sdi manual of construction with steel deck · sdi notice the steel deck institute makes no...

48
SDI MANUAL OF CONSTRUCTION WITH STEEL DECK SDI MANUAL OF CONSTRUCTION WITH STEEL DECK MOC2 2006 2 2 SECOND EDITION

Upload: others

Post on 01-Apr-2020

10 views

Category:

Documents


2 download

TRANSCRIPT

Page 1: SDI MANUAL OF CONSTRUCTION WITH STEEL DECK · SDI NOTICE The Steel Deck Institute makes no representation or warranty respecting any information contained in this manual, including,

SDI MANUALOF CONSTRUCTIONWITHSTEEL DECK

SDI MANUALOF CONSTRUCTION

WITHSTEEL DECK

MOC22006

22SECOND EDITION

Page 2: SDI MANUAL OF CONSTRUCTION WITH STEEL DECK · SDI NOTICE The Steel Deck Institute makes no representation or warranty respecting any information contained in this manual, including,

TABLE OF CONTENTS Page I. PRODUCTDESCRIPTIONS.......................................... 4 1 General–AllDeckProducts................................... 4 2 CompositeFloorDeck.......................................... 4 3 RoofDeck........................................................ 5 4 CellularDeck..................................................... 5 5 FormDeck........................................................ 6 II. APPROVEDERECTIONDRAWINGS................................12 III. PACKAGING..........................................................12 IV. LOADING&SHIPPING...............................................14 V. RECEIVING,UNLOADING,STORAGE&PROTECTION............ 15 1 DeckProtectionExample...................................... 16 2 DeckOrderingCheckList...................................... 17 VI. ERECTIONOFDECK&JOBSITESAFETY.........................18 1 Alertness......................................................... 19 2 Lifting............................................................. 20 3 Fastening&Installing...........................................26 4 Housekeeping................................................... 34VII. DECKDAMAGE&PENETRATIONS.................................35 1 RoofDeck.........................................................35 2 PenetrationExample............................................36 3 DetailsforOpeningExample..................................37 4 SumpPans....................................................... 38 5 FloorDeck........................................................40 6 CantileversExample............................................ 41VIII. PLACINGCONCRETE................................................42 IX. SPECIALCONSIDERATIONSFORDIAPHRAGMS................. 45 1 ConstructionLoadTable........................................45 2 DeckLoadingDiagrams........................................46 3 References........................................................47

SDI NOTICE

TheSteelDeckInstitutemakesnorepresentationorwarrantyrespectinganyinformationcontainedinthismanual,including,butnotlimitedto,theaccuracy,completeness,orsuitabilityofsuchinformationforanyparticularpurposeoruse.TheSteelDeckInstituteexpresslydisclaimsanyandallwarranties,expressedorimplied.Bymakingthisinformationavailable,theSteelDeckInstituteisnotrenderingprofessionalservices,andassumesnodutyorresponsibilitywithrespecttoanypersonmakinguseofthisinformation.Inaddition,neithertheSteelDeckInstitutenoranyofitsMembersorAssociateMembersshallbeliableforanyclaim,demand,injury,loss,expense,costorliabilityofanykindwhatsoeverwhichinanywayarisesoutoforisconnectedwiththeuseoftheinformationcontainedinthispublication,whetherornotsuchclaim,demand,loss,expense,orliabilityresultsdirectlyorindirectlyfromanyactionoromissionoftheSteelDeckInstituteoranyofitsMembersorAssociateMembers.Anypartyusingtheinformationcontainedinthismanualassumesallliabilityarisingfromsuchuse.

©Copyright2006SteelDeckInstitute

2 3

Page 3: SDI MANUAL OF CONSTRUCTION WITH STEEL DECK · SDI NOTICE The Steel Deck Institute makes no representation or warranty respecting any information contained in this manual, including,

PURPOSE Thismanualisintendedtobeanaideandgeneralguideforthesafeandpropererectionofsteeldeck.Theobjectivesaresafety,whichisalwaysparamount,andprovidingagoodqualityjob.Thismanualisnotintendedtodefinespecificdutiesorresponsibilitiesofanyoftheparticipantsinvolvedindoingtheworknorisitintendedtoreplacenecessarycontractdocuments.Eachparticipantthedesignprofessional,thedeckmanufacturer,thegeneralcontractor,thedeckerector,theowner,andeachindividualworkershouldbeawareoftheirindividualresponsibilities,asdefinedinthecontractdocuments,sothatthejobenvironmentwillbeassafeaspossibleandalsotoproduceagoodjob. Whiletheinformationpresentedinthismanualhasbeenpreparedinaccordancewithgenerallyrecognizedengineeringprinciplesandacceptedconstructionpractice,itisrecommendedthatitbereviewedbythedesignprofessionalandthebuilderforitsapplicabilityforanyspecificjob.

ACKNOWLEDGEMENT ThispublicationisarevisionoftheoriginaldocumentreflectingchangesinconstructionpracticesandrevisionstoOSHA1926SubpartR.Sincethisisarevisionoftheoriginalmanualwiththemajorityofitbeingreprinted,theSDIwouldstillliketorecognizethoseinvolvedwiththisoriginalmanual.EspeciallyProfessorLarryD.LuttrellofWestVirginiaUniversity(ResearchAdvisortotheSDI)forhisreviewandcomments;Mrs.CherylJanuszforeditingthetext;Mr.MerleNordykeforhisexcellentcartoons;Mr.JohnMcMahonoftheInstituteoftheIronworkingIndustryforhisadvice;andthemembersoftheSteelErectorsAssociationofAmerica(SEAA)fortheirmanyhelpfulsuggestions.

TheSDIErectionCommittee

SDI MANUALOF CONSTRUCTION

WITHSTEEL DECK

2 3

Page 4: SDI MANUAL OF CONSTRUCTION WITH STEEL DECK · SDI NOTICE The Steel Deck Institute makes no representation or warranty respecting any information contained in this manual, including,

1. General - All Deck Products

Steeldeckismadebycoldformingstructuralgradesheetsteelintoarepeatingpatternofparallelribs.Thestrengthandstiffnessofthepanelsarearesultoftheshapeoftheribsandthemate-rialpropertiesofthesteel.Decklengthscanbevariedtosuitjobconditionsbut,becauseofshippingconsiderations,areusuallylessthan40’.Standarddeckwidthvarieswiththeproductusedbutfullsheetsareusually12”,18”,24”,30”or36”.Deckistypicallyfurnishedinastandardwidthwiththeendssquarecut.Anycuttingforwidth,suchasatopeningsorforangularfit,isdoneatthejobsite. Deckistypicallyattachedtothebuildingframewitharcpuddlewelds,selfdrillingscrewsorpowderorpneumaticallydrivenpins.Sheettosheetfasteningisdonewithscrews,buttonpunching(crimping),orwelds.

2. Composite Floor Deck

Afterinstallationandadequatefastening,floordeckservesseveralpurposes.It(a)actsasaworkingplatform(b)stabilizestheframe(c)servesasconcreteformfortheslaband(d)reinforcestheslabtocarrythedesignloadsappliedduringthelifeofthebuild-ing.Compositedecksaredistinguishedbythepresenceofshearconnectordevicesaspartofthedeck.Thesedevicesaredesignedtomechanicallylocktheconcreteanddecktogethersothattheconcreteandthedeckworktogethertocarrysubsequentfloorloads.Theshearconnectordevicescanberolledinembossments,lugs,holesorwiresweldedtothepanels.Thedeckprofileconfigu-rationcanalsobeusedtointerlockconcreteandsteel. Compositedeckfinishesareeithergalvanized(zinccoated)orphosphatized/painted.Phosphatized/painteddeckhasabare(phosphatized)topsurfacewhichisthesidetobeincontactwiththeconcrete.Thisbaretopsurfacecanbeexpectedtodeveloprustbeforeconcreteisplaced.Thebottomsideofthedeckhasaprimercoatofpaint.(SeethenextsectiononRoofDeckforadescriptionofprimerpaint.)Galvanizeddeckhasazinccoatingonbothsides. Compositefloordeckisnormallyinstalledsothepanelendsdonotoverlaponthesupportingbeams.Shearlugsorprofileshapeoftenpreventatightmetal-to-metalfitifpanelendsoverlap.Theairgapcausedbyoverlappingpreventsproperfusionwiththestructuralsteelwhensheetendlapsareshearstudwelded. Adequateendbearingofthedeckmustbeobtainedasshownontheerectiondrawings.Ifbearingisactuallylessthanshown,furtherinvestigationisrequired.

Steel DeckInstitute

I. PRODUCT DESCRIPTIONS

4 5

Page 5: SDI MANUAL OF CONSTRUCTION WITH STEEL DECK · SDI NOTICE The Steel Deck Institute makes no representation or warranty respecting any information contained in this manual, including,

3. Roof Deck

Roofdeckisnotdesignedtoactcompositelywithothermateri-als.Roofdeckactsaloneintransferringhorizontalandverticalloadsintothebuildingframe.Roofdeckribopeningsareusuallynarrowerthanfloordeckribopenings.Thisprovidesadequatesup-portofrigidthermalinsulationboard. Roofdeckistypicallyinstalledtoendlapapproximately2”oversupports.However,itcanbebutted(orlappedmorethan2”)tosolvefieldfitproblems.Sincedesignprofessionalsfrequentlyusetheinstalleddecksystemaspartofthehorizontalbracingsystem(thedeckasadiaphragm),anyfasteningsubstitutionorchangeshouldbeapprovedbythedesignprofessional.Continuousperim-etersupportofthedeckisnecessarytolimitedgedeflectioninthefinishedroofandmayberequiredfordiaphragmsheartransfer. Standardroofdeckfinishesaregalvanizedorprimedpainted.Thestandardfactoryappliedpaintforroofdeckisaprimerpaintandisnotintendedtoweatherforextendedtimeperiods.Fieldpainting,touchupofabrasionsanddeteriorationoftheprimercoatorotherprotectivefinishesaretheresponsibilityofthebuyer.Itisrecommended,however,thatanyfieldpaintbeappliedoverasmalltestareaoftheprimeddeckandtestedforcompatibilityandadhesionpriortoproceedingwithfieldpainting.Specialpaint,orpainttobeappliedovergalvanizing,isavailableonspecialorderbutmustbeadequatelydescribedtothemanufacturerbeforebidding.

