Second Annual Investors & Analyst Meeting Maurício Novís Botelho President & CEO Second Annual Investors & Analyst Meeting Maurício Novís Botelho President & CEO

Upload: embraer-ri

Post on 19-May-2015

244 views

Category:

Documents


3 download

TRANSCRIPT

Page 1: Second Annual Analysts & Investors Meeting - 2000 & 2001 in Review

Second Annual Investors & Analyst

Meeting

Maurício Novís BotelhoPresident & CEO

Second Annual Investors & Analyst

Meeting

Maurício Novís BotelhoPresident & CEO

Page 2: Second Annual Analysts & Investors Meeting - 2000 & 2001 in Review

2000 in Review2000 in Review

0,00

5,00

10,00

15,00

20,00

20.07.0001.09.00 17.10.0030.11.0012.01.01 28.02.0111.04.0125.05.01 12.07.0123.08.01 11.10.0123.11.0110.01.02

Global Offering (IPO) at NYSE with the launch of the

ADSs Level III with US$ 18.50 launch price

July 2000

Page 3: Second Annual Analysts & Investors Meeting - 2000 & 2001 in Review

2000 in Review2000 in Review

0,00

5,00

10,00

15,00

20,00

25,00

30,00

35,00

40,00

45,00

20.07.0001.09.0017.10.0030.11.0012.01.0128.02.0111.04.0125.05.0112.07.0123.08.0111.10.0123.11.0110.01.02

Singapore Sales Office is inaugurated

December 2000

Page 4: Second Annual Analysts & Investors Meeting - 2000 & 2001 in Review

EmbraerEmbraer SingaporeSingapore

Q Representative officeQ Markets aircraft and provides after-sales supportQ Inaugurated in December 2000

Singapore

Page 5: Second Annual Analysts & Investors Meeting - 2000 & 2001 in Review

EmbraerEmbraer ChinaChina

Q Representative office located in Beijing, ChinaQ Markets aircraft and provides after-sales supportQ Inaugurated in May 2000

Beijing, China

Page 6: Second Annual Analysts & Investors Meeting - 2000 & 2001 in Review

Le Bourget - FrançaDallas - EUA

Weybridge,Reino Unido

Embraer – Global PresenceEmbraer – Global Presence

Fort Lauderdale-EUA

São José dos Campos

Gavião PeixotoBotucatu Eugênio de Melo

West Palm Beach -EUA

Melbourne- Austrália

Cingapura

Beijing - China

Page 7: Second Annual Analysts & Investors Meeting - 2000 & 2001 in Review

2001 in Review2001 in Review

0,00

5,00

10,00

15,00

20,00

25,00

30,00

35,00

40,00

45,00

20.07.00 01.09.00 17.10.00 30.11.00 12.01.01 28.02.01 11.04.01 25.05.01 12.07.01 23.08.01 11.10.01 23.11.01 10.01.02

American Eagle confirms Six Options for the ERJ 140

January 2001

Page 8: Second Annual Analysts & Investors Meeting - 2000 & 2001 in Review

2001 in Review2001 in Review

0 , 0 0

5 , 0 0

1 0 , 0 0

1 5 , 0 0

2 0 , 0 0

2 5 , 0 0

3 0 , 0 0

3 5 , 0 0

4 0 , 0 0

4 5 , 0 0

2 0 . 0 7 . 0 0 0 1 . 0 9 . 0 0 1 7 . 1 0 . 0 0 3 0 . 1 1 . 0 0 1 2 . 0 1 . 0 1 2 8 . 0 2 . 0 1 1 1 . 0 4 . 0 1 2 5 . 0 5 . 0 1 1 2 . 0 7 . 0 1 2 3 . 0 8 . 0 1 1 1 . 1 0 . 0 1 2 3 . 1 1 . 0 1 1 0 . 0 1 . 0 2

