seismic disaster mitigation in pakistan

36
1 Seismic Disaster Mitigation in Pakistan Dr. Qaisar Ali Associate Professor and Deputy Director Earthquake Engineering Center Department of Civil Engineering NWFP University of Engineering and Technology, Peshawar Pakistan

Upload: enoch

Post on 10-Feb-2016

168 views

Category:

Documents


0 download

DESCRIPTION

Seismic Disaster Mitigation in Pakistan. Dr. Qaisar Ali Associate Professor and Deputy Director Earthquake Engineering Center Department of Civil Engineering NWFP University of Engineering and Technology, Peshawar Pakistan. Roadmap. Basic terminology - hazard, risk, vulnerability and disaster - PowerPoint PPT Presentation

TRANSCRIPT

Page 1: Seismic Disaster Mitigation in Pakistan

1

Seismic Disaster Mitigation in Pakistan

Dr. Qaisar AliAssociate Professor and Deputy Director Earthquake Engineering Center Department of Civil Engineering NWFP University of Engineering and Technology, Peshawar Pakistan

Page 2: Seismic Disaster Mitigation in Pakistan

2

Roadmap Basic terminology - hazard, risk, vulnerability and

disaster

Factors contributing to seismic disaster mitigation

Hazard assessment in context of the Oct 08 earthquake

Vulnerability of structures in context of the Oct 08 earthquake

Recommendations for seismic disaster mitigation in Pakistan

Page 3: Seismic Disaster Mitigation in Pakistan

3

Hazard, Risk, Vulnerability and Disaster ?

How these terms are interconnected

Page 4: Seismic Disaster Mitigation in Pakistan

4

Disaster

An event causing widespread human or material losses which exceeds the ability of the affected community to cope using its own resources

Page 5: Seismic Disaster Mitigation in Pakistan

5

Disaster risk = Hazard x Vulnerability

Source: Satoru NISHIKAWACabinet Office JAPAN

Page 6: Seismic Disaster Mitigation in Pakistan

6

Implications of Disasters A single disaster can wipe

out annual GDP of a country.

Losses from the current earthquake

80,000 dead 200,00 injured 4 million homeless Economic losses more than

USD 5 billion

Disaster Reduction is a MUST for Sustainable Development

Page 7: Seismic Disaster Mitigation in Pakistan

7

Disaster mitigation Pre-earthquake scenario Realistic hazard assessment Reducing vulnerability through

Seismic resistant design of structures.

Implementation of code, inspection and monitoring mechanism.

Post-earthquake scenario Emergency preparedness and

planning

Page 8: Seismic Disaster Mitigation in Pakistan

8

Seismic hazard zoning of Pakistan and the current earthquake

Geophysical center Quetta, Met deptt. of Pakistan

Page 9: Seismic Disaster Mitigation in Pakistan

9

Realistic seismic hazard assessmentRealistic seismic hazard assessment is crucial because placing a low-seismicity region in a high hazard zone will require construction of costly structures thereby making them uneconomical. Similarly, placing a high-seismicity region in a low hazard zone will allow construction of relatively weaker structures thereby making them vulnerable to collapse during an earthquake.

Page 10: Seismic Disaster Mitigation in Pakistan

10

Seismic Vulnerability

Low Seismic capacity of buildings due to low quality of material, improper design and construction; buildings constructed on loose soil, or constructed in areas prone to liquefaction and land slides etc. will make the

structures vulnerable to collapse during an earthquake.

Page 11: Seismic Disaster Mitigation in Pakistan

11

Seismic vulnerability with respect to the Oct 08, earthquake

Page 12: Seismic Disaster Mitigation in Pakistan

12

Stone masonry buildings constitute around 40% of the total building stock. (20% of it in cities and 80% in villages). Approx 95 % of buildings either completely collapsed or got severely damaged.

Undressed stone masonry Dressed stone masonry

Smooth round stones in mud mortar, or low quality cs mortars, no bond beams, no proper connections

Page 13: Seismic Disaster Mitigation in Pakistan

13

30% of the total building stock (100% of it in cities, negligible in villages) was un-reinforced cement concrete block masonry having RC roof slab, out of which approx 50% either collapsed or got severely damaged.

Low quality concrete blocks laid in mud mortar, or low quality cs mortars, no bond beams, no proper connections

Page 14: Seismic Disaster Mitigation in Pakistan

14

Total stock of brick masonry building constitutes around 20%, (100 % in cities, negligible in villages), out of which less than 5% collapsed and around 15% got severely damaged. By and large the brick masonry has performed very well.