4. Cellular Deck

Cellulardeckismadebyattachingabottomsteelsheettoaroofdeckorcompositefloordeckpanel.Cellulardeckcanbeusedinthesamemannerasfloordeck.Electrical,telephoneandcom-puterwiresareeasilyrunthroughthechasecreatedbetweenthedeckpanelandthebottomsheet. Whenusedasapartoftheelectricaldistributionsystem,thecellulardeckmustbeinstalledsothattheribslineupandcreateasmoothcelltransitionatabuttingends.Thejointthatoccursatbuttingcellendsmustbetapedorotherwiseprotectedtopreventconcretefromenteringthecell.Cellinteriorsmustbefreeofweld-ingburrsorothersharpintrusionstopreventdamagetowires. Whenusedasroofdeck,thebottomflatplateisusuallyleftexposedtoview.Caremustbemaintainedduringerectiontokeepgoodalignmentandpreventdamage.

Steel DeckInstitute

I. PRODUCT DESCRIPTIONS

4 5

Page 6: SDI MANUAL OF CONSTRUCTION WITH STEEL DECK · SDI NOTICE The Steel Deck Institute makes no representation or warranty respecting any information contained in this manual, including,

Cellulardeckissometimesusedwiththeflatplateonthetopsidetoprovideaflatwalkingsurface.Installationofdeckforthispurposerequiresspecialmethodsforattachmenttotheframebecausetheflatplatenowonthetopcanpreventdirectaccesstothedeckmaterialthatisbearingonthestructuralsteel.Itmaybeadvisabletotreattheflattopsurfacetopreventslipping. Cellulardeckisalwaysfurnishedgalvanizedorpaintedovergalvanized.

5. Form Deck

Formdeckcanbeanyfloororroofdeckproductusedasaconcreteform.Connectionstotheframearebythesamemethodsusedtoattachfloorandroofdeck.Weldingwashersarerecom-mendedwhenweldingmetalthicknessislessthan0.0280inches. Formdeckisfurnishedgalvanized,primepaintedoruncoated.Galvanizeddeckmustbeusedforthoseroofdecksystemswhereformdeckisusedtocarryalightweightinsulatingconcretefill. Inapatented,dryinstalledroofdeckassembly,formdeckisuti-lizedastheprimaryloadcarryingelement.Thisassemblyfunctionsasastructuralroofdeckdiaphragm.Theassemblymayincludedryinstalledthermalinsulationplacedaboveeitherprimepainted,fieldpaintedgalvanizedorgalvanizedandpaintedsteelsections.

Steel DeckInstitute

PRODUCT DESCRIPTIONS

6 7

Page 7: SDI MANUAL OF CONSTRUCTION WITH STEEL DECK · SDI NOTICE The Steel Deck Institute makes no representation or warranty respecting any information contained in this manual, including,

Steel DeckInstitute

PRODUCT DESCRIPTIONS

6 7

DECK PROFILES

Figure 1ALL DIMENSIONS ARE NOMINAL

3”X12”

2”X12”

1-1/2”X12”

2”X6”

1-1/2”X6”

3”X8”(DR)

1-1/2”X6”(WR)

1-1/2”X6”(IR)

1-1/2”X6”(NR)

9/16”XVARIES

15/16”XVARIES

1-5/16”XVARIES

TYPICAL COMPOSITE FLOOR DECK PROFILES

TYPICAL ROOF DECK PROFILES

TYPICAL FORM DECK PROFILES

Page 8: SDI MANUAL OF CONSTRUCTION WITH STEEL DECK · SDI NOTICE The Steel Deck Institute makes no representation or warranty respecting any information contained in this manual, including,

Steel DeckInstitute

DECK PROFILES

8 9

Figure 1AAll dimensions are nominal.

36”O

R24

”CO

VER

AG

E

12”

24-1

/2”C

OV

ERA

GE

36”O

R30

”CO

VER

AG

E

6”

24”C

OV

ERA

GE

8”

61 /8”

”X1

2”2”

X1

2”3”

X1

2”Co

mp

osite

2”X

6”

Com

pos

ite

”X6

”Co

mp

osite

3”X

8”

Com

pos

ite

.03” to .06”

.0

3” to .06”

.03” to .06”

.03” to .06”

2p

sfto 4p

sf

2p

sfto 4p

sf

2p

sfto 4p

sf

2p

sfto 4p

sf

Emb

ossm

entp

atte

rns

will

var

yfr

omm

anuf

actu

rert

om

anuf

actu

rer.

Side

lap

sar

efla

tadj

usta

ble

orb

utto

np

unch

able

.

Emb

ossm

entp

atte

rns

will

var

yfr

omm

anuf

actu

rert

om

anuf

actu

rer.

Side

lap

sar

efla

tadj

usta

ble

orb

utto

np

unch

able

.

Emb

ossm

entp

atte

rns

will

var

yfr

omm

anuf

actu

rert

om

anuf

actu

rer.

Side

lap

sar

efla

tadj

usta

ble

orb

utto

np

unch

able

.Thi

sp

rofil

eis

not

gen

eral

lys

uita

ble

foru

sew

iths

hear

stu

ds.

Page 9: SDI MANUAL OF CONSTRUCTION WITH STEEL DECK · SDI NOTICE The Steel Deck Institute makes no representation or warranty respecting any information contained in this manual, including,

Steel DeckInstitute

DECK PROFILES

8 9

Figure 1BAll dimensions are nominal.

36”O

R30

”CO

VER

AG

E

36”O

R30

”CO

VER

AG

E

36”O

R30

”CO

VER

AG

E

6”

24”C

OV

ERA

GE

8”6”

”X

6”

Wid

eRi

b(W

R)

”X

6”

Inte

rmed

iate

Rib

(IR)

”X

6”

Nar

row

Rib

(NR)

3”X

8”

Dee

pR

ib(D

R)

.03” to .06”

.0

3” to .06”

.03” to .06”

.03” to .06”

2p

sfto 4p

sf

2p

sfto 4p

sf

2p

sfto 4p

sf

2p

sfto 4p

sf

May

be

refe

rred

toa

s“B”

dec

k.Si

dela

ps

may

be

flata

djus

tab

leo

rb

utto

np

unch

able

.Aco

ustic

al

deck

will

hav

ep

erfo

rate

dw

ebs.

May

be

refe

rred

toa

s“F”

dec

k.

May

be

refe

rred

toa

s“A”

dec

k.

May

be

refe

rred

toa

s“N

”dec

k.Si

dela

ps

may

be

flata

djus

tab

leo

rb

utto

np

unch

able

.Aco

ustic

al

de

ckw

illh

ave

per

fora

ted

web

s.

6”

1 /2”

MIN

.

13 /4”

MIN

.

13 /4”

NO

M.

3 /8”

MIN

.

1”N

OM

.

11 /2”

MIN

.

21 /2”

NO

M.

23 /4”

NO

M.

Page 10: SDI MANUAL OF CONSTRUCTION WITH STEEL DECK · SDI NOTICE The Steel Deck Institute makes no representation or warranty respecting any information contained in this manual, including,

Steel DeckInstitute

DECK PROFILES

10 11

Figure 1CAll dimensions are nominal.

24”O

R36

”CO

VER

AG

E

12”

6”

24”C

OV

ERA

GE

8”

3”X

12”

Com

pos

ite

Cellu

lar

2”X

12”

Com

pos

iteCe

llula

r

”X

6”

Com

pos

ite

Cellu

lar

3”X

8”

Com

pos

ite

Cellu

lar

.03” to .06”

.0

3” to .06”

.03” to .06”

.03” to .06”

4p

sfto 7p

sf

4p

sfto 7p

sf

4p

sfto 7p

sf

4p

sfto 7p

sf

Bott

omp

late

may

be

per

fora

ted

fora

cous

tical

.

Bott

omp

late

may

be

per

fora

ted

fora

cous

tical

.

May

als

ob

eus

eda

sa

roof

dec

k.Bo

ttom

pla

tem

ayb

ep

erfo

rate

dfo

raco

ustic

al.

May

als

ob

eus

eda

sa

roof

dec

k.Bo

ttom

pla

tem

ayb

ep

erfo

rate

dfo

raco

ustic

al.

24”O

R36

”CO

VER

AG

E

12”

24”O

R36

”CO

VER

AG

E

Page 11: SDI MANUAL OF CONSTRUCTION WITH STEEL DECK · SDI NOTICE The Steel Deck Institute makes no representation or warranty respecting any information contained in this manual, including,

Steel DeckInstitute

DECK PROFILES

10 11

Figure 1DAll dimensions are nominal.

24”T

O3

6”C

OV

ERA

GE

9/16

”X

Var

ies

Form

Dec

k

15/1

6”X

Var

ies

Form

Dec

k

1-5/

16”

XV

arie

sFo

rmD

eck

1-1/

2”o

r2”

XV

arie

sFo

rmD

eck

.014

”to .030

.017

”to .040

.017

”to .047

.023

”to .047

0.8

psf

to1.

