september 2012 community update · september 2012 additional crossing of the clarence river at...

11
Community Update SEPTEMBER 2012 Additional crossing of the Clarence River at Grafton – Route Options Display Roads and Maritime Services is seeking your input on the six short-listed route options for an additional crossing of the Clarence River at Grafton. The Route Options Development Report (September 2012) is now available. Comments are invited by 10 October 2012. In this update: A summary of the six route options for community comment. Route option maps. Upcoming community consultation activities. Summary of what’s in the Route Options Development Report. Information on how a preferred route will be decided and an invitation to participate in that process. TO BALLINA TO COFFS HARBOUR TO GLEN INNES TO CASINO BENT STRE ET Washpool Road Iolanthe Street Alipou Creek Through Street Bacon Street Pound Street Duke St Victoria Street Clarence Street Kent Street Crown Street Kirchner Street Fry Street Hoof Street North Street Arthur Street Powell Street PRINCE STREET Cowan St Wharf St Riverside Dr Abbott Street Ryan Str e et Skinner Street Heber Street PACIFIC HIGHWAY CENTENARY DRIVE GWYDIR HIGHWAY Fitzroy Street Villiers Street Mary Street QUEEN STREET Oliver Street DOBIE STREET TURF STREET SUMMERLAND WAY BENT STREET ARMIDALE ROAD Elizabeth Island Susan Island P A C I F I C H IG H W AY C L A R E N C E R I V E R CLARENZA SOUTH GRAFTON GRAFTON GREAT MARLOW E C 11 15 14 15 15 14 A Six route options over the Clarence River, Grafton N Short-listed route options Link to Grafton town centre – Prince Street upgraded for heavy vehicle access – for options 14 and 15 Existing 25/26m long B-double routes Commercial core KEY

Upload: others

Post on 11-Jun-2020

3 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: September 2012 community update · SEPTEMBER 2012 Additional crossing of the Clarence River at Grafton – Route Options Display Roads and Maritime Services is seeking your input

Community UpdateSEPTEMBER 2012

Additional crossing of the Clarence River at Grafton – Route Options Display

Roads and Maritime Services is seeking your input on the six short-listed route options for an additional crossing of the Clarence River at Grafton.

The Route Options Development Report (September 2012) is now available. Comments are invited by 10 October 2012.

In this update:

• A summary of the six route options for community comment.

• Route option maps.

• Upcoming community consultation activities.

• Summary of what’s in the Route Options Development Report.

• Information on how a preferred route will be decided and an invitation to participate in that process.

TOBALLINA

TOCOFFS

HARBOUR

TOGLENINNES

TOCASINO

BENT STREET

Washpool R

oad

Iolanthe Street

Alipou Creek

Thro

ugh

Stre

et Baco

n St

reet

Poun

d St

reet

Duke St

Vict

oria

Stre

et

Clarence StreetKent Street

Cro

wn

Stre

etKi

rchn

er S

treet

Fry

Stre

et

Hoo

f Stre

et

Nor

th S

tree

t

But

terf

acto

ry L

ane

Gre

at M

arlo

w R

oad

Arth

ur

Stre

etPo

wel

l Stre

et

PRINCE STREET

Cowan St

Wharf St

Riverside Dr

Abbott Street

Ryan Str eet

Skinner Street

Heber Street

PACIFIC HIGHWAY

CENTENARY DRIVE

GW

YD

IR

HIG

HW

AY

Fitz

roy

Stre

et

Villiers Street

Mary Street

QUEEN STREET

Oliv

er S

treet

DO

BIE

STR

EET

TURF STREET

SUMMERLAND WAY

BENT STREET

ARMIDALE ROAD

ElizabethIsland

SusanIsland

PACIFIC

HIG

HW

AY

CL

AR

EN

CE RIVER

CLARENZA

SOUTHGRAFTON

GRAFTON

GREATMARLOW

E

C

11

15

14

15

1514A

Six route options over the Clarence River, GraftonN

Short-listed route options

Link to Grafton town centre – Prince Street upgraded for heavy vehicle access – for options 14 and 15

Existing 25/26m long B-double routes

Commercial core

KEY

Page 2: September 2012 community update · SEPTEMBER 2012 Additional crossing of the Clarence River at Grafton – Route Options Display Roads and Maritime Services is seeking your input

Update on the projectThis project is to identify an additional crossing of the Clarence River at Grafton to address short-term and long-term transport needs.

Further investigations have been carried out on the six short-listed options announced in January 2012. These include field investigations, traffic, flood and noise modelling and further refinements to the six options.

