sequa otto systain case studies v2 · 2018. 5. 2. · sequa_otto_systain_case studies_v2 created...

1
Improving chemical management in the textile supply chain FACTORY 04 FACTORY PROFILE: LOCATION: Savar / Bangladesh PRODUCTION PROCESS: Yarn Dyeing NUMBER OF WORKERS: 600 PRODUCTION VOLUME: 9.000 t/year WASTE WATER TREATMENT PLANT: Off-Site ETP BEFORE AFTER IMPLEMENTED IMPROVEMENT MEASURES: GHS pictograms displayed in relevant production areas EXAMPLES MSDS including short summary and displayed in front of every chemical container

Upload: others

Post on 01-Mar-2021

1 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Sequa Otto Systain Case Studies v2 · 2018. 5. 2. · Sequa_Otto_Systain_Case Studies_v2 Created Date: 4/26/2018 4:00:24 PM

Improving chemical management in the textile supply chain

FACTORY 04

FACTORY PROFILE:

LOCATION: Savar / Bangladesh

PRODUCTION PROCESS: Yarn Dyeing

NUMBER OF WORKERS: 600

PRODUCTION VOLUME: 9.000 t/year

WASTE WATER TREATMENT PLANT: Off-Site ETP

BEFORE AFTER

IMPLEMENTED IMPROVEMENT MEASURES:

GHS pictograms displayed in relevant production areas

EXAMPLES

MSDS including short summary and displayed in front of every chemical container