5p

sf

1.0

psf

to2.

0p

sf

1.0

psf

to2.

8p

sf

1.4

psf

to2.

8p

sf

Stan

dard

form

dec

k.U

sed

as

cent

erin

g.

Hea

vyd

uty

form

dec

k.U

sed

asc

ente

ring

Extr

ahe

avy

duty

form

dec

k.U

sed

asc

ente

ring.

Sup

erd

uty

form

dec

k.U

sed

asc

ente

ring.

24”T

O3

6”C

OV

ERA

GE

24”T

O3

6”C

OV

ERA

GE

24”T

O3

2”C

OV

ERA

GE

Not

e: A

ll pr

ofile

s m

ay b

e us

ed a

s ro

of d

eck

(for

a p

aten

ted

asse

mbl

y)

Page 12: SDI MANUAL OF CONSTRUCTION WITH STEEL DECK · SDI NOTICE The Steel Deck Institute makes no representation or warranty respecting any information contained in this manual, including,

Onlythoseinstallationdrawingsthathavebeenstamped“APPROVEDFORCONSTRUCTION”i.e.“FIELDUSE”shouldbeusedfordeckerection. Priortobeginningdeckerection,theerectorshouldreviewtheplansforoveralljobsiteorientation.Onprojectswithmultipledeckprofilesandgages,individualareasshouldbeidentifiedforeachtypeofdeck. AllGeneralNotesshouldbereviewedforspecialinstructions.Drawingsectionsinparticularneedtobestudiedforinstallationdetails.Thedrawingsandbundletagsneedtobeexaminedforproperbundleplacement. The engineer of record has approved the attachment method and pattern. Therefore, all fastening to the structure and sheet side laps should be carefully followed as shown on the “APPROVED FOR CONSTRUCTION” drawings.

Deckisbandedintobundlesthatcanweighseveralthousandpoundsbutthedeckbundleweightwillbelimitedtoamaximum4000poundsfordecktobeappliedtojoists.Deckbundleweightsformaterialtobeappliedoverstructuralsteelframesorotherfram-ingsystemswillbeasrequiredtosuitjobconditions,andtomeetsafehoisting,spreadingandinstallationprocedures.Ifheavierorlighterbundlesarerequiredbecauseofjobconditions,thisinfor-mationmustbeconveyedtothedecksupplierwellbeforeproduc-tionisscheduled.Thedecksupplier,theerectorandthepurchasershouldallbeinagreementaboutthebundlesizesandweightsthataretobedeliveredtothejob. Tags(seeFigure2)onthebundlesmayprovidesomeorallofthefollowinginformation:

1. weightofbundle 2. deckmanufacturer’scontractnumber 3. customernameandjobname 4. productdescriptiongage(thickness),productname, andfinish 5. numberofpieces,lengths 6. area(onjob)thatistoreceivethebundle 7. bundlenumber 8. anyspecialnoticesorstorageinstructions

Specialtags,suchasthoserequiredbyUnderwritersLabora-toriesorFactoryMutual,areappliedtothebundleandnottotheindividualsheets. Any special markings or other information (as well as special pack-aging) must be agreed upon prior to fabrication. Previouslyagreeduponcolorcodingisoftenveryhelpfulforgageidentificationonamultigageproject.Colorcodingmayalsobeagreeduponforotherquickidentificationpurposes.

Steel DeckInstitute

II. APPROVED ERECTION DRAWINGS

12 13

III. PACKAGING

Page 13: SDI MANUAL OF CONSTRUCTION WITH STEEL DECK · SDI NOTICE The Steel Deck Institute makes no representation or warranty respecting any information contained in this manual, including,

Steel DeckInstitute

II. APPROVED ERECTION DRAWINGS

12 13

EXAMPLE OF BUNDLE TAGFigure 2

STEEL DECKFABRICATOR

CONTRACT NO.

CUSTOMER NAMEPROJECT NAME

PROJECT ADDRESS

DECK TYPE, GAGE, FINISH

NOTES:

NUMBER LENGTH OF PIECES FT. IN. INCHES MARK

20 27 10.00 334.00 20 25 11.00 311.00 5 25 7.00 307.00 45

BUNDLENO XOFX TRUCK:XXCONTROLNO. XXXX-XXX-XXXXXBOM.BUNDLENO. XX

Page 14: SDI MANUAL OF CONSTRUCTION WITH STEEL DECK · SDI NOTICE The Steel Deck Institute makes no representation or warranty respecting any information contained in this manual, including,

Bundletagsshowthejobarea(derrick)wherethebundlebelongs.Thedeckmanufacturerwillsequencedeckbundlingsothatdeckwillbedeliveredinaproper(orpreviouslyagreedupon)orderandbeunloadedandhoistedinlogicalsequences.Erectioninformationshouldbemadeavailabletothedeckmanufacturerassoonaspossibleafterplacingtheordersothatsequencingcanbedoneduringpreparationofapprovaldrawings. Alljobconditionsthatwillaffectshipping(i.e.weightrestric-tions,staging,specialstrapping,blocking,tarping)shouldbedeter-minedwellinadvanceoffabricationsothatappropriatestepscanbetakenbytheshipper. Thedeckmanufacturerwillloadtrucksusingstandardproce-dures.Theseproceduresmayconsiderthefollowing:

1. Strappingwillbesecured,preventingblowofforloosening ofsheetsduringtransit. 2. Deckbundlesmaybeplacedagainstthetrailerortruck bulkheadtopreventforwardmovementincaseofa suddenstop.Notethatloaddistributionmaydictate anotherarrangement. 3. Deckbundlesareseparatedwithdunnage(horizontallyand vertically)ofatleast1½“(moreifagreedupon)sothat liftingslingscanbeinsertedforunloading. 4. Deckwillbeloadedwiththelongestbundlesonthebedof thetrucktoensurethattheloadwillbebalanced. 5. Toensuresafeandlevelloads,everyotherbundlemaybe turnedonthetruck.Inallcasesthebundlearrangementon thetrailerwillbemadewithanefforttoprovidethe greateststabilityoftheloadandtoachievethe allowableweight.

Duringtransportation,shockandvibrationtendstocompressbundles,whichcanresultinslackeningofthetrailerloadbindersnormallyusedinthetransportofdeck.Thismaycauseadangeroussituation;overtighteningofthetiedownsinanticipationofsettlingwilldamagetheproduct.Periodicadjustmentsandretighteningarenecessary.Eachadjustmentshouldalsoensurethatthetarpsarerepositionedtokeeptheloaddrytopreventmoisturefromaffectingthefinish. Unlesspartialshipmentsorlessthantruckload(LTL)shipmentsareagreedupon,fulltruckloadshipmentsarestandard.Truckloadswillbedeterminedbyweightandvolume.IfLTLshipmentsareused,thedeckmanufacturercannotberesponsibleforanydamagecausedbyrehandlingorloadtransferbetweentruckingcompanies.

Steel DeckInstitute

IV. LOADING AND SHIPPING

14 15

Page 15: SDI MANUAL OF CONSTRUCTION WITH STEEL DECK · SDI NOTICE The Steel Deck Institute makes no representation or warranty respecting any information contained in this manual, including,

Receiving

Theremustbeproperaccesstothestructureforthedeckdelivery.Theaccessmustbeadequatetosupporttheliftingequip-mentandthedeliverytrucks.Liftingequipmentmustbecapableofsafelyliftingthedeckbundlesandhavesufficientreachtoproperlyplacethebundlesonthestructure.

Unloading

Materialshouldbecheckedasitisreceived.Bundlesshouldbecounted.Thebillofladingshouldbecheckedtoverifytrailercontents.Smallpackagesaresometimescarriedinsidethetractor.Checktoseeifallitemsarepresent.Anymaterialdamagesorshort-agesshouldbenotedonthebillofladingpriortosigningforthematerialandthesuppliershouldbeimmediatelynotified.

Steel DeckInstitute

IV. LOADING AND SHIPPING

14 15

V. RECEIVING, UNLOADING STORAGE AND PROTECTION

“KEEP LOAD IN SIGHT UNTIL SAFELY LANDED”

Page 16: SDI MANUAL OF CONSTRUCTION WITH STEEL DECK · SDI NOTICE The Steel Deck Institute makes no representation or warranty respecting any information contained in this manual, including,

Storage and Protection

Ifgroundstorageisneeded,thedeckbundlesshouldbestoredofftheground,withoneendelevatedtoprovidedrainage.Bundlesshouldbeprotectedagainstcondensationwithaventilatedwaterproofcovering.Bundlesshouldbestackedsothatthereisnodangeroftipping,sliding,rolling,shiftingormaterialdamage. Bundlesshouldbecheckedfortightnesssowindcannotloosensheetsorworkthebundlesapart.Tightnessshouldbeperiodicallycheckedandadditionalsecurementshouldbeusedasneeded.Bundlesshouldneverbehoistedbythestrappingandshouldalwaysbeplacedtagsideup.ItisthepositionoftheSteelDeckInstitutethat;DECKBUNDLESMUSTALWAYSBEPLACEDONTHEFRAMENEARAMAINSUPPORTINGBEAMATACOLUMNORWALL.INNOCASE,SHOULDTHEBUNDLESBEPLACEDONUNBOLTEDFRAMESORUNATTACHEDORUNBRIDGEDJOISTS.Thestructuralframemustbeproperlybracedtoreceivethebundles. OSHAFederalRegisterSubpartR1926.757doesallowsomeflexibilityastohowandwhen,duringthestructure’serectionpro-cess,landingbundlesofdeckispermitted.ThisOSHAregulationmustbeexaminedbyanyoneengagedinthisactivity,suchthatallcriteriaisunderstoodandmet.

