Severe error(s) occ...

12/25/0923:07: _Is R3load used in U...

01/15/1423:48: _ERP Upgrade 2syste...

01/16/1402:36: _How to upgrade SAP ...

01/16/1421:39: _Can anyone tell if ...

01/16/1422:49: _Is ther any things ...

02/14/1018:25: _R/3 4.6 C to ECC 6....

01/18/1421:15: _Checks after phase ...

(showing articles 201 to 220 of 870)

Browse the Latest Snapshot Browsing All Articles (870 Articles) Live Browser

Channel Description:

All Content in SAP ERP 6.0 Upgrade

older | 1 | .... | 8 | 9 | 10 | (Page 11) | 12 | 13 | 14 | .... | 44 | newer

0 011/23/1220:50: A practical approach to performTechnical assessment for SAP Upgrade project

A practical approach to perform Technical assessment for SAPUpgrade project

Technical assessment is the first step for any SAP Upgrade project. Initially I struggleda bit to gather all the required information in structured format as I did not get anysuitable template on internet and SDN site. Finally I have decided to prepare a generictemplate for any upgrade project so that I can use for any client / company. Being aSAP Basis upgrade consultant / architect, what is the most important information I needfor my upgrade project, so that it will help me to smoothly execute and deliver theproject on time and can cover most of the unknown(s). From my personal experience,a technical upgrade assessment is a combined effort of SAP Basis, DBA, infrastructureand functional team, primarily driven by Basis upgrade consultant or designated projectmanager. Since this is a technical assessment, I will not cover any functionalspecifications or information about affected customized programs and changes. Themain focus of technical assessment is to collect information about source landscape ,interfaces and target landscape what is going to be changed and what are interdependencies. Finally, what tool you will use and how you will translate orimplement these changes and resolve all interdependencies. A lot of upgrade projectsneed to perform both upgrade and Unicode migration; formally we called CU&UC(combine upgrade and Unicode conversion). So I will cover some of the criticalassessment points of Unicode migration too.

A assessment report varies from company to company – it may be a simple page ,twopagedocument or a comprehensive report with detail technical specifications. Ihave prepared the following checklist as the starting point for any SAP upgrade projectas a template for technical assessment. Once again this is not for functional upgrade orfunctional assessment – hence this will help SAP Basis folks only.

Please share your experience if I missed something.

Technical Assessment Checklist

SlNo

Topic Collected Information

1 Project

Project is for :

Release Upgrade

Combine upgrade andUnicode migration

Example :

SAP BW 7.0 upgrade to BW7.3

CU&UC from SAPEnterprise 4.7 to SAP ECC6.0 with EHP6

HOME | SEARCH | REGISTER RSS | MY ACCOUNT | EMBED RSS | SUPER RSS | Contact Us |

http://scn.sap.com/community/feeds/allcontent?community=2095

SCN : All Content SAP ERP 6.0 Upgrade

Page 2: Scn _ All Content - Sap Erp 6

8/24/2015 SCN : All Content SAP ERP 6.0 Upgrade

http://upgrade137.rssing.com/chan19291971/all_p11.html#item201 2/24

OS+DB upgrade and SAPtechnical upgrade.

Need to decide ( There areinstances when client doesnot know whether upgraderequires OS+DB upgradeas well as platformupgrade and which paththey need to follow ).

Multi steps upgrade process:First upgrade OS + DB,stabilize the environment.Start SAP release upgradefrom CRM 4.0 to CRM 7.0 –EHP2

Multistep scenario.

2 Informationabout sourcesystem

SAP Release

Is it a single stack or duelstack

SPS level

Database version

DB size

OS ( Make and Version)

Hardware

Any clustering setup

Any HA / DR solution

Landscape details

How many systems arethere on this landscape

Location of the servers

Additional App Servers

User base

Example : Source system is ECCsystem :

ECC 5.0

Single stack

SP18

Oracle 10.0.2.4

3 TB

Solaris 10

SUN M5000

No clustering

Oracle RAC for QA andProduction systems.

Example :

Five systems landscape:Sandbox, DEV, QA, Trainingand Production.

All nonproduction systemsare on Data Center X andproduction system is on Datacenter Y ( 50 miles apart fromeach other and they areconnected with 1 GBPSshared network.)

For production system thereare 20 App Servers.

For ECC 5.0 – 14,000 namedusers across North Americaand EUROPE.

30,000 Enterprise Portal user– for ESS/MSS applications.

3 Is there anychanges to the

Example

Page 3: Scn _ All Content - Sap Erp 6

8/24/2015 SCN : All Content SAP ERP 6.0 Upgrade

http://upgrade137.rssing.com/chan19291971/all_p11.html#item201 3/24

existingenvironment ?

What are the things you needto change for the existingenvironment to perform thisupgrade

SAP Release upgrade

Is the anyminimumsupport packlevel for thisupgrade

Changes toother SAPproducts ( releaseupgrade orpatches )

SolutionManager patchingor upgraderequired togenerate stackxml

Changes tophysical resourceof the SAP

Yes ( for example) upgrade the 640kernel to 640_EXTwhile upgradingform ECC 5.0 toECC 6.0 (EHP6) andthat will supporthigher release of DBand OS.