First Flight of the AEW&C

for the Sivam Program

January 2001

Page 9: Second Annual Analysts & Investors Meeting - 2000 & 2001 in Review

EMB 145 AEW&CEMB 145 AEW&C

Q The AEW&C (Airborne Early Warning & Control) is equipped with a

state-of-the-art command, contro l & communicat ion system

Q Five aircraft wil l be del ivered for the SIVAM program and wil l operate

in the Amazon Region

Q A derivative of this version has been contracted by the Hellenic Air

Force (Greece)

Page 10: Second Annual Analysts & Investors Meeting - 2000 & 2001 in Review

EMB 145 RS/AGSEMB 145 RS/AGS

Q The EMB 145 RS/AGS was designed to carry out ground survei l lance

and environmental protection activit ies in Brazi l ’s Amazon region

Q It features an advanced Synthetic Aperture Radar (SAR), capable of

providing day/night and al l -weather imagery of the ground over large areas, plus other sophist icated sensors

Page 11: Second Annual Analysts & Investors Meeting - 2000 & 2001 in Review

2001 in Review2001 in Review

0,00

5,00

10,00

15,00

20,00

25,00

30,00

35,00

40,00

45,00

20.07.00 01.09.00 17.10.00 30.11.00 12.01.01 28.02.01 11.04.01 25.05.01 12.07.01 23.08.01 11.10.01 23.11.01 10.01.02

Mexico s igns a contract for one EMB 145

AEW&C and two EMB 145 MP.

February 2001

Page 12: Second Annual Analysts & Investors Meeting - 2000 & 2001 in Review

EMB 145 MP/ASWEMB 145 MP/ASW

Q The EMB 145 MP/ASW, for marit ime patrol and anti-submarine warfare missions, is the latest addit ion to the highly successful family of

survei l lance and intel l igence gathering aircraft based on the ERJ 145

regional jet

Q It features a marit ime and ground survei l lance radar plus other

sophist icated sensors.

Page 13: Second Annual Analysts & Investors Meeting - 2000 & 2001 in Review

2001 in Review2001 in Review

0 , 0 0

5 , 0 0

1 0 , 0 0

1 5 , 0 0

2 0 , 0 0

2 5 , 0 0

3 0 , 0 0

3 5 , 0 0

4 0 , 0 0

4 5 , 0 0

2 0 . 0 7 . 0 0 0 1 . 0 9 . 0 0 1 7 . 1 0 . 0 0 3 0 . 1 1 . 0 0 1 2 . 0 1 . 0 1 2 8 . 0 2 . 0 1 1 1 . 0 4 . 0 1 2 5 . 0 5 . 0 1 1 2 . 0 7 . 0 1 2 3 . 0 8 . 0 1 1 1 . 1 0 . 0 1 2 3 . 1 1 . 0 1 1 0 . 0 1 . 0 2

As part of the Brazilian Air Force

modernization program, the first two

units of the F5 aircraft of the Brazilian

Air Force arrived in SJC

February 2001

Page 14: Second Annual Analysts & Investors Meeting - 2000 & 2001 in Review

2001 in Review2001 in Review

0 , 0 0

5 , 0 0

1 0 , 0 0

1 5 , 0 0

2 0 , 0 0

2 5 , 0 0

3 0 , 0 0

3 5 , 0 0

4 0 , 0 0

4 5 , 0 0

2 0 . 0 7 . 0 0 0 1 . 0 9 . 0 0 1 7 . 1 0 . 0 0 3 0 . 1 1 . 0 0 1 2 . 0 1 . 0 1 2 8 . 0 2 . 0 1 1 1 . 0 4 . 0 1 2 5 . 0 5 . 0 1 1 2 . 0 7 . 0 1 2 3 . 0 8 . 0 1 1 1 . 1 0 . 0 1 2 3 . 1 1 . 0 1 1 0 . 0 1 . 0 2

400th ERJ 145 serial number

delivered to Crossair

February 2001

Page 15: Second Annual Analysts & Investors Meeting - 2000 & 2001 in Review

2001 in Review2001 in Review

0,00

5,00

10,00

15,00

20,00

25,00

30,00

35,00

40,00

45,00

20.07.00 01.09.00 17.10.00 30.11.00 12.01.01 28.02.01 11.04.01 25.05.01 12.07.01 23.08.01 11.10.01 23.11.01 10.01.02