Steel DeckInstitute

RECEIVING, UNLOADINGSTORAGE AND PROTECTION

16 17

Recommendation for Protecting DeckBundles at Job Site

Important:Leaveendopenforventilation.

Properlysecuretarptopreventblow-off.

Waterproofcovering.Suchasplasticoratarp

Placeafewpiecesofblockingonbundletocreateoverhangtosupporttarp.

Elevate“thick”endofbundletohelpshedordrainanymoisturepenetration.

Important:Leaveendopenforventilation.

Page 17: SDI MANUAL OF CONSTRUCTION WITH STEEL DECK · SDI NOTICE The Steel Deck Institute makes no representation or warranty respecting any information contained in this manual, including,

I. DeckProfile WideRib(WR)-B IntermediateRib(IR)-FNarrowRib(NR)A 3”DeepRib(3DR)-NOther

II. DeckType(thickness)–Gageandinches. 22(0.0295”) 20(0.0358”) 18(0.0474”) 16(0.0598”) CellularBottomPlate 20(0.0358”) 18(0.0474”) 16(0.0598”) Other-Specifydecimalthickness

III. DeckFinish PrimePaintedManufacturer’sStandard G60Galvanized G90Galvanized PrimePaint(manufacturer’sstandard)overG60 GalvanizingUncoated Other-SpecifyinSeparateDocument

IV. IsFireRatingRequired? Yes-GiveAppropriateU.L.DesignNumberandHours RequiredorF.M.Number

V. SheetLengthLimits NoneorSpecify

VI. BundleWeightRestrictions Nottoexceed_________lbs. NoRestrictions

VII.RequiredSpaceBetweenBundlesforHoistingDevices Standard1½”. Other-Specify

VIII.SpecialTaggingonBundles U.L.Labels F.M.Labels Other-Specify

Anyspecialsequencing,timingorotherrestrictionsmustbeprovidedtothedecksupplier.Thedecksuppliermustbeprovidedacompleteandaccurateaddressforshipping.

Steel DeckInstitute

RECEIVING, UNLOADINGSTORAGE AND PROTECTION

16 17

DECK ORDERINGCHECK LIST

Page 18: SDI MANUAL OF CONSTRUCTION WITH STEEL DECK · SDI NOTICE The Steel Deck Institute makes no representation or warranty respecting any information contained in this manual, including,

Steel DeckInstitute

VI. ERECTION OF DECK AND JOB SITE SAFETY

18 19

Serious injury or death can result from failure to familiarize and comply with all applicable safety requirements of federal, state and local regulations and these safety guidelines before erecting steel deck. OSHAFederalRegisterSubpartR1926issuedJanuary18,2002providesspecificerectionguidelinesfortypicalconditions.How-ever,whereemployerselect,duetoconditionsspecifictothesite,todevelopalternatemeansandmethodsthatprovideemployeeprotection,asitespecificerectionplanshallbedevelopedbyaqualifiedperson.OSHAprovidesguidelinesforestablishingasitespecificerectionplaninAppendixAoftheOSHAFederalRegis-terSubpartR1926.Thedeckmanufacturerisnotresponsibleforpreparingthe“sitespecific”erectionplan.However,deckerectiondrawingsmaybehelpfultothosepreparingtheplan. Deckerectorscreatetheirownworkingplatform.Forthemostparttheseplatformswillnothaveprotectededgesorprotectedopenings.Erectorsmustalsoworkontheopensteelframeanduseladdersorscaffoldingtoaccessthework. Coil ordering practices and manufacturing processes have been established and are being followed so that as shipped deck products will be free of visible liquid lubricants and dry residues will be minimized. The purpose of establishing these practices and processes is to reduce the slipping hazard of the walking surfaces of decking products. For more information on this issue, please refer to the “Steel Coalition Lubricant Task Group Report” dated May 14, 2002. This report is available on the SDI web site.

Page 19: SDI MANUAL OF CONSTRUCTION WITH STEEL DECK · SDI NOTICE The Steel Deck Institute makes no representation or warranty respecting any information contained in this manual, including,

Alertness

Mostdeckinstallationsaredoneonanelevatedstructureandthedangeroffallingisalwayspresent.Fallsmayoccuratanytimeandatanylocation.Alertnessisessential.Laddersshouldbesecurelytiedtothestructuralframeorthescaffolding.Stairs,ifavailable,shouldberigidlyattachedtothebuildingframe. Accessareasshouldbespeciallypatrolledtokeepthemfreeofequipment,material,anddebris. Deckedgesaresharp.Workersshouldtakeprecautionstopro-tectthemselvesfromsharpedgesorprojectingcorners. Itisveryimportantthatthestructurebereadytoreceivethedeck.Beforedeckbundlesareplacedontheframe,theframeplumbnessandconnectionsshouldbechecked.Verifythattempo-rarybracingisinplacetokeeptheframeinaplumbconditionuntilthedeckisplacedandsecured.

Steel DeckInstitute

VI. ERECTION OF DECK AND JOB SITE SAFETY

18 19

“ SHARP EDGES ARE A CONSTANT THREAT”

Page 20: SDI MANUAL OF CONSTRUCTION WITH STEEL DECK · SDI NOTICE The Steel Deck Institute makes no representation or warranty respecting any information contained in this manual, including,

Lifting

Steeljoistsmustbesecurelyattachedattheirbearingendsandhavetheirbridgingcompletelyattached.Verifythestructure’scapacitytocarrythedeckbundles. Thebundlesmustberiggedforliftingsothatshiftingandex-cessivetippingwillnotoccurandsotheliftingdevicewillnotdam-agethedeck(seeFigure3).Allliftingequipmentmustbeadequateforthejob.Thehoistingoperationmustbeproperlydirectedandmanned.Taglinesattachedtothebundles(nottothebands)willhelpworkerscontrolandpositiontheload.Nevermovebundlesbypullingonthestrapping.(SeeSectionVonUnloading).Ifpos-sible,spreaddeckbundlesoutalongthebuildingcolumnlinestocreateseveralsmallstacksratherthanstackingallthebundlesinonearea.Workersshouldbeinstructedtokeeptheloadinsightuntilitissafelyplacedonthestructure.Bundlesshouldbelandedsothattheendsofthebundlesrestonabearingsurfaceratherthanhavingoneorbothendscantilevered.Thebundlesshouldbepositionedforconvenientspreadingofsheetsandorientedsoindividualdecksheetswillnotneedtobeturned.Bundlesofdeckwhichhavebeenunbandedmustbesecuredtopreventindividualsheetsfrombeingblownoffthestructure.

Steel DeckInstitute

ERECTION OF DECK AND JOB SITE SAFETY

20 21

Page 21: SDI MANUAL OF CONSTRUCTION WITH STEEL DECK · SDI NOTICE The Steel Deck Institute makes no representation or warranty respecting any information contained in this manual, including,

Steel DeckInstitute

ERECTION OF DECK AND JOB SITE SAFETY

20 21

EXAMPLE OF ONE LIFTING METHODFigure 3

Cranehookwithspring-loadedsafetypin

Liftingcables

Chokerhitch

Bundlestrapsappliedatfactoryaretoremainonbundleuntilplacedforerectionandsheetsarereadytobespread.Checkfortightness.Bundle straps are not to be used to move or lift deck bundles.

Page 22: SDI MANUAL OF CONSTRUCTION WITH STEEL DECK · SDI NOTICE The Steel Deck Institute makes no representation or warranty respecting any information contained in this manual, including,

Safe Working Platform

Tomaketheworkingplatformsafeandpreventdeckdam-age,thedeckunitsshouldbeattachedtotheframeandsidelapsconnectedassoonaspossible.Ifdecksheetsaretemporarilyusedtoaccessbundles,theymustbeendbearing(notcantilevered)andmustbesecurelyattachedtotheframetopreventslipoff.Aworkingareashouldbeatleast12feetwide.Itisrecommendedthataworkingareabeestablishedaroundoralongeachbundlesothatthebundlecansafelybeaccessed.Theplatformcanthenbeextendedinanyconvenientdirection.Specificjobrequirementsneedtobeconsideredtodeterminedeckerectionstartingpointsanderectionprogression.Astheplatformisextendeditwillbenecessaryforatleastoneworkertoworkfromthestructuralframe.OSHAstandardsrequirethatemployersprovidefallprotectionduringdeckerectionoperationsandallOSHAguidelinesforsafetywhileerectingdeckmustbefollowed.RefertoOSHARegulation29CFRSection1926.759(c)(2003)whichstatesthatunderspecialcircumstancesaControlledDeckZone(CDZ)maybeestablishedwhichpermitsflexibilitytothemethodsofpersonalfallprotection.

Steel DeckInstitute

ERECTION OF DECK AND JOB SITE SAFETY

22 23

“ PLACE HEAVY LOADS OVER MAIN SUPPORTS”

Page 23: SDI MANUAL OF CONSTRUCTION WITH STEEL DECK · SDI NOTICE The Steel Deck Institute makes no representation or warranty respecting any information contained in this manual, including,

Placing Deck

Asthedecksheetsareplaced,oneedgeofdeckwillalwaysbe“open”orleading.Thisleadingedgeshouldonlybeapproachedinordertoplacethenextsheet.Workersshouldalsomaintainasafedistance(6feetifpossible)fromtheendofthedeckunit.Whenaligningtheedge(side)lap,theworkershouldkneel.Kneelinglow-ershiscenterofgravityanddecreasesthechanceoffalling.RefertoOSHARegulation29CFRSection1926.759(a)(1)(2003)whichstatesthatunderspecialcircumstancesaControlledDeckZone(CDZ)maybeestablishedwhichpermitsflexibilitytothemethodsofdeckinstallation. Roofandfloorholesandopeningsshallbedeckedover,unlessthesizeoftheholeorspecialdesigncircumstancespreventitfrombeingdeckedover.Itistheresponsibilityofthedesignprofession-altodefinewhetheraholeisrequiredtobedeckedover.Wherelargesizeholesorotherconditionsthatdonotallowanopeningtobedeckedover,employeesshallbeprotectedinaccordancewithOSHARegulation29CFRSection1926.760(a)(1)(2003).