Based on changes– it may triggeranother SAPproduct to change.For example, if youlike to upgrade toECC 6.0 with EHP6and you have CRM4.0 system, there isa strong possibilitythat you have toupgrade your CRMsystem too. Sogather informationabout all changes.

Another example is :if you upgrade yourCRM system toCRM 7.0 EHP2 andyour connectedbackend system isECC 6.0 withEHP3, you need toapply patches forPI_Basis on yourECC system forinteroperability.

Apply patch forSolution Manager (for example togenerate EHP6 stackxml you need tohave minimumSPS23 for SolutionManager ).

Does it requiremore memory andCPU to cover yourdowntime?

In certain

Page 4: Scn _ All Content - Sap Erp 6

8/24/2015 SCN : All Content SAP ERP 6.0 Upgrade

http://upgrade137.rssing.com/chan19291971/all_p11.html#item201 4/24

server.

Does itrequire DB or OSupgrade ?

Combine Upgradeand Unicodemigration projects.

(Printer is a key area need toaddress carefully in case ofUnicode migration.).

upgrade scenario,you have to upgradeOS or DB or bothbefore upgrade (verify with PAM)

Perform CU&UC from SAPR/3 4.6 to SAP ECC 6.0EHP5. Verify all third partysoftware’s Unicodecompatibility. Check allprinters.

Changes to physical resourceof the SAP server – Memoryand CPU cores. Database sizeand storage.

Changes to security andauthorization. Specializeprivilege require to performupgrade.

4 High level reasonfor changes

Upgrade projects

Upgrade SAP release to thelatest release to reducelicensing and maintenancecost, as extended maintenancesupport for SAP XXXproduct will end by firstquarter of this year.

5 Informationabout SAPInterfaces andAddons :

Collect information about allSAP systems connectedthrough RFC and SSO setup.

Is there any NFS fileshared between sourcesystem and any other SAPsystem (viz with PIsystem ).

Is there any enterpriselevel / embedded searchfunctionality has beenconfigured?

Is there any FPN

Example :

Current source system is ECC6.0 is connecting to

SAP BW 7.0 system

CRM 7.0

Portal 7.01 (ESS/MSS)

PI 7.1 system

Yes. NFS between PI andECC system.

TREX 7.0 is using. Does itrequire to upgrade currentTREX?

Page 5: Scn _ All Content - Sap Erp 6

8/24/2015 SCN : All Content SAP ERP 6.0 Upgrade

http://upgrade137.rssing.com/chan19291971/all_p11.html#item201 5/24

(Federated Portal Network) configuration exist. ( Thisis useful in case of upgradeof Portal or duel stacksystem )

UME ( User managementengine ) – this is useful incase of Enterprise portal.

Does your system use anyexternal knowledgemanagement or documentmanagement system using?

Does your system use anyarchiving solution

Does your system use anyradio frequency device

Addons :

Addon play a critical roles incase of upgrade and Unicodemigration, so find out all SAPand third party Addons andtheir compatibility afterupgrade or Unicode migration:

Does your system use anySAP Addon ?

Current release and status

Unicode compatibility

Upgrade require ?

Third party Addon

Does your system use anythird party Addon ?

Current release and status

Unicode compatibility

Upgrade require ?

Any additional licensingcost ?

Collect all info about all FPNsystems and gather info if youupgrade one system whetherfederation will work or not.Does it require to upgradeother system(s) too ?

Local UME or external UME– like LDAP or other ABAPsystem.

Information about externalsystem / location fordocument management.

Archiving solution like IXOS?

Radio frequency devices areconfiguring through SAPTelnet.

Example :

BICONT, STPI

Example :

BizRight Approva.

6 Informationabout NonSAPinterfaces :

Non SAP interfaces are morecritical for Upgrade andUnicode conversion projects.Compatibility issue with

Non SAP interfaces are :Example :

Page 6: Scn _ All Content - Sap Erp 6

8/24/2015 SCN : All Content SAP ERP 6.0 Upgrade

http://upgrade137.rssing.com/chan19291971/all_p11.html#item201 6/24

upgraded SAP release is oneof the major concerns. Soimportant question will bewhether existing third partysoftware will run withupgraded SAP release or not ?Typical you need to gatherinfo as follows :

Is there any third partysoftware connected to SAPsystem ?

Any upgrade required?

How it connects to SAPsystem

Is there any FTP / SFTPtransfer to/from SAPsystem that require SSHkey to exchange.

There are three four thirdparty software ( Vertax,TexWare, Seeburger andXiPay ) connected to SAP.

Must be Unicode compatible.

RFC (TCP/IP) connection

SFTP communication withtwo banks (using Unix levelscripts). One waycommunication.