Brick masonry building Muzafarabad

Page 15: Seismic Disaster Mitigation in Pakistan

15

Improper lap length

Less than 5% of the total building stock consisted of RC frame structures with brick or block masonry infill walls., 100% in cities.Generally performed well, The collapse and damage were found to be the result of improper design, detailing and low quality material.

Page 16: Seismic Disaster Mitigation in Pakistan

16

Strong-beam weak-column

Page 17: Seismic Disaster Mitigation in Pakistan

17

Incredible

Page 18: Seismic Disaster Mitigation in Pakistan

18

Improper lateral reinforcement

Page 19: Seismic Disaster Mitigation in Pakistan

19

Page 20: Seismic Disaster Mitigation in Pakistan

20

Water tanks collapse occurred as far as 200 km from the epicenter

Page 21: Seismic Disaster Mitigation in Pakistan

21

Original position of deck

1 meter displacement

Life lines---Bridges

Page 22: Seismic Disaster Mitigation in Pakistan

22

Pipe lines transmission lines

Page 23: Seismic Disaster Mitigation in Pakistan

23

Massive land sliding washed out entire villages

Page 24: Seismic Disaster Mitigation in Pakistan

24

Letter written by Sony, a student in NepalRef: Program on Educational Building, OECD

Approx 17,000 school children killed

Page 25: Seismic Disaster Mitigation in Pakistan

25

None-existence of seismic design guidelines and building codes. site specific ground characteristics for seismic

design. scientifically determined indigenous material

properties. trained professionals for carrying out

construction activities in seismic prone areas awareness of general public for realizing the

seismic risk. Implementing/regulating and inspection

mechanism for construction monitoring

Issues contributing towards seismic vulnerability

Page 26: Seismic Disaster Mitigation in Pakistan

26

Emergency preparedness and planning

In the post-earthquake scenario the quantum of disaster can increase enormously due to lack of effective emergency preparedness and planning strategies.

Page 27: Seismic Disaster Mitigation in Pakistan

27

Measures to be taken to avoid disasters in

future ?

Page 28: Seismic Disaster Mitigation in Pakistan

28

Page 29: Seismic Disaster Mitigation in Pakistan

29

Short Term measures For the reconstruction of the affected areas, general seismic guidelines and building

recommendations can be adapted from already established international codes. This should act like an interim code and not as a permanent code for the country. To develop a proper seismic code for the country will take time.

The enactment of a law for strict enforcement of these recommendations is also required.

Training should be imparted to the contractors, masons, construction supervisors and local government hierarchy at the union council and tehsil level for effective reconstruction and rehabilitation activities.

The design and construction of educational institutions, hospitals and other important government buildings should be given special attention. The EEC should be involved in this process.

Page 30: Seismic Disaster Mitigation in Pakistan

30

Short Term measures--- Construction of new buildings in the areas prone to landsliding and

liquefaction should be avoided.

Rapid assessment of damaged public and private buildings is crucial. There should be authorized qualified technical professionals to carry out these activities. (Fear among the people is so high that even some slightly damaged buildings have been declared as uninhabitable.)

Repair, strengthening and /or retrofitting of existing buildings deficient in seismic capacity is also vital.

Page 31: Seismic Disaster Mitigation in Pakistan

31

Improving the seismic performance of masonry structure-general guidelines (ref Eurocode-8)

Note: such arrangement provide overall integrity and stability to the structure.

Page 32: Seismic Disaster Mitigation in Pakistan

32

Page 33: Seismic Disaster Mitigation in Pakistan

33

Long term measures Installation of strong motion net work

Development of seismic hazard maps based on PGA and PGV, liquefaction and landslide maps, micro zoning for highly seismic prone regions etc.

Development of seismic code for the country

Seismic risk assessment for various categories of buildings and engineering structures.

Structural assessment of important buildings such as dams, long span bridges, educational institutions, hospitals, secretariat etc and their strengthening, if required.

Page 34: Seismic Disaster Mitigation in Pakistan

34

Long term measures (contd) Technology development for low cost base isolation and

damper systems for brittle structures. Development of repair and strengthening techniques for

seismically distressed local structural systems. Development of disaster mitigation methodologies. Seismic risk assessment for sustainability of life lines

including, highways, railways, Gas, Sewerage and Water pipe lines and electricity transmission lines etc.

Page 35: Seismic Disaster Mitigation in Pakistan

35

Proverb by Japanese Physics Scientist Dr. Torahiko

“Natural disasters will hit us by the time people have

forgotten about it”

Page 36: Seismic Disaster Mitigation in Pakistan

36

Thanks