Legacy First Flight

March 2001

Page 16: Second Annual Analysts & Investors Meeting - 2000 & 2001 in Review

LegacyLegacy

Q Corporate Jet based on the ERJ 135

Q First del ivery scheduled for January 2002

Q 174 units sold (73 f i rm orders and 97 opt ions -

January)

Q Executive

Q Corporate Shuttle

Q Transport for Authorities

Versions

Page 17: Second Annual Analysts & Investors Meeting - 2000 & 2001 in Review

2001 in Review2001 in Review

March 2001

0 ,00

5 ,00

1 0 , 0 0

1 5 , 0 0

2 0 , 0 0

2 5 , 0 0

3 0 , 0 0

3 5 , 0 0

4 0 , 0 0

4 5 , 0 0

2 0 . 0 7 . 0 0 0 1 . 0 9 . 0 0 1 7 . 1 0 . 0 0 3 0 . 1 1 . 0 0 1 2 . 0 1 . 0 1 2 8 . 0 2 . 0 1 1 1 . 0 4 . 0 1 2 5 . 0 5 . 0 1 1 2 . 0 7 . 0 1 2 3 . 0 8 . 0 1 1 1 . 1 0 . 0 1 2 3 . 1 1 . 0 1 1 0 . 0 1 . 0 2

WTO Canada requested a panel agaist

Brazil to verify the Complience of PROEX

with WTO rules

Page 18: Second Annual Analysts & Investors Meeting - 2000 & 2001 in Review

2001 in Review2001 in Review

April 2001

0,00

5,00

1 0 , 0 0

1 5 , 0 0

2 0 , 0 0

2 5 , 0 0

3 0 , 0 0

3 5 , 0 0

4 0 , 0 0

4 5 , 0 0

20 .07 .0001 .09 .00 17 .10 .00 30 .11 .00 12 .01 .01 28 .02 .0111 .04 .01 25 .05 .01 12 .07 .01 23 .08 .0111 .10 .01 23 .11 .01 10 .01 .02

One ERJ 145 opt ion

converted by Brit ish

Midland

Page 19: Second Annual Analysts & Investors Meeting - 2000 & 2001 in Review

2001 in Review2001 in Review

April 2001

0,00

5,00

10 ,00

15 ,00

20 ,00

25 ,00

30 ,00

35 ,00

40 ,00

45 ,00

50 ,00

20.07.00 01.09.00 17.10.00 30.11.00 12.01.01 28.02.01 11.04.01 25.05.01 12.07.01 23.08.01 11.10.01 23.11.01 10.01.02

Legacy: the f i r s t f i rm order

rece ived f rom a Braz i l ian

Cus t ome r

Page 20: Second Annual Analysts & Investors Meeting - 2000 & 2001 in Review

2001 in Review2001 in Review

May 2001

0 ,00

5 ,00

10,00

15,00

20,00

25,00

30,00

35,00

40,00

45,00

50,00

20 .07 .00 01 .09 .00 17 .10 .00 30 .11 .00 12 .01 .01 28 .02 .01 11 .04 .01 25 .05 .0112 .07 .01 23 .08 .01 11 .10 .01 23 .11 .01 10 .01 .02

ERJ 135: One f irm order +

one option by Occitania

Page 21: Second Annual Analysts & Investors Meeting - 2000 & 2001 in Review

2001 in Review2001 in Review

0,00

5,00

10,00

15,00

20,00

25,00

30,00

35,00

40,00

45,00

50,00

20.07.00 01.09.00 17.10.00 30.11.00 12.01.01 28.02.01 11.04.01 25.05.01 12.07.01 23.08.01 11.10.01 23.11.01 10.01.02

Secondary Of fer ing for US$ 750 MM ADSs pr i ced a t US$ 38 .90

US$ 300 MM BNDES Exchangeb le fo r ERJs ADSs

June 2001

Page 22: Second Annual Analysts & Investors Meeting - 2000 & 2001 in Review

2001 in Review2001 in Review

0,00

5,00

10,00

15,00

20,00

25,00

30,00

35,00

40,00

45,00

50,00

20.07.00 01.09.00 17.10.00 30.11.00 12.01.01 28.02.01 11.04.01 25.05.01 12.07.01 23.08.01 11.10.01 23.11.01 10.01.02

AEROChain launched during the 44th Paris

Air Show in a partneship with ATR, ORACLE & KPMG Consulting

June 2001

Page 23: Second Annual Analysts & Investors Meeting - 2000 & 2001 in Review

eMarketplaceeMarketplace

Q Mission

Q Connect the av ia t ion indust ry through the internet .