The Route Options Development Report (September 2012) describes these investigations.

Your feedback is important to us. To understand issues in the community associated with the six options, we ask some questions in this brochure (back page).

What’s in the Route Options Development Report?

The Route Options Development Report:

• Builds on information from the Preliminary Route Options Report – Final (January 2012) and investigations undertaken since then.

• Assesses the six options using field investigations and modelling undertaken since the announcement of the options in January 2012.

• Describes the preliminary concept designs for each of the six options.

• Includes technical papers on:

– Traffic assessment

– Flooding assessment

– Geotechnical investigations

– Landscape and urban character assessment

– Social and economic assessment

– Aboriginal and non-Aboriginal heritage assessments

– Flora and fauna assessment

– Noise assessment

– Cost estimates and value for money assessment.

• Outlines the next steps to identify a preferred location of an additional crossing of the Clarence River at Grafton.

We encourage you to take a look at this report. The report is on the project website or contact the project team.

Process from hereCommunity comments on the six options, the investigations undertaken and the outcomes of a value management workshop will help a decision on the preferred route option.

RMS is targeting to identify the recommended preferred option by the end of 2012.

Your feedback on the recommended preferred option will be considered before a final decision is made on the preferred option for an additional crossing of the Clarence River at Grafton.

The process to identify the preferred option is shown in the flowchart below.

MAR 2011 Further community forums on route suggestions

OCT 2011

Develop preliminary route option report including environmental and other constraints for

community comment

Consideration and decision by RMS and the Minister for Roads on the preferred route option

and preserve the route

Display Route Options Development Report

WE ARE

hERE

Consider public

submissions

Value Management

Workshop

Consider submissions from display of recommended preferred route option

Identify and announce preferred route option

DEC 2010

Announce revised approach to engage more effectively with the community in identifying a

preferred route and community surveys

JUN 2011 Review feasibility of community suggestions

Evaluation workshops including the community to assist in identifying a short-list of route options

NOV 2011

Announce short-list of route optionsJAN 2012

Identify and announce recommended preferred option for community comment

Following a decision to proceed with the project an environmental assessment would be prepared.

Upcoming community consultation activities Get involved to help select the preferred option.

Staffed displays – Grafton ShoppingworldCommunity updates are available to pick up.

Information displaysThese are informal sessions. You are invited to drop in any time during the session. The team can take your feedback and answer any questions you may have about the project or how it may impact on you.

Maps and reports will be available to assist in discussions.

Public forumThe public forum will have a facilitator and community presentations. The audience can ask questions to the RMS team and any other presenter.

You can also watch a recording of the public forum shortly after the event on the Grafton Bridge project website.

Talk back radioTune into 2GF to hear members of the project team and stakeholders discuss key issues associated with planning for the additional crossing and answer questions from the community.

Date to be advertised on the project website.

Dates to mark in your calendar

Staffed display Grafton Shoppingworld

13 September 10am to 5pm

Public forum Grafton Community Centre

18 September 6pm to 8pm

Information display Grafton Community Centre

19 September 11am to 2pm and 3pm to 6pm

Information display South Grafton Ex-Servicemen’s Club

25 September 10am to 2pm

Staffed display Grafton Shoppingworld

4 October 10am to 5pm

Nominations due Value Management workshop

10 October

Comment period closes Community feedback due

10 October

Short-listed options including possible staging opportunitiesThe plans on the following pages show the key features of the six short-listed options.

The plans show the upgrades required for each option to cater for predicted traffic volumes in 2049 (30 years after the assumed date of opening in 2019 of the additional crossing).

Only some of the upgrades (e.g. intersection upgrades and road widening) shown would be required when the additional crossing is opened to traffic. Further upgrades could be undertaken when required to cater for increases in traffic volumes. A possible first stage for each option is shown in the Route Options Development Report (September 2012) and will be considered in more detail as part of the environmental assessment for the preferred option.

All options assume that, by the time the additional crossing is open to traffic, South Grafton would have been bypassed by the upgrade of the Pacific Highway between Glenugie and Tyndale.

Route Options Development Report Volume 1 – Main ReportSEPTEMBER 2012

Additional crossing of the Clarence River at Grafton

RMS 12.221 ISBN 978-922040-90-9

Value management workshopA workshop with participants from the project team, Council, government agencies, other key stakeholders and the community will be held on Tuesday 23 and Wednesday 24 October 2012.

