Second Avenue Subway Newsletter 63rd St / Lexington Av Station Area Issue XLV – December 2016 Announcements Subscribe! Want to stay most informed? Send your email address to [email protected] to sign up for our e-news distribution list. Be sure to specify “63rd St Station Area.” MTACC contractors are finishing testing and readying the station for revenue service. SAS Community News Construction Update Photo CIC HOURS of OPERATION Monday, Wednesday, Friday: 10 a.m. – 6 p.m. Tuesday, Thursday: 11 a.m. – 7 p.m. Saturday: 11 a.m. – 3 p.m. (second Saturday of the month) Community Information Center Visit the CIC to experience the new controller for the Second Avenue Subway Train Simulator. The upgraded, more realistic controller features a driver’s safety device that creates an additional backup break for the simulator. In order to engage the throttle, the driver must twist the controller and advance the handle to power the train. If the driver releases the handle, the brake is automatically engaged preventing the train from operating without an active driver. Entrance 1 (SE corner of 63rd Street and Third Avenue)

Upload: others

Post on 21-May-2020

3 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Second Avenue Subway - MTAweb.mta.info/capital/sas_pdf/SASNewsletter63rd-Dec2016.pdfSecond Avenue Subway Newsletter 63rd St / Lexington Av Station Area Issue XLV – December 2016

Second Avenue SubwayNewsletter

63rd St / Lexington Av Station AreaIssue XLV – December 2016

Announcements

Subscribe!Want to stay most informed? Send your email address to [email protected] to sign up for our e-news distribution list. Be sure to specify “63rd St Station Area.”

MTACC contractors are finishing testing and readying the station for revenue service.

SAS Community News

Construction Update Photo

CIC HOURS of OPERATION

Monday, Wednesday, Friday: 10 a.m. – 6 p.m.

Tuesday, Thursday: 11 a.m. – 7 p.m.

Saturday: 11 a.m. – 3 p.m. (second Saturday of the month)

Community Information CenterVisit the CIC to experience the new controller for the Second Avenue Subway Train Simulator. The upgraded, more realistic controller features a driver’s safety device that creates an additional backup break for the simulator. In order to engage the throttle, the driver must twist the controller and advance the handle to power the train. If the driver releases the handle, the brake is automatically engaged preventing the train from operating without an active driver.

Entrance 1 (SE corner of 63rd Street and Third Avenue)

Page 2: Second Avenue Subway - MTAweb.mta.info/capital/sas_pdf/SASNewsletter63rd-Dec2016.pdfSecond Avenue Subway Newsletter 63rd St / Lexington Av Station Area Issue XLV – December 2016

The new 63rd Street/Lexington Av Station is a renovation of the existing line station constructed in the 1970s. When renovation is complete, riders will be able to transfer between the and . The remodled station will have four new entrances at the intersection of 63rd Street and Third Avenue. Entrance 1 will provide two new street-level escalators, Entrances 3 and 4 will provide new staircases, and Entrance 2 will have a street-level ADA accessible elevator. The station will also have four new elevators

from the mezzanine to platform levels.

Work to reconstruct the existing 63rd Street/Lexing-ton Av Station involves excavation for the construction of new entrance and ancillary buildings, removal and upgrade of the structural elements within the existing subway tunnel, and a traction power connection to the 57th/7th Street Station on the Line. This work is expected to be completed by December 2016.

Project Overview

63rd St/Lexington Av Station Area – December 2016Second Avenue Subway Newsletter

Follow the SAS project on the MTA website at http://mta.info/sas

Underground

Construction Update

MONDAY-FRIDAY: 7:00 a.m. to 10:00 p.m. 7:00 a.m. to 5:00 p.m. (At Entrance 1)

SATURDAY: 10:00 a.m. to 7:00 p.m.

Work is permitted underground 24/7.

For concerns regarding Second Avenue Subway construc-tion activities please contact Ghazal Hajizadeh at [email protected] or 718-554-2351 after business hours or on weekends please use the SAS 24/7 hotline # (212) 792-9716

Work

• Completion of ceiling and wall tiles, lighting, and column enclosures

• Testing of mechanical, electrical, and plumbing systems

• Testing of elevators and escalators

63rd StreetStation StructureContractor:Judlau Contracting

Budget:$185.3 Million

Future station entrance at 63rd Street and Third Avenue.

Q

Award Date:January 2011

Contract Forecast Completion:December 2016

F

The 63rd Street station is 99% complete.

The Second Avenue Subway project is 98.3% complete

Project Overview:

F Q