Q Enable supply cha in co l laborat ion and

e lec t ron ic t rade between Embrae r , manufacturers , supp l iers , and

customers .

Q Offer cus tomers conven ient access to a wide range of va lue added log is t i ca l

and technica l serv ices, inc lud ing f leet

management , ma in tenance p lann ing , parts and a i rcraf t serv ice track ing,

t ra in ing, warranty management , and

spare parts forecast ing.

Q Object ives

Q Trans form the way to do bus iness

and communicate wi th in the av ia t ion

industry.

Page 24: Second Annual Analysts & Investors Meeting - 2000 & 2001 in Review

2001 in Review2001 in Review

0,00

5,00

1 0 , 0 0

1 5 , 0 0

2 0 , 0 0

2 5 , 0 0

3 0 , 0 0

3 5 , 0 0

4 0 , 0 0

4 5 , 0 0

5 0 , 0 0

20 .07 .00 01 .09 .00 17 .10 .00 30 .11 .00 12 .01 .01 28 .02 .01 11 .04 .01 25 .05 .0112 .07 .01 23 .08 .01 11 .10 .01 23 .11 .01 10 .01 .02

44th Par is A i r Show

with several

announcements

June 2001

Page 25: Second Annual Analysts & Investors Meeting - 2000 & 2001 in Review

• Chautaqua Airl ines confirmed 28 options for the ERJ 145 to ERJ 140 and orderaed more 25 options

• Transtates Airlines placed a new order for 10 ERJ 140 and an additional 25 options

• Brazil’s TAM airlines signed a Memo of understanding for thepurchase of up to 100 Embraer 170/190 jet family

• Embraer announced orders of 7 new Legacy business jet

44th Paris Air Show44th Paris Air Show

Page 26: Second Annual Analysts & Investors Meeting - 2000 & 2001 in Review

2001 in Review2001 in Review

0,00

5,00

10,00

15,00

20,00

25,00

30,00

35,00

40,00

45,00

50,00

20.07.00 01.09.00 17.10.00 30.11.00 12.01.01 28.02.01 11.04.01 25.05.01 12.07.01 23.08.01 11.10.01 23.11.01 10.01.02

Engineering Special ization

Program: 195 students

June 2001

Page 27: Second Annual Analysts & Investors Meeting - 2000 & 2001 in Review

Q To evaluate the aircraft aerodynamic characterist ics Embraer uses the

aerodynamic tunnel of CTA - Centro Técnico Aeroespacial

Q Technological cooperation with Russia’s TsAGI in aeroelasticity and

aerodynamic tests.

Aerodynamic TunnelAerodynamic Tunnel

Page 28: Second Annual Analysts & Investors Meeting - 2000 & 2001 in Review

Q Began activit ies in February/2000

Q Provides for visualizing the aircraft

structure and systems during the

project phase, using electronic models

Q Reduces the development cycle

Q Customers:

Q Can fol low development

Q Can check internal configuration

Q Can define certain characterist ics

Virtual Reality CenterVirtual Reality Center

Page 29: Second Annual Analysts & Investors Meeting - 2000 & 2001 in Review

Q The fl ight simulator is operated by Fl ight Safety International to train pilots

Q Today, 8 simulators are avai lable in different parts of the world

Flight SimulatorFlight Simulator

Page 30: Second Annual Analysts & Investors Meeting - 2000 & 2001 in Review

Q Composite material parts are prepared for cure under control led condit ions of temperature and pressure in a special oven cal led

“autoclave”