At this workshop participants will assess the six route options based on the outcomes of the technical and environmental investigations (reported in the Route Options Development Report) and the issues raised in the submissions received from the display of the report.

The workshop will input to the identification of a recommended preferred option.

how will the community participants

be selected?

Attendance is limited. To register your interest in the workshop please complete and send the attached reply paid form by 10 October 2012.

Community members who nominate need to attend a briefing on Tuesday 16 October 2012, where the workshop participants will be identified and their roles and responsibilities explained in greater detail.

We will ask people to self select to attend the workshop. If everyone can’t agree, then we could draw from a hat – to ensure fairness. If you attend, you are not being asked to represent a group or an area. We just want you to examine and discuss the issues.

Page 3: September 2012 community update · SEPTEMBER 2012 Additional crossing of the Clarence River at Grafton – Route Options Display Roads and Maritime Services is seeking your input

OPTION E

CL

AR

EN

CE RIVER

CLARENZA

SOUTHGRAFTON

GRAFTON

GREATMARLOW

E

C

11

15

14

15

1514A

SKINNER STREET

NEW STREET

WhARF STREET

COWAN STREET

BLIGh STREET

BENT STREET

BENT STREET

VILLIERS STREET

CLARENCE STREET

DUKE STREET

SP

RIN

G S

TRE

ET

VIC

TOR

IA S

TREE

T

ShOPPING WORLD

SUSAN ISLAND

POUND S

TREE

T

FITZ

RO

Y ST

REE

T

BA

CO

N S

TREE

T

RA

ILW

AY

GW

YDIR

hW

Y

PA

CIF

IC h

WY

RYA

N S

TREE

T

RAILWAY

Proposed bridge – one lane in each direction

New roundabout

Upgrade Parking

Upgrade parking

Left in/left out onlyLeft in/left out only

Replace existing roundabout with traffic lights

New roundabout

Proposed embankment

Navigational channels – 35m wide and 9.1m high

Upgrade Ryan Street (Gwydir Highway) to four lanes from Pacific Highway to Cowan Street

Upgrade Villiers Street to four lanes (with turning lanes) between new bridge and Pound Street

Villiers Street to be lowered to provide 5.3m high vehicle clearance beneath railway

Upgrade Pound Street to four lanes between Villiers and Prince streets

Existing bridge to remain one lane in each direction

ThR

OU

Gh

STR

EE

T

ThR

OU

Gh

STR

EE

T

N Details and staging opportunities are in the Route Options Development Report (September 2012).

N

Upgrade roundabout

Upgrade roundabout

Proposed upgrades for 2049 trafficIndicative road boundaryProposed embankment

KEY

INSET 1

INSET 1 – Dobie Street / Villiers Street intersection

Upgrade roundabout

VILLIERS STREET DOBIE

STR

EET

N

SCALE0 100m

Page 4: September 2012 community update · SEPTEMBER 2012 Additional crossing of the Clarence River at Grafton – Route Options Display Roads and Maritime Services is seeking your input

OPTION AOPTION A

CL

AR

EN

CE RIVER

CLARENZA

SOUTHGRAFTON

GRAFTON

GREATMARLOW

E

C

11

15

14

15

1514A

SKINNER STREET

NEW STREET

WhARF STREET

VILLIERS STREET

PRINCE STREET

DUKE STREET

SP

RIN

G S

TRE

ET

FITZ

RO

Y ST

REE

T

BA

CO

N S

T

RAILWAY

POUND S

TREE

T

GW

YDIR

hW

Y

PACIF

IC h

WY

RYA

N S

T

RAILWAY BENT STREET

IOLANThE STREET

PA

CIF

IC h

WY

CLARENCE STREET

ThR

OU

Gh

STR

EE

T

Existing bridge to become one lane southbound

Left in/left out only

Left in/left out only

Viaduct

New roundabout

New roundabout

Replace existing roundabout with traffic lights

Replace existing roundabout with traffic lights

Upgrade roundabout

New traffic lights

Upgrade roundabout

Upgrade Villiers Street to four lanes (with turning lanes)

Upgrade Pound Street to four lanes between Villiers and Prince streets

Navigational channels – 35m wide and 9.1m high

Proposed bridge – one lane southbound and two lanes northbound Villiers Street to

be lowered to provide 5.3m high vehicle clearance beneath railway

ShOPPING WORLD

Upgrade parking

Additional upgrades (not shown on map)

This option also involves upgrading the roundabout at the intersection of Villiers and Dobie streets (see Inset 1 in Option E map).

Details and staging opportunities are in the Route Options Development Report (September 2012).