Steel DeckInstitute

ERECTION OF DECK AND JOB SITE SAFETY

22 23

Page 24: SDI MANUAL OF CONSTRUCTION WITH STEEL DECK · SDI NOTICE The Steel Deck Institute makes no representation or warranty respecting any information contained in this manual, including,

Other Trades

Othertradesshouldbekeptofftheworkingplatformandtheareaimmediatelybelowtheworkingplatformduringthedeckerectionprocess.Caremustbetakenwhencuttingbundlestrapstopreventstrapsordunnagefromdroppingontopersonnelorequipment.Workersshouldbeinstructedonallaspectsofdecksafetybeforeanydeckisinstalled.SuchinstructionisavailabletomembersonrequestfromtheIronWorkersInternationalAssocia-tion(AFL-CIO)bycontactingalocaluniontrainingcoordinator.Non-unionsourcesmayalsobeavailable. Floordeckshouldbeselectedsothatitprovidesatleastfiftypoundspersquarefootcapacityasaworkingplatform.Iftempo-raryshoringisrequiredtoattainfiftypoundspersquarefoot,thentheshoringmustbesecurelyinplacebeforethefloordeckerectionbegins.Thefifty-poundpersquarefootloadingdoesnotconsiderconcreteweight.SeeFigure16forrecommendedloadingofthedeckasaconcreteform. Roofdeckisnotgenerallyrequiredtocarryasmuchfoottrafficasfloordeck,butatleastthirtypoundspersquarefootshouldbemadeavailablebyroofdeck.Iftheroofdeckbeinguseddoesnotprovideaplatformcapacityof30psf,thenitshouldbeplankedorsupportedduringerection.Areassubjecttotrafficormaterialstag-ingshouldbeplanked.Themaximumrecommendedspansforroofdecks(seeFigure15)shouldalsobeusedasaguide. Asteeldecksurfaceisinherentlyslipperywhenwet.Cautionisrequiredbyanyoneonthedeckwhenthisconditionexists.

Figures 15 & 16 are on pages 46 & 47 respectively

Steel DeckInstitute

ERECTION OF DECK AND JOB SITE SAFETY

24 25

Page 25: SDI MANUAL OF CONSTRUCTION WITH STEEL DECK · SDI NOTICE The Steel Deck Institute makes no representation or warranty respecting any information contained in this manual, including,

1. Makesurethatriggingisadjustedtokeephoistedloads

wellbalanced.

2. Donotstandunderloadsbeinghoisted.

3. Keeploadsinview.

4. Useproperhandsignalstocraneoperators.

5. Checkerectiondrawingstolanddeckinproperpositionand

orientationtoavoidturningdeck.

6. Makesurebundlesaresecureandstablebeforecuttingbands.

7. Payparticularattentiontosinglespanbundles.

a. Donotusesinglespanbundlesasaworkingplatform,

especiallytocutbands.

b. Sheetscouldshiftduetohandling.Ensurebottomsheet

extendspastthesupportatbothends,otherwise

placewherefullsupportcanbeobtained.

8. Whencuttingbandsonbundlesusebothhandsandstandwell

back-bandsareundertension.Eyeprotectionisrecommended.

9. Payspecialattentiontoshortunitsorsinglespanunits—

makesuredeckisfirmlysecuredbeforeusingitasa

workingplatform.

10.Makesurecutoutsandopeningsareadequatelysupported

andguarded.

11.Usechalklinestolocatesupportingsteel-measureaccurately.

12.Bealertforsharpedges.

13.Wetdeckisinherentlyslippery-watchyourfooting.

14.Keepalitterfreeworkplace.

15.Weareyeprotectionwhennearwelding.

16.Wheninstallinggalvanizeddeckonsunnydays,sunglasses

andsunburnprotectionareadvisable.

17.Stayalert.

Steel DeckInstitute

ERECTION OF DECK AND JOB SITE SAFETY

24 25

SAFETY NOTES

Page 26: SDI MANUAL OF CONSTRUCTION WITH STEEL DECK · SDI NOTICE The Steel Deck Institute makes no representation or warranty respecting any information contained in this manual, including,

Fastening and Installing Deck

Deckisinstalledinaccordancewiththe“ApprovedforConstruc-tion”drawings.Thedeckmustbeinstalledbyqualifiedandexpe-riencedworkers.Thebeginningpointshouldbecarefullyselectedforproperdeckorientationandedgeofrooforfloorslablocation. Maintainingriborflutealignmentacrossthestructureisveryimportant.Asnapchalklineshouldbeusedatreasonableintervalstoassureproperalignmentofdeckpanels.Panelcoverwidthsmustbemaintainedtoachievelongstraightrunsofdeck. Roofdeckisoftenleftexposedonthebottom.Ribalignmentmustbeparalleltothegirdersatallgirderlinestopreventun-sightlyconditions. Floordeckflutesshould,ifpossible,maintainalignmenttoachievecontinuousconcreteribsacrossabuttingsheetends,mini-mizingconcreteleakage.Flutesthatdonotaligncancreateclosureproblemsthatmayinterrupttheslabdesign.Properalignmentcanonlybeachievedbyproperadjustmentofeachdeckpanelasitisplaced.Coverwidtherrorsaccumulatedacrossthebaycannotbecorrectedwiththelastsheetsintherun. On-siteexperiencehasdemonstratedthatthefrequencyofsnappingachalklinedeterminestheaccuracyofribandflutealignment.Thisminoreffortatthetimeofdeckplacementelimi-natestheneedforfieldcorrections. Fordecktoperformitsdesignfunctionsandserveasaworkingplatform,itmustbeadequatelyandproperlyattached.Oftenthedeckisusedaspartofthehorizontalbracingsystemandthefas-teningmethodandpatternhavebeenselectedtoprovideacertainstrengthandstiffnessintheplaneofthedeck.NO SUBSTITUTION of fastener type or pattern should be made without the approval of the designer. Deckfasteningtothestructuralframecanbeaccomplishedwithwelds,selfdrillingscrews,airdriven,orpowderdrivenfasten-ers.Aminimumof1½”ofendbearingshouldbeprovidedfordeck.Ifthereislessthan1½”ofbearing,additionalfasteningshouldbeprovidedandthedeckendloadcapacityshouldbechecked.Fordeckthatisintendedtoendlap(roofdeck),theendlaplocationshouldbeadjustedsothecenterofthelappedportionoccursoverthesupportor,whensupportedbybarjoists,overatopchordmember. Onlyqualifiedoperatorsmayusepowderactuatedtools;airactuatedtoolsmustbeusedbytrainedoperatorsfamiliarwithallsafetyprocedures.

Steel DeckInstitute

ERECTION OF DECK AND JOB SITE SAFETY

26 27

Page 27: SDI MANUAL OF CONSTRUCTION WITH STEEL DECK · SDI NOTICE The Steel Deck Institute makes no representation or warranty respecting any information contained in this manual, including,

Steel DeckInstitute

ERECTION OF DECK AND JOB SITE SAFETY

26 27

SIDE LAP CONNECTIONSFigure 6

Example of Overlapping

BUTTONPUNCH

WELDAFTERCLINCHING

SCREWORWELD

SCREWORWELD

SCREWSMAYBEPLACEDATANANGLEIFMALELEGISSHORT

Page 28: SDI MANUAL OF CONSTRUCTION WITH STEEL DECK · SDI NOTICE The Steel Deck Institute makes no representation or warranty respecting any information contained in this manual, including,

Attaching

Specialelectricscrewgunsareusedtodriveself-drillingscrewstoattachdecktothestructuralframe.Thesescrewgunsareequippedwithaclutchanddepthlimitingnosepiecetopreventovertorquing.Screwsaretypically#12’sor1/4inchdiameterwithaspecialdrillpointselectedaccordingtothetotalthicknessofmetal(deckplusframe)beingjoined. Airdriventoolsareoperatedatapre-setpressurelevelconsis-tentwiththefasteningrequirementsofthedeckattachment.Airissuppliedbyacompressorequippedwitharegulatorthatpreventsover-drivingorunder-drivingthefastener.Thefastenershaveaflatheadatthedriveendandaballisticpointatthepenetratingend.Avarietyofsizesareavailabletomeetthepenetrationrequirementsofthesteelsubstrate.

Steel DeckInstitute

ERECTION OF DECK AND JOB SITE SAFETY

28 29

Powder Actuated Self Tapping/Drilling

Page 29: SDI MANUAL OF CONSTRUCTION WITH STEEL DECK · SDI NOTICE The Steel Deck Institute makes no representation or warranty respecting any information contained in this manual, including,

Welding

Weldingmustbedonebyaqualifiedwelderduringproperweatherconditions.Qualityweldingoflightgagedeckrequiresexperienceandtheselectionofproperamperageandelectrodes.AweldqualitycontroltestprocedureisshowninFigure7.Allweld-ingshouldbedoneinaccordancewiththeStructuralWeldingCode,AWSD1.1orD1.3.Weldwashersarenotrecommendedfordeckthicknessesof0.028inchesthick(minimum22gage)andgreater.Weldwashersarerecommendedformetalthicknesseslessthan0.028inches.Properweldingrequiresgoodmetaltometalcontact;therefore,lappingcompositedeckunitswithshearlugsisnotrec-ommended.Forthesamereason,builtinhangertabs(infloordeck)thatbearonstructuralsteelshouldbeflattenedorremoved.