Q Embraer ’s world-class expertise in this f ield dates back to the 70's

Composite MaterialsComposite Materials

Page 31: Second Annual Analysts & Investors Meeting - 2000 & 2001 in Review

2001 in Review2001 in Review

June 2001

0 ,00

5 ,00

10,00

15,00

20,00

25,00

30,00

35,00

40,00

45,00

50,00

20.07.00 01.09.00 17.10.00 30.11.00 12.01.01 28.02.01 11.04.01 25.05.01 12.07.01 23.08.01 11.10.01 23.11.01 10.01.02

5th ERJ 145 de l ivered to

S i chuan f rom Ch ina

Page 32: Second Annual Analysts & Investors Meeting - 2000 & 2001 in Review

2001 in Review2001 in Review

July 2001

0 ,00

5 ,00

1 0 , 0 0

1 5 , 0 0

2 0 , 0 0

2 5 , 0 0

3 0 , 0 0

3 5 , 0 0

4 0 , 0 0

4 5 , 0 0

5 0 , 0 0

2 0 . 0 7 . 0 0 0 1 . 0 9 . 0 0 1 7 . 1 0 . 0 0 3 0 . 1 1 . 0 0 1 2 . 0 1 . 0 1 2 8 . 0 2 . 0 1 1 1 . 0 4 . 0 1 2 5 . 0 5 . 0 1 1 2 . 0 7 . 0 1 2 3 . 0 8 . 0 1 1 1 . 1 0 . 0 1 2 3 . 1 1 . 0 1 1 0 . 0 1 . 0 2

ERJ 140 first delivery

Page 33: Second Annual Analysts & Investors Meeting - 2000 & 2001 in Review

2001 in Review2001 in Review

July 2001

0,00

5,00

10 ,00

15 ,00

20 ,00

25 ,00

30 ,00

35 ,00

40 ,00

45 ,00

50 ,00

20.07.00 01.09.00 17.10.00 30.11.00 12.01.01 28.02.01 11.04.01 25.05.01 12.07.01 23.08.01 11.10.01 23.11.01 10.01.02

PROEX cons ide red i n comp l i ence

w i th the WTO ru les

Page 34: Second Annual Analysts & Investors Meeting - 2000 & 2001 in Review

Q Regional jet with 44 seats

Q 98% commonal i ty wi th ERJ 135 & ERJ 145

Q The f irst del ivery took place in July 2001

Q 166 units sold

ERJ 140ERJ 140

Page 35: Second Annual Analysts & Investors Meeting - 2000 & 2001 in Review

2001 in Review2001 in Review

0 ,00

5 ,00

10,00

15,00

20,00

25,00

30,00

35,00

40,00

45,00

50,00

20 .07 .00 01 .09 .00 17 .10 .0030 .11 .00 12 .01 .01 28 .02 .01 11 .04 .01 25 .05 .01 12 .07 .01 23 .08 .01 11 .10 .01 23 .11 .01 10 .01 .02

Midwest Express signed a

contract for 40 ERJ 140s

( 20 firms + 20 options)

August 2001

Page 36: Second Annual Analysts & Investors Meeting - 2000 & 2001 in Review

2001 in Review2001 in Review

0,00

5,00

10,00

15,00

20,00

25,00

30,00

35,00

40,00

45,00

50,00

20.07.00 01.09.00 17.10.00 30.11.00 12.01.01 28.02.01 11.04.01 25.05.01 12.07.01 23.08.01 11.10.01 23.11.01 10.01.02

Brazi l ian Air Force s igned a contract

for 99 Super Tucano (ALX) - 76 f i rms

and 23 opt ions

August 2001

Page 37: Second Annual Analysts & Investors Meeting - 2000 & 2001 in Review

SuperSuper TucanoTucano (ALX)(ALX)

Q High-performance der ivat ive

of the proven EMB 312 Tucano

Q State-of-the-art systems, with glass cockpit and advanced

avionics

Q Optimized for advanced training and operat ional

appl icat ions in host i le environments

Q 726 units sold, operating in 15 Air Forces

(Tucano and Super Tucano models)