7 BusinessExpectation :

Being a SAP Basisconsultant, in manyprojects we do notknow why company hasdecided to upgrade thisSAP release or what isthe business justificationof this upgrade project.However, it is importantto know the drivingforce for this changes.

This is high levelobjective of the projects

Upgrade projects

Upgrade andUnicode migrationprojects.

Example :

Upgrade SAP release tocurrent version to reducelicensing and maintenancecost, as extended maintenancesupport for SAP XXXproduct will end by firstquarter of this year.

Expanding business to newcountries ( having differentlanguages) , so convertingsystem to Unicode will helpin this aspect. Performanceimprovements of SAPsystem and reduce licensingand maintenance cost, as

Page 7: Scn _ All Content - Sap Erp 6

8/24/2015 SCN : All Content SAP ERP 6.0 Upgrade

http://upgrade137.rssing.com/chan19291971/all_p11.html#item201 7/24

extended maintenance supportfor SAP XXX product willend by first quarter of thisyear.

8 Expecteddowntime

This is the expecteddowntime time from thebusiness.

Example :

Business can give maximumproduction downtime of 36 hrs.

This is one of the criticalinformation to plan forproduction cutover activity andyou have to optimize downtimeto fit into this time frame.

In certain instances downtime isdetermine based on trial run ofthe upgrade.

9 Resourcerequirement(Hardware andSoftware)

Hardware requirement :

AS per SAP sizing guide,identify H/W requirements.This is a preliminary estimateand there is a possibility toadjust ( 20 30 %).

Upgrade Projects

Upgrade and Unicodemigration projects

Software requirement :

Example :

For upgrade projects

30 % morememory

30 % more CPUcores

20 % moredatabase space

100 GBadditional space forSAP file system.

For upgrade & Unicode projects

40 % morememory

40 % more CPUcores

40 % moredatabase space

1 TB additionalspace for Unicodeexport /import

Additional Appservers for – SAP

Page 8: Scn _ All Content - Sap Erp 6

8/24/2015 SCN : All Content SAP ERP 6.0 Upgrade

http://upgrade137.rssing.com/chan19291971/all_p11.html#item201 8/24

All media require to performthe upgrade.

Upgrade projects

Upgrade and Unicodemigration projects

distribution monitor

100 GBadditional space forSAP file systems.

Upgrade projects – check thePAM. Also identify any OSor DB upgrade require?

Check / identify any thirdparty software / Addon needupgrade

For CU&UC projects check the PAM. Also identifyany OS or DB upgrade require?

Check / identify any thirdparty software / Addon needupgrade

10 Expected Targetenvironment

Expected Target environmentin terms of SAP release,hardware platform, OS andDatabase.

Upgrade projects

New SAP release alongwith OS and Databasedetail.

Upgrade and Unicodemigration projects

Example

Target SAP release is ECC6.0 with EHP6. DatabaseIBM DB2 LUW 9.7 and OS:AIX 6.1. Upgraded systemmust contain same number ofApp Serves.

All connected SAP systemsBW, CRM, SRM and EP etcmust work without any error.

Target SAP release is ECC6.0 with EHP6. DatabaseIBM DB2 LUW 9.7 and OS:AIX 6.1

All connected SAP systemsBW, CRM, SRM and EP etcmust work without any error.All third party software must

Page 9: Scn _ All Content - Sap Erp 6

8/24/2015 SCN : All Content SAP ERP 6.0 Upgrade

http://upgrade137.rssing.com/chan19291971/all_p11.html#item201 9/24

work correctly.

CustomizeTablespaces

Nowadays it iscommon to have userdefined tablespaces inlarge SAP system ( aslot organizations movedout very large tablefrom standard package,like APPL1, APPL2 tocustomize one). Collectall info related tocustomize tablespaces (and this info will be veryuseful for Unicodemigration export/import).

Is there anycustomize tablespaceexist ?

TABART or DataClasses are corrector not ?

Example

Yes. There are fiveuser definedtablespaces.

Verify tablespacemapping and definitionof TABART orDataclass.

11 Infrastructuresupport

Support from theinfrastructure team is crucialfor any Upgrade projects.You need to identify availableexpert or resource in therespective areas :

Hardware and OS support

DBA support

Network team support

Example

Outline info about infrastructureteam

In house support team for OSor hardware and storage areavailable however the supportteam sits in different location.

There is no separate DBAteam – you need perform alldatabase related activity.

Network support team issupporting from offshore.

12 Knownconstraint andassumption

Constraints

Known constraints (example )

Strict downtime window of24 hours. No inhouse expert /

Page 10: Scn _ All Content - Sap Erp 6

8/24/2015 SCN : All Content SAP ERP 6.0 Upgrade

http://upgrade137.rssing.com/chan19291971/all_p11.html#item201 10/24

Assumption

support team for database.

No structured documentationfor SAP landscape info andthird party softwareconnected to SAP.

Assumption : ( example )

Current backup system willwork in case of emergency.

Current team has all requiredauthentication info – includingall DDIC password andJ2EE_ADMIN password.