Steel DeckInstitute

ERECTION OF DECK AND JOB SITE SAFETY

28 29

Air Driven/Pneumatic

Page 30: SDI MANUAL OF CONSTRUCTION WITH STEEL DECK · SDI NOTICE The Steel Deck Institute makes no representation or warranty respecting any information contained in this manual, including,

Shear Studs

Shearstuds,weldedinplacewithspecialequipment(inac-cordancewithAWSD1.1)canserveasweldingtoholdthedecktotheframe.Thesestudsareusuallyinstalledafterthedeckhasbeenspreadtoactasaworkingplatform.Therefore,itisnecessarythattheplatformbeadequatelyattachedtothestructurebeforethestudsareinstalled. Shearstudscanbeweldedthroughthedoublemetalthick-nessofcellulardeck.Note:Ifthedeckisheavierthan16gagethestudmanufacturershouldbeconsultedforinstallationprocedures.Shearstuds,likeallotherfasteners,mustbeinstalledinaccordancewiththedesigndrawings. Sincemostconstructionworkisdoneinopenair,ventilationforweldingisusuallyadequate.However,forclosedinareas,ventila-tionmustbeprovided.Adequateventilationisextremelyimportantwhenweldinggalvanizeddeck.Allworkersinvolvedintheweldingoperationmustweareyeprotectiontoavoidweldflash.

Steel DeckInstitute

ERECTION OF DECK AND JOB SITE SAFETY

30 31

WELD QUALITY CONTROL TEST PROCEDUREFigure 7

Apreliminarycheckforweldingmachinesettingsandoperatorqualificationscanbemadethroughasimplefieldtestbyplacingapairofweldsinadjacentvalleysatoneendofapanel.Theoppositeendofthepanelcanthenberotated,whichplacestheweldsinshear.Separationleavingnoapparentexternalweldperimeterdistresses,butoccurringatthesheet-to-structureplane;mayindi-cateinsufficientweldingtimeandpoorfusionwiththesubstrate.Failurearoundtheexternalweldperimeter,showingdistresswithinthepanelbutwiththeweldstillattachedtothesubstrate,wouldindicateahigherqualityweld.

PUDDLEWELDS

STEELDECK(TESTSAMPLE)

STRUCTURALANGLEORCHANNELUSEDASSUPPORTANDWELDINGBASE

USEC-CLAMPOROTHERRIGIDATTACHMENTTOCOLUMN

STEELCOLUMNOROTHERSTRUCTURALLYSTABLEMEMBER

*“IN-PLANE”FORCE

“*”NOTE: MAYUSEWOODBLOCKINGTO STABILIZE“FREE-END”

Page 31: SDI MANUAL OF CONSTRUCTION WITH STEEL DECK · SDI NOTICE The Steel Deck Institute makes no representation or warranty respecting any information contained in this manual, including,

Weldingshouldnotbedonenearanytypeofcombustiblematerial.Cuttingandweldingsparkscancauseconstructionfires.Conditionsataconstructionsitearesubjecttorapidchange.Weld-ingmaybesafeinagivenareaandthen,becausecombustiblesareintroduced,theareaissuddenlynotsafe.TheGeneralContractor(jobsupervisor)shouldpreventothertradesfromstoringcombustiblesnearorunderareaswhereweldingistobedone.Constantalertnessinandbelowthegeneralareaismandatory.

Steel DeckInstitute

ERECTION OF DECK AND JOB SITE SAFETY

30 31

“DO NOT WELD NEAR COMBUSTIBLES”

Page 32: SDI MANUAL OF CONSTRUCTION WITH STEEL DECK · SDI NOTICE The Steel Deck Institute makes no representation or warranty respecting any information contained in this manual, including,

Side Lap Connections

Sheettosheetconnectionsmayberequiredatthesidelapsofdeck.Thesearefrequentlyreferredtoasstitchconnections.Selfdrillingscrews,weldsorbuttonpunchesaretheusualstitchcon-nections.Stitchscrewsareusuallyselfdrillingtype;#8’sthrough1/4inchdiametercanbeusedbutscrewssmallerthan#10diameterarenotrecommended.Theinstallermustbesurethattheunderly-ingsheetisdrawntightlyagainstthetopsheet.Again,aswhenscrewsareusedastheframeattachment,thespecialscrewdrivinggunsareusedtopreventovertorquing. Manualbuttonpunchingofsidelapsrequiresaspecialcrimpingtool.Buttonpunchingrequirestheworkertoadjusthisweightsothetopofthedeckstayslevelacrossthejoint.Sincethequalityofthebuttonpunchattachmentdependsonthestrengthandcareofthetooloperator,itisimportantthataconsistentmethodbedeveloped.Automaticpowerdrivencrimpingdevicesarerarelyseenondeckjobsbutshouldnotberuledoutasafasteningmethod. Goodmetaltometalcontactisnecessaryforgoodsidelapwelds.Burnholesaretheruleratherthantheexceptionandaninspectorshouldnotbesurprisedtoseetheminthedeck.Thewelddevelopsitsstrengthbyholdingaroundtheperimeter.Agoodweldwillhave75%ormoreofitsperimeterworking.Onocca-sion,sidelapweldswillbespecifiedfordeckthathasthebuttonpunchablesidelaparrangement(seeFigure8forcommentsonthissubject;seeFigures8and9forweldingthesedeckunitstotheframe).Weldingsidelapsisnotrecommendedfordeckstype22(0.028inchminimum)orlighter.Weldwashersshouldneverbeusedatsidelapsbetweensupports.Justaswhenweldingtotheframe,adequateventilationmustbeavailableandweldingnearcombustiblesprohibited.

Steel DeckInstitute

ERECTION OF DECK AND JOB SITE SAFETY

32 33

SIDE LAP WELDS BETWEEN SUPPORTSFigure 8A

Page 33: SDI MANUAL OF CONSTRUCTION WITH STEEL DECK · SDI NOTICE The Steel Deck Institute makes no representation or warranty respecting any information contained in this manual, including,

Steel DeckInstitute

ERECTION OF DECK AND JOB SITE SAFETY

32 33

SIDE LAP WELDS AT SUPPORTSFigure 8B

FRAME CONNECTION LAYOUTSConnections may be arc puddle welds, screws, powder-actuated or pneumatically driven fasteners.Figure 9

Page 34: SDI MANUAL OF CONSTRUCTION WITH STEEL DECK · SDI NOTICE The Steel Deck Institute makes no representation or warranty respecting any information contained in this manual, including,

Housekeeping

Bundlingstraps,wooddunnage,anddeckcutoffsshouldbecollectedandremovedfromtheworkingplatformdailysoasnottocreateasafetyhazardunderfoot.Loosetoolsshouldnotbeleftlyingabout.Studweldingferrulesshouldbebrokenoffofthestuds.Alldebrismustberemovedfromfloordeckbeforeconcreteispoured. Allpartiesconcernedwiththeconstructionprocessshouldcooperatetoproperlystorecombustiblematerialandremovetrashthatcanbeafirehazard. Absolutelynoloosedecksheetsshouldbeleftattheendoftheworkingday.Anypartiallyusedbundlesmustbetightlysecuredtopreventblowoff.

Steel DeckInstitute

ERECTION OF DECK AND JOB SITE SAFETY

34 35

“ CLEANING IS EASIER THAN RECUPERATING”

Page 35: SDI MANUAL OF CONSTRUCTION WITH STEEL DECK · SDI NOTICE The Steel Deck Institute makes no representation or warranty respecting any information contained in this manual, including,

Damagetodeckandpurposefulpenetrationshavemuchincommon:theirlocationandseverityareseldomknownbeforehand.Usuallythedesignprofessionalknowsthegeneralareawhereaventstackmaycuttheroof,orapproximatelywhereatelephoneconduitmaypiercetheslab;buthemaynotknowhowbigtheholewillbe.Thislackofinformationmakesitdifficulttoadvisehowholesshouldbereinforced,ifatall,orhowdamageddeckshouldberepaired.Guidespecificationsreflectthislackofspecificknowledge.TheSDISpecificationstates,“Openingsnotshownontheerectiondiagrams,suchasthoserequiredforstacks,conduits,plumbing,vents,etc.,shallbecut(andreinforced,ifnecessary)bythetradesrequiringtheopenings.”Thedesignprofessionalshouldbeconsultedforreinforcingrequirements,butfrequently,unlessdetailsareshownontheplans,nodeckreinforcingisprovidedandthedesignprofessionalisnotconsulted. Deckdamagepresentssimilarproblems.Broadstatementssuchas,“Alldamageddeckmustbereplaced,”canbemade.Thedesignprofessionalmustthenmakethedecisionastowhatconstitutesdamageddeckwhileconsideringhowreplacementmaydelaythejob.Howmuchdamagecanbetolerateddependsonarchitec-turalandstructuralconsiderations.Iftheundersideofthedeckisexposedtopublicview,verylittlevisibledamagemaybeallowed.Inmostcases,however,thedeckwillbehiddenbyaceilingorductsandutilitiesandtheusualconcernisaboutstructuralperformance.