Page 38: Second Annual Analysts & Investors Meeting - 2000 & 2001 in Review

2001 in Review2001 in Review

0 , 0 0

5 , 0 0

1 0 , 0 0

1 5 , 0 0

2 0 , 0 0

2 5 , 0 0

3 0 , 0 0

3 5 , 0 0

4 0 , 0 0

4 5 , 0 0

5 0 , 0 0

2 0 . 0 7 . 0 0 0 1 . 0 9 . 0 0 1 7 . 1 0 . 0 0 3 0 . 1 1 . 0 0 1 2 . 0 1 . 0 1 2 8 . 0 2 . 0 1 1 1 . 0 4 . 0 1 2 5 . 0 5 . 0 1 1 2 . 0 7 . 0 1 2 3 . 0 8 . 0 1 1 1 . 1 0 . 0 1 2 3 . 1 1 . 0 1 1 0 . 0 1 . 0 2

10 Super Tucano ordered from

Dominican Republic

August 2001

Page 39: Second Annual Analysts & Investors Meeting - 2000 & 2001 in Review

2001 in Review2001 in Review

0,00

5,00

10 ,00

15 ,00

20 ,00

25 ,00

30 ,00

35 ,00

40 ,00

45 ,00

50 ,00

20.07.00 01.09.00 17.10.00 30.11.00 12.01.01 28.02.01 11.04.01 25.05.01 12.07.01 23.08.01 11.10.01 23.11.01 10.01.02

Revis ion of the de l iver ies forecast for

2001 f rom 200 to 185 and fo r the

year 2002 f rom 220 to 205 a i r c ra f t

August 2001

Page 40: Second Annual Analysts & Investors Meeting - 2000 & 2001 in Review

2001 in Review2001 in Review

0 , 0 0

5 , 0 0

10 ,00

15 ,00

20 ,00

25 ,00

30 ,00

35 ,00

40 ,00

45 ,00

50 ,00

2 0 . 0 7 . 0 0 0 1 . 0 9 . 0 0 1 7 . 1 0 . 0 0 3 0 . 1 1 . 0 0 1 2 . 0 1 . 0 1 2 8 . 0 2 . 0 1 1 1 . 0 4 . 0 1 2 5 . 0 5 . 0 1 1 2 . 0 7 . 0 1 2 3 . 0 8 . 0 1 1 1 . 1 0 . 0 1 2 3 . 1 1 . 0 1 1 0 . 0 1 . 0 2

Sep tember 11 th US

Terror is t Attacks

September 2001

Page 41: Second Annual Analysts & Investors Meeting - 2000 & 2001 in Review

2001 in Review2001 in Review

September 2001

0,00

5,00

10 ,00

15 ,00

20 ,00

25 ,00

30 ,00

35 ,00

40 ,00

45 ,00

50 ,00

20.07.00 01.09.00 17.10.00 30.11.00 12.01.01 28.02.01 11.04.01 25.05.01 12.07.01 23.08.01 11.10.01 23.11.01 10.01.02

Announcements

New de l ivery forecast :

2001 : f r om 185 to 160

2002 : f r om 205 to 135

layo f f o f 14% Embraer ' s l abor

fo r ce

Page 42: Second Annual Analysts & Investors Meeting - 2000 & 2001 in Review

New Delivery ForecastNew Delivery Forecast

4

3 2

6 0

9 6

160

135

161

0

2 0

4 0

6 0

8 0

100

120

140

160

180

1996 1997 1998 1999 2000 2001 2002E

Page 43: Second Annual Analysts & Investors Meeting - 2000 & 2001 in Review

2001 in Review2001 in Review

October 2001

0 , 0 0

5 , 0 0

1 0 , 0 0

1 5 , 0 0

2 0 , 0 0

2 5 , 0 0

3 0 , 0 0

3 5 , 0 0

4 0 , 0 0

4 5 , 0 0

5 0 , 0 0

2 0 . 0 7 . 0 0 0 1 . 0 9 . 0 0 1 7 . 1 0 . 0 0 3 0 . 1 1 . 0 0 1 2 . 0 1 . 0 1 2 8 . 0 2 . 0 1 1 1 . 0 4 . 0 1 2 5 . 0 5 . 0 1 1 2 . 0 7 . 0 1 2 3 . 0 8 . 0 1 1 1 . 1 0 . 0 1 2 3 . 1 1 . 0 1 1 0 . 0 1 . 0 2