Replace existing roundabout with traffic lights

Upgrade Gwydir Highway to four lanes between Pacific Highway and Bent Street

N

Proposed upgrades for 2049 trafficIndicative road boundaryProposed embankment

KEYN

SCALE0 100m

Page 5: September 2012 community update · SEPTEMBER 2012 Additional crossing of the Clarence River at Grafton – Route Options Display Roads and Maritime Services is seeking your input

CL

AR

EN

CE RIVER

CLARENZA

SOUTHGRAFTON

GRAFTON

GREATMARLOW

E

C

11

15

14

15

1514A

SKINNER STREET

BENT STREET

RAILWAY

SP

RIN

G S

TRE

ET

IOLANThE STREET

VILLIERS STREET

DUKE STREET

CLARENCE STREET

KENT STREET

SP

RIN

G S

TRE

ET

ThR

OU

Gh

STR

EE

T

FITZ

RO

Y ST

REE

T

BA

CO

N S

TREE

T

RAIL

WAY

POU

ND

ST

REE

T

OLI

VER

STR

EET

GW

YD

IR h

WY

PACI

FIC

hWY

RYA

N

STR

EET

PA

CIF

IC h

WY

GR

EA

VE

S S

TR

EE

T

Viaduct

Existing bridge to remain one lane in each direction

Upgrade Gwydir Highway to four lanes between Pacific Highway and Bent Street

Proposed bridge – one lane in each direction

Viaduct

Upgrade roundabout

Upgrade roundabout

Upgrade parking

Navigational channels – 35m wide and 9.1m high

Villiers Street to be lowered to provide 5.3m high vehicle clearance beneath railway

Greaves Street to be lowered to retain existing clearance (4m)beneath viaduct

Pound Street to be lowered to provide 5.3m high vehicle clearance beneath railway

Upgrade Pound Street to four lanes (with turning lanes) between Clarence and Prince streets

Upgrade Villiers Street to four lanes

ShOPPING WORLD

Left in/left out only

New carpark access

Left in/left out only

Existing clearance under viaduct (4m) to be retained

New roundabout

New roundabout

New roundabout

Upgrade parking

New traffic lights

Replace existing roundabout with traffic lights

Diversion of existing Pacific Highway

Additional upgrades (not shown on map)

This option also involves upgrading the roundabouts at the intersections of:

• Gwydir Highway and Skinner Street (see Inset 1 in Option 11 map).

• Villiers and Dobie streets (see Inset 1 in Option E map).

Details and staging opportunities are in the Route Options Development Report (September 2012).

BENT STREET

WhARF STREET

N

Proposed upgrades for 2049 trafficIndicative road boundaryProposed embankment

KEY

Proposed embankment

N

SCALE0 100m

OPTION C

Page 6: September 2012 community update · SEPTEMBER 2012 Additional crossing of the Clarence River at Grafton – Route Options Display Roads and Maritime Services is seeking your input

OPTION 11N

VIL

LIE

RS

ST

RE

ET

New roundabout

Upgrade roundabout

OLIVER STREET

DOBIE STREET

FRY STREET

OLIVER STREETMCCLAERS LANE

CL

AR

EN

CE

ST

RE

ET

KE

NT

ST

RE

ET

BR

EIM

BA

ST

RE

ET

MCh

UG

h S

TR

EE

T

PAC

IFIC

hIG

hW

AY

Viaduct required to cross over creek

Viaduct across floodplain

New roundabout

Upgrade intersection Left in/left out only

Navigational channels – 35m wide and 17m high

Proposed bridge – one lane in each direction

New roundabout located to minimise impact to traffic on existing Pacific Highway during construction

Details and staging opportunities are in the Route Options Development Report (September 2012).

Proposed embankment

Proposed upgrades for 2049 trafficIndicative road boundaryProposed embankment

KEY NSCALE

0 100m

CL

AR

EN

CE RIVER

CLARENZA

SOUTHGRAFTON

GRAFTON

GREATMARLOW

E

A

C

11

15

14

15

1514

INSET 2

INSET 1

INSET 3

Railway

SPRING STREET

RYAN STREET

BE

NT S

TRE

ET

IOL

AN

Th

E S

TR

EE

T

GWYDIR hIGhWAY

PACIFIC

hIG

hWAY

N N N

NE

W S

TR

EE

T

GWYDIR hIGhWAY

SK

INN

ER

ST

RE

ET

Left in/left out only

Upgrade roundabout

Upgrade roundabout

Upgrade Gwydir Highway to four lanes between Pacific Highway and Bent Street

Upgrade Pacific Highway/Gwydir Highway intersection

Villiers Street to be lowered to provide 5.3m high vehicle clearance beneath railway