Roof Deck

Formost1½”roofdecksthelossofoneribpersheet,eitherbydentingorpenetration,canbetolerated.Noreinforcingisgenerallyrequiredforanopeningof6”aslongasnotmorethantwowebsareremoved.Inmostcasesthecapacityofthedeckisgreaterthanrequiredforroofloads.Onesixinchdiameterholepersheetinaspanshouldnotadverselyaffectthediaphragmstrengthandadentcanbelargerthan6”andstillcarrythehorizontalload.Cover-ingadentoran8”maximumholewitha0.045”plateandextendingtheplatetoadjacentribscouldeliminateworriesaboutinsulationboardspanningthedentandabouta“softspot”intheroof.Forholesordentsgreaterthanarib(8”to13”),itisadvisabletousea0.057”minimumplate.Exceptionstothisrecommendationare: 1. theholemaybelocatedinsuchaplacethatthedeckcan safelycantileverfromeachadjacentsupport; 2. agroupofholesmaybesoclosetogetherthatastructural frameisrequired.

Steel DeckInstitute

ERECTION OF DECK AND JOB SITE SAFETY

34 35

VII. DECK DAMAGE AND PENETRATIONS

Page 36: SDI MANUAL OF CONSTRUCTION WITH STEEL DECK · SDI NOTICE The Steel Deck Institute makes no representation or warranty respecting any information contained in this manual, including,

Steel DeckInstitute

DECK DAMAGE AND PENETRATIONS

36 37

SUGGESTED SCHEDULE:

OneRibRemoved(6”Diameter) NoReinforcingOr 0.045”Plate(Min.)8”Diameter 0.045”Plate(Min.)8”to13”Diameter 0.057”Plate(Min.)Over13” FrameOpening* (DesignByProjectEngineer)*Checkcantileverabilityofdeck

EXAMPLE OF 6” PENETRATION

Page 37: SDI MANUAL OF CONSTRUCTION WITH STEEL DECK · SDI NOTICE The Steel Deck Institute makes no representation or warranty respecting any information contained in this manual, including,

Steel DeckInstitute

DECK DAMAGE AND PENETRATIONS

36 37

EXAMPLE OF DETAILS FOR OPENINGS

DETAILS FOR OPENINGS TO 24”PERPENDICULAR TO DECK

Note:Forholes6”Øorlessnoreinforcingorminimum0.045”platerequired,dependingonlocation.

DETAILS FOR OPENINGS TO 12”PERPENDICULAR TO DECK

Page 38: SDI MANUAL OF CONSTRUCTION WITH STEEL DECK · SDI NOTICE The Steel Deck Institute makes no representation or warranty respecting any information contained in this manual, including,

Sump Pans

Aspecialcaseofroofpenetrationisthesumppan.Whenproper-lyattached,thesumppanwillcarrytheloadofthedeckitreplaces.Italsoactsasasmallheadertotransferloadsintoadjacentuncutsheets.Approximateperfoot(ofwidth)sectionpropertiesofastandard(0.075”)sumppanare:I=0.36in4;Sp=0.20in3.ApproximatesumppananalysismethodsareshowninFigure11;areinforcingtechniqueisshowninFigure12.

Steel DeckInstitute

DECK DAMAGE AND PENETRATIONS

38 39

M=50(22.5/12)2(12)+100(22.5)=3,305in.lb.2

TypicaldeckSn=0.184in.3/ftofwidth(20gageWR)

fb=3,305=18,000psi <20,000psiO.K.0.184 <26,000psiO.K.(temp.manload)

20GA.WRDECK DESIGN: LL = 40psf TL= 50psf

SUMP LOCATED AT CENTER OF SPAN

SUMP PAN ANALYSIS:

SUMPPANCALCULATION(Approximate)Figure11

Page 39: SDI MANUAL OF CONSTRUCTION WITH STEEL DECK · SDI NOTICE The Steel Deck Institute makes no representation or warranty respecting any information contained in this manual, including,

Burnholesindecksidelaps,causedbyweldedsidelapattach-ments,arespacedfarenoughapartnottocauseproblems.Burnholesnearintermediatesupportsareunlikelytocausemuchlossofstrengthunlessatotalareagreaterthana6”diameterholeisremoved.Theseburnholesareusuallycausedbytheweldersearchingfortheunseenstructuralmember;thereforetheuseofchalklinesisrecommended. Distributedsmalldents,suchasthosecausedbyfoottraffic,willnotcauseastructuralproblem;butifthedentingcoversalargepercentageofthejob,theinsulationboardwillbebetterattachedwithmechanicalfastenersratherthanbyadhesives.Thedesignprofessionalmustapproveanychangeinfastening. Vigilanceshouldbemaintainedtodetectandcorrectany“soft”spotsinroofsthatcouldcauseinsulationboardstocrackunderfootloading.

Steel DeckInstitute

DECK DAMAGE AND PENETRATIONS

38 39

SUMP REINFORCING AT END OF DECKFigure 12

Put1-1/2”deepreinforcingchannelsineachribateachsideofopening(flushwithtopofdeck).Channelsspanbetweenjoists.Attachflangesofsumppantochannels.

Page 40: SDI MANUAL OF CONSTRUCTION WITH STEEL DECK · SDI NOTICE The Steel Deck Institute makes no representation or warranty respecting any information contained in this manual, including,

Floor Deck Beforeconcreteispoured,thecontractorshouldinspectthedecktofindanyareasthatmaybedamagedorcrushedwhichmayrequireshoringfortheconcretepour.Areasthatbuckleduringthepourareusuallycausedbypreviousdamage,overspanningthedeck,orallowingconcretetopileup.Buckledareasdonotad-verselyaffecttheliveloadcapacity.TestsatWestVirginiaUniversity,byDr.LarryLuttrell,showednolossinliveloadcapacitywhenthedeckwaspurposelybuckled. Sincefloordeckdamageorpenetrationcanaffectthedeck’scapacitytocarryconcrete,anyfloordeckdamageorpenetrationmustbeevaluatedpriortopouringconcrete.Floordeck,likeroofdeck,canbeexaminedasacantilever.HowevertheSDIdoesnotpublishacantilevertableforfloordeckbecauseofthegreatprofilevariationsavailable.AmethodforcalculatingallowablecantileverspansisshowninFigure13.Apreferredformingmethodistoblockoutconcretefromwhereapenetrationwilloccur;and,aftertheconcretesufficientlycures,burnthedeckaway.Thedesignprofes-sionaldeterminestheneedforadditionalbarsormesharoundtheblockout. Itistheresponsibilityofthedesignprofessionaltodesignateholes/openingstobedeckedoverincompliancewithOSHARegu-lation29CFRSection1926.754(e)(2)(2003).Whenahole/openingisnotshownanddimensionedonthestructuraldesigndrawings,noprovisionsforconcreteretainagewillbeprovided.Whenaframedhole/openingisshownanddimensionedonthestructuraldesigndrawingsinfloordeck,pourstop(screed)anglewillbeprovidedfromthetopofthedecktothetopofslabonly.Cellclosureswillbeprovidedinthestrongdimensioninstandard10’-0”lengthstobefieldsized,cutandinstalledasshowninFigure14.Donotfieldcutdeckatholes/openingsuntilconcretehasreached75%ofitsdesignstrength(minimumofseven(7)daysinmostcases). Thedeckshouldbeinspectedforadequateattachmentatsupportsandatsidelaps.Sidelapsmustbetightlyconnectedtopreventopeningduringconcretepouring. Concreteprovidesanalkalineenvironmentthatdiscouragescorrosion.Sincemostapplicationsofcompositedeckareindryinteriorareas,fieldpaintingofburned,cutorabradedareasisnotusuallyrequired.Anytouchuprequirementsmustbeprovidedinthejobspecificationssincethedesignprofessionalestablishesthedeckfinishrequiredfortheenvironment.

Steel DeckInstitute

DECK DAMAGE AND PENETRATIONS

40 41

Page 41: SDI MANUAL OF CONSTRUCTION WITH STEEL DECK · SDI NOTICE The Steel Deck Institute makes no representation or warranty respecting any information contained in this manual, including,

Steel DeckInstitute

DECK DAMAGE AND PENETRATIONS

40 41

MAXIMUM FLOOR DECK CANTILEVERSFigure 13

NOTES:1) Allowablebendingstressof20ksiwithloadingofconcrete+deck+20psf, orconcrete+deck+150lb.concentratedload,whicheverisworse.

2) Allowabledeflectionoffreeedge(basedonfixedendcantilever)of1/120of cantileverspanunderloadingofconcrete+deck.

3) Bearingwidthof3-1/2”assumedwebcripplingcheck-concrete+deck+20 psfovercantileverandadjacentspan.Ifwidthislessthan3-1/2”checkwith thedeckmanufacturer.