13 Tools andtechnique

Identify specific toolneed to use for upgradeor migration projects :

SAP Upgradeproject

Combine Upgrade& Unicodemigration projects.

Example :

Use ASU tool.

Use Solution Manager(SOLAR_PROJCE_ADMIN)for project admin and changecontrol.

Which SAP upgrade tool willbe appropriate for thisupgrade – is it SAPEHPI or SUM (SAP UpgradeManager) or SOLMANUP (for solution manager upgrade).

Use standard predefineconfiguration mode for allnonproduction systems anduse customize mode whereyou can select number ofRtrans, number of R3load andnumber of batch processes.

Use SAPINST to performUnicode export/import for alldatabase less than 200 GB.

Use Migration Monitor toperform Unicodeexport/import for all databaseless than 1 TB and greaterthan 300 GB.

Use Distribution monitor toperform Unicodeexport/import for all databasebigger than 1 TB.

14 Unicode / Nonunicode

For any CU&UCproject, better todetermine whether the

Based on whether single codepage or MDMP, Unicodemigration time and effort as wellas process will change.

Run the report RSCPINST or

Page 11: Scn _ All Content - Sap Erp 6

8/24/2015 SCN : All Content SAP ERP 6.0 Upgrade

http://upgrade137.rssing.com/chan19291971/all_p11.html#item201 11/24

existing non Unicodesystem is “single codepage” or “MDMP” ?How many additionallanguages has beeninstalled on the system.

I18N to verify this settings

Also check SMLT.

15 Any changes toSAP levelsecurity andauthorization

Based on SAP product andupgrad release there will benumber of changes to securityand authorization area. Notedown all major knownchanges.

SAP Upgradeproject

Example

Upgrade projects

Example :Upgrade fromCRM 4.0 to CRM 7.0(EHP2)

New CRMWEBUI

Concept ofbusiness role + UIrole

16 Changemanagementprocess

Is there any changemanagement system in place? Change managementprocess will play a vital rolefor project schedules and milestone dates.

Example :

Company XXX is using“Remedy” changemanagement system for anychanges to OS level –including all Kernelparameters and file systemadjustment. For all nonproduction system approvalis require from SAP BasisManager and Infrastructuremanager.

For any database changes,raise a helpdesk ticket toDBA team.

17 Number ofeffectedstructuresor programs

This is one of the keyquestions – businessteam and developmentteam is alwaysinterested. Howeverthere is no straightforward answer for thisquestion – until andunless use some thirdparty tools or performthe first upgrade onSandbox system.

Note down all SPDD andSPAU objects from the firsttest upgrade.

Page 12: Scn _ All Content - Sap Erp 6

8/24/2015 SCN : All Content SAP ERP 6.0 Upgrade

http://upgrade137.rssing.com/chan19291971/all_p11.html#item201 12/24

0 0

18 Key contacts Key contact from projectsponsored, infrastructure teamand entire team.

Conclusion : This is a generic template, all examples must be replace with your actual data.This technical assessment document is primarily developed to gather info related to ECCupgrade and upgrade of any component of NetWeaver stack like – BW, SRM, CRM, SCMand Enterprise Portal. It may work for other SAP products; so far I did not try for other SAPproducts, except Business Objects ( BOBJ 4.0) upgrade.

12/16/1305:15: EHP5 to EHP7 Upgrade: PreprocessingerrorMAIN_SHDIMP/SUBMOD_SHDIMP/SHADOW_IMPORT_INC

Dear ALL ,

I am performing an SAP update ECC6 EHP5 to EHP7 and I got stuck at Preprocessing phase with thefollowing error:

Checks after phase MAIN_SHDIMP/SUBMOD_SHDIMP/SHADOW_IMPORT_INC were negative!

Last error code set: Detected 10 errors summarized in 'SHDALLIMP.ELG'<br/> Calling'D:\SUM\abap\exe/tp' failed with return code 8, check D:\SUM\abap\log\SAPup.ECO for details

ERROR: Detected the following errors due to error summary in SHDALLIMP.ELG:

D:\SUM\abap\log\SAPK60523INLOCHRSAE.PRO:

3WETW000 Key field is not in NTAB.

3WETW000 different nametabs for table T7AEPBS22 (field OPR).

4 ETW000 Field is not in NTAB.

4 ETW000 table T7AEPBS22: entry in DB is 28 bytes smaller than in file.

4 ETW000 ... ignoring such differences.

2EETW000 key field T7AEPBS22ITEXT contained the value 'Actions ': key field T7AEPBS22ITEXT missing, key is truncated.

2EETW000 key field T7AEPBS22SUBTY contained the value '8G': key field T7AEPBS22SUBTYmissing, key is truncated.

2EETW000 key of table T7AEPBS22 (0000000Actions 8G) only valid up to offset 14 (in bytes).It's better to skip it.

2EETW000 key field T7AEPBS22SUBTY contained the value '0450': key field T7AEPBS22SUBTYmissing, key is truncated.

2EETW000 key of table T7AEPBS22 (0002001 0450) only valid up to offset 14 (in bytes).It's better to skip it.