POUND STREET

BACON STREET

VIL

LIE

RS

ST

RE

ET

Railway

INSET 2 – Pacific highway / Gwydir highwayINSET 1 – Gwydir highway / Skinner Street Intersection

INSET 3 – Villiers Street underpass

N

N

Page 7: September 2012 community update · SEPTEMBER 2012 Additional crossing of the Clarence River at Grafton – Route Options Display Roads and Maritime Services is seeking your input

OPTION 14

SOUTH GRAFTONSECTION

GRAFTONSECTION

CL

AR

EN

CE RIVER

CLARENZA

SOUTHGRAFTON

GRAFTON

GREATMARLOW

14

E

C

11

15

14

15

15A

SOUTH GRAFTONSECTION

GRAFTONSECTION

CL

AR

EN

CE RIVER

CLARENZA

SOUTHGRAFTON

GRAFTON

GREATMARLOW

14

E

C

11

15

14

15

15A

NO

RTh

STR

EET

KIRChNER STREET

POWELL STREET

hOOF STREET

ARThUR STREET

CROWN STREET

ALUMY CREEK

MA

RY STR

EET

VILLIERS STR

EET

DU

KE STR

EET

PRIN

CE STR

EET

PRIN

CE STR

EET

qU

EEN STR

EET

LAWRENCE ROAD

TO C

BD

ALIC

E STREET

TUR

F STREET

DOBIE STREET

EGGINS L

ANE

EGGINS LANE

PAC

IFIC h

WY

CENTENARY DRIVE

MEONA L

ANE ELIZABETh ISLAND

Proposed bridge – one lane in each direction

Viaduct

Access to Corcoran Park

New roundabout

New roundabout

Left in/left out

New roundabout

New roundabout located to minimise impact to traffic on existing Pacific Highway during construction

Upgrade intersection Proposed bridge over creek

Viaduct across floodplain

DAVEY AVE

CONTINUES/CONNECTS

TO SOUTH GRAFTON

SECTION

Additional upgrades (not shown on map)

This option also involves upgrading:

• The Gwydir Highway to four lanes between the Pacific Highway and Bent Street (see Inset 2 in Option 11 map).

• The intersection of the Pacific and Gwydir highways (see Inset 2 in Option 11 map).

• The roundabouts at the intersections of:

– Gwydir Highway and Skinner Street (see Inset 1 in Option 11 map).

– Gwydir Highway and Bent Street (see Inset 2 in Option 11 map).

– Villiers and Dobie streets (see Inset 1 in Option E map).

• Villiers Street to be lowered to provide 5.3m high vehicle clearance beneath railway (see Inset 3 in Option 11 map).

Details and staging opportunities are in the Route Options Development Report (September 2012).

CONTINUES/CONNECTS TO GRAFTON SECTION

Grafton sectionSouth Grafton section

Proposed embankment

N

N

SCALE0 100m

Navigational channels – 35m wide and 17m high

Proposed upgrades for 2049 trafficIndicative road boundaryProposed embankment

KEY

NN

Page 8: September 2012 community update · SEPTEMBER 2012 Additional crossing of the Clarence River at Grafton – Route Options Display Roads and Maritime Services is seeking your input

Proposed upgrades for 2049 trafficIndicative road boundaryProposed embankment

KEY

See overleaf for more information on Option 15.

SUMMERLAND WAY

NO

RT

h S

TR

EE

T

CROW

N STR

EET

ARThUR S

TREE

T

KIRChNER

STREE

T TO

PACIF

IC h

WY

qUEEN STREET

qUEEN STREET

ALUMY CREEK

GRAFTON-LAWERENCE ROAD

PRINCE STREET

DO

BIE

ST

RE

ET

PO

WE

LL S

TRE

ET

hO

OF

ST

RE

ET

AR

ThU

R S

TRE

ET

EGGINS L

ANE

EGGINS LANE

PACIFIC hWY

PAC

IFIC h

WY

CENTENARY

DRIVE

MEONA L

ANE

ELIZABETh ISLAND

Proposed bridge – one lane in each direction

Viaduct

Upgrade Prince Street to Dobie Street

Proposed bridge over creek

New roundabout

New roundabout

Proposed bridge over creek

TO CBD

Navigational channels – 35m wide and 17m high

New roundabout located to minimise impact to traffic on existing Pacific Highway during construction

Viaduct across floodplain

OPTION 15

Grafton sectionSouth Grafton section

CL

AR

EN

CE RIVER

CLARENZA

SOUTHGRAFTON

GRAFTON

GREATMARLOW

14

E

C

11

15

14

15

15A

SOUTH GRAFTONSECTION

GRAFTONSECTION

N

Additional upgrades (not shown on map)

This option also involves upgrading:

• The Gwydir Highway between the Pacific Highway and Bent Street to four lanes (see Inset 2 in Option 11 map).