WTO Dispute: Canadian EDC (Export

Development Corporation) support to

certain 1996 Bombardier's deals were

considered illegal

Page 44: Second Annual Analysts & Investors Meeting - 2000 & 2001 in Review

2001 in Review2001 in Review

October 2001

0,00

5,00

10,00

15,00

20,00

25,00

30,00

35,00

40,00

45,00

50,00

20.07.00 01.09.00 17.10.00 30.11.00 12.01.01 28.02.01 11.04.01 25.05.01 12.07.01 23.08.01 11.10.01 23.11.01 10.01.02

Gavião Peixoto

runway concluded

Page 45: Second Annual Analysts & Investors Meeting - 2000 & 2001 in Review

EmbraerEmbraer GaviãoGavião PeixotoPeixoto

Q Located in Gavião Peixoto, Brazil

Q Manufacturing faci l ity that wil l host the final assembly activit ies

of the company´s corporate and defense aircraft, as wel l as a

runway for f l ight tests

Q Site area: 4.12 mill ion sq.ft.

Q Number of employees: 18

Q Start-up of operat ions in October 2001

BRAZILBolivia

A r g e n t i n a

P e r u

C o l o m b i a

Uruguay

Pac

ific

Oce

an

S ã o P a u l o

V e n e z u e l a

Ch

ile

P a r a g u a y

Atla

ntic

Oce

an

BRAZILBolivia

A r g e n t i n a

P e r u

C o l o m b i a

Uruguay

Pac

ific

Oce

an

S ã o P a u l o

V e n e z u e l a

Ch

ile

P a r a g u a y

Atla

ntic

Oce

an

Gavião Peixoto

Page 46: Second Annual Analysts & Investors Meeting - 2000 & 2001 in Review

2001 in Review2001 in Review

October 2001

0,00

5,00

10 ,00

15 ,00

20 ,00

25 ,00

30 ,00

35 ,00

40 ,00

45 ,00

50 ,00

20 .07 .00 01 .09 .00 17 .10 .00 30 .11 .00 12 .01 .01 28 .02 .01 11 .04 .01 25 .05 .01 12 .07 .01 23 .08 .01 11 .10 .01 23 .11 .01 10 .01 .02

EMBRAER 170 Ro l l Ou t

Page 47: Second Annual Analysts & Investors Meeting - 2000 & 2001 in Review

The Jet Family Embraer 170/175/190/195

The Jet Family Embraer 170/175/190/195

Page 48: Second Annual Analysts & Investors Meeting - 2000 & 2001 in Review

Q Commercial jets with 70 and 78 seats

Q 212 units sold (82 f irm orders and 130 options)

Q EMBRAER 170 f irst f l ight was February 2002

Q First del iver ies: EMBRAER 170 Dec 2002

Q EMBRAER 175 Jun 2004

EMBRAER 170 / EMBRAER 175EMBRAER 170 / EMBRAER 175

Page 49: Second Annual Analysts & Investors Meeting - 2000 & 2001 in Review

Q Pressurized commercial jets with a capacity for 98 passengers

(EMBRAER 190) or 108 passengers (EMBRAER 195)

Q 102 units sold (30 f irm orders and 72 options)

Q First del iver ies: EMBRAER 190 Dec. 2005

EMBRAER 195 Dec. 2004

EMBRAER 190 / EMBRAER 195EMBRAER 190 / EMBRAER 195

Page 50: Second Annual Analysts & Investors Meeting - 2000 & 2001 in Review

2001 in Review2001 in Review

December 2001

0 , 0 0

5 , 0 0

1 0 , 0 0

1 5 , 0 0

2 0 , 0 0

2 5 , 0 0

3 0 , 0 0

3 5 , 0 0

4 0 , 0 0

4 5 , 0 0

5 0 , 0 0

2 0 . 0 7 . 0 0 0 1 . 0 9 . 0 0 1 7 . 1 0 . 0 0 3 0 . 1 1 . 0 0 1 2 . 0 1 . 0 1 2 8 . 0 2 . 0 1 1 1 . 0 4 . 0 1 2 5 . 0 5 . 0 1 1 2 . 0 7 . 0 1 2 3 . 0 8 . 0 1 1 1 . 1 0 . 0 1 2 3 . 1 1 . 0 1 1 0 . 0 1 . 0 2