3WETW000 Key field is not in NTAB.

3WETW000 different nametabs for table T7AEPBS22 (field OPR).

4 ETW000 Field is not in NTAB.

Choose action:

Page 13: Scn _ All Content - Sap Erp 6

8/24/2015 SCN : All Content SAP ERP 6.0 Upgrade

http://upgrade137.rssing.com/chan19291971/all_p11.html#item201 13/24

0 0

0 0

*Repeat phase MAIN_SHDIMP/SUBMOD_SHDIMP/SHADOW_IMPORT_INC to continue at the point itstopped

*Exit program

Initialize phase MAIN_SHDIMP/SUBMOD_SHDIMP/SHADOW_IMPORT_INC to restart it from thebeginning

INT *

Please help me solve this issue

Best Regards,

01/06/1422:15: SAP ERP 6.0 EHP 6

Hi Everyone!

Before anything else, i would like to say that I'm a student very eager to learn and understand all that ican from SAP, but still a STUDENT, so please take it easy on me and i apologize in advance if i don'tcatch up so quickly,

My Questions are:

1. What are the hardware/software requirements or specifications for implementing Enhancement Pack6 on an existing SAP ERP 6.0? any ideas on the cost?2. Are the rumors about an SAP ERP 7.0 true? or is it a version 7.0 of SAP EHP?

Thank you in Advance!

01/07/1400:29: Stuck at preprocessing stage for 4.7to ECC6 Ehp6 upgrade

Hi Experts,

In the process of upgrading from 4.7 to ECC6 EHP6. The upgrade wasstopped at the pre processingstage with the error

MAIN_SHDPREPUT/SUBMOD_SHDALIASDEL/SCEXEC_DEL_ALI!

Page 14: Scn _ All Content - Sap Erp 6

8/24/2015 SCN : All Content SAP ERP 6.0 Upgrade

http://upgrade137.rssing.com/chan19291971/all_p11.html#item201 14/24

0 0

0 0

I upgraded & downgraded the the r3tans & tp versions but error remainplease find the attached log files

01/09/1410:27: Upgrade tool to be used

Experts,

It would be great if you can clear a confusion.

I would be upgrading R/3 4.7 to ECC 6.0 EHP 5. As per EHP 5 upgrade guide and note 1863907 (notesuggests that SAPup needs to be used for release upgrade and SUM for updating or upgrading EHPlevels) the tool that should be used is SAPup. However I read that SUM can be used to upgrade R/3 4.7to ECC 6.0 EHP 6.

Please throw light on my below doubts

Is SUM tool only used when EHP 6 comes into picture (like updating or upgrading to EHP 6)?

Can SUM tool not be used to upgrade R/3 4.7 to ECC 6.0 EHP5 or any update or upgrade to EHP 5?

Regards,

Sourabh Majumdar

01/17/1302:31: PSAPSR3702 not empty after ERP6Ehp6 upgrade 8 tables still in place

Hi,

after completing the ERP Ehp5 > Ehp6 upgrade using the SUM tool I found that the old PSAPSR3702tablespace still had 8 tables residing in it. These were :

TTREE

TTREED

TTREEI

TTREEN

Page 15: Scn _ All Content - Sap Erp 6

8/24/2015 SCN : All Content SAP ERP 6.0 Upgrade

http://upgrade137.rssing.com/chan19291971/all_p11.html#item201 15/24

0 0

TTREEP

TTREET

TTREE_APPL

TTREE_FLNK

I have encountered a similar issue in the past when upgrading R/3 4.7 to ERP 6 Ehp5 where sometables were left in the PSAPSR3620 tablespace post upgrade. OSS 674070 was actioned in this caseto resolve.

This note however is specific to upgrades from the r/3 4.7 release and does not seem to work in mycase where the upgrade source release was ERP6 EHp5.

Has anyone seen anything similar with their upgrade process to Ehp6 from Ehp5.

I'm thinking about using brtools to reorg these tables into the PSAPSR3731 tablespace which will thenleave the PSAPSR3702 tablespace empty and it can then be dropped as per upgrade guide.

brspace p init<SID>.sap s 20 l E f tbreorg a reorg mode online s PSAPSR3702 oSAPSR3 t TTREED n PSAPSR3731

Before I do this it'd like to check if anyone else has encountered the same issue withtables left in PSAPSR3702 post upgrade and if my solution is the preferred way tocorrect.

Regards,

Brian.