• The intersection of the Pacific and Gwydir highways (see Inset 2 in Option 11 map).

• The roundabouts at the intersections of:

– Gwydir Highway and Skinner Street (see Inset 1 in Option 11 map).

– Gwydir Highway and Bent Street (see Inset 2 in Option 11 map).

– Villiers and Dobie streets (see Inset 1 in Option E map).

Details and staging opportunities are in the Route Options Development Report (September 2012).

CONTINUES/CONNECTS TO SOUTH GRAFTON SECTION

CONTINUES/CONNECTS

TO INSET 1 – PRINCE STREET

CONTINUES/CONNECTS TO GRAFTON SECTION

CL

AR

EN

CE RIVER

CLARENZA

SOUTHGRAFTON

GRAFTON

GREATMARLOW

14

E

C

11

15

14

15

15A

SOUTH GRAFTONSECTION

GRAFTONSECTION

INSET 1

Proposed embankment

N N

SCALE0 100m

INSET 1 – Prince Street

N

N

Page 9: September 2012 community update · SEPTEMBER 2012 Additional crossing of the Clarence River at Grafton – Route Options Display Roads and Maritime Services is seeking your input

CL

AR

EN

CE RIVER

CLARENZA

SOUTHGRAFTON

GRAFTON

GREATMARLOW

E

C

11

15

14

15

1514A

COMPARING ThE OPTIONS

OPTION E OPTION A OPTION C OPTION 11 OPTION 14 OPTION 15

Traffic – Bridge utilisationTraffic volumes for 2 hour AM peak period (7am-9am) (both ways): Number of vehicles using the additional crossing (approximate % of total vehicles crossing the river) 1.• 2019• 2049

2697 (66%)5231 (65%)

3188 (78%)5919(74%)

2808(67%)5431(68%)

1296 (32%)3515(45%)

936 (23%)2673 (36%)

921 (22%)2578 (35%)

Traffic – Reducing delaysAverage travel time between the Bent Street/Gwydir Highway intersection, South Grafton and Prince Street/Pound Street intersection,Graftonusingtheexistingbridge,30yearsafteropening(2049)inmorning(AM)peakperiod(minutes).2

7 8 7 8 14 14

heavy vehiclesTravel between the Pacific Highway/Tyson Street intersection, South Grafton and Summerland Way/Butterfactory Lane intersection, Grafton using the additional crossing: • Traveldistance(km).• Traveltime30yearsafteropening(2049)inmorning(AM)

peak period (minutes).

9.115

8.714

8.413

1011

10.510

10.310

Road SafetyNumber of issues identified in road safety audit: • Highpriority.• Mediumpriority.• Lowpriority.

297

3137

1104

384

275

275

Property impactsNumber of potentially directly affected properties:• Residential• Businesses• Rural• Community• Total

1670831

212101557

24421242

2212530

627520

11146

22

Noise impacts10yearsafteropening(2029)(withoutmitigationmeasures).Number of residential properties where noise levels 3:• Aremorethan50dBAatnight4.• Increaseby12dBormoreatnight.

46111

4480

4621

50551

47730

41521

Aboriginal cultural heritageImpact on areas of Aboriginal cultural heritage.

None NoneImpact on the

aesthetic value of 1 site – Golden Eel

NoneDirect impact

on 1 site – Great Marlow

Direct impact on 1 site –

Great Marlow

Non-Aboriginal heritageDirect impact on non-Aboriginal heritage items and archaeological sites:• ItemsofStateheritagesignificance(No.).• Otheritems(No.).

021

225

024

012

010

010

EnvironmentalPotential direct impact on identified Endangered Ecological Communities (EEC) m2.

100 550 1,450 14,250 22,000 37,500

Landscape and urban character Maintains visual integrity of existing bridge. Would not fragment existing urban settlement patterns.

Impacts on views to, and visual character of, existing bridge. Would fragment existing urban settlement patterns.

Impacts on views to, and visual character of, existing bridge. Would significantly fragment existing urban settlement patterns.