Wexford confirmed 8 ERJ

140 options

Page 51: Second Annual Analysts & Investors Meeting - 2000 & 2001 in Review

2001 in Review2001 in Review

December 2001

0 , 0 0

5 , 0 0

1 0 , 0 0

1 5 , 0 0

2 0 , 0 0

2 5 , 0 0

3 0 , 0 0

3 5 , 0 0

4 0 , 0 0

4 5 , 0 0

5 0 , 0 0

2 0 . 0 7 . 0 0 0 1 . 0 9 . 0 0 1 7 . 1 0 . 0 0 3 0 . 1 1 . 0 0 1 2 . 0 1 . 0 1 2 8 . 0 2 . 0 1 1 1 . 0 4 . 0 1 2 5 . 0 5 . 0 1 1 2 . 0 7 . 0 1 2 3 . 0 8 . 0 1 1 1 . 1 0 . 0 1 2 3 . 1 1 . 0 1 1 0 . 0 1 . 0 2

Indigo ordered 25 F i rms +

50 Option of Legacy

Shutt le version

Page 52: Second Annual Analysts & Investors Meeting - 2000 & 2001 in Review

2001 in Review2001 in Review

December 2001

0,00

5,00

10,00

15,00

20,00

25,00

30,00

35,00

40,00

45,00

50,00

20.07.00 01.09.00 17.10.00 30.11.00 12.01.01 28.02.01 11.04.01 25.05.01 12.07.01 23.08.01 11.10.01 23.11.01 10.01.02

Embraer the la rgest

Braz i l ian Export Company

for the 3rd Year

Page 53: Second Annual Analysts & Investors Meeting - 2000 & 2001 in Review

(US$ Million)

Trade Balance Contribution

( * ) F o n t e : D e c e x

193 264

634

1.173

1.692

2.702

2.897

1 4 72 2 0

4 6 9

8 8 1

1 . 1 7 8

1 . 3 5 2

1 . 8 4 3

-

5 0 0

1 . 0 0 0

1 . 5 0 0

2 . 0 0 0

2 . 5 0 0

3 . 0 0 0

9 5 9 6 9 7 9 8 99 (*) 00 ( * ) 01 (* )

US

$ M

ilh

õe

s

E x p o r t a ç ã o I m p o r t a ç ã o

Page 54: Second Annual Analysts & Investors Meeting - 2000 & 2001 in Review

2002 2002

January 2002

0 ,00

5 ,00

10,00

15,00

20,00

25,00

30,00

35,00

40,00

45,00

50,00

20.07.00 01.09.00 17.10.00 30.11.00 12.01.01 28.02.01 11.04.01 25.05.01 12.07.01 23.08.01 11.10.01 23.11.01 10.01.02

Begin ing of the Due Di l igence of an MRO

(Maintenance Repa i r and Overha l l ) Fac i l i ty in

Nashv i l l e -Tenesse

Page 55: Second Annual Analysts & Investors Meeting - 2000 & 2001 in Review

2002 2002

February 19, 2002

0 , 0 0

5 , 0 0

1 0 , 0 0

1 5 , 0 0

2 0 , 0 0

2 5 , 0 0

3 0 , 0 0

3 5 , 0 0

4 0 , 0 0

4 5 , 0 0

5 0 , 0 0

20 .07 .00 01 .09 .00 17 .10 .00 30 .11 .00 12 .01 .01 28 .02 .01 11 .04 .01 25 .05 .01 12 .07 .01 23 .08 .01 11 .10 .01 23 .11 .01 10 .01 .02

EMBRAER 170 First Fl ight