STANDARD ACCESSORIES AT DECKED OVER OPENINGSFigure 14

Cellclosure(FIELDCUTTOCONTOUROFDECK,

ORUSEALTERNATEMEANSTODAMCONCRETE)

TYPICAL DETAIL @ ANGLE FRAMEDOPENING

(DECKINSTRONGDIRECTION)

Pourstop

Deck-fieldcutafterconcretepour(NOTBYDECKMANUFACTURER)

Pourstop

Pourstop

Pourstop

Deck-fieldcutafterconcretepour(NOTBYDECKMANUFACTURER)

TYPICAL DETAIL @ ANGLE FRAMEDOPENING

(DECKINWEAKDIRECTION)

Page 42: SDI MANUAL OF CONSTRUCTION WITH STEEL DECK · SDI NOTICE The Steel Deck Institute makes no representation or warranty respecting any information contained in this manual, including,

42 43

Afterthefloordeck(orformdeck)hasbeenproperlyinstalled,itactsasaworkingplatformformanytrades.Thedeckshouldhavebeenselectedtoprovideatleastfiftypoundspersquarefootcapacityasaworkingplatform.Ifthecontractoranticipatesloadsontheplatformthatwillexceed50psf,heshouldtakeappropriatestepstoensurethedeckwillcarrytheload. Beforeconcreteispoured,thecontractorshouldmakesurethatthedeckisproperlyandcompletelyfastenedinaccordancewithap-proveddeckerectiondrawingsandthedeckhasadequatebearingonallsupports.Damagedareasmustberepairedoraccepted.Allferrulesshouldhavebeenbrokenoffthestuds.Alldirtanddebrismustberemoved.Allreinforcement,wiresorrods,shouldbesecure-lyinplace.Theconcretecontractorshouldreviewthedeckshoringrequirementsandmakesurethatshoresaresecurelyinplace. Concreteshouldbepouredfromalowleveltoavoidimpact-ingthedeck.Itshouldbeplaceduniformlyoverthesupportingstructureandspreadtowardsthecenterofthedeckspan.Concreteshouldbeplacedinadirectionsothattheweightisfirstappliedtothetopsheetatthesidelap,reducingthepossibilityofthesideopeningduringthepour.Workersshouldnotcongregatearoundtheconcreteplacementzone.Ifbuggiesareusedtoplacetheconcrete,runwaysshouldbeplankedandthebuggiesshouldonlyoperateontheplanking.Theplanksshouldbestiffenoughtotransferthebuggyloadswithoutdamagingthedeck.Deckdamagecausedbyrollbarsorcarelessplacementmustbeavoided. ForcalculatingdeckstressesanddeflectionsduringconcretingtheSDIloadingscheduleasshowninFigure16isrecommended.Thismethodofanalysishasbeeninuseformanyyearsandhasprovidedgoodresults.Becausepouringroomcanberestricted,specialconsiderationisrequiredforsinglespanconditions.Forexample,asinglespanconditioncommonlyoccursbetweenelevatorshafts,anditislikelythatconcreteplacementwillbelesscontrolled.A50%factoristhenaddedtotheconcreteweightandadeckgageselectedisbasedonthisloading.Asanalternative,shor-ingmaybespecified.Althoughdeckconnectionsareimportantforallspanconditions,theyareextremelyimportantforsinglespans.Connectionsshouldbethoroughlychecked. Asconcreteisplaced,theentireframeaswellasthedeckwilldeflect.Concretequantitiesshouldbecalculatedwithalldeflec-tionstakenintoaccount.Theweightofconcretefinishingequip-mentwillalsoaffectthecapacityofthedeckasaworkingplatform.Forexample,heavyequipmentsuitableforusetofinishslabsongradewillgenerallynotbesuitabletofinishelevatedconcreteslabssupportedbysteeldeck.

VIII. PLACING CONCRETE

Page 43: SDI MANUAL OF CONSTRUCTION WITH STEEL DECK · SDI NOTICE The Steel Deck Institute makes no representation or warranty respecting any information contained in this manual, including,

Steel DeckInstitute

42 43

Page 44: SDI MANUAL OF CONSTRUCTION WITH STEEL DECK · SDI NOTICE The Steel Deck Institute makes no representation or warranty respecting any information contained in this manual, including,

44 45

PLACING CONCRETE

Page 45: SDI MANUAL OF CONSTRUCTION WITH STEEL DECK · SDI NOTICE The Steel Deck Institute makes no representation or warranty respecting any information contained in this manual, including,

Whenthedeckhasbeendesignedtoactasasheardiaphragm,itshouldbenotedontherecorddrawings.Thenoteshouldcau-tionthatthedeckpanelsactasbracingforthebuildingandthatremovinganyofthepanelsisprohibitedunlessseparatebracingisdesignedandprovided.Deckfastenersusedaroundframedopen-ingsshouldbethesameas,andtheirspacingequaltoorcloserthan,thefastenersusedtoattachthedecktotheframe. Ifthedeckistoactasadiaphragmduringconstruction,itmustberealizedthatthediaphragmisnoteffectiveuntilalldeckunitsareinplaceandfullyconnected.Therefore,ifdeckerectionisinter-ruptedbeforecompletion,temporarybracingmayberequired.

Steel DeckInstitute

IX. SPECIAL CONSIDERATIONS FOR DIAPHRAGMS

44 45

Figure 15

Recommended Maximum Spans for Construction and Maintenance Loads Standard 1 ½” and 3” Roof Deck

Narrow NR22 1 3’-10”1’-0”

RibDeck NR22 2ormore 4’-9” NR20 1 4’-10”

1’-2” NR20 2ormore 5’-11” NR18 1 5’-11”

1’-7” NR18 2ormore 6’-11”Intermediate IR22 1 4’-6”

1’-2”

RibDeck IR22 2ormore 5’-6” IR20 1 5’-3”

1’-5” IR20 2ormore 6’-3” IR18 1 6’-2”

1’-10” IR18 2ormore 7’-4”Wide WR22 1 5’-6”

1’-11”RibDeck WR22 2ormore 6’-6“ WR20 1 6’-3”

2’-4” WR20 2ormore 7’-5” WR18 1 7’-6”

2’-10” WR18 2ormore 8’-10”Deep 3DR22 1 11’-0”

3’-6”RibDeck 3DR22 2ormore 13’-0” 3DR20 1 12’-6”

4’-0” 3DR20 2ormore 14’-8” 3DR18 1 15’-0”

4’-10” 3DR18 2ormore 17’-8”

Maximum Span Span RecommendedSpans Type Condition Ft.-In. RoofDeckCantilever

CONSTRUCTION LOAD TABLE

Page 46: SDI MANUAL OF CONSTRUCTION WITH STEEL DECK · SDI NOTICE The Steel Deck Institute makes no representation or warranty respecting any information contained in this manual, including,

DECK LOADING DIAGRAMS

46 47

Bending Moments — Deflections — Support ReactionsFigure 16

concentratedmanorequipmentload(150lbs./ft.ofwidthunfactored)

P

uniformconcreteload

/ clearspan uniformconstructionload(20psf,unfactored)

IIIIIIIIIIIIIIIIIIIIIII

Page 47: SDI MANUAL OF CONSTRUCTION WITH STEEL DECK · SDI NOTICE The Steel Deck Institute makes no representation or warranty respecting any information contained in this manual, including,

1. Design Manual for Composite Decks, Form Decks and Roof Decks, PublicationNo.30,SteelDeckInstitute,FoxRiverGrove,Illinois.2. Luttrell,L.D.andEllifritt,D.S.,“TheStrengthandStiffnessofSteel DeckSubjecttoIn-PlaneLoading’,’ReportNo.2011,Department ofCivilEngineering,WestVirginiaUniversity,1970.3. Steel Deck Institute Diaphragm Design Manual, DDM03.Third Edition,September,2004,SteelDeckInstitute, FoxRiverGrove,Illinois.4. “PreventingDamagetoBuildingsUnderConstruction”,1988 FactoryMutualApprovedProductNews,FactoryMutual Research,Norwood,Massachusetts.5. “FallProtectionforDeckInstallation”,ConstructionSafety AssociationofOntario,Toronto,Ontario,Canada.6. “StandardforSteelRoofDeck”,CanadianSheetSteelBuilding Institute,Willowdale,Ontario,Canada.7. Heagler,R.B.,Luttrell,L.D.,“HowtoFastenSteelDeck-Update andReview”,ModernSteelConstructionNumber1,1988, AmericanInstituteofSteelConstruction,Chicago,Illinois.8. 29CFRPart1926SafetyStandardforSteelErection,FinalRule, OSHA/U.S.Dept.ofLabor2001,Washington,D.C.9. “HandlingandErectionofSteelJoistsandJoistGirders”, TechnicalDigestNo.9-March,2006,SteelJoistInstitute, MyrtleBeach,SouthCarolina.10.Cold Formed Steel Design Manual,2002Edition,AmericanIron andSteelInstitute,Washington,D.C.11.Manual of Steel Construction,ThirteenthEdition,American InstituteofSteelConstruction,Inc.,Chicago,Illinois.12.Yu,W.W.,Cold Formed Steel Design,2000,JohnWileyandSons, NewYork,NewYork.13.Fire Resistance Directory,2006,UnderwritersLaboratories,Inc., Northbrook,Illinois.14.2006 Approval Guide,FactoryMutualSystem,Norwood, Massachusetts15.“LossPreventionData1-28”,2005,FactoryMutualSystem, Norwood,Massachusetts.16.NFPA.51B,StandardforFirePreventioninuseofCuttingand WeldingProcesses,NationalFireAssociation,Quincy, Massachusetts.17.Heagler,R.B.,“MetalDeckandConcreteQuantities”,SteelDeck Institute,FoxRiverGrove,Illinois.18.Structural Welding Code—Steel,ANSI/AWSD1.1-2006,American WeldingSociety,Miami,Florida.19.Structural Welding Code—Sheet Steel,ANSI/AWSD1.3-98, AmericanWeldingSociety,Miami,Florida.

Steel DeckInstitute

46 47

REFERENCES

Page 48: SDI MANUAL OF CONSTRUCTION WITH STEEL DECK · SDI NOTICE The Steel Deck Institute makes no representation or warranty respecting any information contained in this manual, including,

Publication No. MOC2

STEEL DECK INSTITUTEP.O. Box 25Fox River Grove, IL 60021-0025TEL: 847-458-4647FAX: 847-458-4648WEB SITE: http://www.sdi.org