Maintains visual integrity of existing bridge. Would significantly fragment existing urban settlement patterns.

Maintains visual integrity of existing bridge. Would fragment existing urban settlement patterns.

Maintains visual integrity of existing bridge. Would fragment existing urban settlement patterns.

FloodingLength of levees upstream of additional crossing that will need to be raised to retain existing flood protection (km) 5.

11.75 16.70 18.10 19.50 16.50 16.50

Cost• Routeoptionstrategiccostestimates($M)(allupgrades

at2012).• Benefitcostratioover30yearsfrom2019basedonstrategic

cost estimates 6.

215

1.6

231

1.3

231

1.6

210

1.7

304 1.0

340 0.9

Summary comparison of options (from upstream to downstream)This snapshot considers some key themes raised by the community. It does not include all assessment results.

For more information and details of the assessment results please refer to the Route Options Development Report (Chapter six).

Table notes

1 For Option A the new bridge would be two lanes northbound and one lane southbound, and the existing bridge would become one lane southbound only. For the other five options, the new bridge would be one lane northbound and one lane southbound, and the existing bridge would remain as one lane northbound and one lane southbound.

2 Typical recorded travel times between the Bent Street/Gwydir Highway intersection South Grafton and Prince Street/Pound Street intersection Grafton in the morning (AM) peak earlier in 2012 were between 8 and 10 minutes.

3 Only includes receivers identified in the Noise Assessment technical paper (September 2012).

4 Includes 468 properties that would exceed 50 dBA at night if no additional crossing was built.

5 Maximum height of increase for all options is less than or equal to 0.1 metre. For Option C, drainage mitigation measures would be required to provide the required flood immunity for the underpass of the railway viaduct between Kent and Clarence streets.

6 A benefit cost ratio (BCR) that is greater than one indicates that the road user benefits exceed the cost.

Page 10: September 2012 community update · SEPTEMBER 2012 Additional crossing of the Clarence River at Grafton – Route Options Display Roads and Maritime Services is seeking your input

© Roads and Maritime Services

Roads and Maritime Services (“RMS”) is subject to the Privacy and Personal Information Protection Act 1998 (or PPIP Act) which requires that we comply with the Information Protection Principles set out in the PPIP Act.

All information in correspondence is collected for the sole purpose of assisting in the assessment of this proposal. The information received, including names and addresses of respondents, may be published in subsequent documents unless a clear indication is given in the correspondence that all or part of that information is not to be published. Otherwise RMS will only disclose your personal information, without your consent, if authorised by the law. Your personal information will be held by RMS at the Pacific Highway office. You have the right to access and correct the information if you believe that it is incorrect.

For further enquiries Grafton Bridge project team T 1800 633 332 | E [email protected]

September 2012 RMS 12.219

Prior to nominating, please carefully consider your suitability based on the following self assessment criteria:

• Ability to commit the necessary time (you cannot substitute other people if you can’t make it) to:

– A pre-workshop briefing planned for Tuesday 16 October 2012 from 6pm to 8pm at Grafton Community Centre.

– Day one of the workshop planned for Tuesday 23 October 2012 from 9am to 4pm (lunch included).

– Day two of the workshop planned for Wednesday 24 October 2012 from 9am to 4pm (lunch included).

• You represent yourself and participate as an individual.

• You agree to contribute within the agreed structure of the workshop.

• You acknowledge there will be a diversity of views and agree to allow all participants to contribute equally.

• You give a genuine commitment to achieving the best outcome.

• You agree with common courtesy and will treat others with respect throughout all dealings.

• You are either:

1. A property owner, residential or business owner/tenant within Grafton/South Grafton, Clarenza or Junction Hill; or

2. A regular bridge user that does not live in the vicinity of one of the route options.

• You have studied the Route Options Development Report and are familiar with the project.

Outcomes from the workshop will be reported back to participants as part of the release of the Preferred Route Option Report.

Nominations close 10 October.

I hereby nominate myself to participate in the value management workshop.

I am a property owner or resident (primary residency), or business owner/tenant impacted on or near one of the route options (please tick).

Option E

Option A

Option C

Option 11

Option 14

Option 15

Or, I am a regular bridge user living at:

I am able to commit my time for the pre workshop briefing on Tuesday 16 October from 6pm to 8pm, and the value management workshop on Tuesday 23 and Wednesday 24 October 2012 from 9am to 4pm.

Nomination to attend the value management workshop

Personal detailsName:

Address:

Suburb: Postcode: State:

Phone Number:

Mobile Number:

Please indicate best phone number and time for contact.