05/23/1014:21: MAIN_INIT/CHECKCDMOUNTS: ExportDVD for product ERP

Hi guys,

Current action:

Upgrade from SAP R/3 4.6C to SAP ERP 6.0 EhP4 / NW 7.01

Upgrade is stopped at MAIN_INIT/CHECKCDMOUNTS asking for:

«Enter at least the mount point for the DVD titled "Export DVD for product ERP"»

We've provided the requested media:

C:SAPMEDIASAPUPGEXP51036903_1

LABEL.ASC

SAP:::MM::D51036903_1

Page 16: Scn _ All Content - Sap Erp 6

8/24/2015 SCN : All Content SAP ERP 6.0 Upgrade

http://upgrade137.rssing.com/chan19291971/all_p11.html#item201 16/24

0 0

and

C:SAPMEDIASAPUPGEXP51036903_2

LABEL.ASC

SAP:::MM::D51036903_2

We get the following error:

The requested Data Carrier is not mounted on any of the mount points you entered.

class com.sap.mid.mxp.UnspecificDataCarrierRequest:com.sap.sdt.bootstrap.BootStrap@2c641e9a

incompatible with class java.io.File:null

Please enter mount points for the DVDs required for the upgrade.

Enter at least the mount point for the DVD titled "Export DVD for product ERP"

Any ideias?

Thank you.

Bruno Pereira

03/15/1302:57: Error atMAIN_UPTRANS/STARTSAP_PUPG

Hello,

at implementing EHP 6 SUM fails in PHASE MAIN_UPTRANS/STARTSAP_PUPG.

At PHASES.LOG I get the following error:

1 ETQ399 SYSTEM MANAGER: Contents of instance list. Instance Number: 00.

1EETQ399 SYSTEM MANAGER: Instance Q61 00 not found

2EETQ354 Starting system failed, rc="1"

The strange effect is, that the SAP System is startet. The service SAPSTARTSRV is running. I havestopped the system several times with the following comands:

sapcontrol nr 00 function StopWait 300 10

SAPup stoporig

stopsap R3

Then I have stopped SAPSTARTSRV, SAPCCM4X and SUM

After this I did a "cleanipc all remove"

Then I have started the system an SUM again and got the same error.

Page 17: Scn _ All Content - Sap Erp 6

8/24/2015 SCN : All Content SAP ERP 6.0 Upgrade

http://upgrade137.rssing.com/chan19291971/all_p11.html#item201 17/24

0 0

0 1

I found several notes where the SAP did not start but no one where the system runs but the error occurs.

I found following strange behavior:

hges2100:q61adm 24% /saptmp/SUM/abap/bin/SAPup rootdir=/saptmp/SUM/abap stoporig

Waiting 20 seconds for proper system stop...

hges2100:q61adm 25% /saptmp/SUM/abap/bin/SAPup rootdir=/saptmp/SUM/abap checksysstatus

ERROR: Original system should be up, but appears to be down!

hges2100:q61adm 26% /saptmp/SUM/abap/bin/SAPup rootdir=/saptmp/SUM/abap startorig

Starting service ...

hges2100:q61adm 27% /saptmp/SUM/abap/bin/SAPup rootdir=/saptmp/SUM/abap checksysstatus

Original system is down.

I can logon to the system now!

Does anyone know this behaviours?

How does the "SAPup checksysstatus" get the information if the system is running?

Best regards

Andreas

01/13/1417:52: issue after upgrade EHP7

Hi

we finished upgrade ECC6 EHP5 to EHP7 ( OS : windows 2008 R2 / DB : SQL 2008 R2 ) on DEV /QASsystems There are some problems such as :

1 The appearance of Overlap in some screens . despite the presence of these screens a good onthe client 000 .

2 when trying to System Copy ( Export/import ) occur problem and didn't completed

(Unloading of 'SAPNTAB' export package: ERROR ) please find attached for more details .

Best Regards,

01/13/1423:33: Posting Goods issue in different UOMthan Delivery

Page 18: Scn _ All Content - Sap Erp 6

8/24/2015 SCN : All Content SAP ERP 6.0 Upgrade

http://upgrade137.rssing.com/chan19291971/all_p11.html#item201 18/24

0 0

I want to post goods issue which will be in different UOM than delivery through BAPI/FM.

Any Function module or BAPi will be helpful with the list of parameter to be passed.

I tried using ws_delivery_update with quantity passed in BASE UOM(Different than Sales UOM ondelivery/Order) , but it always post material document(Godds issue) in sales UOM.

Is there some customizing which controls UOM on material document ?

Or i am missing something here ?

Please suggest something.

Thanks in Advance.

01/14/1411:22: 4.6C Upgrade to ECC 6.00 EHP6(CU&UC)

Hi all,

we are planing to Upgrade our SAP System.

Now we are on Windows Server 2003 x86, MaxDB 7.7 and non Unicode.

I´ve read the Upgrade Guides and CU&UC Guides.

But some Questions are left:

When i upgrade to EHP6, wich Netweaver Version is it? (7.02 or 7.31)?

And wich Tool should i take? In the (CU&UC) Guides is it SapUp. Or should i take the SUM?

I found the Upgrade Master from 4.6C to ECC 6.00 and also the Upgrade Export. But only without EHP.

I´ve read that i can go directly from 4.6C to ERP 6.00 with EHP6. Is that correct?

If it is possible to upgrade directly, where can i find the Upgrade Export to EHP6?

Can i use the normal EHP6 Export (for a new SAP Installation) from the Download Center for theUpgrade?

And at the end we want to move from MaxDB to Sybase ASE.

So in short:

From SAP 4.6C non Unicode to ECC 6.00 EHP6 Unicode.

Page 19: Scn _ All Content - Sap Erp 6

8/24/2015 SCN : All Content SAP ERP 6.0 Upgrade

http://upgrade137.rssing.com/chan19291971/all_p11.html#item201 19/24

0 0

0 0

Please provide me the best Solution.

Thanks in advance.

Marcel

01/14/1413:49: SP stack implementation with SUM:incorrect detection of the system technology

Hello,

I would like to implement support package stack 24 (10/2013) with SUM on a SAP ECC 6.0 ABAPsystem, but when I start the SUM tool,

on the bottom of the first screen, in the "Detected SAP NetWeaver system" section the "SystemTechnology" is "Dual Stack system" .

Unfortunately, I don't know anything about the history of the instance, I only noticed that this was a dualstack system in the past,

in the meantime the Java part was incompletely uninstalled and now only the ABAP instance and theCentral Services instance

(Message Server + Enqueue Server) are up and running.

My question is, is there a way to make an adjustment in the configuration of SUM to display the correctsystem technology

(Single Stack ABAP system) without doing the "cleanup" after the incomplete unistallation of the Javapart?

Thank you in advance for your help.

Kind regards,

Noemi

01/15/1400:56: Severe error(s) occurred in phase

MAIN_SHDPREPUT/SUBMOD_SHDALIASDEL/SCEXEC_DEL_ALI!

Hi Experts,

During upgrade from ECC 5.0 to EHP 7 i'm facing one error at Preprocessing phase as below:

Severe error(s) occurred in phase MAIN_SHDPREPUT/SUBMOD_SHDALIASDEL/SCEXEC_DEL_ALI!

Last error code set: 6 processes failed, check 'SCEXEC_D.*' for details

On checking details under log file SCEXEC_D.* getting description as :

Page 20: Scn _ All Content - Sap Erp 6

8/24/2015 SCN : All Content SAP ERP 6.0 Upgrade

http://upgrade137.rssing.com/chan19291971/all_p11.html#item201 20/24

Starting subprocess with PID 25803 in phase 'SCEXEC_DEL_ALI' at 20140115132700

ENV: DIR_LIBRARY=/usr/sap/QTY/SUM/abap/exe

ENV:LD_LIBRARY_PATH=/usr/sap/QTY/SUM/abap/exe:/usr/sap/QTY/SUM/jvm/jre/lib/amd64/server:/usr/sap/QTY/SUM/jvm/jre/lib/amd64:/usr/sap/QTY/SUM/jvm/

jre/../lib/amd64:/usr/sap/QTY/SUM/abap/exe/:/oracle/client/11x_64/instantclient

ENV: NLS_LANG=AMERICAN_AMERICA.WE8DEC

ENV: ORACLE_BASE=/oracle

ENV: ORACLE_HOME=/oracle/QTY/112_64

ENV: ORACLE_SID=QTY

ENV:PATH=/usr/sap/QTY/SUM/abap/exe:/oracle/QTY/112_64/bin:.:/home/qtyadm:/usr/sap/QTY/SYS/exe/run:/usr/lib64/qt3.3/bin:/usr/local/bin:/bin:/usr

/bin

ENV: SAPDATA_HOME=/oracle/QTY

ENV: SAPSYSTEMNAME=QTY

ENV: auth_shadow_upgrade=1

ENV: dbms_type=ORA

ENV: dbs_ora_schema=SAPQTY

ENV: dbs_ora_tnsname=QTY

EXECUTING /usr/sap/QTY/SUM/abap/exe/tp pf=/usr/sap/QTY/SUM/abap/var/EXDBNEW.TPPexecdbscript QTY x ../var/PTALDR02.XQL DBEXECNONT DBEXECNOCHECK

This is tp version 380.10.11 (release 740)

ERROR: uncaught internal error:

ERROR: EXIT(16) > process ID is: 25803

HALT 20140115132705

tp returncode summary:

TOOLS: Highest return code of single steps was: 16

ERRORS: Highest tp internal error was: 0234

tp finished with return code: 234

meaning:

uncaught error > function err_exit called

Referred SAP Notes : 526600,152420 .Still issue persists and also find attached files for more onissue.

Please help me to resolve.

Regards,

Gaurav Rana

Page 21: Scn _ All Content - Sap Erp 6

8/24/2015 SCN : All Content SAP ERP 6.0 Upgrade

http://upgrade137.rssing.com/chan19291971/all_p11.html#item201 21/24

0 0

0 0

0 0

12/25/0923:07: Is R3load used in Upgrade process

Hi all,

During Upgrade in CONFIGURATION PHASE when we select

> MANUAL SELECTION OF PARAMETERS & provide values R3load is by default 3

I am pretty confused where R3load is used in Upgrade process

Why is R3load not mentioned in the Upgrade Guide if it is effectively used

SAP ERP 6.0 Including Enhancement Package 4 Support Release 1 ABAP

Based on SAP NetWeaver 7.0 Including Enhancement Package 1

Pls advice on the following

Rahul

01/15/1423:48: ERP Upgrade 2system landscape

Dear experts,

Kindly asking your guidance in the following query.