Email address:

Forfurtherinformationortospeaktoamemberoftheprojectteam,pleasecall1800633332(tollfree).

Next step: to recommend a preferred route option Each of these six options provide opportunities and challenges. The preferred route to cross the Clarence River and any road connections will be selected by assessing which option represents the most appropriate balance between functional, social, environmental, engineering and cost factors.

Comments received, the investigations carried out, and the outcomes of a value management workshop will all be inputs to the decision on a recommended preferred option, which is expected later in 2012.

Community feedback on the recommended preferred option will be invited. This feedback will be considered before a final decision is made on the preferred option.

Interactive maps – take a lookInteractive maps on the website have been updated. The maps show the six options and the potential issues and constraints around them. The information is from the Route Option Development Report. Please click on the link from the project website.

Contact the project teamPhone: 1800 633 332 (toll free)

Email: [email protected]

Write to: Chris Clark, RMS Project Manager PO Box 546 Grafton NSW 2460

Or visit the shop front at the Pacific Highway office for more information at 21 Prince Street, Grafton (opposite Westpac Bank), Monday to Friday, 8.30am to 4.30pm.

To find out where the nearest display location is near you visit the project website www.rms.nsw.gov.au/graftonbridge

Page 11: September 2012 community update · SEPTEMBER 2012 Additional crossing of the Clarence River at Grafton – Route Options Display Roads and Maritime Services is seeking your input

Width: 95 mm X Length: 210 mm Note: All components must be printed.The artwork components must not be re-scaled. Re-scaling will createprocessing problems.

Delivery Address:PO Box 546GRAFTON NSW 2460

RMSGrafton BridgeReply Paid 546GRAFTON NSW 2460

Filename: D3415971900295210N101116.pdf date: 16/11/2010 17:58:01

Please note:• It is the customer's responsibility to check that the artwork is correct, please check the delivery address details and the addressee details below the barcode. Contact Australia Post if any changes are

required.• Failure to adhere to correct addressing and formatting standards will result in higher customer charges or cancellation of service.• Refer to the Reply Paid Service Guide or visit www.auspost.com.au/replypaid• Please check the artwork details thoroughly. Australia Post is not responsible for any errors.

Summary: Envelope Paper Requirements:- weight of 65 to 100gsm;- thickness of 0.08 to 0.18 mm;- stiffness: machine direction of 3 mN; and,- stiffness: cross direction of 1.5mN.

No print content can appear in the bottom 15 mm on the front of the article or 20mm on therear of the article.

WARNINGChanges to this artwork not complying withReply Paid Service Guidelines may result incancellation of your Reply Paid service.

FOLD HERE FIRST

FOLD HERE SECOND

Width: 95 mm X Length: 210 mm Note: All components must be printed.The artwork components must not be re-scaled. Re-scaling will createprocessing problems.

Delivery Address:PO Box 546GRAFTON NSW 2460

RMSGrafton BridgeReply Paid 546GRAFTON NSW 2460

Filename: D3415971900295210N101116.pdf date: 16/11/2010 17:58:01

Please note:• It is the customer's responsibility to check that the artwork is correct, please check the delivery address details and the addressee details below the barcode. Contact Australia Post if any changes are

required.• Failure to adhere to correct addressing and formatting standards will result in higher customer charges or cancellation of service.• Refer to the Reply Paid Service Guide or visit www.auspost.com.au/replypaid• Please check the artwork details thoroughly. Australia Post is not responsible for any errors.

Summary: Envelope Paper Requirements:- weight of 65 to 100gsm;- thickness of 0.08 to 0.18 mm;- stiffness: machine direction of 3 mN; and,- stiffness: cross direction of 1.5mN.

No print content can appear in the bottom 15 mm on the front of the article or 20mm on therear of the article.

WARNINGChanges to this artwork not complying withReply Paid Service Guidelines may result incancellation of your Reply Paid service.

FeedbackWe would like to hear your views on the six short-listed options; in particular, we’d like to know:

• What do you think is the most important consideration when determining the preferred route option?

• What do you like about some of the options?

• What don’t you like about some of the options?

Please provide your feedback in writing by 10 October 2012. Submissions may be sent attached to this reply paid envelope, emailed to [email protected], submitted via the project website, or hand delivered to the Pacific Highway Office at 21 Prince Street, Grafton.

To mail this questionnaire fold along the dotted lines and seal with clear tape.

Mail your completed form (no stamp required) to the address below.