What would be the best approach and the steps in a 2system landscape (DEV,PRD) upgrade (ERP2004 to ERP 6.0 EHP5, Win 2003/MSSQL 2005), to be able to achieve dual maintenance?

Any pointing to useful documents/blogs/discussions would be very appreciated also.

Thanks and regards,

Shkelzen

01/16/1402:36: How to upgrade SAP from ECC 6.0EHP0 to ECC 6.0 EHP7 with database Oracle 10g ?

I am a newbie in SAP. Please Help.

Thanx and Regards,

kamal

Page 22: Scn _ All Content - Sap Erp 6

8/24/2015 SCN : All Content SAP ERP 6.0 Upgrade

http://upgrade137.rssing.com/chan19291971/all_p11.html#item201 22/24

0 0

0 0

0 0

0 0

01/16/1421:39: Can anyone tell if EHP7 has released ?

I am newbie in sap please help me to confirm ???

thanks and regards,

kamal

01/16/1422:49: Is ther any things like ECC6.0 EHP0 orits only ECC6.0 ???

I am confused about EHP0, If it is any "SAP ECC6.0 EHP0" available or we can only say it as ECC6.0????

I am newbie in SAP Please help me.

thanks and regards,

kamal

02/14/1018:25: R/3 4.6 C to ECC 6.0 Upgrade

We are currently running R/3 4.6C on AIX with Oracle 9i. We have to upgrade to ECC 6.0 and migrate toSQL Server / Windows eventually.

we are planning to Upgrade the DB to 10G, Unicode conversion and upgrade to ECC and finallymigrate to SQL Server, Windows. Can you comment on this strategy?

Anybody suggests the PreReqs needed for DB and/or SAP support packs to Upgrade and UnicodeConversion?

Please share any OSS notes/ documentation regarding Prereqs.

Thanks in advance,

Vidyadhar

01/18/1421:15: Checks after phase

MAIN_SHDIMP/SUBMOD_SHD2_RUN/RUN_RADCUCNT_ALL2 were negative!

Hi,

Page 23: Scn _ All Content - Sap Erp 6

8/24/2015 SCN : All Content SAP ERP 6.0 Upgrade

http://upgrade137.rssing.com/chan19291971/all_p11.html#item201 23/24

During upgrade pre processing phase i got below error:

Checks after phase MAIN_SHDIMP/SUBMOD_SHD2_RUN/RUN_RADCUCNT_ALL2 were negative!

Last error code set: Single errors (code &lt;= 8) found in logfile 'RADCUCNTALL2.ELG'

ERROR: Batchjob RADCUCNTUPG on shadow system failed. Detected the following errors:

# /usr/sap/QTY/SUM/abap/log/RADCUCNTALL.QTY:

3 EDO551 Level "99":"4" objects assigned, "33" less dependencies

3 EDO551 Level "100":"22" objects assigned, "18" less dependencies

3 EDO551 Level "101":"15" objects assigned, "3" less dependencies

3 EDO551 Level "102":"2" objects assigned, "0" less dependencies

3 EDO653 Graph_Analysis: "91.595" objects on "102" topological levels

1EEDO538 DD sources table "YMUS~" could not be read

1EEDO538 DD sources table "VTEST11~" could not be read

1EEDO538 DD sources table "VTEST10~" could not be read

1EEDO538 DD sources table "VBLOG~" could not be read

1EEDO538 DD sources table "UTAB~" could not be read

1EEDO538 DD sources table "TERCL~" could not be read

1EEDO538 DD sources table "TERCL3~" could not be read

1EEDO538 DD sources table "TERCL2~" could not be read

1EEDO538 DD sources table "T512CLU~" could not be read.

For resolution i followed SAP Note 765475 for Unicode Conversion Troubleshooting and found

"‘Table type XXXXXX: Row type YYYYYYY does not exist. Nametab cannot be created.'

1EED: DD sources table “xxx” could not be read.

Runtime object for "TABINCSTR" could not be generated. Tabletype UMGTTABNM: LinetypeUMGSTABNM does not exist. Nametab not created.

Solution: You can ignore such error messages for the following obsolete tables:

TABINCSTR, H_DC1RULES, DHISTSTR, BDLYTCC, UMGTTABNM, UMGTCPFLD, UMGTCHKP"

Please guide me more for the specified issue.

Regards,

Gaurav Rana

older | 1 | .... | 8 | 9 | 10 | (Page 11) | 12 | 13 | 14 | .... | 44 | newer

HOME | ABOUT US | CATALOG | CONTACT US | © 2015 http://www.rssing.com

Page 24: Scn _ All Content - Sap Erp 6

8/24/2015 SCN : All Content SAP ERP 6.0 Upgrade

http://upgrade137.rssing.com/chan19291971/all_p11.html#item201 24/24